A refrigeration equipment duct mounting structure device

By designing a duct installation structure with a support frame and replacement mechanism, the problem of inconvenient replacement of damping rubber after aging was solved, enabling convenient replacement, improving replacement efficiency, and avoiding abnormal noise.

CN225015936UActive Publication Date: 2026-11-24临沂市交通制冷工程有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202620004141.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2026-01-05
Publication Date
2026-11-24
Estimated Expiration
2036-01-05

AI Technical Summary

Technical Problem

In the existing refrigeration equipment duct installation structure, the vibration damping rubber is not easy to replace after aging, which leads to a decrease in vibration damping performance and the occurrence of abnormal noise.

Method used

A duct installation structure including a support frame, a vertical frame, a hanger, an adjustable clamping mechanism, and a replacement mechanism was designed. The adjustable clamping mechanism enables convenient disassembly and replacement of the shock-absorbing rubber, while the replacement mechanism allows for the replacement of the lower shock-absorbing rubber without disassembling the ventilation duct.

Benefits of technology

It enables convenient replacement of shock-absorbing rubber, improves replacement efficiency, and avoids abnormal noise problems caused by aging.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225015936U_ABST
    Figure CN225015936U_ABST
Patent Text Reader

Abstract

This utility model discloses a duct installation structure for refrigeration equipment, relating to the field of duct mounting brackets. It includes a support frame with vertical supports fixedly installed on both sides. A hanger rod connected to a top wall is sleeved on the top plate of the vertical supports. A nut for limiting the vertical support is threaded onto the outer wall of the hanger rod below the top plate. A slot is horizontally formed on the vertical plate of the support frame, and an adjustable clamping mechanism is slidably connected to the inner wall of the slot. A replacement mechanism is detachably connected inside the support frame, and a shock-absorbing rubber is installed on the top of the replacement mechanism. This utility model, by setting a replacement mechanism, allows for disassembly from below, thereby simultaneously removing the shock-absorbing rubber below without any operation on the ventilation duct. This facilitates the replacement of the shock-absorbing rubber below and improves replacement efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of duct installation brackets, specifically a duct installation structure device for refrigeration equipment. Background Technology

[0002] Ventilation ducts for refrigeration equipment are generally installed using a hoisting method, and the installation structure typically used is a hoisting mounting bracket.

[0003] As air flows through the ventilation duct, the duct will vibrate slightly. To avoid abnormal noise, damping rubber is installed at the contact point between the bracket and the duct. However, after long-term use, the damping rubber will age and its damping performance will decrease. At this time, the damping rubber needs to be replaced. The damping rubber below the ventilation duct is not easy to remove, and it is also inconvenient to remove and install new damping rubber. Utility Model Content

[0004] The purpose of this utility model is to provide a refrigeration equipment duct installation structure device in order to solve the problems mentioned in the background art.

[0005] To achieve the above objectives, this utility model provides the following technical solution: a refrigeration equipment duct installation structure device, including a support frame, vertical frames fixedly installed on both sides of the support frame, a hanger rod connected to the top wall of the vertical frame sleeved on the top plate of the vertical frame, a nut for limiting the vertical frame being threadedly connected to the outer wall of the hanger rod below the top plate of the vertical frame, a slot horizontally opened on the vertical plate of the support frame, an adjustable clamping mechanism slidably connected to the inner wall of the slot, a replacement mechanism detachably connected inside the support frame, and shock-absorbing rubber installed on the top of the replacement mechanism.

[0006] As a further embodiment of this utility model: the adjustable clamping mechanism includes a sliding screw slidably connected to the inner wall of the slot, a sliding plate welded to one end of the sliding screw, and a bent portion formed at both the bottom and top of the sliding plate. The top of the bent portion at the bottom of the sliding plate contacts the bottom of the support frame, and there is a gap between the bottom of the bent portion at the top of the sliding plate and the top of the horizontal plate of the support frame for inserting shock-absorbing rubber.

[0007] As a further embodiment of this utility model: the adjustable clamping mechanism further includes a fixing rod welded to the top of the bent portion of the sliding plate, and a strip groove is inserted into the outer periphery of the two fixing rods. A clamping plate is inserted into the inside of the strip groove, and a nut for clamping the clamping plate is threadedly connected to the outer wall of the fixing rod above the clamping plate.

[0008] As a further embodiment of this utility model: the replacement mechanism includes a mating interface opened at the top of the horizontal plate of the support frame and extending to the bottom of the support frame. The support frame has connecting grooves on both sides of the mating interface. The top of the connecting groove is closed and the bottom of the connecting groove is open.

[0009] As a further embodiment of this utility model: the replacement mechanism further includes a replacement plate inserted into the inner wall of the interface. Both ends of the replacement plate are integrally formed with protruding plates that are opposite to the inner wall of the connecting groove. A downwardly protruding fixing screw is welded to the top of the inner wall of the connecting groove. A through hole is opened inside the protruding plate. The fixing screw passes through the through hole and is threadedly connected to a nut. The shock-absorbing rubber is fixedly installed on the top of the interface by adhesive.

[0010] Compared with the prior art, the beneficial effects of this utility model are: By setting up a replacement mechanism, the replacement mechanism can be disassembled from below, and the shock-absorbing rubber below can be removed simultaneously without any operation on the ventilation duct. This facilitates the replacement of the shock-absorbing rubber below and improves replacement efficiency. Attached Figure Description

[0011] Figure 1 This is a schematic diagram of the structure of this utility model; Figure 2 This is a schematic diagram of the structure of this utility model from another perspective; Figure 3 This is a schematic diagram of the installation of the replacement mechanism of this utility model.

[0012] In the diagram: 1. Support frame; 2. Vertical frame; 3. Hanger rod; 4. Groove; 5. Sliding plate; 6. Fixing rod; 7. Pressing plate; 8. Strip groove; 9. Replacement plate; 10. Sliding screw; 11. Protruding plate; 12. Fixing screw; 13. Connecting interface; 14. Connecting groove. Detailed Implementation

[0013] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0014] Please see Figures 1-3In this embodiment of the utility model, a refrigeration equipment duct installation structure device includes a support frame 1, vertical frames 2 are fixedly installed on both sides of the support frame 1, a hanger 3 connected to the top wall is sleeved on the top plate of the vertical frame 2, and a nut for limiting the vertical frame 2 is threadedly connected to the outer wall of the hanger 3 below the top plate of the vertical frame 2. A slot 4 is horizontally opened on the vertical plate of the support frame 1, and an adjustable clamping mechanism is slidably connected to the inner wall of the slot 4. A replacement mechanism is detachably connected inside the support frame 1, and a shock-absorbing rubber is installed on the top of the replacement mechanism.

[0015] In this embodiment: First, a hole is drilled at the top of the wall at the installation location using a drilling tool. Then, an expansion tube is inserted into the hole (the lower half of the hanger 3 shown in the attached figure is not shown). Next, the top thread of the hanger 3 is connected to the expansion tube to fix the hanger 3. Then, the top plate of the vertical frame 2 is inserted into the outer wall of the hanger 3 and threaded with the hanger 3 using a nut to limit the vertical frame 2 to the installation height. After the ventilation pipe is connected, its bottom contacts the top of the support frame 1. Then, the adjustable sliding mechanism is pushed to clamp the adjustable sliding mechanism on both sides of the ventilation pipe. Finally, the position of the adjustable sliding mechanism is fixed and the top of the ventilation pipe is pressed to complete the installation of the ventilation pipe. At this time, the bottom of the ventilation pipe is in contact with the shock-absorbing rubber. Therefore, when the ventilation pipe vibrates, the shock-absorbing rubber can absorb the vibration and avoid abnormal noise. When the shock-absorbing rubber ages after prolonged use, causing abnormal noise, first use a wedge to wedge into the gap to provide temporary support for the ventilation duct. Then, the replacement mechanism can be disassembled, and the shock-absorbing rubber can be scraped off with a scraper. Use adhesive to fix the new shock-absorbing rubber to the top of the replacement mechanism. Finally, reinstall the replacement mechanism and remove the wedge.

[0016] Please refer to this carefully. Figure 1 and Figure 2 The adjustable clamping mechanism includes a sliding screw 10 slidably connected to the inner wall of the slot 4. A sliding plate 5 is welded to one end of the sliding screw 10. Both the bottom and top ends of the sliding plate 5 are formed with bent portions. The top end of the bent portion at the bottom of the sliding plate 5 contacts the bottom of the support frame 1. There is a gap between the bottom end of the bent portion at the top of the sliding plate 5 and the top end of the horizontal plate of the support frame 1 for inserting shock-absorbing rubber. The adjustable clamping mechanism also includes a fixing rod 6 welded to the top end of the bent portion at the top of the sliding plate 5. A strip groove 8 is inserted into the outer periphery of the two fixing rods 6. A clamping plate 7 is inserted into the inside of the strip groove 8. A nut for clamping the clamping plate 7 is threadedly connected to the outer wall of the fixing rod 6 above the clamping plate 7.

[0017] In this embodiment: when the pipe is clamped and installed, the sliding plate 5 is pushed to move, and the sliding plate 5 drives the sliding screw 10 to slide, so that the two fixed rods 6 are located on both sides of the air duct. Then, the clamping plate 7 with another shock-absorbing rubber fixed at the bottom is put on the outer periphery of the two fixed rods 6. At this time, the shock-absorbing rubber at the bottom of the clamping plate 7 is in contact with the top of the ventilation duct. Then, the nut is used to connect with the fixed rod 6 by thread, so that the clamping plate 7 clamps the ventilation duct.

[0018] Please refer to this carefully. Figure 3 The replacement mechanism includes a mating interface 13 located at the top of the horizontal plate of the support frame 1 and extending to the bottom of the support frame 1. The support frame 1 has connecting grooves 14 on both sides of the mating interface 13. The top of the connecting grooves 14 is closed and the bottom is open. The replacement mechanism also includes a replacement plate 9 inserted into the inner wall of the mating interface 13. The two ends of the replacement plate 9 are integrally formed with protruding plates 11 that are opposite to the inner wall of the connecting grooves 14. The top of the inner wall of the connecting grooves 14 is welded with a downward protruding fixing screw 12. The protruding plate 11 has a through hole. The fixing screw 12 passes through the through hole and is threaded to a nut. The shock-absorbing rubber is fixedly installed on the top of the mating interface 13 by adhesive.

[0019] In this embodiment: when the damping rubber ages and its damping efficiency decreases, failing to achieve effective damping, the upper damping rubber can be replaced by directly disassembling the clamping plate 7. When replacing the lower damping rubber, the replacement plate 9 can be removed by unscrewing the nut connected to the fixing screw 12. The aged damping rubber on the top of the replacement plate 9 can then be scraped off without displacing or disassembling the ventilation duct, which is quite convenient. After replacing the new damping rubber, the replacement mechanism can be reinstalled in its original position.

[0020] The above description is only a preferred embodiment of the present utility model, but the protection scope of the present utility model is not limited thereto. Any equivalent substitutions or changes made by those skilled in the art within the technical scope disclosed in the present utility model, based on the technical solution and the inventive concept of the present utility model, should be included within the protection scope of the present utility model.

Claims

1. A duct installation structure for refrigeration equipment, comprising a support frame (1), characterized in that, The support frame (1) is fixedly installed with vertical frames (2) on both sides. A hanging rod (3) connected to the top wall is sleeved on the top plate of the vertical frame (2). The outer wall of the hanging rod (3) is threaded with a nut that limits the position of the vertical frame (2) below the top plate of the vertical frame (2). A slot (4) is horizontally opened on the vertical plate of the support frame (1). An adjustable clamping mechanism is slidably connected to the inner wall of the slot (4). A replacement mechanism is detachably connected inside the support frame (1). Shock-absorbing rubber is installed on the top of the replacement mechanism.

2. The refrigeration equipment duct installation structure device according to claim 1, characterized in that, The adjustable clamping mechanism includes a sliding screw (10) slidably connected to the inner wall of the slot (4). A sliding plate (5) is welded to one end of the sliding screw (10). Both the bottom and top ends of the sliding plate (5) are formed with bent portions. The top end of the bent portion at the bottom of the sliding plate (5) is in contact with the bottom of the support frame (1). There is a gap between the bottom end of the bent portion at the top of the sliding plate (5) and the top end of the horizontal plate of the support frame (1) for the insertion of shock-absorbing rubber.

3. The refrigeration equipment duct installation structure device according to claim 2, characterized in that, The adjustable clamping mechanism also includes a fixing rod (6) welded to the top of the top bend of the sliding plate (5). The outer periphery of the two fixing rods (6) is inserted with a strip groove (8). The inside of the strip groove (8) is inserted with a clamping plate (7). The outer wall of the fixing rod (6) is threaded above the clamping plate (7) with a nut for clamping the clamping plate (7).

4. The refrigeration equipment duct installation structure device according to claim 3, characterized in that, The replacement mechanism includes a mating interface (13) located at the top of the horizontal plate of the support frame (1) and extending to the bottom of the support frame (1). The support frame (1) has connecting grooves (14) on both sides of the mating interface (13). The top of the connecting groove (14) is closed and the bottom of the connecting groove (14) is open.

5. The refrigeration equipment duct installation structure device according to claim 4, characterized in that, The replacement mechanism also includes a replacement plate (9) inserted into the inner wall of the interface (13). The two ends of the replacement plate (9) are integrally formed with protruding plates (11) that are opposite to the inner wall of the connecting groove (14). A downward protruding fixing screw (12) is welded to the top of the inner wall of the connecting groove (14). A through hole is opened inside the protruding plate (11). The fixing screw (12) passes through the through hole and is threadedly connected to a nut. The shock-absorbing rubber is fixedly installed on the top of the interface (13) by adhesive.