A municipal public works pipeline construction auxiliary device
By designing a foldable pipe construction auxiliary device, the problems of large size and inconvenience in moving existing devices have been solved, achieving convenient storage and stable support, and improving construction efficiency and quality.
Patent Information
- Application Number
- CN202620026365.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2026-01-09
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2036-01-09
AI Technical Summary
Existing sewage pipeline construction equipment is bulky and cannot be folded and stored, resulting in a large space occupation at the construction site and increasing the labor intensity and inconvenience of workers.
A pipe construction auxiliary device was designed, comprising a support base, first and second auxiliary frames, a movable plate, and magnetic blocks. It has a folding function and provides stable support and limiting through hinges, magnetic blocks, and anti-slip protrusions, ensuring the stability and convenience of pipe connection.
It enables convenient storage and relocation of the equipment, reduces labor intensity, ensures the stability and accuracy of pipeline connections, and improves construction efficiency.
Smart Images

Figure CN225015915U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of pipeline construction technology, specifically to an auxiliary device for pipeline construction in municipal public works. Background Technology
[0002] Municipal public works are an important part of urban infrastructure construction, covering a wide range of aspects closely related to urban residents' lives and economic and social development. They mainly include multiple systems such as urban roads, bridges, water supply and drainage, gas, heating, sewage treatment, garbage disposal, and lighting. The construction and improvement of these projects play a vital role in ensuring the normal operation of the city, improving the quality of life of residents, and promoting the sustainable development of the city. Pipeline construction is a critical link in municipal public works. In the water supply system, the quality of pipeline construction is directly related to the stability of water supply and water quality safety.
[0003] A search revealed a sewage pipeline construction auxiliary device, application number: CN202420024379.9. This device connects two pipelines by moving an installation plate and a movable seat. However, the device itself is large and cannot be folded for storage, which means it occupies a lot of space at the construction site. Moreover, workers need to frequently move the device to adapt to different pipeline connection positions, which means that workers not only have to carry the pipelines but also move the device back and forth, increasing the labor intensity of the workers and causing inconvenience to the connection work. Utility Model Content
[0004] The purpose of this utility model is to provide an auxiliary device for pipeline construction in municipal public works, so as to solve the problems mentioned in the background art.
[0005] To achieve the above objectives, this utility model provides the following technical solution: an auxiliary device for pipeline construction in municipal public works, comprising a support base and a first auxiliary frame fixed on the front and rear sides of the top of the support base, and further comprising:
[0006] The second auxiliary frame is arranged above the first auxiliary frame, and both the first and second auxiliary frames are semi-circular arc-shaped. The first and second auxiliary frames are hinged together by a hinge, and handles are bolted to the left and right surfaces of the support base.
[0007] A fixing groove is formed inside the lower part of the support base. Movable plates are provided through the front and rear sides of the support base. The movable plates are L-shaped and are slidably connected to the inner wall of the fixing groove. An auxiliary bracket is fixed above the movable plates.
[0008] Preferably, the top of the auxiliary bracket is arc-shaped, and the center of the arc at the top of the auxiliary bracket is the same as the center of the first auxiliary bracket.
[0009] Preferably, limit grooves are provided on the front and back sides of the left and right sides of the inner wall of the fixed groove, and limit blocks are fixed on the surfaces of the left and right sides of the movable plate. One side of the limit block extends into the interior of the limit groove and slides in connection with the inner wall of the limit groove.
[0010] Preferably, fixing plates are fixed on both the left and right sides of the first auxiliary frame and the second auxiliary frame, and a positioning pin is provided through the top of the fixing plate, and the positioning pin is slidably connected to the fixing plate.
[0011] Preferably, magnetic blocks are embedded on the outer surfaces of both the first auxiliary frame and the second auxiliary frame, and the magnetic blocks on the surface of the first auxiliary frame and the magnetic blocks on the surface of the second auxiliary frame are attracted to each other by opposite poles.
[0012] Preferably, the surfaces of the inner walls of the first auxiliary frame and the second auxiliary frame are each bonded with a plurality of anti-slip protrusions, and the bottom surface of the support base is bonded with a reinforcing pad, and the anti-slip protrusions and the reinforcing pad are both made of wear-resistant rubber.
[0013] Compared with the prior art, the beneficial effects of this utility model are as follows:
[0014] This utility model has a folding function, which can be folded into a flat shape when not in use, making it convenient for staff to store and operate. It also makes it easy for staff to move the overall position of the device. Moreover, the device can provide stable support and precise circumferential restraint for two pipes to be connected at the same time, effectively preventing the pipes from shifting during the insertion process, ensuring construction quality, and providing convenience for the staff's construction work. Attached Figure Description
[0015] Figure 1 This is a three-dimensional structural diagram of the present invention;
[0016] Figure 2 This is a three-dimensional schematic diagram of the present invention after folding;
[0017] Figure 3 This is a three-dimensional schematic diagram of the first auxiliary frame in this utility model;
[0018] Figure 4 This is a three-dimensional schematic diagram of the support base in this utility model;
[0019] Figure 5 This is a cross-sectional view of the support base in this utility model.
[0020] In the diagram: 1. Support base; 2. First auxiliary frame; 3. Second auxiliary frame; 4. Handle; 5. Fixing groove; 6. Movable plate; 7. Auxiliary bracket; 8. Fixing piece; 9. Positioning pin; 10. Magnetic block; 11. Anti-slip protrusion; 12. Reinforcing pad; 13. Limiting groove; 14. Limiting block. Detailed Implementation
[0021] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0022] Please see Figure 1-5 As shown, a pipeline construction auxiliary device for municipal public works includes a support base 1, wherein the upper part of the support base 1 is an arc-shaped concave surface, and a first auxiliary frame 2 is fixed on both the front and rear sides of the top of the support base 1. A second auxiliary frame 3 is arranged above the first auxiliary frame 2, and both the first auxiliary frame 2 and the second auxiliary frame 3 are semi-circular arc-shaped. The first auxiliary frame 2 and the second auxiliary frame 3 are hinged together by a hinge, wherein the first auxiliary frame 2 and the second auxiliary frame 3 have the same diameter and form a complete ring. Their hinge position is located on the outer surface of the first auxiliary frame 2 and the second auxiliary frame 3. Handles 4 are bolted to the left and right sides of the support base 1. A fixing groove 5 is opened in the lower part of the inside of the support base 1. Movable plates 6 are arranged through the front and rear sides of the support base 1. The movable plates 6 are L-shaped and are slidably connected to the inner wall of the fixing groove 5. An auxiliary bracket 7 is fixed above the movable plate 6.
[0023] The top of the auxiliary bracket 7 is arc-shaped, and the center of the arc at the top of the auxiliary bracket 7 is the same as the center of the first auxiliary bracket 2. Limiting grooves 13 are provided on the front and back sides of the left and right sides of the inner wall of the fixed groove 5. Limiting blocks 14 are fixed on the surfaces of the left and right sides of the movable plate 6. One side of the limiting block 14 extends into the interior of the limiting groove 13 and slides to connect with the inner wall of the limiting groove 13. When the worker inserts the pipe to be constructed into the opposite direction, the worker can pull the movable plates 6 on both sides below in advance, so that the auxiliary bracket 7 can move. When one end of the pipe is inserted between the first auxiliary bracket 2 and the second auxiliary bracket 3, the lower auxiliary bracket 7 can support the pipe and improve the stability when inserting. Moreover, the pulling range of the movable plate 6 can be controlled by the setting of the limiting groove 13 and the limiting block 14.
[0024] The first auxiliary frame 2 and the second auxiliary frame 3 are both fixed with fixing plates 8 on the left and right sides. A positioning pin 9 is provided through the top of the fixing plate 8 and is slidably connected to the fixing plate 8. When the first auxiliary frame 2 and the second auxiliary frame 3 are in a complete ring state, the second auxiliary frame 3 can be positioned by the positioning pin 9 through the two fixing plates 8, so as to avoid the second auxiliary frame 3 from moving during pipe connection. After the subsequent construction is completed, when it is necessary to fold and store, the second auxiliary frame 3 can be flipped and folded by lifting the positioning pin 9.
[0025] Magnetic blocks 10 are embedded on the outer surfaces of both the first auxiliary frame 2 and the second auxiliary frame 3. The magnetic blocks 10 on the surface of the first auxiliary frame 2 and the magnetic blocks 10 on the surface of the second auxiliary frame 3 are attracted to each other by opposite poles. After construction is completed, the second auxiliary frame 3 is flipped over, so that the surfaces of the second auxiliary frame 3 and the first auxiliary frame 2 are attached together. At this time, the positions of the magnetic blocks 10 will coincide, and the magnetic blocks 10 will be attracted and fixed together, thereby positioning the second auxiliary frame 3.
[0026] Several anti-slip protrusions 11 are adhered to the inner wall surfaces of the first auxiliary frame 2 and the second auxiliary frame 3. A reinforcing pad 12 is adhered to the bottom surface of the support base 1. Both the anti-slip protrusions 11 and the reinforcing pad 12 are made of wear-resistant rubber. When the pipe to be connected is inserted between the first auxiliary frame 2 and the second auxiliary frame 3, the anti-slip protrusions 11 will contact the surface of the pipe and deform. The anti-slip protrusions 11 can be used to simply position the pipe and prevent it from sliding. The reinforcing pad 12 at the bottom of the support base 1 can improve the stability of the entire device during auxiliary connection and prevent sliding.
[0027] Working Principle: The operator first moves the device to the designated work position by holding the handles 4 on both sides of the support base 1. When two pipes need to be connected, the operator places one pipe between the first auxiliary frame 2 and the second auxiliary frame 3 on one side, and simultaneously pulls the lower movable plate 6. This causes the movable plate 6 to move the auxiliary bracket 7 below the pipe. The auxiliary bracket 7 is pulled outward a short distance and then stopped, allowing it to work in conjunction with the first and second auxiliary frames 2 and 3 to support the pipe. The other pipe is then moved to the other side between the first and second auxiliary frames 2 and 3, and supported again by the auxiliary bracket 7. At this point, both pipes are horizontal, and their connection points are facing each other. Then the operation... Personnel can then push the pipes on both sides to move them towards each other, connecting them via the connecting rings on the pipes to complete the connection operation between the pipes. After the pipe connection is completed, the personnel can remove the positioning pins 9 on both sides and then flip the entire second auxiliary frame 3 outwards, so that the surfaces of the second auxiliary frame 3 and the first auxiliary frame 2 are in contact. The second auxiliary frame 3 is then attracted and fixed by the magnetic block 10. Then, the personnel can push the auxiliary bracket 7 to move the front and rear auxiliary brackets 7 towards each other. When one side of the auxiliary bracket 7 is in contact with the surface of the flipped second auxiliary frame 3, the folding operation of the device can be completed. Then, the personnel can move the device through the handles 4 on both sides for subsequent storage.
[0028] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A pipeline construction auxiliary device for municipal public works, comprising a support base (1) and a first auxiliary frame (2) fixed on the front and rear sides of the top of the support base (1), characterized in that, Also includes: The second auxiliary frame (3) is set above the first auxiliary frame (2), and both the first auxiliary frame (2) and the second auxiliary frame (3) are semi-circular arc-shaped. The first auxiliary frame (2) and the second auxiliary frame (3) are hinged together by a hinge. The left and right surfaces of the support base (1) are all bolted with handles (4). A fixing groove (5) is opened inside the lower part of the support base (1). Movable plates (6) are provided through the front and rear sides of the support base (1). The movable plates (6) are L-shaped in general, and the movable plates (6) are slidably connected to the inner wall of the fixing groove (5). An auxiliary bracket (7) is fixed above the movable plates (6).
2. The auxiliary device for pipeline construction in municipal public works according to claim 1, characterized in that: The top of the auxiliary bracket (7) is arc-shaped, and the center of the arc at the top of the auxiliary bracket (7) is the same as the center of the first auxiliary bracket (2).
3. The auxiliary device for pipeline construction in municipal public works according to claim 1, characterized in that: Limiting grooves (13) are provided on the front and back sides of the left and right sides of the inner wall of the fixed groove (5). Limiting blocks (14) are fixed on the surfaces of the left and right sides of the movable plate (6). One side of the limiting block (14) extends into the interior of the limiting groove (13) and slides in connection with the inner wall of the limiting groove (13).
4. The auxiliary device for pipeline construction in municipal public works according to claim 1, characterized in that: The first auxiliary frame (2) and the second auxiliary frame (3) are fixed with fixing plates (8) on both the left and right sides. A positioning pin (9) is provided through the top of the fixing plate (8), and the positioning pin (9) is slidably connected to the fixing plate (8).
5. The auxiliary device for pipeline construction in municipal public works according to claim 1, characterized in that: Magnetic blocks (10) are embedded on the outer surfaces of the first auxiliary frame (2) and the second auxiliary frame (3), and the magnetic blocks (10) on the surface of the first auxiliary frame (2) and the magnetic blocks (10) on the surface of the second auxiliary frame (3) attract each other with opposite poles.
6. The auxiliary device for pipeline construction in municipal public works according to claim 1, characterized in that: The inner wall of the first auxiliary frame (2) and the inner wall of the second auxiliary frame (3) are both bonded with a number of anti-slip protrusions (11), and the bottom surface of the support base (1) is bonded with a reinforcing pad (12). The anti-slip protrusions (11) and the reinforcing pad (12) are both made of wear-resistant rubber.
Citation Information
Patent Citations
Sewage pipeline construction auxiliary device
CN221441689U