An inlet flue and desulfurization tower
By adding an interlayer space between the main body of the flue and the outer protective layer and controlling the internal air pressure to be higher than that inside the flue, an active pressure seal is formed, which solves the problem of frequent leakage in the flue inlet of the desulfurization tower, and realizes long-term stable operation of the desulfurization system and cost reduction.
Patent Information
- Application Number
- CN202620008888.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2026-01-06
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2036-01-06
AI Technical Summary
Frequent and long-term leaks at the flue gas inlet of the desulfurization tower have led to unstable operation of the desulfurization system, and existing repair methods are not effective in the long term.
An interlayer space is added between the main body of the flue and the outer protective layer. The air pressure in the interlayer space is controlled to be higher than the air pressure in the internal flue through a sealing air system, forming an active pressure seal to ensure that the leakage direction is that the sealing air enters the internal flue rather than the flue gas leaks out.
This effectively eliminates the risk of flue gas leakage, ensures the long-term stable operation of the desulfurization system, reduces maintenance costs, and extends the maintenance cycle.
Smart Images

Figure CN225016050U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of flue sealing technology, and more specifically, to an inlet flue and a desulfurization tower. Background Technology
[0002] Ultra-low emissions and leak-free operation have become stringent requirements for industrial enterprises such as coal-fired power plants and steel mills. Driven by the need to reduce costs and increase efficiency, enterprises are increasingly demanding extended maintenance cycles, making the reliability of desulfurization systems, as key environmental protection facilities, particularly important. The operating conditions at the inlet flue gas interface of the desulfurization tower are extremely harsh, requiring long-term exposure to high temperatures and strong corrosion. Furthermore, due to the mismatch in thermal expansion properties caused by welding dissimilar materials, the weld seams at this location are prone to repeated cracking, becoming a major source of leaks in the desulfurization system.
[0003] Therefore, how to solve the problem of long-term and frequent leakage in the flue gas duct at the desulfurization tower and ensure the long-term stable operation of the desulfurization system has become a technical problem that urgently needs to be solved by those skilled in the art. Utility Model Content
[0004] In view of this, the purpose of this application is to provide an inlet flue to solve the problem of long-term and frequent leakage and ensure the long-term stable operation of the desulfurization system.
[0005] Another objective of this application is to provide a desulfurization tower including the aforementioned inlet flue.
[0006] An inlet flue, comprising:
[0007] The flue body has an inner cavity that forms an internal flue for the passage of flue gas.
[0008] The outer protective layer is fitted over the main body of the flue and has an interlayer space between it and the main body of the flue.
[0009] A sealed ventilation system, which is connected to the mezzanine space;
[0010] The control system is used to control the sealed air system to supply air to the interlayer space and to make the air pressure in the interlayer space higher than the air pressure in the internal flue.
[0011] In some embodiments, the control system includes:
[0012] The first pressure measuring element is used to detect the pressure inside the internal flue.
[0013] The second pressure measuring element is used to detect the pressure within the interlayer space.
[0014] The control module, the first pressure measuring device and the second pressure measuring device are both electrically connected to the input interface of the control module, and the output interface of the control module is electrically connected to the sealing air system. The control module controls the sealing air system to supply air to the interlayer space based on the detection signals of the first pressure measuring device and the second pressure measuring device.
[0015] In some embodiments, the sealed air system includes:
[0016] The air intake duct is connected at one end to the mezzanine space.
[0017] A sealing fan is connected to the second end of the air inlet duct, and the control system controls the sealing fan to supply air into the interlayer space.
[0018] In some embodiments, the control system includes a third pressure measuring element, which is disposed on the air inlet duct and used to detect the pressure inside the air inlet duct;
[0019] The control system controls the sealing fan based on the detection signal of the third pressure measuring device to maintain the air pressure in the interlayer space at a preset pressure, which is higher than the pressure in the internal flue.
[0020] In some embodiments, the sealed air system further includes an air outlet duct that communicates with the interlayer space.
[0021] In some embodiments, a first control valve is provided on the air inlet duct, and a second control valve is provided on the air outlet duct.
[0022] In some embodiments, the main body of the flue is made of stainless steel, and the outer protective layer is made of carbon steel.
[0023] In some embodiments, the flue body has multiple connection holes, which are filled with welding metal, and the flue body and the outer protective layer are fixedly connected in a point-like manner by the welding metal.
[0024] In some embodiments, the air pressure within the interlayer space is lower than atmospheric pressure.
[0025] A desulfurization tower, including the inlet flue of any one of the above.
[0026] The inlet flue provided in this application includes a flue body, an outer protective layer, a sealing air system, and a control system. The inner cavity of the flue body forms an internal flue for the passage of flue gas. The outer protective layer is fitted outside the flue body and has an interlayer space between it and the flue body. The sealing air system is connected to the interlayer space, and the control system is used to control the sealing air system to supply air to the interlayer space and make the air pressure in the interlayer space higher than the air pressure in the internal flue.
[0027] Compared to related technologies, the inlet flue provided in this application transforms passive leak sealing into active pressure sealing. An interlayer space is added between the flue body and the outer protective layer to introduce sealing air. A control system regulates the air pressure within this interlayer space to always be slightly higher than the air pressure inside the internal flue, forming a stable sealing air curtain. Even if micro-cracks appear in the welds of the flue body, the higher pressure within the interlayer space ensures that leakage occurs as sealing air flows inward from the interlayer space into the internal flue, rather than flue gas leaking outward. This fundamentally eliminates the risk of flue gas leakage, solves the problem of frequent leaks at the desulfurization tower inlet flue, and ensures long-term stable operation of the desulfurization system. Furthermore, the inlet flue structure provided in this application is simple, requiring no changes to the original flue dimensions, and can be directly modified based on the existing structure, resulting in a compact on-site layout. It significantly reduces weld repair and material replacement costs during major overhauls, extends maintenance cycles, significantly reduces unplanned downtime losses, and effectively lowers labor costs due to reduced daily maintenance hours.
[0028] The desulfurization tower provided in this application includes the aforementioned inlet flue, and therefore also possesses the aforementioned structure and beneficial effects. Other structures are described in accordance with relevant technologies and will not be elaborated upon here. Attached Figure Description
[0029] To more clearly illustrate the technical solutions in the embodiments or related technologies of this application, the accompanying drawings used in the description of the embodiments or related technologies will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0030] Figure 1 This is a schematic diagram of the desulfurization tower disclosed in the embodiments of this application.
[0031] Among them, 100 is the main body of the flue, and 101 is the internal flue;
[0032] 200 is the outer protective layer, and 201 is the interlayer space;
[0033] 300 is a sealing fan, 310 is an air inlet duct, 311 is a first control valve, 312 is a third pressure measuring device, 320 is an air outlet duct, and 321 is a second control valve.
[0034] 400 represents the desulfurization tower body. Detailed Implementation
[0035] This application discloses an inlet flue to solve the problem of long-term and frequent leakage, and to ensure the long-term stable operation of the desulfurization system.
[0036] This application also discloses a desulfurization tower that includes the aforementioned inlet flue.
[0037] Hereinafter, embodiments will be described with reference to the accompanying drawings. Furthermore, the embodiments shown below do not limit the scope of the utility model as described in the claims. Additionally, the complete contents of the structures represented in the embodiments below are not limited to those necessary for the solution of the utility model as described in the claims. It should be noted that, for ease of description, only the parts relevant to the utility model are shown in the drawings. Unless otherwise specified, the embodiments and features described in this application can be combined with each other.
[0038] Given that desulfurization tower inlet flues are typically constructed using butt welding of carbon steel and 2507 stainless steel, with a difference of approximately 30% in their coefficients of linear expansion, the thermal expansion and contraction cycles during operation can lead to significant alternating thermal stress at the weld, inducing fatigue cracks. Once cracks form, corrosive media penetrate the weld, exacerbating corrosion and material deterioration. Conventional welding repair methods often fail to address the underlying stress, resulting in recurring problems and a vicious cycle. Therefore, this application discloses an inlet flue design to solve the aforementioned problem of frequent and persistent leakage, ensuring the long-term stable operation of the desulfurization system.
[0039] Combination Figure 1 The inlet flue disclosed in this application embodiment is used to be installed on the desulfurization tower body 400, including a flue body 100, an outer protective layer 200, a sealing air system and a control system. The inner cavity of the flue body 100 forms an internal flue 101 for supplying flue gas. The outer protective layer 200 is sleeved on the outside of the flue body 100 and has an interlayer space 201 between it and the flue body 100. The sealing air system is connected to the interlayer space 201. The control system is used to control the sealing air system to supply air to the interlayer space 201 and make the air pressure in the interlayer space 201 higher than the air pressure in the internal flue 101.
[0040] Compared to existing technologies, the inlet flue disclosed in this application transforms passive sealing into active pressure sealing. An interlayer space 201 is added between the flue body 100 and the outer protective layer 200 to introduce sealing air. The air pressure in the interlayer space 201 is always slightly higher than that in the internal flue 101 by the control system to form a stable sealing air curtain. Even if micro-cracks appear in the welds on the flue body 100, the leakage direction is still that the sealing air enters the internal flue 101 from the interlayer space 201 because the pressure in the interlayer space 201 is higher than that in the internal flue 101, rather than the flue gas leaking outward. This fundamentally eliminates the risk of flue gas leakage, solves the problem of frequent leakage at the inlet flue of the desulfurization tower, and ensures the long-term stable operation of the desulfurization system. In addition, the inlet flue structure disclosed in this application is simple, does not require changes to the original flue size, can be directly modified based on the existing structure, and has a compact on-site layout; it can significantly save on weld repair and material replacement costs during major overhauls, extend the maintenance cycle, significantly reduce unplanned downtime losses, and effectively reduce labor costs due to reduced daily maintenance hours.
[0041] Furthermore, the control system controls the air pressure in the interlayer space 201 to be slightly lower than atmospheric pressure to prevent air leakage in the interlayer space 201.
[0042] In some embodiments disclosed in this application, the control system includes a first pressure measuring element, a second pressure measuring element, and a control module. The first pressure measuring element is used to detect the pressure inside the internal flue 101, and the second pressure measuring element is used to detect the pressure inside the interlayer space 201. Both the first and second pressure measuring elements are electrically connected to the input interface of the control module, and the output interface of the control module is electrically connected to the sealing air system. This allows the sealing air system to control the supply of air to the interlayer space 201 based on the detection signals from the first and second pressure measuring elements, achieving closed-loop control of the air supply and effectively maintaining the pressure difference between the interlayer space 201 and the internal flue 101. The first and second pressure measuring elements can be pressure sensors, pressure transmitters, or other devices that can convert air pressure signals into electrical signals for output, facilitating remote monitoring and data acquisition by the control module.
[0043] In order to achieve air supply to the mezzanine space 201, combined with Figure 1 The sealed air system includes an air inlet duct 310 and a sealing fan 300. The first end of the air inlet duct 310 is connected to the interlayer space 201; the sealing fan 300 is connected to the second end of the air inlet duct 310. The control system controls the sealing fan 300 to provide stable and clean air to the interlayer space 201 and maintain the air pressure in the interlayer space 201 higher than that in the internal flue 101.
[0044] In some embodiments, combined with Figure 1The control system includes a third pressure measuring element 312, which is installed on the air inlet duct 310 and used to detect the pressure inside the air inlet duct 310, thereby obtaining the pressure inside the interlayer space 201. Based on the detection signal from the third pressure measuring element 312, the control system can control the sealing fan 300 to maintain the air pressure inside the interlayer space 201 at a preset pressure, which is higher than the pressure inside the internal flue 101. For example, the air pressure inside the interlayer space 201 can be directly maintained at approximately 0.1 MPa-0.3 MPa, which is higher than the air pressure inside the internal flue 101.
[0045] Because the air pressure inside the internal flue 101 flues, in order to avoid the pressure difference between the interlayer space 201 and the internal flue 101 being too large and affecting the service life of the flue body 100, the air pressure inside the interlayer space 201 is always set to be slightly higher than the air pressure inside the internal flue 101. The sealed air system also includes an air outlet duct 320, which is connected to the interlayer space 201 to realize the air outlet of the interlayer space 201 to the outside, thereby realizing the reduction and regulation of the air pressure inside the interlayer space 201.
[0046] In a specific usage process, the sealed air system maintains the state of air intake into the interlayer space 201, and the air outlet duct 320 also maintains air circulation. Technicians regularly check the air flow at the outlet of the air outlet duct 320. If no airflow is found at the outlet, technical troubleshooting should be carried out and the air inlet duct 310 and the air outlet duct 320 should be cleared. If liquid or ammonium sulfate crystal blockage is found at the outlet duct 320 during the inspection, it can be determined that there is a leak in the flue body 100, and maintenance should be carried out accordingly.
[0047] To achieve airflow control in a sealed air system, combined with Figure 1 A first control valve 311 is installed on the air inlet duct 310, and a second control valve 321 is installed on the air outlet duct 320. The first control valve 311 and the second control valve 321 can be manual or electric valves, allowing for flexible control of the opening and closing of the air inlet duct 310 and the air outlet duct 320. This effectively isolates airflow during equipment maintenance or emergencies, ensuring the stability and safety of the sealed air system.
[0048] Furthermore, a check valve can be installed on the air inlet duct 310 to prevent airflow from flowing back towards the sealing fan 300. The nominal diameter of the air inlet duct 310 and the air outlet duct 320 can be selected from DN15-20, and the specific specifications can be determined according to actual needs. This application does not impose any restrictions on this.
[0049] In some embodiments, the flue body 100 is made of stainless steel, which can directly contact the flue gas. For example, the flue body 100 can be made of 2507 stainless steel or other two-dimensional stainless steel. The outer protective layer 200 is made of carbon steel and is used as structural support. Furthermore, the thickness of both the flue body 100 and the outer protective layer 200 is not less than 5 mm to prevent bulging caused by compressed air pressure.
[0050] To enhance the protective effect, in some embodiments, a lining layer such as fire-resistant concrete, anti-corrosion glass flakes, or wear-resistant ceramics may be provided on the inner wall of the flue body 100 to improve the corrosion resistance, high temperature resistance, and wear resistance of the flue body 100 and extend the service life of the inlet flue.
[0051] To achieve the fixation between the flue body 100 and the outer protective layer 200, in some embodiments, the flue body 100 is provided with multiple connection holes, each filled with welding metal. The flue body 100 and the outer protective layer 200 are fixedly connected at points by welding metal. Specifically, the diameter of the point-reinforced area is controlled between 50mm and 80mm to ensure local connection strength while controlling the impact of heat input. In addition, a stainless steel sealing layer can be used to cover the connection holes and point-reinforced areas, thereby forming a physical isolation between the reinforcement points and the weld seams to prevent the intrusion of corrosive media.
[0052] The desulfurization tower disclosed in this application includes the aforementioned inlet flue, and therefore also possesses the aforementioned structure and beneficial effects. Other structures are described in reference to related technologies and will not be repeated here.
[0053] The terms "first" and "second," etc., used in the specification and claims of this application are used to distinguish different objects, not to describe a specific order, and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion. For example, a process, method, system, product, or device that includes a series of steps or units may include steps or units not listed, but rather steps or units not listed. Additionally, in the description of embodiments in this application, "a plurality of" means two or more.
[0054] The above description of the disclosed embodiments enables those skilled in the art to make or use this application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of this application. Specific technical means in some embodiments may be incorporated, in whole or in part, into another embodiment unless explicitly excluded by another embodiment. Therefore, this application is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. An inlet flue, characterized in that, The application relates to a flue inlet, which comprises: a flue body (100), an inner cavity of the flue body (100) forming an internal flue (101) for flue gas to pass through; an outer protective layer (200) sleeved outside the flue body (100) and having a sandwich space (201) with the flue body (100); a sealing air system in communication with the sandwich space (201); a control system for controlling the sealing air system to supply air into the sandwich space (201) and making the air pressure in the sandwich space (201) higher than that in the internal flue (101).
2. The inlet flue of claim 1 wherein, The control system comprises: a first pressure detector for detecting the pressure in the internal flue (101); a second pressure detector for detecting the pressure in the sandwich space (201); a control module, the first pressure detector and the second pressure detector being electrically connected to the input interface of the control module, the output interface of the control module being electrically connected to the sealing air system, and the control module controlling the sealing air system to supply air into the sandwich space (201) based on the detection signals of the first pressure detector and the second pressure detector.
3. The inlet flue of claim 1 wherein, The sealing air system comprises: an air inlet pipeline (310) having a first end in communication with the sandwich space (201); a sealing air fan (300) in communication with a second end of the air inlet pipeline (310), and the control system controls the sealing air fan (300) to supply air into the sandwich space (201).
4. The inlet flue of claim 3 wherein, The control system comprises a third pressure detector (312) arranged on the air inlet pipeline (310) and used for detecting the pressure in the air inlet pipeline (310); the control system controls the sealing air fan (300) to maintain the air pressure in the sandwich space (201) at a preset pressure based on the detection signal of the third pressure detector (312), and the preset pressure is higher than the pressure in the internal flue (101).
5. The inlet flue of claim 3 wherein, The sealing air system further comprises an air outlet pipeline (320) in communication with the sandwich space (201).
6. The inlet flue of claim 5 wherein, A first control valve (311) is arranged on the air inlet pipeline (310), and a second control valve (321) is arranged on the air outlet pipeline (320).
7. The entry flue of claim 1 wherein, The flue body (100) is made of stainless steel, and the outer protective layer (200) is made of carbon steel.
8. The inlet flue of claim 7 wherein, A plurality of connecting holes are formed in the flue body (100), and the connecting holes are filled with welding metal, and the flue body (100) and the outer protective layer (200) are fixedly connected in a dot shape through the welding metal.
9. The entry flue of claim 1 wherein, The air pressure in the sandwich space (201) is lower than the atmospheric pressure.
10. A desulfurizing tower characterized by comprising: The application further relates to an inlet flue comprising the flue inlet.