A train steam generator

By adopting a closed heat exchange cavity formed by the combination of an outer shell and a combustion chamber in the train steam generator, and a flue structure inside the cylinder, the problems of high operating load, low traction efficiency and high cost caused by the bulkiness of the existing technology have been solved. This has achieved efficient heat exchange and lightweight design, and improved energy utilization and manufacturing efficiency.

CN225016495UActive Publication Date: 2026-11-24JIANGSU ANXIN BOILER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522699797.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-19
Publication Date
2026-11-24
Estimated Expiration
2035-12-19

AI Technical Summary

Technical Problem

Existing small train steam generators suffer from problems such as high operating load, low traction efficiency, poor energy economy, high material consumption, complex manufacturing process, and high production cost due to their bulky integral structure.

Method used

The system employs a closed heat exchange chamber formed by the outer shell and the combustion chamber, combined with parallel flue pipes arranged inside the cylinder, to create a highly efficient dual heat exchange path. At the same time, the combination of the plate shell structure and the straight tie rod achieves a lightweight design while ensuring pressure resistance and sealing performance.

Benefits of technology

It significantly increases the heat exchange area, improves thermal efficiency, reduces operating load, enhances traction efficiency and energy economy, simplifies manufacturing processes, and reduces production costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225016495U_ABST
    Figure CN225016495U_ABST
Patent Text Reader

Abstract

This utility model belongs to the technical field of steam power equipment, specifically relating to a train steam generator, including a combustion chamber, an outer casing, a furnace inlet, a cylinder, an end plate, multiple smoke pipes, a first straight tie rod, multiple second straight tie rods, a steam drum seat, and a water inlet. This utility model forms a highly efficient dual heat exchange path, thereby significantly increasing the heat exchange area and improving thermal efficiency. While ensuring pressure resistance and sealing performance, it also effectively achieves lightweighting, thereby reducing operating load, improving traction efficiency, enhancing energy economy, reducing material consumption, simplifying manufacturing processes, and lowering production costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the technical field of steam power devices and relates to a steam generator for trains. Background Technology

[0002] As a heat energy conversion device for small steam-powered trains, the steam generator's structural performance directly affects the train's operating efficiency, energy consumption, and manufacturing cost. Currently, existing steam generators for small trains on the market are generally manufactured using integral casting technology to achieve structural integrity and pressure resistance. However, while this traditional construction method meets structural strength requirements, it also has significant drawbacks.

[0003] Specifically, the monolithic structure makes the equipment too bulky and heavy, making it difficult to meet the requirements for lightweight small trains. This increases the operating load, affects traction efficiency, and reduces energy economy. In addition, it leads to high material consumption, complex manufacturing processes, and significantly increases production costs. Utility Model Content

[0004] The purpose of this invention is to provide a train steam generator that solves the technical problems of high operating load, low traction efficiency, poor energy economy, large material consumption, complex manufacturing process and high production cost caused by the bulky structure in the prior art.

[0005] This utility model discloses a train steam generator, comprising: The combustion chamber has a slag discharge port at the bottom; An outer casing is provided outside the combustion chamber, and the inner wall of the casing forms a closed heat exchange cavity with the outer wall of the combustion chamber. The heat exchange cavity covers the top and circumferential side walls of the combustion chamber. The furnace opening is located on one side of the outer casing and passes through the heat exchange cavity to communicate with the interior of the combustion chamber; The cylindrical body is located on the other side of the outer casing and is connected to the heat exchange cavity; An end plate is sealed and fixed inside the end of the cylinder away from the outer casing; Multiple flue pipes are arranged in parallel at intervals inside the cylinder, with one end of each flue pipe passing through the end plate and communicating with the outside, and the other end passing through the heat exchange cavity and communicating with the inside of the combustion chamber. Multiple first straight tie rods are arranged parallel to the flue, with one end connected to the end plate and the other end connected to the inner wall of the outer casing away from the cylinder. Multiple second straight tie rods are connected at intervals between the inner wall of the outer casing and the outer wall of the combustion chamber; A steam drum holder is located at the top of the cylinder and communicates with the interior of the cylinder. The water inlet is located on the outer wall of the outer casing away from the cylinder and is connected to the heat exchange chamber.

[0006] This application forms a highly efficient dual heat exchange path by combining the heat exchange cavity created by the outer shell and the combustion chamber with multiple parallel smoke pipes arranged inside the cylinder. This significantly increases the heat exchange area and improves thermal efficiency. Furthermore, through the cooperation of the plate shell structure with the first and second straight tie rods, lightweighting is effectively achieved while ensuring pressure resistance and sealing performance. This reduces operating load, improves traction efficiency, enhances energy economy, reduces material consumption, simplifies manufacturing processes, and significantly lowers production costs.

[0007] Based on the above technical solution, the solution of this application can be further improved as follows: Preferably, the combustion chamber comprises: The inner top panel is arranged horizontally. Two inner side plates are respectively perpendicularly disposed on both sides of the bottom surface of the inner top plate along the length direction; Two inner arc plates are symmetrically arranged on both sides of the bottom surface of the inner top plate along the width direction, and the distance between them gradually increases from bottom to top to form an inverted V-shaped structure. This design creates a funnel shape that is wider at the top and narrower at the bottom, thereby accelerating and enhancing the mixing of fuel and air through the narrow throat at the bottom, while the expanded space at the top provides a smooth diffusion channel for high-temperature flue gas, thus improving combustion efficiency.

[0008] Preferably, the inner top plate and the two inner arc plates are integrally formed, and the connection has a first arc segment. This solution reduces the number of welds, improves production efficiency, reduces the risk of welding deformation, eliminates stress concentration, enhances the structural reliability of the connection area under high temperature and high pressure conditions, and helps to maintain smooth airflow inside the combustion chamber.

[0009] Preferably, the outer casing comprises: The outer top panel is arranged horizontally. Two outer side plates are respectively perpendicularly disposed on both sides of the bottom surface of the outer top plate along its length; Two outer arc plates are symmetrically arranged on both sides of the bottom surface of the outer top plate along the width direction. Each outer arc plate includes a vertical section and an arc-shaped section at the bottom of the vertical section. The distance between the arc-shaped section and the corresponding inner arc plate remains equal from top to bottom. A U-shaped base plate is horizontally arranged and fitted around the bottom outer periphery of the combustion chamber, and is connected to the bottom of the two outer side plates and the two outer arc plates respectively. This design forms a circumferential, equally spaced heat exchange cavity surrounding the combustion chamber, ensuring uniform flow of the heat exchange medium and efficient heat transfer, while the overall plate structure significantly reduces weight.

[0010] Preferably, the outer top plate and the two outer arc plates are integrally formed, and the connection has a second arc segment; by adopting this solution, welding seams are reduced, manufacturing efficiency and structural integrity are improved, a smooth transition is achieved, stress concentration at the connection is effectively avoided, fatigue strength and long-term reliability are significantly improved, thereby ensuring structural safety and sealing stability.

[0011] Preferably, the multiple second straight tie rods are divided into multiple X-axis tie rods, multiple Y-axis tie rods, and multiple Z-axis tie rods; Multiple X-axis tie rods are horizontally connected between the outer and inner side plates, which are away from the cylinder; multiple Y-axis tie rods are horizontally connected between the arc segment and the corresponding inner arc plate; multiple Z-axis tie rods are vertically connected between the outer top plate and the inner top plate. This solution forms a three-dimensional reinforced structure, which precisely maintains the geometric stability of each region of the heat exchange cavity, and achieves uniform distribution and efficient bearing of internal pressure loads, thereby achieving extremely high reliability under the lightweight structure of plate welding.

[0012] Preferably, it includes: A gas intake pipe is installed parallel to the cylinder body. One end extends into the heat exchange chamber and then protrudes to the outside through the top side of the outer casing away from the cylinder body. The other end protrudes to the outside through the steam drum seat. This solution achieves efficient recovery of waste heat from the system. Its built-in flow channel makes full use of the high-temperature area of ​​the device itself as a heat source. The structure is compact and consumes no additional energy, significantly improving the overall thermal efficiency of the entire system and enhancing the economy and energy utilization of operation.

[0013] Preferably, it includes: A support plate is provided between the outer wall of the gas intake pipe and the inner wall of the cylinder. This design provides intermediate support for the slender gas intake pipe, effectively preventing vibration or deformation and ensuring long-term operational reliability.

[0014] Through the above technical solution, this utility model achieves the following beneficial effects: 1. This application forms a heat exchange cavity by combining the outer shell with the combustion chamber and multiple smoke pipes arranged in parallel inside the cylinder, thereby significantly increasing the heat exchange area and improving thermal efficiency. 2. This application achieves lightweighting by using a plate shell structure in conjunction with the first and second straight tie rods, while ensuring pressure resistance and sealing performance. This reduces operating load, improves traction efficiency, enhances energy economy, reduces material consumption, simplifies manufacturing processes, and significantly lowers production costs. Attached Figure Description

[0015] To more clearly illustrate the specific embodiments of this utility model or the technical solutions in the prior art, the drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this utility model. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.

[0016] Figure 1 This is a front sectional view of the train steam generator according to a specific embodiment of the present utility model; Figure 2 for Figure 1 The diagram shows a top-view cross-sectional view of the train's steam generator. Figure 3 for Figure 1 Side view at point A; Figure 4 for Figure 1 Side view section at point BB; Figure 5 for Figure 1 A bottom view at point C; Explanation of reference numerals in the attached figures: 1. Combustion chamber; 2. Outer casing; 3. Furnace inlet; 4. Cylinder; 5. End plate; 6. Smoke pipe; 7. First straight tie rod; 8. Second straight tie rod; 9. Steam drum seat; 10. Water inlet; 1A. Gas intake pipe; 1B. Support plate; 101. Slag discharge port; 11. Inner top plate; 12. Inner side plate; 13. Inner arc plate; 14. First arc segment; 201. Heat exchange chamber; 21. Outer top plate; 22. Outer side plate; 23. Outer arc plate; 231. Vertical segment; 232. Arc segment; 24. U-shaped bottom plate; 25. Second arc segment; 81. X-axis tie rod; 82. Y-axis tie rod; 83. Z-axis tie rod. Detailed Implementation

[0017] The embodiments of the present invention will now be described in detail with reference to the accompanying drawings. These embodiments are merely illustrative of the present invention and should not be construed as limiting the scope of protection of the present invention.

[0018] The terms “first” and “second” are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined as “first” or “second” may explicitly or implicitly include one or more of the stated features.

[0019] In this application, unless otherwise expressly specified and limited, the terms "installation" and "connection" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model according to the specific circumstances.

[0020] To better understand the above technical solutions, the following will provide a detailed description of the technical solutions in conjunction with the accompanying drawings and specific embodiments.

[0021] Example: like Figure 1 As shown in the figure, this application discloses a train steam generator, which is suitable for small steam-powered trains with high requirements for lightweight and structural reliability. Its specific structure includes: combustion chamber 1, outer shell 2, furnace opening 3, cylinder 4, end plate 5, multiple smoke pipes 6, first straight tie rod 7, multiple second straight tie rods 8, steam drum seat 9 and water inlet 10.

[0022] Combustion chamber 1 is a combustion space for fuels such as coal and wood to generate heat energy. It is equipped with a slag discharge port 101 at the bottom to connect with the ash collection box below, so that the ash produced after combustion can be discharged by gravity, which is convenient for cleaning and maintenance.

[0023] The outer casing 2 is installed outside the combustion chamber 1, and the inner wall of the casing 2 forms a closed heat exchange cavity 201 between the outer wall of the combustion chamber 1 and the inner wall of the combustion chamber 1. The heat exchange cavity 201 covers the top and circumferential side walls of the combustion chamber 1, thereby making full contact with the outer wall of the combustion chamber 1, greatly increasing the heat exchange area and improving the heat exchange efficiency. At the same time, it also cools and protects the wall of the combustion chamber 1, ensuring that it is not damaged due to long-term heating.

[0024] The furnace opening 3 is located on one side of the outer casing 2 and passes through the heat exchange cavity 201 to communicate with the interior of the combustion chamber 1. It is an opening for adding fuel (such as coal or wood) and observing the fire.

[0025] The cylinder 4 is located on the other side of the outer casing 2 and is connected to the heat exchange chamber 201 to form a secondary heat exchange zone, which is the main space for water storage and steam generation.

[0026] The end plate 5 is sealed and fixed inside the end of the cylinder 4 away from the outer casing 2 to form a sealed pressure vessel and to provide a fixing point for the first tie rod 7.

[0027] Multiple flue pipes 6 are arranged in parallel at intervals inside the cylinder 4. One end of the flue pipe 6 passes through the end plate 5 and communicates with the outside, while the other end passes through the heat exchange cavity 201 and communicates with the inside of the combustion chamber 1. It serves as a channel for high-temperature flue gas to flow from the combustion chamber 1 to the smoke chamber. The pipe wall forms a huge secondary heat exchange surface to efficiently transfer the residual heat in the flue gas to the water inside the cylinder 4.

[0028] Multiple first straight tie rods 7 are arranged parallel to the flue pipe 6, with one end connected to the end plate 5 and the other end connected to the inner wall of the outer casing 2 away from the cylinder 4. They are used to bear the axial tensile force generated by the internal pressure acting on the end plate 5 and the end of the outer casing 2, and to prevent the connection between the cylinder 4 and the outer casing 2 from being pried open, thus ensuring the axial structural stability of the equipment.

[0029] Multiple second straight tie rods 8 are spaced between the inner wall of the outer casing 2 and the outer wall of the combustion chamber 1 to withstand the internal pressure of the heat exchange cavity 201, prevent the combustion chamber 1 from collapsing inward and the outer casing 2 from bulging outward, and ensure the structural integrity of the primary heat exchange zone.

[0030] The steam drum seat 9 is located at the top of the cylinder 4 and communicates with the interior of the cylinder 4. It is an interface for connecting to the external steam drum and is used to draw the steam-water mixture generated inside the cylinder 4 to the steam drum for steam-water separation so as to output dry saturated steam.

[0031] The water inlet 10 is located on the outer wall of the outer casing 2 away from the cylinder 4 and is connected to the heat exchange chamber 201. It is used to allow the water to first enter the heat exchange chamber 201 for preheating, and then naturally circulate to the cylinder 4 for secondary heating, thereby improving the heating efficiency.

[0032] The workflow of the above technical solution is as follows: First, water is injected into the equipment through the water inlet 10. The water first enters the heat exchange chamber 201, and then fills the entire chamber and the cylinder 4 connected to it until the predetermined working water level is reached.

[0033] Secondly, fixed fuels such as coal are added into the combustion chamber 1 through the furnace opening 3. The fuel burns continuously in the combustion chamber 1 to produce high-temperature flue gas and flames, which then exchange heat fully with the water in the heat exchange cavity 201 through the wall of the combustion chamber 1. As a result, the water temperature in the heat exchange cavity 201 rises rapidly, thus completing one heat exchange.

[0034] Secondly, after completing the first heat exchange, the high-temperature flue gas in the combustion chamber 1 enters and passes through multiple flue pipes 6 arranged inside the cylinder 4. During the flow of the high-temperature flue gas in the flue pipes 6, its heat is continuously transferred through the pipe wall to the water body surrounding the flue pipes 6 inside the cylinder 4, thereby completing the second heat exchange and realizing the recovery and utilization of the waste heat of the flue gas. The low-temperature flue gas after completing the heat exchange is discharged from one end of the flue pipe 6 through the end plate 5 to the external smoke chamber for treatment.

[0035] Finally, the water inside the cylinder 4 absorbs the heat transferred from the flue pipe 6, partially boils and vaporizes, and the resulting steam-water mixture continues to rise and is then drawn out through the steam drum seat 9 into the externally connected steam drum for water and steam separation. The dry saturated steam is transported to the steam-using equipment, while the separated water returns to the heat exchange chamber 201. As the water in the cylinder 4 continues to decrease, the water in the heat exchange chamber 201 will replenish it, thus forming a natural cycle.

[0036] During the entire operation, there is a large pressure inside the equipment. The first straight tie rod 7 and the second straight tie rod 8 continuously bear the tensile stress generated by the internal pressure, ensuring the positional stability between the combustion chamber 1, the outer shell 2, the end plate 5 and the cylinder 4, and preventing structural deformation. The ash produced by combustion accumulates at the bottom of the combustion chamber 1. When it accumulates to a certain extent, the grate at the top of the ash collection box is removed, and the ash can fall into the ash collection box through the ash discharge port 101, thus completing the cleaning.

[0037] This invention forms a heat exchange cavity 201 by combining the outer shell 2 with the combustion chamber 1, and combines it with multiple parallel smoke pipes 6 inside the cylinder 4 to create a highly efficient dual heat exchange path, thereby significantly increasing the heat exchange area and improving thermal efficiency. Furthermore, through the cooperation of the plate shell structure with the first straight tie rod 7 and the second straight tie rod 8, lightweighting is effectively achieved while ensuring pressure resistance and sealing performance. This reduces operating load, improves traction efficiency, enhances energy economy, reduces material consumption, simplifies manufacturing processes, and significantly reduces production costs.

[0038] In some embodiments, such as Figure 1 and Figure 4 As shown, combustion chamber 1 includes: an inner top plate 11, two inner side plates 12, and two inner arc plates 13, the specific arrangement of which is as follows: The inner top plate 11 is arranged horizontally to enclose the top; Two inner side plates 12 are respectively perpendicularly disposed on both sides of the bottom surface of the inner top plate 11 along the length direction; Two inner arc plates 13 are symmetrically arranged on both sides of the bottom surface of the inner top plate 11 along the width direction, and the spacing between them gradually increases from bottom to top to form an inverted V-shaped structure.

[0039] The above design creates a funnel shape that is wider at the top and narrower at the bottom. This allows for faster and more efficient mixing of fuel and air through the narrow throat at the bottom, while the expanded space at the top provides a smooth diffusion channel for the high-temperature flue gas, thereby improving combustion efficiency.

[0040] Based on the above embodiments, such as Figure 4 As shown, the inner top plate 11 and the two inner arc plates 13 are integrally formed, and the connection has a first arc segment 14.

[0041] The above design reduces the number of welds, improves production efficiency, reduces the risk of welding deformation, eliminates stress concentration, enhances the structural reliability of the connection area under high temperature and high pressure conditions, and helps maintain smooth airflow inside the combustion chamber 1.

[0042] Based on the above embodiments, such as Figure 1 , Figures 3 to 5 As shown, the outer casing 2 includes: an outer top plate 21, two outer side plates 22, two outer arc plates 23, and a U-shaped bottom plate 24, the specific configuration of which is as follows: The outer top plate 21 is arranged horizontally and is parallel to the inner top plate 11 of the combustion chamber 1, together forming the top space of the heat exchange cavity 201. Two outer side plates 22 are respectively perpendicularly arranged on both sides of the bottom surface of the outer top plate 21 along the length direction, parallel to the inner side plate 12 of the combustion chamber 1, forming equally spaced vertical straight channels on both sides of the heat exchange cavity 201. Two outer arc plates 23 are symmetrically arranged on both sides of the bottom surface of the outer top plate 21 along the width direction. The outer arc plate 23 includes a vertical section 231 and an arc section 232 at the bottom of the vertical section 231. The distance between the arc section 232 and the corresponding inner arc plate 13 remains equal from top to bottom. The U-shaped bottom plate 24 is arranged horizontally and fitted around the bottom outer periphery of the combustion chamber 1. It is connected to the bottom of the two outer side plates 22 and the two outer arc plates 23 respectively, and together with the bottom outer wall of the combustion chamber 1, it forms the bottom boundary of the heat exchange cavity 201.

[0043] Through the above design, a full-circumferential, equally spaced heat exchange cavity 201 is formed around the combustion chamber 1, which ensures uniform flow of the heat exchange medium and efficient heat transfer, and the overall plate structure significantly reduces the weight.

[0044] In this embodiment, as Figure 4 As shown, the outer top plate 21 and the two outer arc plates 23 are integrally formed, and the connection has a second arc segment 25.

[0045] The above design reduces welding seams, improves manufacturing efficiency and structural integrity, achieves a smooth transition, effectively avoids stress concentration at the connection points, significantly improves fatigue strength and long-term reliability, thereby ensuring structural safety and sealing stability.

[0046] In this embodiment, as Figure 1 and Figure 4 As shown, the multiple second straight tie rods 8 are divided into multiple X-axis tie rods 81, multiple Y-axis tie rods 82 and multiple Z-axis tie rods 83; Multiple X-axis tie rods 81 are horizontally connected between the outer side plate 22 and the inner side plate 12, which are far away from the cylinder 4; multiple Y-axis tie rods 82 are horizontally connected between the arc segment 232 and the corresponding inner arc plate 13; multiple Z-axis tie rods 83 are vertically connected between the outer top plate 21 and the inner top plate 11.

[0047] Through the above design, a three-dimensional reinforced structure is formed, which precisely maintains the geometric stability of each region of the heat exchange cavity 201, and achieves uniform distribution and efficient bearing of internal pressure loads, thereby achieving extremely high reliability under the lightweight structure of plate welding.

[0048] In some embodiments, such as Figure 1 As shown, it includes: The gas intake pipe 1A is installed parallel to the cylinder 4. One end extends into the heat exchange chamber 201 and then protrudes out of the outside through the top side of the outer casing 2 away from the cylinder 4. The other end protrudes out of the outside through the steam drum seat 9.

[0049] The low-temperature steam cooled after working in the external system first enters from the end of the intake pipe 1A located at the top of the outer casing 2, then flows through the pipe section located in the heat exchange chamber 201, and is heated by the heat emitted from the combustion chamber 1. After that, the steam continues to flow through the pipe section inside the cylinder 4, and is further heated by the flue gas in the flue pipe 6. Finally, the steam that has been fully reheated to a high temperature is output from the end of the intake pipe 1A located in the steam drum seat 9, and is returned to the system for reuse. This efficiently recovers the waste heat of the steam and improves the overall energy utilization rate.

[0050] Through the above design, efficient recovery of waste heat from the system is achieved. Its built-in flow channel makes full use of the high-temperature area of ​​the device itself as a heat source. The structure is compact and has no additional energy consumption, which significantly improves the overall thermal efficiency of the entire system and enhances the economy and energy utilization of operation.

[0051] In this embodiment, as Figure 1 As shown, it also includes: Support plate 1B is located between the outer wall of air intake pipe 1A and the inner wall of cylinder 4.

[0052] The above design provides intermediate support for the slender air intake pipe 1A, effectively preventing it from vibrating or deforming and ensuring long-term operational reliability.

[0053] Numerous specific details are set forth in this specification. However, it will be understood that embodiments of this invention may be practiced without these specific details. In some instances, well-known methods, structures, and techniques have not been shown in detail so as not to obscure the understanding of this specification.

[0054] In the description of this specification, the references to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of the present invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.

[0055] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this utility model, and not to limit it. Although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of this utility model, and they should all be covered within the scope of the claims and specification of this utility model.

Claims

1. A train steam generator, characterized in that, include: The combustion chamber has a slag discharge port at the bottom; An outer casing is provided outside the combustion chamber, and the inner wall of the casing forms a closed heat exchange cavity with the outer wall of the combustion chamber. The heat exchange cavity covers the top and circumferential side walls of the combustion chamber. The furnace opening is located on one side of the outer casing and passes through the heat exchange cavity to communicate with the interior of the combustion chamber; The cylindrical body is located on the other side of the outer casing and is connected to the heat exchange cavity; An end plate is sealed and fixed inside the end of the cylinder away from the outer casing; Multiple flue pipes are arranged in parallel at intervals inside the cylinder, with one end of each flue pipe passing through the end plate and communicating with the outside, and the other end passing through the heat exchange cavity and communicating with the inside of the combustion chamber. Multiple first straight tie rods are arranged parallel to the flue, with one end connected to the end plate and the other end connected to the inner wall of the outer casing away from the cylinder. Multiple second straight tie rods are connected at intervals between the inner wall of the outer casing and the outer wall of the combustion chamber; A steam drum holder is located at the top of the cylinder and communicates with the interior of the cylinder. The water inlet is located on the outer wall of the outer casing away from the cylinder and is connected to the heat exchange chamber.

2. The train steam generator according to claim 1, characterized in that, The combustion chamber includes: The inner top panel is arranged horizontally. Two inner side plates are respectively perpendicularly disposed on both sides of the bottom surface of the inner top plate along the length direction; Two inner arc plates are symmetrically arranged on both sides of the bottom surface of the inner top plate along the width direction, and the distance between them gradually increases from bottom to top to form an inverted V-shaped structure.

3. The train steam generator according to claim 2, characterized in that, The inner top plate and the two inner arc plates are integrally formed, and the connection has a first arc segment.

4. The train steam generator according to claim 2, characterized in that, The outer casing includes: The outer top panel is arranged horizontally. Two outer side plates are respectively perpendicularly disposed on both sides of the bottom surface of the outer top plate along its length; Two outer arc plates are symmetrically arranged on both sides of the bottom surface of the outer top plate along the width direction. Each outer arc plate includes a vertical section and an arc-shaped section at the bottom of the vertical section. The distance between the arc-shaped section and the corresponding inner arc plate remains equal from top to bottom. A U-shaped base plate is horizontally arranged and fitted around the bottom outer periphery of the combustion chamber, and is connected to the bottom of the two outer side plates and the two outer arc plates respectively.

5. The train steam generator according to claim 4, characterized in that, The outer top plate and the two outer arc plates are integrally formed, and the connection has a second arc segment.

6. The train steam generator according to claim 4, characterized in that, The multiple second straight tie rods are divided into multiple X-axis tie rods, multiple Y-axis tie rods, and multiple Z-axis tie rods; Multiple X-axis tie rods are horizontally connected between the outer and inner side plates, which are away from the cylinder; multiple Y-axis tie rods are horizontally connected between the arc segment and the corresponding inner arc plate; and multiple Z-axis tie rods are vertically connected between the outer top plate and the inner top plate.

7. The train steam generator according to claim 1, characterized in that, include: The gas intake pipe is installed parallel to the cylinder body. One end extends into the heat exchange chamber and then protrudes out of the outside through the top side of the outer casing away from the cylinder body. The other end extends out of the outside through the steam drum seat.

8. The train steam generator according to claim 7, characterized in that, include: A support plate is disposed between the outer wall of the gas intake pipe and the inner wall of the cylinder.