A working end assembly for a drill-anchor-grouting integrated trolley
By integrating multi-functional modules with suction holes and outer protective tubes, the problem of air bubbles entering during grouting is solved, achieving efficient anchor bolt support construction and ensuring the solidification quality of the anchor injection agent.
Patent Information
- Application Number
- CN202620042770.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2026-01-14
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2036-01-14
AI Technical Summary
Existing technology allows air bubbles to enter during grouting, resulting in pores in the anchoring agent after solidification, which affects the solidification quality.
It integrates multiple modules for rock drilling, anchor bolt grabbing, grout delivery, rotary mixing, and pull-out testing. Through the cooperation of suction holes and outer protective pipes, it realizes fully automated operation, and performs gas suction during grouting, using a self-resetting baffle filter frame to intercept impurities.
It achieves fully automated operation, improves construction efficiency, reduces the generation of internal pores after the anchoring agent solidifies in the later stage, and ensures solidification quality.
Smart Images

Figure CN225015095U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of anchor bolt support, and in particular to a working end component for a drilling, anchoring and injection integrated trolley. Background Technology
[0002] Anchor bolt support is a reinforcement method used in surface engineering projects such as slopes and deep foundation pits, as well as underground chamber construction such as tunnels and mining areas. It involves using anchor bolts made of metal, wood, polymer, or other materials, driven into pre-drilled holes in the surface rock or the rock mass surrounding the chamber. Utilizing the special structure of the bolt head and body, and the tail plate, or relying on bonding, the anchor bolts combine with the surrounding rock to alter its mechanical state, forming a unified and stable rock band around the tunnel. The combined action of the anchor bolts and the surrounding rock creates a suspension effect, a composite beam effect, and a reinforcement effect, thus achieving the purpose of support.
[0003] The prior art CN202511239418.2 discloses a multi-functional trolley working device integrating drilling, injection and anchoring on high slopes. A top-mounted hydraulic cylinder assembly is introduced below the fixed propulsion beam to enhance the overall stability of the working device, reduce the impact during drilling, and improve the hole alignment accuracy. The propulsion beam is divided into a fixed section and a rotating section to reduce the hole alignment deviation caused by the rotation switching of the dual propulsion beams.
[0004] The prior art CN202111249119.9 discloses an integrated anchoring and grouting machine. The machine controls the anchoring and grouting mechanism to work through a pushing mechanism. The drilling machine on the pushing mechanism drills holes in the rock wall. The position of the drilling machine and the grouting mechanism is replaced by a propulsion beam flipping device. The anchor rod placement mechanism locks the anchor rod into the limiting mechanism. The pushing mechanism drives the anchor rod and the grouting mechanism to move simultaneously. After the anchor rod is inserted into the hole in the rock wall, it connects with the grouting mechanism to start grouting, thus improving work efficiency.
[0005] In the aforementioned prior art, if the entry of air bubbles is ignored during grouting, it will result in pores inside the anchoring agent after solidification, affecting the quality after solidification. Therefore, this needs to be improved. Utility Model Content
[0006] The core of this invention lies in its integrated trolley, which combines rock drilling, anchor bolt grabbing, grout delivery, rotary mixing, and pull-out testing into a single unit, achieving fully automated operation. Furthermore, the combination of a suction port and an outer protective pipe solves the problem of air bubbles causing porosity in the grout after solidification, a problem present in existing technologies. Simultaneously, it seals any blockages filtered during grouting to prevent spillage.
[0007] To solve the above problems, the present invention adopts the following technical solution.
[0008] A working end assembly for a drilling, anchoring, and injection integrated trolley includes a motor base. A first motor is mounted on the top of the motor base, and the output end of the first motor is connected to a boom. A second motor is mounted on one side surface of the motor base, and its output end is connected to the surface of the motor base. Two push beams are mounted on the boom, and a swing cylinder is mounted on one end surface of the boom. The power end of the swing cylinder is movably connected to the surface of the push beam through a shaft. A power frame assembly and a rock drill system are respectively mounted on the two push beams. An anchor bolt magazine assembly and an anchor bolt gripper are arranged on one side of the push beam with the power frame assembly, and the anchor bolt gripper is located in the middle of the power frame assembly and the anchor bolt magazine assembly. An anchor injection frame is installed in the middle of the two push beams. The power frame assembly includes a power head propulsion cylinder mounted on the propulsion beam, and the output end of the power head propulsion cylinder is connected to a power head; A top plate cylinder is installed on one side of the boom where the swing cylinder is mounted, located between the two push beams, and the power end of the top plate cylinder is connected to the top plate.
[0009] Furthermore, the power head includes a main shaft, an outer protective tube is installed on the outside of the main shaft through a bushing, multiple suction holes are arranged around the surface of the main shaft, and the inside of the suction holes is sealed and filled with waterproof and breathable blocks. A grouting machine interface is installed at one end of the main shaft, and air holes are opened on the surface of the outer protective tube.
[0010] Furthermore, an intermediate shaft is installed on the outside of the outer protective tube, and an anchor bolt sleeve is connected to the tail end of the main shaft. A locking nut sleeve located outside the anchor bolt sleeve is connected to the tail end of the intermediate shaft, and a pulling cylinder with a power end threaded to the surface of the anchor bolt sleeve is installed on the outside of the intermediate shaft.
[0011] Furthermore, the anchoring agent holder includes multiple fixed frames and guide rail seats. Adjacent fixed frames and guide rail seats are equipped with resin tube propulsion cylinders via shafts, and the power end of the resin tube propulsion cylinder is connected to a resin tube component that slides through the fixed frame and guide rail seat.
[0012] Furthermore, the bolt magazine assembly includes a rotating motor, the output end of which is connected to a central rod, and the surface of the central rod is fitted with an bolt disc.
[0013] Furthermore, the anchor bolt gripper includes a lower bracket, an upper bracket is mounted on the lower bracket via a second pin, a clamping cylinder is installed inside the lower bracket, a fixed gripper is installed inside the upper bracket, a movable gripper located below the fixed gripper is mounted inside the upper bracket via a first pin, and the power end of the clamping cylinder is movably connected to the surface of the movable gripper, and a gripper swinging cylinder with its power end movably connected to the surface of the lower bracket is mounted on the surface of the upper bracket via a third pin.
[0014] Optionally, the grouting machine interface has an internal threaded connection with a connecting block, and a filter frame with a rectangular cross-section is installed inside the connecting block. Two self-resetting damping shafts are installed on the inner wall of the open side of the filter frame, and baffles are installed on the surface of both self-resetting damping shafts.
[0015] Compared with existing technologies, the advantages of this utility model are: (1) This solution integrates rock drilling, anchor bolt grabbing, grout delivery, rotary mixing and pull-out testing into a single multi-functional module, achieving fully automated operation. Through the coordinated action of multiple hydraulic cylinders, precise and flexible positioning is achieved, enabling rapid approach to multi-angle working surfaces and automatic switching of processes, thereby improving the construction efficiency of anchor bolt support. In addition, by utilizing the combination of suction holes and outer protective pipes, gas can be extracted during grouting, reducing the generation of internal pores after the anchor grout solidifies, and ensuring the quality of the anchor grout after solidification.
[0016] (2) This solution adds a filter frame with a self-resetting baffle inside the grouting interface, so that the grout flows through the baffle and through the filter frame during grouting, effectively intercepting impurities; when the filter frame is removed after grouting, the baffle automatically resets and closes to prevent the intercepted material from spilling. Attached Figure Description
[0017] Figure 1 This is a schematic diagram of the overall appearance structure of this utility model; Figure 2 This is a schematic diagram of the overall front view of the present invention; Figure 3 This is a top view of the overall structure of this utility model; Figure 4 This is a partial front view schematic diagram of the present invention; Figure 5 This is a side view of the entire utility model; Figure 6 This is a schematic diagram of the composition of the anchoring agent holder of this utility model; Figure 7 This is a schematic diagram of the composition of the anchor bolt magazine assembly of this utility model; Figure 8 This is a schematic diagram of the components of the anchor bolt gripper of this utility model; Figure 9 This is a schematic diagram showing the installation of the intermediate shaft, main shaft, and grouting machine interface of this utility model; Figure 10 This is a cross-sectional view of the main shaft, outer protective tube, and suction hole of this utility model; Figure 11 This is an installation diagram of the grouting machine interface, connecting block, filter frame, and baffle of this utility model; Figure 12 This is a schematic diagram showing the state of the baffle during grouting according to this utility model; Figure 13 This is a schematic diagram showing the state of the baffle when the filter frame is removed according to this utility model. Figure 14 This is a schematic diagram showing how the swing cylinder of this utility model drives the propulsion beam to switch positions under different swing states.
[0018] Explanation of the labels in the diagram: 1. Motor mount; 2. Swing cylinder; 3. Anchor bolt magazine assembly; 4. Power frame assembly; 5. Rock drill system; 6. Anchor bolt gripper; 7. Top plate cylinder; 8. Top plate; 9. Resin coil fittings; 10. Anchor injection frame; 11. Power head propulsion cylinder; 12. Motor No. 1; 13. Motor No. 2; 14. Fixing frame; 15. Guide rail seat; 16. Resin coil propulsion cylinder; 17. Grouting machine interface; 18. Pulling oil 19. Cylinder; 20. Anchor bolt sleeve; 21. Main shaft; 22. Outer protective tube; 23. Suction hole; 24. Movable gripper; 25. Clamping cylinder; 26. Fixed gripper; 27. Gripper swing cylinder; 28. Lower bracket; 29. Rotary motor; 30. Anchor bolt disc; 31. Center rod; 32. Upper bracket; 33. Intermediate shaft; 34. Locking nut sleeve; 171. Filter frame; 172. Connecting block; 173. Baffle. Detailed Implementation
[0019] The technical solution will now be clearly and completely described with reference to the accompanying drawings in the embodiments of this utility model.
[0020] Example 1: Please see Figures 1-5 A working end assembly for a drilling, anchoring, and injection integrated trolley includes a motor base 1, a first motor 12 mounted on the top of the motor base 1, and a boom connected to the output end of the first motor 12. A second motor 13 with its output end connected to the surface of the motor base 1 is mounted on one side surface of the motor base 1. Two push beams are mounted on the boom, and a swing cylinder 2 is mounted on one end surface of the boom. The power end of the swing cylinder 2 is movably connected to the surface of the push beams via a shaft. A power frame assembly 4 and a rock drill system 5 are mounted on the two push beams respectively. An anchor bolt magazine assembly 3 and an anchor bolt gripper 6 are arranged on one side of the push beam on which the power frame assembly 4 is mounted, and the anchor bolt gripper 6 is located in the middle of the power frame assembly 4 and the anchor bolt magazine assembly 3. An anchor injection agent frame 10 is mounted in the middle of the two push beams. The power frame assembly 4 includes a power head propulsion cylinder 11 mounted on the propulsion beam, and the output end of the power head propulsion cylinder 11 is connected to a power head; A top plate cylinder 7 is installed on one side surface of the boom where the swing cylinder 2 is installed, located between the two push beams, and the power end of the top plate cylinder 7 is connected to the top plate 8.
[0021] Specifically, during construction, the top plate cylinder 7 pushes the top plate 8 to be fixed to the working face. After fixing, with the top plate 8 as the center, the boom is switched to the propulsion beam equipped with the rock drill system 5 using the swing cylinder 2. The rock drill system 5 first performs drilling (the rock drill system 5 is existing technology and will not be described in detail here). After drilling is completed, the boom is retracted and switched to the anchor injection frame 10. The resin roll fitting 9 is installed on the anchor injection frame 10 and connected to the air compressor to blow the anchor injection agent into the anchor hole drilled by the rock drill. Then, the boom is switched to the rock drill using the swing cylinder 2. Hydraulic cylinder 2 switches to the push beam on which the power frame assembly 4 is installed. After the anchor bolt gripper 6 clamps the anchor bolt in the anchor bolt disc 29 and fixes it to the push beam on which the power frame assembly 4 is installed, the power head pushes the hydraulic cylinder 11 to push it into the anchor bolt hole. The power head drives the anchor bolt to rotate and stir the anchoring agent until it solidifies. After solidification, the pull cylinder 18 pulls the anchor bolt to provide pre-tightening force. Then the locking nut is rotated. Finally, the grouting machine is connected through the grouting machine interface 17. The grouting operation is carried out by the grouting machine. The anchor bolt support is completed by grouting and curing.
[0022] The joints in this application are stable, flexible, quick and accurate in positioning, and simple to operate, making them suitable for drilling and anchoring operations under various working conditions.
[0023] Motor 12 drives the propulsion beam to rotate around the axis of Motor 12, and Motor 2 13 drives the propulsion beam to rotate around the boom, so that the propulsion beam can approach the working surface at any angle. After approaching the working surface, the top plate cylinder 7 extends the top plate 8.
[0024] Please see Figure 14 The swing cylinder 2 drives the two propulsion beams to swing left and right within a range of ±27°. After the top plate 8 extends, the two propulsion beams, which are equipped with the rock drill system 5 and the power frame assembly 4, are automatically controlled to switch between construction with the top plate 8 axis as the center.
[0025] Please see Figure 6 The anchoring agent holder 10 includes multiple fixed frames 14 and guide rail seats 15. Resin roll propulsion cylinders 16 are mounted on adjacent fixed frames 14 and guide rail seats 15 via shafts. The power end of the resin roll propulsion cylinder 16 is connected to a resin roll component 9 that slides through the fixed frames 14 and guide rail seats 15.
[0026] Specifically, the fixing frame 14 and the guide rail seat 15 are responsible for supporting the installation of the resin roll fitting 9 and the resin roll propelling cylinder 16. The piston rod of the resin roll propelling cylinder 16 is connected to the resin roll fitting 9 through the cylinder bracket. During construction, the tail of the resin roll fitting 9 is connected to the vehicle-mounted air compressor and the anchoring agent is inserted through a three-way valve. The anchoring agent in the resin roll fitting 9 is blown into the anchor bolt hole. When the piston rod of the resin roll propelling cylinder 16 extends, it drives the resin roll fitting 9 to extend and align with the anchor bolt hole, ensuring that the anchoring agent is blown in smoothly.
[0027] Please see Figure 9An intermediate shaft 32 is installed on the outside of the outer protective tube 21. An anchor bolt sleeve 19 is connected to the tail end of the main shaft 20. A locking nut sleeve 33 located outside the anchor bolt sleeve 19 is connected to the tail end of the intermediate shaft 32. A pulling cylinder 18 with a power end threaded to the surface of the anchor bolt sleeve 19 is installed on the outside of the intermediate shaft 32.
[0028] Specifically, after the anchor bolt is pushed to the predetermined depth, one of the drive motors drives the main shaft 20 and the anchor bolt sleeve 19 to rotate through gear meshing, and at the same time drives the anchor bolt to rotate (because the anchor bolt sleeve 19 is fitted onto the end of the anchor bolt, it can drive the rotation). This stirs the anchoring agent in the anchor bolt hole evenly. After the anchoring agent is stirred evenly and solidified, the pull-out cylinder 18 pulls out to test the solidification effect, and at the same time applies a pre-tightening force to the anchor bolt. If the condition is normal, the other drive motor drives the intermediate shaft 32 and the locking nut sleeve 33 through gears to drive the locking nut (installed on the thread at the tail of the anchor bolt, used to press the pad, and finally lock the anchor bolt to the rock wall) to rotate and tighten. After the locking nut is tightened, the grouting machine interface 17 is connected to the grouting machine, and the grout is injected into the anchor bolt hole through the cavity between the main shaft 20 and the anchor bolt to solidify and ensure the anchor bolt support effect. In this application, the rotation operation of the main shaft 20 and the intermediate shaft 32 are existing technologies, and will not be described in detail here.
[0029] Please see Figure 8 The anchor bolt gripper 6 includes a lower bracket 27, an upper bracket 31 is mounted on the lower bracket 27 via a second pin, a clamping cylinder 24 is installed inside the lower bracket 27, a fixed gripper 25 is installed inside the upper bracket 31, a movable gripper 23 located below the fixed gripper 25 is mounted inside the upper bracket 31 via a first pin, and the power end of the clamping cylinder 24 is movably connected to the surface of the movable gripper 23. A gripper swing cylinder 26 with its power end movably connected to the surface of the lower bracket 27 is mounted on the surface of the upper bracket 31 via a third pin.
[0030] Specifically, when clamping the anchor rod from the anchor rod magazine assembly 3, the piston rod of the clamping cylinder 24 pushes up the movable gripper 23 to rotate around the first pin and approach the fixed gripper 25 to clamp the anchor rod. After clamping the anchor rod, when it is placed on the push beam, the piston rod of the gripper swing cylinder 26 extends, and the swing cylinder 2 rotates around the third pin, which at the same time drives the clamped anchor rod to rotate around the second pin. After rotating until it contacts the limit nut (installed on the surface of the lower bracket 27, as shown in the figure), it stops and waits for the power head push cylinder 11 to push the anchor rod into the hole before releasing the anchor rod.
[0031] Please see Figure 7 The anchor bolt assembly 3 includes a rotating motor 28, the output end of which is connected to a central rod 30, and an anchor bolt disc 29 is sleeved on the surface of the central rod 30.
[0032] Specifically, the anchor bolt magazine assembly 3 can be equipped with up to 10 anchor bolts, which are fixed on the anchor bolt plate 29. When changing anchor bolts, the anchor bolt grabber 6 grabs them from the anchor bolt plate 29. When changing anchor bolts, the rotating motor 28 drives the central rod 30 to rotate, and the anchor bolt plate 29, which is fixed on the central rod 30, rotates accordingly. A positioning plate is also installed on the central rod 30, and a sensor is installed on the positioning plate to control the rotation angle of the anchor bolt plate 29, so that it rotates 36° each time an anchor bolt is changed.
[0033] Please see Figure 10 The power head includes a main shaft 20. An outer protective tube 21 is installed on the outside of the main shaft 20 through a bushing. Multiple suction holes 22 are arranged around the surface of the main shaft 20, and the inside of the suction holes 22 is sealed and filled with waterproof and breathable blocks. A grouting machine interface 17 is installed at one end of the main shaft 20, and air holes are opened on the surface of the outer protective tube 21.
[0034] Specifically, during each grouting process, the anchoring agent is injected through the hollow spindle 20. However, in actual operation, air injection is unavoidable, which results in pores in the solidified anchoring agent, leading to poor solidification quality. To improve this issue, a suction device can be used during grouting. The pores are connected to the suction device via a hose, and suction is performed during grouting. Since the outer protective tube 21 and the spindle 20 can provide a gas passage through the suction hole 22 without causing grout leakage, air bubble management can be strengthened during the grouting process to improve the subsequent solidification quality of the anchoring agent.
[0035] Example 2: Please see Figure 11 The grouting machine interface 17 has a connecting block 172 internally threaded. A filter frame 171 with a rectangular cross-section is installed inside the connecting block 172. Two self-resetting damping shafts arranged vertically are installed on the inner wall of the open side of the filter frame 171, and baffles 173 are installed on the surface of both self-resetting damping shafts.
[0036] Specifically, during grouting, the filter frame 171 can be used to filter the grout, and due to the flow of the grout, the baffle 173, which was originally vertically placed and closed to the filter frame 171, can be tilted (e.g., Figure 12 As shown), this will not interfere with the flow of fluid and the corresponding filtration process. After grouting is completed, the grouting machine leaves the grouting machine interface 17. At this time, the filter frame 171 is rotated and removed. During the removal process, the objects intercepted by the filter are intercepted and sealed by the automatically recovering baffle 173 (as shown). Figure 13 As shown in the image, it will not fall off and is easy to handle in a centralized manner.
[0037] The above description is merely a preferred embodiment of this utility model; it encompasses all the protection scope of this utility model. Any equivalent substitutions or modifications made by those skilled in the art within the technical scope disclosed in this utility model, based on the technical solution and its improved concept, should be covered within the protection scope of this utility model.
Claims
1. A working end assembly for a drilling, anchoring, and injection integrated trolley, comprising a motor base (1), wherein a first motor (12) is mounted on the top of the motor base (1), and the output end of the first motor (12) is connected to a boom, and a second motor (13) is mounted on one side surface of the motor base (1), the second motor (13) having its output end connected to the surface of the motor base (1), characterized in that: The arm frame is provided with two advancing beams, one end surface of the arm frame is provided with a swing oil cylinder (2), and a power end of the swing oil cylinder (2) is movably connected to the surface of the advancing beam through a shaft member, the two advancing beams are respectively provided with a power frame assembly (4) and a rock drill system (5), one side of the advancing beam provided with the power frame assembly (4) is provided with an anchor rod warehouse assembly (3) and an anchor rod gripper (6), and the anchor rod gripper (6) is located between the power frame assembly (4) and the anchor rod warehouse assembly (3), and an anchor grouting frame (10) is arranged between the two advancing beams. The power frame assembly (4) comprises a power head advancing oil cylinder (11) mounted on the advancing beam, and a power head is connected to the output end of the power head advancing oil cylinder (11). The arm frame is provided with a top disc oil cylinder (7) located between the two advancing beams on one side surface of the arm frame provided with the swing oil cylinder (2), and a top disc (8) is connected to the power end of the top disc oil cylinder (7).
2. The working end assembly for a drill-and-grout integrated jumbo according to claim 1, characterized in that: The power head comprises a main shaft (20), an outer protection pipe (21) is mounted on the outside of the main shaft (20) through a shaft sleeve, a plurality of suction holes (22) are arranged around the surface of the main shaft (20), the inside of the suction hole (22) is sealed and filled with a waterproof and breathable block, a grouting machine interface (17) is mounted on one end of the main shaft (20), and a gas hole is formed in the surface of the outer protection pipe (21).
3. The working end assembly for a drill-and-grout integrated jumbo according to claim 2, characterized in that: The outer protection pipe (21) is provided with an intermediate shaft (32), the tail end of the main shaft (20) is connected with an anchor rod sleeve head (19), the tail end of the intermediate shaft (32) is connected with a locking nut sleeve head (33) located outside the anchor rod sleeve head (19), and a pulling oil cylinder (18) is mounted on the outside of the intermediate shaft (32) and is screwed with the surface of the anchor rod sleeve head (19).
4. The working end assembly for a drill-and-grout integrated jumbo according to claim 1, characterized in that: The anchor grouting frame (10) comprises a plurality of fixing frames (14) and guide rail seats (15), and a resin pipe pushing oil cylinder (16) is mounted on the adjacent fixing frame (14) and guide rail seat (15) through a shaft member, and the power end of the resin pipe pushing oil cylinder (16) is connected with a resin pipe member (9) slidingly penetrating into the fixing frame (14) and the guide rail seat (15).
5. The working end assembly for a drill-and-grout integrated jumbo according to claim 1, characterized in that: The anchor rod warehouse assembly (3) comprises a rotating motor (28), and the output end of the rotating motor (28) is connected with a center rod (30), and the surface of the center rod (30) is sleeved with an anchor rod disc (29).
6. The working end assembly for a drill-and-grout integrated jumbo according to claim 1, characterized in that: The anchor rod gripper (6) comprises a lower support (27), the upper support (31) is mounted on the lower support (27) through a pin shaft two, the inside of the lower support (27) is provided with a clamping oil cylinder (24), the inside of the upper support (31) is provided with a fixed gripper (25), the inside of the upper support (31) is provided with a movable gripper (23) located below the fixed gripper (25) through a pin shaft one, the power end of the clamping oil cylinder (24) is movably connected to the surface of the movable gripper (23), and the surface of the upper support (31) is provided with a gripper swing oil cylinder (26) movably connected to the surface of the lower support (27) through a pin shaft three.
7. The working end assembly for a drill-and-grout integrated jumbo according to claim 2, characterized in that: The internal thread of the grouting machine interface (17) is connected with a connecting block (172), the internal part of the connecting block (172) is mounted with a filter frame (171) with a rectangular cross section, the inner wall of the open side of the filter frame (171) is mounted with two self-resetting damping rotating shafts arranged in an up-down mode, and the surface of the two self-resetting damping rotating shafts is mounted with baffle plates (173).