A subway shield section evacuation platform external channel installation structure

By pre-embedding positioning manhole sleeves inside the shield tunnel segments and using bolts to connect external steel channels, the problems of structural damage and complex construction in traditional installation methods are solved, achieving the installation of a subway shield tunnel evacuation platform that is highly safe, durable, and low-cost.

CN225015113UActive Publication Date: 2026-11-24POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522716856.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-22
Publication Date
2026-11-24
Estimated Expiration
2035-12-22

AI Technical Summary

Technical Problem

Traditional subway tunnel evacuation platform installation processes can easily damage the integrity of the tunnel segments, leading to problems such as water leakage. Furthermore, on-site positioning and drilling operations are complex, increasing the labor intensity of construction workers and project costs.

Method used

The method of pre-embedded positioning manhole sleeves is adopted. Positioning manhole sleeves are pre-set on the inner wall of the shield tunnel segment. The external steel channel is connected to the positioning manhole sleeve by bolts. Combined with the platform steel beam and support structure, the channel is installed.

Benefits of technology

This avoids on-site drilling, maintains the integrity of the tunnel segment structure, improves safety and durability, and reduces project costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225015113U_ABST
    Figure CN225015113U_ABST
Patent Text Reader

Abstract

An external channel installation structure for an evacuation platform in a subway shield tunnel section includes shield tunnel segments, an external steel channel, positioning pilot hole sleeves, an evacuation platform plate, a platform steel beam, bolt holes, bolts, and a lower cable support. The positioning pilot hole sleeves are pre-embedded in the inner wall of the shield tunnel segments. Bolt holes are formed in the external steel channel, and bolts pass through the bolt holes to anchor the external steel channel to the positioning pilot hole sleeves. The platform steel beam and the lower cable support are welded to the side of the external steel channel away from the shield tunnel segments. A support structure is set between the lower part of the platform steel beam and the external steel channel. An evacuation platform plate is laid on top of the platform steel beam, and the evacuation platform plate is fixed to the platform steel beam by a fixing structure. By pre-embedding the positioning pilot hole sleeves with fixed angle modules during the casting of the shield tunnel segments, this method has advantages such as not damaging the shield tunnel segment structure, high safety factor, strong durability, and low overall cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of rail transit engineering technology, and in particular to an external channel installation structure for a subway shield tunnel evacuation platform. Background Technology

[0002] The installation of evacuation platforms in subway tunnel sections often adopts the traditional post-anchoring process, which involves drilling holes on-site after the shield tunnel segments are formed, and then inserting anchor bolts for installation. On-site drilling can easily damage the structural integrity of the segments, induce water leakage and other problems, and threaten the durability and safety of the structure. Moreover, on-site positioning and drilling is troublesome, increases the labor intensity of construction workers, and increases the project cost. Summary of the Invention

[0003] The purpose of this utility model is to overcome the shortcomings of existing technologies and provide an external channel installation structure for a subway shield tunnel evacuation platform that has low engineering cost, does not damage the tunnel segment structure, has high structural safety, and strong durability.

[0004] The technical solution of the present invention for the installation structure of an external channel for an evacuation platform in a subway shield tunnel section is as follows: It includes a shield tunnel segment, an external steel channel, a positioning pilot hole sleeve, an evacuation platform plate, a platform steel beam, bolt holes, bolts, and a lower cable support. The positioning pilot hole sleeve is pre-embedded in the inner wall of the shield tunnel segment. Bolt holes are opened in the external steel channel, and the external steel channel is anchored to the positioning pilot hole sleeve through bolts passing through the bolt holes. The platform steel beam and the lower cable support are welded to the side of the external steel channel away from the shield tunnel segment. A support structure is set between the lower part of the platform steel beam and the external steel channel. An evacuation platform plate is laid on top of the platform steel beam, and the evacuation platform plate is fixed to the platform steel beam by a fixing structure.

[0005] Furthermore, the positioning guide sleeves are arranged circumferentially and uniformly on the inner wall of the shield tunnel segment with a module angle of 5.625°.

[0006] Furthermore, the external steel channel is provided with bolt holes corresponding to the set module of the positioning guide sleeve.

[0007] Furthermore, the supporting structure is a stiffened steel plate, one side of which is welded to an external steel channel, and the upper side of which is welded to the lower part of the platform steel beam.

[0008] Furthermore, the fixing structure is a stainless steel clamp, and the evacuation platform plate is fixed to the platform steel beam by the stainless steel clamp.

[0009] The beneficial effects of this utility model of an external channel installation structure for an evacuation platform in a subway shield tunnel section are: by pre-embedding a fixed angle module positioning guide sleeve during the casting of the shield tunnel segments, the current situation of traditional on-site positioning drilling and anchor bolt installation of the evacuation platform in subway shield tunnel sections is solved, which has the advantages of not damaging the shield tunnel segment structure, high safety factor, strong durability, and low overall cost. Attached Figure Description

[0010] Figure 1 This is a schematic diagram of the external channel installation structure of the evacuation platform in a subway shield tunnel section according to this utility model; Figure 2 This is a partially enlarged structural diagram showing the coordinated state of the shield tunnel segments, positioning manhole sleeves, external steel channels, reinforced steel plates, platform steel beams, evacuation platform plates, and lower cable supports. Figure 3 This is a partially enlarged top view of the shield tunnel segments, external steel ducts, evacuation platform slabs, and platform steel beams in their coordinated state. Figure 4 This is a partially enlarged side view of the external steel channel, evacuation platform plate, platform steel beam, and stainless steel clamps in their coordinated state.

[0011] In the diagram, 1. Shield tunnel segment; 2. External steel channel; 3. Positioning pilot hole sleeve; 4. Evacuation platform plate; 5. Reinforcing steel plate; 6. Platform steel beam; 7. Stainless steel clamp; 8. Bolt hole; 9. Bolt; 10. Lower cable support. Detailed Implementation

[0012] To enable those skilled in the art to better understand the technical solution of this utility model, the preferred embodiments of this utility model are described below in conjunction with specific examples. Examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote elements with the same or similar functions throughout. However, it should be understood that the drawings are for illustrative purposes only and should not be construed as limiting this utility model. To better illustrate this embodiment, some parts in the drawings may be omitted, enlarged, or reduced, and do not represent the actual product size. It is understandable for those skilled in the art that some well-known structures and their descriptions may be omitted in the drawings. The positional relationships described in the drawings are for illustrative purposes only and should not be construed as limiting this utility model.

[0013] It should be noted that the terms "comprising" and "having," and any variations thereof, in the specification, claims, and accompanying drawings of this utility model are intended to cover non-exclusive inclusion. The terms "set," "equipped with," "installed," "connected," and "connected" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral structure; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium, or an internal connection between two mechanisms, elements, or components. Those skilled in the art can understand the specific meaning of the above terms in this utility model according to the specific circumstances.

[0014] In the description of this utility model, it should be understood that the terms "upper", "lower", "left", "right", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the mechanism or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.

[0015] To further illustrate the content, features, and effects of this utility model, the following detailed description of this utility model is provided in conjunction with the accompanying drawings and examples, but it should not be construed as a basis for limiting this utility model.

[0016] This utility model relates to an external channel installation structure for an evacuation platform in a subway shield tunnel section, such as... Figure 1 — Figure 4 As shown, the system includes a shield tunnel segment 1, an external steel channel 2, a positioning pilot hole sleeve 3, an evacuation platform plate 4, a platform steel beam 6, bolt holes 8, bolts 9, and a lower cable support 10. The positioning pilot hole sleeve 3 is pre-embedded in the inner wall of the shield tunnel segment 1. The bolt holes 8 are opened in the external steel channel 2, and the external steel channel 2 is anchored to the positioning pilot hole sleeve 3 through the bolt holes 8 via bolts 9. The platform steel beam 6 and the lower cable support 10 are welded to the side of the external steel channel 2 away from the shield tunnel segment 1. A support structure is set between the lower part of the platform steel beam 6 and the external steel channel 2. The evacuation platform plate 4 is laid on top of the platform steel beam 6 and is fixed to the platform steel beam 6 by a fixing structure.

[0017] Furthermore, the positioning guide sleeves 3 are arranged circumferentially and evenly on the inner wall of the shield tunnel segment 1 with a modular angle of 5.625°. A total of 64 positioning guide sleeves 3 are arranged.

[0018] Furthermore, the external steel channel 2 is provided with bolt holes 8 corresponding to the set module of the positioning guide hole sleeve 3. The spacing of the bolt holes 8 on the external steel channel 2 corresponds to that of the positioning guide hole sleeve 3, so that the bolt 9 can pass through the bolt holes 8 and be anchored to the positioning guide hole sleeve 3.

[0019] Furthermore, the supporting structure is a stiffened steel plate 5. One side of the stiffened steel plate 5 is welded to the external steel channel 2, and the upper side of the stiffened steel plate 5 is welded to the lower part of the platform steel beam 6. The stiffened steel plate 5 can support the platform steel beam 6, making the platform steel beam 6 and the evacuation platform slab 4 laid on it more stable and reliable.

[0020] Furthermore, the fixing structure is a stainless steel clamp 7, and the evacuation platform plate 4 is fixed to the platform steel beam 6 by the stainless steel clamp 7. Reinforcing bars are provided in the evacuation platform plate 4, allowing the stainless steel clamp 7 to pass around the left, bottom, and right sides of the platform steel beam 6, and then around the reinforcing bars in the evacuation platform plate 4, thus tightly clamping the evacuation platform plate 4 to the platform steel beam 6.

[0021] This utility model discloses an external channel installation structure for an evacuation platform in a subway shield tunnel section. During construction, before the shield segment 1 is poured, holes are made in the casting mold of the shield segment 1 (the specific structure of the casting mold is existing technology) according to a fixed angle modulus of 5.625°. A positioning guide sleeve 3 is installed in the hole, and the positioning guide sleeve 3 is positioned and matched with the hole in the mold. Then, concrete is poured in the mold to obtain the shield segment 1 with the positioning guide sleeve 3. The surface of the laitance is removed at the corresponding position of the shield segment 1, and the holes for the pre-embedded positioning guide sleeve 3 are cleaned out. Multiple shield tunnel segments 1 are arranged to form a ring-shaped inner tunnel barrier. At corresponding locations on the evacuation platform 4, the external steel channel 2 is anchored to the positioning guide sleeve 3 pre-embedded in the shield tunnel segment 1 using M12T bolts 9. The platform steel beam 6 and the lower cable bracket 10 are welded to the corresponding positions of the external steel channel 2, and the reinforcing steel plate 5 is welded between the platform steel beam 6 and the external steel channel 2 to form the lower triangular support. The evacuation platform plate 4 is laid on top of the platform steel beam 6 and fixed with stainless steel clamps 7, thus completing the installation structure of the external channel of the evacuation platform in the subway shield tunnel section.

[0022] Although the embodiments of this application disclose the above-described methods, the content is merely an implementation method adopted for ease of understanding. Any person skilled in the art should understand that any modifications and changes in the form and details of the implementation can be made without departing from the spirit and scope disclosed in this utility model. However, the patent protection scope of this utility model shall still be determined by the scope defined in the appended claims.

Claims

1. An external channel installation structure for an evacuation platform in a subway shield tunnel section, characterized in that: The system includes a shield tunnel segment (1), an external steel channel (2), a positioning hole sleeve (3), an evacuation platform plate (4), a platform steel beam (6), bolt holes (8), bolts (9), and a lower cable support (10). The positioning hole sleeve (3) is pre-embedded in the inner wall of the shield tunnel segment (1). The bolt holes (8) are opened in the external steel channel (2). The external steel channel (2) is anchored to the positioning hole sleeve (3) by bolts (9) passing through the bolt holes (8). The platform steel beam (6) and the lower cable support (10) are welded to the side of the external steel channel (2) away from the shield tunnel segment (1). A support structure is set between the lower part of the platform steel beam (6) and the external steel channel (2). An evacuation platform plate (4) is laid on top of the platform steel beam (6). The evacuation platform plate (4) is fixed to the platform steel beam (6) by a fixing structure.

2. The external channel installation structure for a subway shield tunnel evacuation platform as described in claim 1, characterized in that: The positioning guide sleeve (3) is arranged in a circumferential uniform manner on the inner wall of the shield tunnel segment (1) with a module angle of 5.625°.

3. The external channel installation structure for a subway shield tunnel evacuation platform as described in claim 2, characterized in that: The external steel channel (2) is provided with bolt holes (8) according to the set module of the positioning lead hole sleeve (3).

4. The external channel installation structure for a subway shield tunnel evacuation platform as described in claim 1, characterized in that: The supporting structure is a stiffened steel plate (5). One side of the stiffened steel plate (5) is welded to the external steel channel (2), and the upper side of the stiffened steel plate (5) is welded to the lower part of the platform steel beam (6).

5. The external channel installation structure for a subway shield tunnel evacuation platform as described in claim 1, characterized in that: The fixing structure is a stainless steel clamp (7), and the evacuation platform plate (4) is fixed to the platform steel beam (6) by the stainless steel clamp (7).