pulverized coal boiler
By introducing a pulverized coal preheating burner and a combustible heat particle storage device into the pulverized coal boiler, the problems of rapid ignition and restart of the pulverized coal boiler have been solved, enabling rapid load adjustment and flexible response, and efficient consumption of renewable energy power generation.
Patent Information
- Application Number
- CN202521032069.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-23
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-05-23
AI Technical Summary
Existing pulverized coal boilers cannot achieve rapid shutdown and restart, resulting in poor economic performance during peak renewable energy generation periods and insufficient load regulation rate, failing to meet the grid's rapid response requirements.
By employing a pulverized coal preheating burner and a combustible thermal particle storage device, the reactivity of the preheated fuel is improved, and high-temperature fuel is stored when the boiler load is reduced and quickly replenished when the load is increased, thus achieving rapid load adjustment and rapid start-up and shutdown of the boiler.
It enables rapid start-up and shutdown and load regulation of pulverized coal boilers, with a load regulation range of 0-100% and a regulation rate of more than 5%/min, thus solving the flexibility problem of pulverized coal boilers in renewable energy power generation.
Smart Images

Figure CN225016505U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of combustion equipment technology, and in particular to a pulverized coal boiler. Background Technology
[0002] For a long time, coal has been my country's primary energy source. However, the intermittent and fluctuating nature of renewable energy poses a serious challenge to the stable and safe operation of the power grid. my country's power generation capacity is dominated by coal-fired power, with flexible power sources accounting for less than 6%. The insufficient peak-shaving capacity of the existing power grid has become a major technical bottleneck for the grid-connected power generation of new energy sources. Coal-fired power units will bear the responsibility of supporting a large proportion of renewable energy power generation. The mainstay of my country's coal-fired power units is pulverized coal power plant boilers. In 2021, the installed capacity of pulverized coal power plant boilers reached 935 million kilowatts, accounting for 85% of the total installed capacity of coal-fired power. Therefore, the power grid's ability to absorb renewable energy power generation to the maximum extent depends on the deep and flexible peak-shaving of pulverized coal power plant boilers. The peak-shaving rate of pulverized coal power plant boilers is a crucial indicator of the power grid's ability to quickly respond to changes in renewable energy. As the installed capacity and power generation of renewable energy increase, the power grid's requirements for the peak-shaving rate of pulverized coal power plant boilers will become increasingly stringent.
[0003] Currently, many regions have seen coal-fired power units connected to the grid at zero electricity price during periods of high renewable energy generation. Because pulverized coal boilers cannot achieve shut-off firing and rapid restart, they must remain operational during these zero-price periods, resulting in poor economic efficiency. Furthermore, with the increase in installed renewable energy capacity, the grid's load response rate to pulverized coal power units is also increasing. Currently, the load regulation rate of coal-fired power units is generally below 2% / min, which cannot meet the grid's requirements for load regulation.
[0004] Through in-depth research and technological breakthroughs, we can fully tap the deep peak-shaving potential and rapid load-changing capabilities of pulverized coal power plant boilers. This is of great strategic significance for alleviating my country's current peak-shaving pressure, absorbing a high proportion of new energy power, and promoting the low-carbon transformation of my country's energy structure. Utility Model Content
[0005] This utility model is proposed to solve at least one of the above-mentioned technical problems.
[0006] On the one hand, a pulverized coal boiler is provided, comprising:
[0007] Furnace and tail flue; and
[0008] Fuel pretreatment unit,
[0009] in:
[0010] The pulverized coal boiler also includes a fuel pellet storage bin and a fuel pellet conveying device. The fuel pellet storage bin is used to store fuel pellets processed by the fuel pretreatment device, and the fuel pellet conveying device is used to convey the fuel pellets in the fuel pellet storage bin to the fuel pellet inlet located at the bottom of the furnace.
[0011] Optionally, the fuel pretreatment device is a fluidized bed type fuel pretreatment device and includes a riser for preheating combustion, a gas-solid separator communicating with the gas outlet of the riser, and a return feeder communicating with the solid outlet of the gas-solid separator. The return feeder is communicating with the riser, the gas outlet of the gas-solid separator is communicating with the furnace, and the riser is provided with a fuel supply port and a fluidizing air supply port. The return feeder is provided with a distribution valve, one side of which is communicating with the riser and the other side of which is communicating with the fuel pellet storage bin.
[0012] Optionally, the gas outlet of the gas-solid separator is connected to the furnace via a burner at the bottom of the furnace.
[0013] Optionally, the distribution valve is a pneumatic distribution valve.
[0014] Optionally, the gas outlet of the gas-solid separator is connected to the furnace via the lowest burner.
[0015] Optionally, the pulverized coal boiler includes a first coal mill, a gas-solid separation device communicating with the first coal mill, a pulverized coal silo disposed below the separation device, and a feeder. The gas-solid separation device is used to separate pulverized coal from exhaust gas from the first coal mill. The exhaust gas is introduced into the furnace through the furnace exhaust gas inlet to participate in combustion. The feeder is adapted to supply pulverized coal from the pulverized coal silo to the fuel supply port of the riser pipe. The pulverized coal boiler also includes another coal mill, which is adapted to supply pulverized coal to other burners in the furnace.
[0016] Optionally, in the height direction of the furnace, the fuel particle inlet, the burner at the bottom of the furnace, other burners, and the furnace exhaust gas inlet are arranged separately from bottom to top.
[0017] Optionally, the fuel pellet conveying device includes a fuel unloader disposed below the fuel pellet storage bin, and the fuel pellet storage bin is adapted to communicate with the fuel pellet inlet at the bottom of the furnace via a pneumatic conveying pipe through the fuel unloader.
[0018] Optionally, the lower part of the fuel pellet storage bin has a conical structure, and the fuel pellet conveying device includes a pellet feeder disposed at the bottom of the conical structure.
[0019] Optionally, the pellet feeder is a rotary feeder suitable for conveying fuel pellets.
[0020] Optionally, the pulverized coal boiler further includes a control device and a temperature monitoring device; the fuel particles are conveyed pneumatically; when air is used for conveying, the amount of air is 10-20% of the amount of air required for the complete combustion of the conveyed fuel particles; the control device adjusts the amount of air conveyed pneumatically based on the temperature monitored by the temperature monitoring device to ensure that the temperature of the fuel particles entering the furnace is between 800-1100℃.
[0021] Optionally, the outer side of the fuel pellet storage bin is made of steel, and the inner side is made of fire-resistant insulation material.
[0022] Optionally, the temperature of the fuel pellets entering the fuel pellet storage bin is 800-1000℃; and the insulation of the fuel pellet storage bin is set such that the temperature of the fuel pellets is not lower than 700℃ within 12 hours when the fuel pellets are stored in the fuel pellet storage bin.
[0023] Optionally, the fuel pellet storage bin is equipped with an inert gas protection device for filling the storage bin with inert gas.
[0024] Based on the above technical solution, one of the following technical effects can be achieved by utilizing the technical solution of this utility model.
[0025] 1) Pulverized coal boilers can achieve pressurized ignition and restart without combustion support;
[0026] 2) The boiler's start-up time is less than 1 hour;
[0027] 3) Boiler load adjustment range: 0-100%;
[0028] 4) The boiler load regulation rate is greater than 5% / min. Attached Figure Description
[0029] The following description and accompanying drawings will better aid in understanding these and other features and advantages of the various embodiments disclosed herein, wherein the same reference numerals in the drawings always denote the same parts, wherein:
[0030] Figure 1 This is a schematic diagram of the structure of a pulverized coal boiler according to an exemplary embodiment of the present invention. Detailed Implementation
[0031] The technical solution of this utility model will be further described in detail below through embodiments and in conjunction with the accompanying drawings. In this specification, the same or similar reference numerals indicate the same or similar components. The following description of the embodiments of this utility model with reference to the accompanying drawings is intended to explain the overall inventive concept of this utility model and should not be construed as a limitation thereof.
[0032] The purpose of this invention is to provide a pulverized coal boiler that can be quickly started and stopped for peak shaving, which can effectively meet the requirements for the consumption of renewable energy power generation.
[0033] The technical solution of this utility model is as follows:
[0034] According to one embodiment of the present invention, a pulverized coal boiler is provided, comprising: a furnace and a tail flue; and a fuel pretreatment device, wherein: the pulverized coal boiler further comprises a fuel pellet storage bin and a fuel pellet conveying device, the fuel pellet storage bin being used to store fuel pellets processed by the fuel pretreatment device, and the fuel pellet conveying device being used to convey the fuel pellets in the fuel pellet storage bin to a fuel pellet inlet located at the bottom of the furnace.
[0035] Furthermore, the fuel pretreatment device is a fluidized bed type fuel pretreatment device and includes a riser for preheating combustion, a gas-solid separator connected to the gas outlet of the riser, and a return feeder connected to the solid outlet of the gas-solid separator. The return feeder is connected to the riser, the gas outlet of the gas-solid separator is connected to the furnace, the riser is provided with a fuel supply port and a fluidizing air supply port, and the return feeder is provided with a distribution valve. One side of the distribution valve is connected to the riser, and the other side of the distribution valve is connected to the fuel particle storage bin.
[0036] Furthermore, the pulverized coal boiler includes a first coal mill, a gas-solid separation device communicating with the first coal mill, a pulverized coal silo disposed below the gas-solid separation device, and a feeder. The gas-solid separation device is used to separate pulverized coal from exhaust gas from the first coal mill, and the exhaust gas is introduced into the furnace through an exhaust gas pipeline to participate in combustion. The feeder is adapted to supply pulverized coal from the pulverized coal silo to the fuel supply port of the riser pipe. The pulverized coal boiler also includes another coal mill, which is adapted to supply pulverized coal to other burners in the furnace.
[0037] One embodiment of the pulverized coal boiler with rapid start-up and peak-shaving capability provided by this utility model is as follows: Figure 1 The gas-solid separation unit is connected to a coal mill in the boiler. The exhaust gas outlet at the top of the gas-solid separator is connected to the boiler furnace, and the bottom of the gas-solid separator is connected to the pulverized coal silo. A pulverized coal feeder is installed at the bottom of the silo and is connected to the pulverized coal preheating burner via a pneumatic conveying pipeline. The preheating burner outlet is connected to the furnace via the lowest burner. The preheating burner return feeder is equipped with a distribution valve, such as a pneumatic distribution valve. One side of the distribution valve is connected to the preheating burner riser pipe, and the other side is connected to the combustible thermal particle storage silo (i.e., fuel pellet storage silo). A high-temperature fuel unloader is installed at the bottom of the combustible thermal particle storage silo and is connected to the furnace via a pneumatic conveying pipeline.
[0038] The principle of this utility model is:
[0039] This invention proposes a pulverized coal boiler capable of rapid start-up and peak shaving. The pulverized coal is modified through a preheating burner, transforming it into a high-temperature gas / solid fuel, thereby enhancing fuel reactivity and solving the problems of easy flameout and poor burnout rate under low load, achieving efficient and stable combustion at low load. In addition, through a combustible heat particle storage bin, a portion of combustible heat particles are stored when the boiler reduces load. When the boiler needs to rapidly increase load, these combustible heat particles are added to the furnace at a certain coal feeding rate according to the load increase rate requirements, enabling rapid combustion and heat release, thus achieving rapid load increase. Furthermore, the preheating burner adopts a circulating fluidized bed form, which can realize the pulverized coal boiler's fire suppression and hot restart after fire suppression.
[0040] The existing single-layer burner of the pulverized coal power plant boiler is replaced by a pulverized coal preheating burner, and an intermediate small pulverized coal silo and a combustible heat particle storage device are also provided to realize rapid load adjustment and rapid start-up and shutdown of the pulverized coal power plant boiler.
[0041] First, a gas-solid separation device separates the pulverized coal and primary air from the coal mill. The separated pulverized coal is stored in a small pulverized coal silo, while the exhaust gas enters the furnace for combustion through a pipeline. The pulverized coal in the small pulverized coal silo is fed into a pneumatic conveying pipeline at a controlled feed rate by a feeder, and then pneumatically conveyed to the pulverized coal preheating burner. The pulverized coal is modified in the preheating burner, transforming it into a high-temperature gas / solid two-phase fuel with a temperature exceeding 800℃, significantly enhancing its reactivity. This high-temperature gas-solid two-phase fuel enters the burner in the furnace through the preheating burner outlet for combustion. The preheating burner's return feeder uses a pneumatic distribution valve structure. One side of the pneumatic distribution valve is connected to the preheating burner riser pipe, and the other side is connected to the combustible thermal particle storage bin. When the boiler is operating at a stable load, the side of the pneumatic distribution valve leading to the combustible thermal particle storage bin remains closed, only the side leading to the preheating burner riser pipe is open. When the boiler reduces load or shuts down, the pneumatic distribution valve connected to the combustible thermal particle storage bin is opened to store some of the high-temperature combustible thermal particles in the bin. When the boiler needs to shut down, all coal and air supply to the preheating burner is stopped, putting the preheating burner into a shut-down state.
[0042] The combustible thermal particle storage bin has a steel shell on the outside and refractory insulation material on the inside to ensure the temperature of the combustible thermal particles within the bin. Specifically, when the temperature of the combustible thermal particles is 800-1000℃, the temperature on the outside of the bin should not exceed 70℃. The lower part of the bin has a conical structure, with a high-temperature thermal particle feeding device installed at the bottom. This device is a high-temperature resistant rotary feeder that can precisely control the feed rate. The bin can maintain a thermal particle temperature of no less than 700℃ for storage times of up to 12 hours. An inert gas protection device is installed on the bin; the inert gas can be N2 or CO2.
[0043] When the boiler needs to be restarted or its load increased, the preheating burner is restarted or the coal feed rate is increased. Simultaneously, combustible thermal particles are added to the furnace at a coal feed rate required for a certain load increase rate, allowing for rapid combustion and heat release, thus achieving a rapid load increase. The combustible thermal particles are fed into the pulverized coal conveying pipeline through a high-temperature thermal particle feeder. The gas used to transport the high-temperature combustible thermal particles can be air or steam. When air is used, the amount of air is approximately 10-20% of the amount required for complete combustion of the transported combustible thermal particles. The amount of air or steam is adjusted according to the temperature of the combustible thermal particles to ensure that the temperature of the particles entering the furnace is between 800-1100℃.
[0044] In one embodiment of this utility model, a pulverized coal preheating burner is used to replace the first-layer burner of the existing pulverized coal power plant boiler, and a pulverized coal silo and a combustible heat particle storage device are provided, which can realize rapid load adjustment and rapid start-up and shutdown of the pulverized coal power plant boiler.
[0045] In this invention, pulverized coal is modified into a gaseous fuel through a preheating burner, which can improve the fuel's reactivity. The preheating burner can be a circulating fluidized bed, enabling the pulverized coal boiler to be shut down and restarted hot after shutdown. The preheating burner can also be other types of preheating burners, as long as they can achieve partial gasification of pulverized coal particles or modification of pulverized coal. The use of a pulverized coal silo coupled with a fuel particle storage silo can further enable rapid adjustment of the boiler load. A distribution valve is used to collect combustible thermal particles from the preheating burner return feeder and enter the storage silo. A high-temperature unloading valve is added below the storage silo to control the feeding rate of combustible thermal particles into the furnace.
[0046] Based on the above technical solution, one of the following technical effects can be achieved by utilizing the technical solution of this utility model:
[0047] 1) Pulverized coal boilers can achieve pressurized ignition and restart without combustion support;
[0048] 2) The boiler's start-up time is less than 1 hour;
[0049] 3) Boiler load adjustment range: 0-100%;
[0050] 4) The boiler load regulation rate is greater than 5% / min.
[0051] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that variations may be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A pulverized coal boiler, comprising: Furnace and tail flue; and Fuel pretreatment unit, Its features are: The pulverized coal boiler also includes a fuel pellet storage bin and a fuel pellet conveying device. The fuel pellet storage bin is used to store fuel pellets processed by the fuel pretreatment device, and the fuel pellet conveying device is used to convey the fuel pellets in the fuel pellet storage bin to the fuel pellet inlet located at the bottom of the furnace.
2. The pulverized coal boiler according to claim 1, characterized in that: The fuel pretreatment device is a fluidized bed type fuel pretreatment device and includes a riser for preheating combustion, a gas-solid separator connected to the gas outlet of the riser, and a return feeder connected to the solid outlet of the gas-solid separator. The return feeder is connected to the riser, and the gas outlet of the gas-solid separator is connected to the furnace. The riser is provided with a fuel supply port and a fluidizing air supply port. The return feeder is equipped with a distribution valve. One side of the distribution valve is connected to the riser pipe, and the other side of the distribution valve is connected to the fuel pellet storage bin.
3. The pulverized coal boiler according to claim 2, characterized in that: The distribution valve is a pneumatic distribution valve.
4. The pulverized coal boiler according to claim 2, characterized in that: The gas outlet of the gas-solid separator is connected to the furnace via the burner at the bottom of the furnace.
5. The pulverized coal boiler according to claim 4, characterized in that: The pulverized coal boiler includes a first coal mill, a gas-solid separation device communicating with the first coal mill, a pulverized coal bin located below the gas-solid separation device, and a feeder. The gas-solid separation device is used to separate pulverized coal from exhaust gas from the first coal mill. The exhaust gas is introduced into the furnace through the furnace exhaust gas inlet to participate in combustion. The feeder is adapted to supply pulverized coal from the pulverized coal silo to the fuel supply port of the riser; The pulverized coal boiler also includes an additional coal mill adapted to supply pulverized coal to other burners in the furnace.
6. The pulverized coal boiler according to claim 5, characterized in that: In the vertical direction of the furnace, the fuel particle inlet, the burner at the bottom of the furnace, other burners, and the furnace exhaust gas inlet are arranged separately from bottom to top.
7. The pulverized coal boiler according to claim 1, characterized in that: The fuel pellet conveying device includes a fuel unloader located below the fuel pellet storage bin, and the fuel pellet storage bin is adapted to communicate with the fuel pellet inlet at the bottom of the furnace via a pneumatic conveying pipe through the fuel unloader.
8. The pulverized coal boiler according to claim 1, characterized in that: The fuel pellet storage bin has a conical structure at the bottom, and the fuel pellet conveying device includes a pellet feeder located at the bottom of the conical structure.
9. The pulverized coal boiler according to claim 8, characterized in that: The pellet feeder is a rotary feeder suitable for conveying fuel pellets.
10. The pulverized coal boiler according to claim 1, characterized in that: The pulverized coal boiler also includes a control device and a temperature monitoring device; The fuel pellets are conveyed pneumatically. When air delivery is used, the amount of air is 10-20% of the amount of air required for the complete combustion of the delivered fuel particles. The control device adjusts the amount of air delivered by pneumatic conveying based on the temperature monitored by the temperature monitoring device to ensure that the temperature of the fuel particles entering the furnace is between 800-1100℃.
11. The pulverized coal boiler according to any one of claims 1-10, characterized in that: The outer shell of the fuel pellet storage bin is made of steel, while the inner shell is made of fire-resistant and heat-insulating material.
12. The pulverized coal boiler according to claim 11, characterized in that: The temperature of the fuel pellets entering the fuel pellet storage bin is 800-1000℃; and The insulation of the fuel pellet storage bin is set so that the temperature of the fuel pellets is not lower than 700°C within 12 hours when the fuel pellets are stored in the fuel pellet storage bin.
13. The pulverized coal boiler according to claim 11, characterized in that: The fuel pellet storage bin is equipped with an inert gas protection device for filling the bin with inert gas.