Anti-collapse supporting device for mineral exploitation

By adopting a combined structure of fixed frame inner support, positioning part and plug-in part in the anti-collapse support device for mineral mining, the problem of long installation time of existing devices is solved, rapid support and protection are achieved, and work efficiency is improved.

CN225015102UActive Publication Date: 2026-11-24QINGHAI PROVINCIAL GEOLOGICAL SURVEY BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202620040335.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2026-01-14
Publication Date
2026-11-24
Estimated Expiration
2036-01-14

AI Technical Summary

Technical Problem

The installation time for existing mine collapse prevention support devices is too long, and the need to tighten each bolt individually leads to low efficiency.

Method used

A collapse prevention support device for mining operations was designed, which adopts a combination structure of inner support part, positioning part and plug-in part of fixed frame. It achieves quick locking and unlocking through plug rod and spring-loaded part, avoiding the operation of turning multiple bolts.

Benefits of technology

It enables rapid support and protection of the sides of the support frame, reducing installation time and improving work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225015102U_ABST
    Figure CN225015102U_ABST
Patent Text Reader

Abstract

This utility model discloses a mine collapse prevention support device, including a support frame, a sealing plate, and a fixing frame. The support frame has reinforcing parts on its sides; multiple sealing plates are respectively disposed at the top and bottom of the support frame; multiple fixing frames are symmetrically arranged on the sides of the support frame, with a support part on the inner side of each fixing frame for blocking falling debris. A positioning part is provided at the connection between the fixing frame and the support frame, and symmetrical insertion parts for locking the fixing frames are provided at the top of the positioning parts. This utility model uses fixing frames on the sides of the support frame, utilizing the support parts on the inner side of the fixing frames to support falling debris from the tunnel wall, using the positioning parts on the sides of the support frame to position the fixing frames, and then using the insertion parts to lock the fixing frames to the positioning parts. Compared to using multiple bolts to fix the support frame protective structure, this design allows for rapid support and protection of the sides of the support frame, avoiding the time-consuming operation of tightening multiple bolts.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of mine support equipment, and in particular to a mine collapse prevention support device. Background Technology

[0002] With global mineral resource development expanding into deeper and more complex geological conditions, the risk of collapse in mining operations has increased significantly. However, the mainstream solution for current anti-collapse support devices in mining involves first fixing the main support frame to the tunnel wall, and then fixing the protective netting along the sides of the support frame. Existing protective netting is typically fixed to the sides of the support frame using multiple bolts, requiring workers to manually rotate each bolt to install and remove the netting, thus extending the overall installation time. Therefore, to address these issues, a new anti-collapse support device for mining is proposed. Utility Model Content

[0003] The purpose of this invention is to provide a support device for preventing collapse in mineral mining, so as to solve the problems mentioned in the background art.

[0004] To achieve the above objectives, this utility model provides the following technical solution: a mine collapse prevention support device, comprising:

[0005] A support frame, wherein the sides of the support frame are provided with reinforcing parts for auxiliary support of the tunnel wall;

[0006] Enclosure panels, wherein multiple enclosure panels are respectively disposed at the top and bottom of the support frame;

[0007] A fixed frame, wherein multiple fixed frames are symmetrically arranged on the side of the support frame, and a support part for blocking gravel is provided on the inner side of the fixed frame, and a positioning part for limiting the fixed frame is provided at the connection between the fixed frame and the support frame, and a plug-in part for locking the fixed frame is symmetrically provided on the top of the positioning part.

[0008] Preferably, the support includes a protective net, which is disposed on the inner wall of the fixed frame.

[0009] Preferably, the positioning part includes a limiting frame, and a plurality of the limiting frames are symmetrically arranged on the side of the support frame. The side of the fixing frame is inserted and connected to the inner wall of the limiting frame, and the inner wall of the limiting frame is provided with an insertion groove for the fixing frame to pass through.

[0010] Preferably, the insertion part includes:

[0011] Sleeves, a plurality of sleeves are symmetrically arranged on the top of the limiting frame;

[0012] Insert rod, the insert rod is sleeved in the inner cavity of the sleeve, the end of the insert rod is sequentially inserted and connected to the side of the limiting frame and the side of the fixing frame, and the side of the fixing frame is provided with a positioning groove for the insertion of the insert rod;

[0013] A spring-loaded element is disposed in the inner cavity of the sleeve, and the spring-loaded element is used to maintain the insertion of the insertion rod and the fixed frame.

[0014] Preferably, the springback element includes:

[0015] A compression spring, which is sleeved on the outside of the insertion rod;

[0016] A pressure ring is sleeved on the outside of the insertion rod and located on the side of the compression spring near the fixed frame.

[0017] Preferably, a handle is provided at the end of the insertion rod away from the limiting frame, and the handle is used to assist in pulling the insertion rod.

[0018] Preferably, the reinforcing part includes a plurality of reinforcing diagonal bars, which are symmetrically arranged on the sides of the support frame.

[0019] The technical effects and advantages of this utility model are as follows:

[0020] This utility model provides a fixed frame on the side of the support frame, uses the support part inside the fixed frame to support the falling rocks from the tunnel wall, uses the positioning part on the side of the support frame to position the fixed frame, and uses the plug-in part to lock the fixed frame and the positioning part. Compared with using multiple bolts to fix the protective structure of the support frame, this design can provide quick support and protection for the side of the support frame, avoiding the time-consuming operation of tightening multiple bolts. Attached Figure Description

[0021] Figure 1 This is one of the overall structural schematic diagrams of this utility model.

[0022] Figure 2 The second schematic diagram shows the overall structure of this utility model.

[0023] Figure 3 This is a cross-sectional view of the entire utility model.

[0024] Figure 4 This is a cross-sectional view of the connection between the insertion part and the limiting frame of this utility model.

[0025] Figure 5 This is a schematic diagram of the structure of the limiting frame of this utility model.

[0026] In the diagram: 1. Support frame; 2. Enclosed plate; 4. Reinforcing diagonal brace; 5. Fixing frame; 501. Positioning groove; 6. Limiting frame; 601. Insertion groove; 7. Insertion part; 701. Sleeve; 702. Insertion rod; 703. Compression spring; 704. Pressure ring; 705. Handle; 8. Protective net. Detailed Implementation

[0027] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0028] This utility model provides, for example Figure 1 - Figure 5 The shown mining collapse prevention support device includes:

[0029] Support frame 1, the sides of support frame 1 are provided with reinforcing parts for auxiliary support of the roadway wall;

[0030] Enclosed plate 2, multiple enclosed plates 2 are respectively set at the top and bottom of the support frame 1;

[0031] Fixed frame 5, multiple fixed frames 5 are symmetrically arranged on the side of the support frame 1. The inner side of the fixed frame 5 is provided with a support part for blocking gravel. The connection between the fixed frame 5 and the support frame 1 is provided with a positioning part for limiting the fixed frame 5. The top of the positioning part is symmetrically provided with a plug-in part 7 for locking the fixed frame 5.

[0032] Specifically, the sealing plate 2 is welded and fixed to the support frame 1, and the support frame 1 is fixed to the inner wall of the tunnel by inserting anchor bolts on its side.

[0033] The support includes a protective net 8, which is installed on the inner wall of the fixed frame 5.

[0034] Specifically, the protective net 8 is made of stainless steel with a mesh diameter of 0.3cm, and the protective net 8 is fixed to the fixing frame 5 by welding;

[0035] The positioning part includes a limiting frame 6, and multiple limiting frames 6 are symmetrically arranged on the side of the support frame 1. The side of the fixing frame 5 is inserted and connected to the inner wall of the limiting frame 6. The inner wall of the limiting frame 6 is provided with an insertion groove 601 for the fixing frame 5 to pass through.

[0036] Specifically, the limiting frame 6 and the support frame 1 are fixed by welding. There is a gap at the top of the insertion slot 601, which causes the fixing frame 5 to move upward and the bottom of the fixing frame 5 to disengage from the insertion slot 601. Since the thickness of the insertion slot 601 is greater than the thickness of the fixing frame 5, the workers tilt the fixing frame 5 and then pull it out, so that the top of the fixing frame 5 disengages from the insertion slot 601, thus achieving the disassembly of the fixing frame 5.

[0037] The connecting part 7 includes:

[0038] Sleeve 701, multiple sleeves 701 are symmetrically arranged on the top of the limiting frame 6;

[0039] Insert rod 702 is sleeved in the inner cavity of sleeve 701. The end of insert rod 702 is sequentially inserted and connected to the side of limiting frame 6 and the side of fixing frame 5. The side of fixing frame 5 is provided with positioning groove 501 for inserting insert rod 702.

[0040] The spring-loaded component is located inside the sleeve 701 and is used to maintain the insertion of the insertion rod 702 and the fixing frame 5.

[0041] Specifically, the end of the sleeve 701 is threadedly connected to the top of the limiting frame 6, thereby fixing the sleeve 701.

[0042] Furthermore,

[0043] The spring return component includes:

[0044] Compression spring 703 is sleeved on the outside of insert rod 702;

[0045] The pressure ring 704 is sleeved on the outside of the insertion rod 702 and located on the side of the compression spring 703 near the fixing frame 5.

[0046] Specifically, the insertion rod 702 and the pressure ring 704 are fixed by welding. A handle 705 is provided at the end of the insertion rod 702 away from the limiting frame 6. The handle 705 is used to assist in pulling the insertion rod 702.

[0047] It should be noted that by pulling the insertion rod 702 out of the positioning groove 501 by using the handle 705, the fixing frame 5 is unlocked, and the fixing frame 5 can be disassembled and assembled by tilting the fixing frame 5 upwards as described above.

[0048] The reinforcing part includes multiple reinforcing diagonal bars 4, which are symmetrically arranged on the side of the support frame 1;

[0049] Specifically, the reinforcing diagonal brace 4 is fixed to the support frame 1 by welding.

[0050] In practical use, a fixed frame 5 is set on the side of the support frame 1. The support part inside the fixed frame 5 is used to support the falling rocks from the tunnel wall. The positioning part on the side of the support frame 1 is used to position the fixed frame 5. Then, the plug-in part 7 is used to lock the fixed frame 5 and the positioning part. The workers can pull the plug rod 702 to move the fixed frame 5 up and tilt it, and finally move the fixed frame 5 down to disassemble the fixed frame 5. Compared with using multiple bolts to fix the protective structure of the support frame 1, this design can quickly support and fix the fixed frame 5 on the side of the support frame 1 to the protective net 8, avoiding the time-consuming operation of tightening multiple bolts.

[0051] Finally, it should be noted that the above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Although the present utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.

Claims

1. A collapse prevention support device for mineral mining, characterized in that, include: A support frame (1) is provided on the side of the support frame (1) for auxiliary support of the roadway wall; Enclosure plate (2), a plurality of said enclosure plates (2) are respectively disposed at the top and bottom of the support frame (1); Fixed frame (5), multiple fixed frames (5) are symmetrically arranged on the side of the support frame (1). The inner side of the fixed frame (5) is provided with a support part for blocking gravel. The connection between the fixed frame (5) and the support frame (1) is provided with a positioning part for limiting the fixed frame (5). The top of the positioning part is symmetrically provided with a plug-in part (7) for locking the fixed frame (5).

2. The anti-collapse support device for mineral mining according to claim 1, characterized in that, The support includes a protective net (8), which is disposed on the inner wall of the fixed frame (5).

3. The anti-collapse support device for mineral mining according to claim 1, characterized in that, The positioning part includes a limiting frame (6), and a plurality of the limiting frames (6) are symmetrically arranged on the side of the support frame (1). The side of the fixing frame (5) is inserted and connected to the inner wall of the limiting frame (6). The inner wall of the limiting frame (6) is provided with an insertion groove (601) for the fixing frame (5) to pass through.

4. The anti-collapse support device for mineral mining according to claim 1, characterized in that, The insertion part (7) includes: Sleeves (701), a plurality of sleeves (701) are symmetrically arranged on the top of the limiting frame (6); Insert rod (702), the insert rod (702) is sleeved in the inner cavity of sleeve (701), the end of the insert rod (702) is sequentially inserted and connected to the side of the limiting frame (6) and the side of the fixing frame (5), and the side of the fixing frame (5) is provided with a positioning groove (501) for the insertion of the insert rod (702). A spring-loaded element is disposed in the inner cavity of the sleeve (701) and is used to maintain the insertion of the insert rod (702) and the fixed frame (5).

5. The anti-collapse support device for mineral mining according to claim 4, characterized in that, The springback component includes: A compression spring (703) is sleeved on the outside of the insert rod (702); A pressure ring (704) is sleeved on the outside of the insertion rod (702) and located on the side of the compression spring (703) near the fixing frame (5).

6. The anti-collapse support device for mineral mining according to claim 4, characterized in that, A handle (705) is provided at the end of the insertion rod (702) away from the limiting frame (6), and the handle (705) is used to assist in pulling the insertion rod (702).

7. The anti-collapse support device for mineral mining according to claim 1, characterized in that, The reinforcing part includes a plurality of reinforcing diagonal bars (4), which are symmetrically arranged on the side of the support frame (1).