A leak-proof ventilation duct for mine operations
By using sealing gaskets and connecting plates in the ventilation duct for mining operations, combined with a pulley and rope structure, the problems of sealing at the ventilation duct connection and installation/disassembly efficiency were solved, achieving more efficient gas delivery and wear resistance.
Patent Information
- Application Number
- CN202522187010.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-16
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-10-16
AI Technical Summary
The existing ventilation ducts used in mines are difficult to install and disassemble, and have poor sealing properties, making them prone to air leakage and affecting gas transportation.
It uses sealing gaskets and connecting plates in combination, and has been improved to a pulley and rope structure to improve sealing performance and simplify the installation and disassembly process.
It improves the sealing performance of the air duct connections and the efficiency of installation and disassembly, and reduces the risk of wear and tear on the air duct during the pulling process.
Smart Images

Figure CN225015109U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of ventilation duct technology for mine operations, and specifically relates to a leak-proof ventilation duct for mine operations. Background Technology
[0002] Mine ventilation ducts are flexible or rigid pipe systems used in mine ventilation systems to connect to ventilation fans and guide and transport airflow along roadways. Their core function is to force fresh air from the surface to the underground working face through mechanical or natural ventilation, while diluting and expelling methane, dust, fumes, and other harmful gases, regulating mine temperature and humidity, preventing methane buildup and explosions, and protecting miners' respiratory safety and health. Based on material, they are divided into flexible ventilation ducts and rigid metal ventilation ducts. They must possess flame-retardant, anti-static, wear-resistant, and leak-proof properties. Installation must follow the principles of "straight and stable, hanging at every loop, and slow at bends" to optimize ventilation efficiency. They are an indispensable key piece of equipment for safe mine production.
[0003] Because there are many tunnel entrances, ventilation ducts need to be installed at these entrances. However, bends in the ventilation ducts have drawbacks such as reduced airflow and increased susceptibility to damage from passing trucks. One proposed solution (CN219139106U) is a ventilation duct for underground mine tunnel entrances. This technical solution improves upon existing flexible ventilation ducts by replacing the flexible sections at bends with rigid pipes. The rigid bend connectors are only needed at tunnel intersections to connect the ventilation duct bodies in multiple tunnels. This achieves the technical effect of increasing the service life and ventilation efficiency of the ventilation ducts.
[0004] The technical solution still uses traditional sealing rings and binding wires to connect the air ducts, which is not only troublesome to install and disassemble, but also has poor sealing performance, which can lead to air leakage and affect gas transportation. Utility Model Content
[0005] To address the problems of cumbersome installation and disassembly, and poor sealing in existing technologies, this utility model provides a leak-proof ventilation duct for mine operations. It upgrades the traditional sealing collar and binding wire to a combination of sealing gaskets and connecting plates, significantly improving the sealing performance at the duct connections and increasing installation and disassembly efficiency. The specific technical solution is as follows: A leak-proof ventilation duct for mine operations includes: a duct body; a connecting structure is installed on the side wall of the duct body; several duct support structures are installed on the outside of the duct body; and a hanging structure is installed on the upper wall of the several duct support structures. The connecting structure includes: a connecting mother plate, a connecting daughter plate, a leak-proof groove, and a leak-proof protrusion. The connecting mother plate is installed at the tail of the duct body, the connecting daughter plate is installed at the head of the duct body, the leak-proof groove is formed on the outer wall of the connecting mother plate, and the leak-proof protrusion is installed on the outer wall of the connecting daughter plate, and the leak-proof protrusion can be fastened inside the leak-proof groove.
[0006] Preferably, the plurality of the wind tunnel support structures include: an anti-wear belt and an anti-wear fixing ring; the anti-wear belt is installed on the outside of the wind tunnel body, and the anti-wear fixing ring is fixedly installed on the outside of the anti-wear belt.
[0007] Preferably, the mounting structure includes: a mounting base, a mounting wheel, and a mounting spring; the mounting base is fixedly installed on the upper wall of the anti-wear fixing ring pair, the mounting wheel is movably installed inside the mounting base, and the mounting spring is fixedly installed between the mounting base and the mounting wheel.
[0008] Preferably, the leak-proof groove is provided with a sealing gasket.
[0009] Preferably, four protective elastic ropes are provided between the connecting mother plate and the connecting daughter plate.
[0010] Preferably, the mounting wheel is movably mounted inside the mounting base via a square shaft.
[0011] Preferably, the outer side of the mounting wheel is provided with a rope groove.
[0012] Preferably, the connecting mother plate and the connecting daughter plate can be fastened together with bolts and nuts.
[0013] This utility model provides a leak-proof ventilation duct for mine operations. Compared with existing technologies, the advantages are as follows: This device specifically upgrades the connection between ventilation ducts, replacing the traditional sealing collar and binding wire with a combination of sealing gaskets and connecting buckles, greatly improving the sealing performance of the ventilation duct connection and increasing the efficiency of installation and disassembly; furthermore, the iron ring and rope used for hoisting the ventilation duct are improved to pulleys and ropes, reducing friction and ensuring that the ventilation duct is not damaged when being pulled. Attached Figure Description
[0014] Figure 1 A schematic diagram of the first integral structure of the mine operation leak-proof ventilation duct provided by this utility model; Figure 2 A schematic diagram of the second integral structure of the mine-operated air duct for preventing air leakage provided by this utility model; Figure 3 A partial structural schematic diagram of the ventilation duct for preventing air leakage in mine operations provided by this utility model; Figure 4 A schematic diagram showing the combined use of multiple ventilation ducts for leak-proof ventilation in mine operations provided by this utility model; in, Figures 1 to 4 The attached diagrams and components for the mine's leak-proof ventilation duct are as follows: 1. Duct body; 2. Connecting mother plate; 3. Connecting daughter plate; 4. Leak-proof groove; 5. Leak-proof protrusion; 6. Anti-wear belt; 7. Anti-wear fixing ring; 8. Hanging seat; 9. Hanging wheel; 10. Hanging spring; 11. Protective elastic rope; 12. Rope groove. Detailed Implementation
[0015] The following are specific implementation cases and appendices. Figures 1-4 The present invention will be further described, but it is not limited to these embodiments. The present invention provides a technical solution: a leak-proof ventilation duct for mining operations, comprising: a ventilation duct body 1, a connecting structure installed on the side wall of the ventilation duct body 1, a plurality of ventilation duct support structures installed on the outside of the ventilation duct body 1, and a hanging structure installed on the upper wall of the plurality of ventilation duct support structures; the connecting structure comprises: a connecting mother plate 2, a connecting daughter plate 3, a leak-proof groove 4, and a leak-proof protrusion 5; the connecting mother plate 2 is installed at the tail of the ventilation duct body 1, the connecting daughter plate 3 is installed at the head of the ventilation duct body 1, the leak-proof groove 4 is opened on the outer wall of the connecting mother plate 2, the leak-proof protrusion 5 is installed on the outer wall of the connecting daughter plate 3, and the leak-proof protrusion 5 can be fastened to the inside of the leak-proof groove 4, a sealing gasket is provided inside the leak-proof groove 4, and four protective elastic ropes 11 are provided between the connecting mother plate 2 and the connecting daughter plate 3, and the connecting mother plate 2 and the connecting daughter plate 3 can be fastened and fixed by bolts and nuts.
[0016] As a preferred embodiment, further, several duct support structures include: an anti-wear belt 6 and an anti-wear fixing ring 7; the anti-wear belt 6 is installed on the outside of the duct body 1, and the anti-wear fixing ring 7 is fixedly installed on the outside of the anti-wear belt 6.
[0017] As a preferred embodiment, the mounting structure further includes: a mounting base 8, a mounting wheel 9, and a mounting spring 10; the mounting base 8 is fixedly installed on the upper wall of the anti-wear fixing ring 7 pair, the mounting wheel 9 is movably installed inside the mounting base 8, the mounting spring 10 is fixedly installed between the mounting base 8 and the mounting wheel 9, the mounting wheel 9 is movably installed inside the mounting base 8 via a square shaft, and the outside of the mounting wheel 9 is provided with a rope groove 12.
[0018] Working principle: Before using this device, the operator first lays ropes in the mine. The ropes can be installed according to the construction needs, avoiding the construction location.
[0019] The operator installs one of the ventilation duct bodies 1, attaching the mounting wheel 9 onto the rope, and securing the rope groove 12 of the mounting wheel 9 to the outside of the rope. Under the influence of gravity, the mounting seat 8 moves downward outside the mounting wheel 9, and the mounting spring 10 is compressed. Then, the operator pulls the mounting wheel 9 to extend the ventilation duct body 1.
[0020] Next, the operator installs the next air duct body 1, and makes the connecting mother plate 2 face the connecting daughter plate 3 of the previous air duct body 1. The anti-leakage protrusion 5 of the connecting daughter plate 3 is fastened into the anti-leakage groove 4 of the connecting mother plate 2. Then, the connecting mother plate 2 and the connecting daughter plate 3 are fixed by four sets of bolts and nuts. A sealing ring is provided between the anti-leakage groove 4 and the anti-leakage protrusion 5, which can effectively prevent leakage between the two air duct bodies 1.
[0021] The anti-wear fixing ring 7 and the air duct body 1 are provided with an anti-wear strip 6, which can prevent the air duct body 1 from being worn and ensure the integrity of the air duct body 1.
[0022] The outer side of the duct body 1 is equipped with a protective elastic rope 11. When an external force impacts the duct body 1, it is first intercepted by the protective elastic rope 11, thus protecting the duct body 1.
[0023] In the description of this utility model, the term "multiple" refers to two or more. Unless otherwise explicitly defined, the terms "upper," "lower," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model. The terms "connection," "installation," "fixing," etc., should be interpreted broadly. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection or an indirect connection through an intermediate medium. For those skilled in the art, the specific meaning of the above terms in this utility model can be understood according to the specific circumstances.
[0024] The above description is merely a preferred embodiment of this utility model and is not intended to limit the utility model. Various modifications and variations can be made to this utility model by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this utility model should be included within the protection scope of this utility model.
Claims
1. A ventilation duct for preventing air leakage during mining operations, comprising: The air duct body (1) is characterized in that a connecting structure is installed on the side wall of the air duct body (1), a plurality of air duct support structures are installed on the outside of the air duct body (1), and a hanging structure is installed on the upper wall of the plurality of air duct support structures. The connection structure includes: a connecting mother plate (2), a connecting daughter plate (3), a leak-proof groove (4), and a leak-proof protrusion (5); the connecting mother plate (2) is installed at the tail of the air duct body (1), the connecting daughter plate (3) is installed at the head of the air duct body (1), the leak-proof groove (4) is opened on the outer wall surface of the connecting mother plate (2), the leak-proof protrusion (5) is installed on the outer wall surface of the connecting daughter plate (3), and the leak-proof protrusion (5) can be fastened inside the leak-proof groove (4); The duct support structure includes: an anti-wear belt (6) and an anti-wear fixing ring (7); the anti-wear belt (6) is installed on the outside of the duct body (1), and the anti-wear fixing ring (7) is fixedly installed on the outside of the anti-wear belt (6); The mounting structure includes: a mounting seat (8), a mounting wheel (9), and a mounting spring (10); the mounting seat (8) is fixedly installed on the upper wall of the anti-wear fixing ring (7), the mounting wheel (9) is movably installed inside the mounting seat (8), and the mounting spring (10) is fixedly installed between the mounting seat (8) and the mounting wheel (9); The leak-proof groove (4) is provided with a sealing gasket. Four protective elastic ropes (11) are provided between the connecting mother plate (2) and the connecting daughter plate (3). The mounting wheel (9) is movably installed inside the mounting seat (8) through a square shaft. The mounting wheel (9) is provided with a rope groove (12) on its outside.
2. The mine-operated leak-proof ventilation duct according to claim 1, characterized in that, The connecting mother plate (2) and the connecting daughter plate (3) can be fastened together with bolts and nuts.