Air circulation structure for tunnel construction

By installing purification wells and dust suppression components at the top of the tunnel, water atomization is used to treat vehicle exhaust and dust, thereby achieving air circulation and purification within the tunnel, solving the problem of poor air quality in the tunnel, and improving the air purification effect within the tunnel.

CN225015108UActive Publication Date: 2026-11-24CHONGQING URBAN CONSTR HLDG GRP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522777602.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-29
Publication Date
2026-11-24
Estimated Expiration
2035-12-29

AI Technical Summary

Technical Problem

Existing tunnel air circulation systems are ineffective at purifying harmful substances, resulting in poor air quality inside tunnels and affecting human health.

Method used

A purification well is installed at the top of the tunnel body, equipped with dust suppression components, including mounting plates, liquid channels, diversion pipes and nozzles. It uses water atomization to treat vehicle exhaust and dust, and achieves air circulation and purification through the purification well.

Benefits of technology

It effectively reduces the diffusion of particulate matter inside the tunnel, improves air quality, enhances the air purification effect inside the tunnel, and protects human health.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225015108U_ABST
    Figure CN225015108U_ABST
Patent Text Reader

Abstract

This utility model relates to the field of tunnel construction technology, specifically to an air circulation structure for tunnel construction. It includes: a tunnel body with an exhaust vent at its top, a purification well at the top of the tunnel body, and a dust suppression component mounted on the purification well. The dust suppression component includes a mounting plate, a liquid channel, a diversion pipe, and nozzles. The mounting plate is positioned at the top of the purification well, the liquid channel is vertically mounted on the mounting plate and extends into the purification well at its end, the diversion pipe is installed at the end of the liquid channel, and the nozzles are mounted on the diversion pipe. In this air circulation structure for tunnel construction, pollutants such as vehicle exhaust and dust particles in the tunnel body enter the purification well through the exhaust vent. The dust suppression component in the purification well purifies the pollutants. During the dust suppression process, water mist captures particulate matter from vehicle exhaust and dust generated during construction, improving the air quality inside the tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of tunnel construction technology, and in particular to an air circulation structure for tunnel construction. Background Technology

[0002] Subway tunnels are underground engineering structures used for the passage of people and vehicles. The internal clearance of a typical traffic tunnel is over two square meters. Pollutants inside tunnels are complex, mainly including vehicle exhaust and particulate matter, which can threaten human health.

[0003] Since a typical tunnel only has two ventilation openings, an entrance and an exit, its internal ventilation effect is limited. For tunnels with long extensions, the ventilation effect is even more inadequate, and a large amount of dust particles accumulate inside the tunnel, which can cause dizziness, nausea and other adverse effects on the human body.

[0004] In existing technologies, the air circulation system in tunnels only has the function of accelerating the circulation of air in the tunnel. It is insufficient in purifying harmful substances and has low safety performance, which is not conducive to its widespread use. Utility Model Content

[0005] This utility model provides a solution that is significantly different from existing technologies, addressing the problem that existing technologies are too simplistic. To overcome the aforementioned deficiencies of existing technologies, this utility model provides an air circulation structure for tunnel construction, aiming to solve the problems mentioned in the background section.

[0006] To achieve the above objectives, this utility model provides an air circulation structure for tunnel construction, comprising: a tunnel body, an exhaust vent at the top of the tunnel body, a purification well at the top of the tunnel body, the installation position of the purification well corresponding to the installation position of the exhaust vent, a dust suppression component on the purification well, the dust suppression component including a mounting plate, a liquid channel, a diversion pipe and a nozzle, the mounting plate being disposed at the top of the purification well, the liquid channel being vertically disposed on the mounting plate and extending to the interior of the purification well at its end, the diversion pipe being installed at the end of the liquid channel, and the nozzle being disposed on the diversion pipe.

[0007] The tunnel itself is a commercially available subway tunnel structure under construction. Pollutants such as vehicle exhaust and dust particles from the tunnel enter the purification well through exhaust vents. The purification well's dust suppression components treat these pollutants, using water mist to capture particulate matter from vehicle exhaust and dust generated during construction, effectively reducing particulate matter dispersion and improving air quality inside the tunnel. Mounting plates are used to secure the liquid channel, which supplies water for the purification process. Diversion pipes distribute the water evenly to nozzles, which utilize commercially available high-pressure structures to atomize the water, forming a water curtain to treat particulate matter from vehicle exhaust and dust generated during construction.

[0008] Preferably, the cross-section of the purification well has an "L" shape, including a horizontal axis and a vertical axis.

[0009] The "L"-shaped purification well consists of two parts: a horizontal axis and a vertical axis. The horizontal axis and the vertical axis are integrally formed, which ensures its mechanical strength.

[0010] Preferably, the horizontal axis portion is arranged parallel to the air outlet above it.

[0011] In actual use, a fan is pre-installed on the inner wall of the horizontal axis section to draw the gas in the tunnel body into the purification well for treatment through the exhaust port.

[0012] Preferably, a partition is vertically provided at the connection between the longitudinal axis and the transverse axis, and a through hole is pre-set at the top of the partition.

[0013] The baffle is designed to separate the longitudinal and transverse sections, preventing wastewater generated during the longitudinal section from flowing back into the transverse section. The through-hole design allows gas in the transverse section to flow normally into the longitudinal section for purification.

[0014] Preferably, the mounting plate is disposed at the top of the longitudinal axis portion, and a sealing ring is pre-set at the connection between the mounting plate and the longitudinal axis portion, and the mounting plate and the longitudinal axis portion are fixed by bolts.

[0015] The sealing ring design ensures a tight seal between the mounting plate and the longitudinal axis. The bolt-fixing method not only guarantees the stability of the connection between the mounting plate and the longitudinal axis but also facilitates the disassembly and assembly of the mounting plate by staff, enabling cleaning and maintenance of the nozzle and preventing clogging from prolonged use.

[0016] Preferably, one or more nozzles are laterally distributed on the lower end face of the splitter pipe.

[0017] The design of multiple nozzles ensures effective treatment of pollutants.

[0018] Preferably, it also includes an air outlet duct, which is installed on the side of the longitudinal axis away from the transverse axis, and the installation height of the air outlet duct is higher than the installation height of the partition.

[0019] The treated gas flows out of the purification well through the exhaust pipe, and the other end of the exhaust pipe is connected to the air inlet pre-set on the tunnel body, so that the air inside the tunnel body is circulated.

[0020] Preferably, it also includes a drain pipe, which is installed on the side of the longitudinal axis away from the transverse axis, and the installation height of the drain pipe is lower than the installation height of the partition.

[0021] The drain pipe is equipped with a control valve, and the other end of the drain pipe is connected to an external wastewater pump. The wastewater is pumped into an external wastewater tank for temporary storage, and then filtered and recycled, demonstrating the environmental friendliness of this device.

[0022] The beneficial effects of this utility model are: In use, pollutants such as vehicle exhaust and dust particles in the tunnel body enter the purification well through the exhaust vent. The pollutants are then purified by the dust suppression components in the purification well. During the dust suppression process, water mist is used to capture particulate matter in vehicle exhaust and dust generated during construction, thereby effectively reducing particulate matter diffusion and improving the air quality inside the tunnel body. Attached Figure Description

[0023] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0024] Figure 1 This is a front view structural diagram of the entire embodiment of this utility model; Figure 2 This is a specific embodiment of the present utility model. Figure 1 Enlarged structural diagram at point A in the diagram; Figure 3 This is a specific embodiment of the present utility model. Figure 1 A magnified structural diagram at point B in the diagram.

[0025] Part Name 1. Tunnel body; 2. Ventilation outlet; 3. Purification well; 301. Horizontal axis section; 302. Vertical axis section; 4. Partition plate; 401. Through hole; 5. Mounting plate; 6. Liquid channel; 7. Diversion pipe; 8. Nozzle; 9. Air outlet pipe; 10. Drainage pipe. Detailed Implementation

[0026] The embodiments of this utility model are described in detail below. Examples of these embodiments are shown in the accompanying drawings. Preferably, the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain this utility model, and should not be construed as limiting this utility model.

[0027] In the description of this utility model, it should be understood that the terms "length," "width," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," and "outer," etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the accompanying drawings and are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model. Furthermore, in the description of this utility model, "a plurality of" means two or more, unless otherwise explicitly specified.

[0028] Please see Figures 1 to 3 This utility model provides an air circulation structure for tunnel construction, comprising: a tunnel body 1, an exhaust vent 2 at the top of the tunnel body 1, a purification well 3 at the top of the tunnel body 1, the installation position of the purification well 3 corresponding to the installation position of the exhaust vent 2, a dust suppression component on the purification well 3, the dust suppression component including a mounting plate 5, a liquid channel 6, a diversion pipe 7, and a nozzle 8, the mounting plate 5 being disposed at the top of the purification well 3, the liquid channel 6 being vertically disposed on the mounting plate 5, the end of which penetrates into the interior of the purification well 3, the diversion pipe 7 being installed at the end of the liquid channel 6, and the nozzle 8 being disposed on the diversion pipe 7, the purification well 3 having an "L"-shaped cross-section, including a horizontal axis portion 301 and a vertical axis portion 302, the horizontal axis portion 301... 01 is arranged parallel above the exhaust port 2. A partition 4 is vertically arranged at the connection between the longitudinal axis part 302 and the transverse axis part 301. A through hole 401 is pre-set on the top of the partition 4. The mounting plate 5 is set on the top of the longitudinal axis part 302. A sealing ring is pre-set at the connection between the mounting plate 5 and the longitudinal axis part 302. The mounting plate 5 and the longitudinal axis part 302 are fixed by bolts. There is one or more nozzles 8 distributed laterally on the lower end face of the diversion pipe 7. The air outlet pipe 9 is installed on the side of the longitudinal axis part 302 away from the transverse axis part 301. The installation height of the air outlet pipe 9 is higher than the installation height of the partition 4. The drain pipe 10 is installed on the side of the longitudinal axis part 302 away from the transverse axis part 301. The installation height of the drain pipe 10 is lower than the installation height of the partition 4.

[0029] In this embodiment: First, the air in the tunnel body 1 enters the horizontal axis section 301 of the purification well 3 through the exhaust port 2, and after entering the horizontal axis section 301, it enters the interior of the vertical axis section 302 through the through hole 401 on the partition plate 4.

[0030] Secondly, the water in the liquid channel 6 enters the nozzle 8 evenly through the diversion pipe 7, and the nozzle 8 atomizes the water to form a water curtain to purify the gas entering the longitudinal axis section 302.

[0031] Next, the purified gas inside the longitudinal axis section 302 flows back to the pre-set air inlet on the tunnel body 1 through the air outlet pipe 9, thus forming a circulation of air inside the tunnel body 1.

[0032] Then, the wastewater generated during the gas treatment process in the longitudinal section 302 is discharged through the drain pipe 10 for later use.

[0033] Finally, when not in use, loosen the bolts on the mounting plate 5, remove the mounting plate 5 from the top of the longitudinal axis 302, and perform cleaning and maintenance procedures on the nozzle 8 to prevent the nozzle 8 from becoming clogged due to prolonged use.

[0034] The above-disclosed embodiments are merely preferred embodiments of the present utility model and should not be construed as limiting the scope of the present utility model. Those skilled in the art can understand that implementing all or part of the above-described embodiments and making equivalent changes in accordance with the claims of the present utility model are still within the scope of the utility model.

Claims

1. An air circulation structure for tunnel construction, comprising: The tunnel body (1) has an exhaust vent (2) at the top. The tunnel body (1) is characterized by having a purification well (3) at the top. The installation position of the purification well (3) corresponds to the installation position of the exhaust vent (2). A dust suppression component is installed on the purification well (3). The dust suppression component includes an installation plate (5), a liquid channel (6), a diversion pipe (7), and a nozzle (8). The installation plate (5) is installed on the top of the purification well (3). The liquid channel (6) is vertically installed on the installation plate (5) and its end extends into the interior of the purification well (3). The diversion pipe (7) is installed at the end of the liquid channel (6), and the nozzle (8) is installed on the diversion pipe (7).

2. The air circulation structure for tunnel construction as described in claim 1, characterized in that, The purification well (3) has an "L" shaped cross-section, including a horizontal axis (301) and a vertical axis (302).

3. The air circulation structure for tunnel construction as described in claim 2, characterized in that, The horizontal axis (301) is arranged parallel above the exhaust port (2).

4. The air circulation structure for tunnel construction as described in claim 2, characterized in that, A partition (4) is vertically arranged at the connection between the longitudinal axis (302) and the transverse axis (301), and a through hole (401) is pre-set on the top of the partition (4).

5. The air circulation structure for tunnel construction as described in claim 1, characterized in that, The mounting plate (5) is set on the top of the longitudinal shaft part (302), and a sealing ring is preset at the connection between the mounting plate (5) and the longitudinal shaft part (302), and the mounting plate (5) and the longitudinal shaft part (302) are fixed by bolts.

6. The air circulation structure for tunnel construction as described in claim 1, characterized in that, One or more nozzles (8) are laterally distributed on the lower end face of the diverter (7).

7. The air circulation structure for tunnel construction as described in claim 1, characterized in that, It also includes an air outlet pipe (9), which is installed on the side of the longitudinal axis (302) away from the transverse axis (301), and the installation height of the air outlet pipe (9) is higher than the installation height of the partition (4).

8. The air circulation structure for tunnel construction as described in claim 1, characterized in that, It also includes a drain pipe (10), which is installed on the side of the longitudinal axis (302) away from the transverse axis (301), and the installation height of the drain pipe (10) is lower than the installation height of the partition (4).