A sewage backflow prevention system for a slagging machine of a waste incineration power plant
By installing a balance pipe and a sewage discharge system outside the slag remover tank, the problem of sewage backflow caused by water level fluctuations during ram operation was solved, ensuring the stable operation of the slag remover water replenishment device and the cleanliness of the water quality.
Patent Information
- Application Number
- CN202522791608.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-29
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-29
AI Technical Summary
In the existing water replenishment device of the ash removal machine in the waste incineration power plant, the reciprocating operation of the slide causes fluctuations in the water level in the front and rear chambers, resulting in sewage backflow and water pollution, which affects the normal operation of the system.
A balance pipe is installed outside the slag removal machine tank to keep the water level in the front and rear chambers balanced, and a sewage discharge pipe and control valve or sewage pump are provided to prevent sewage backflow and sediment accumulation.
This effectively reduces or prevents backflow of sewage from the rear chamber into the water replenishment tank, keeps the water in the water replenishment tank clean, ensures the water replenishment device operates normally for a long time, and reduces the frequency of maintenance.
Smart Images

Figure CN225016540U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to a slag removal machine for waste incineration power plants, and more particularly to a system for preventing wastewater backflow in a slag removal machine for waste incineration power plants. Background Technology
[0002] During the power generation process in a waste incinerator, the ash removal machine continuously transports ash to the ash pool, causing a constant loss of moisture inside the machine. Therefore, a water replenishment device is needed to ensure that the ash removal machine maintains a normal water level.
[0003] Existing water replenishment devices include a water replenishment tank and a mechanical float valve for water replenishment, which ensures that the water level in the water replenishment tank remains normal. A connecting pipe is installed between the water replenishment tank and the slag remover housing. When the water level in the slag remover drops, water from the water replenishment tank flows into the slag remover through the connecting pipe, thereby maintaining the stability of the slag remover's water level.
[0004] The ash removal machine uses the reciprocating motion of a ram to push ash and slag into the ash pit. During the ram's reciprocating motion, the water level in the tank fluctuates significantly. As the ram pushes the ash forward, the water level in the front chamber gradually rises while the water level in the rear chamber gradually falls; conversely, as the ram retracts, the water level in the front chamber gradually falls while the water level in the rear chamber gradually rises. During the ram's retraction, the water level in the rear chamber gradually rises and exceeds the normal level, causing a small amount of wastewater in the rear chamber to flow back into the makeup water tank through the connecting pipe. This cycle repeats continuously, causing the water quality in the makeup water tank to gradually deteriorate. After a period of time, a large amount of sludge will accumulate at the bottom of the makeup water tank, causing blockage of the connecting pipe; moreover, slag in the water easily forms scale on the surface of the water level monitoring element, ultimately preventing the makeup water device from replenishing water normally, thus affecting the normal operation of the entire waste incinerator system.
[0005] Therefore, maintenance personnel need to frequently inspect the site and promptly remove scum and sludge deposited in the water replenishment tank. Failure to conduct timely inspections can easily lead to blockages in the connecting pipes and scale buildup on the float. Backflow of wastewater from the slag remover causing water pollution in the replenishment tank is a safety hazard in the daily operation of waste-to-energy plants. Utility Model Content
[0006] To address the existing technical problems, this utility model proposes a system for preventing wastewater backflow in a waste incineration power plant's ash removal machine. By installing a balancing pipe outside the ash removal machine's tank, with its two ends connected to the front and rear chambers of the tank respectively, the balancing pipe maintains a balance in the water levels of the front and rear chambers, reducing fluctuations in water levels during ram operation and minimizing or preventing backflow of wastewater from the rear chamber into the makeup water tank, thus effectively solving the existing technical problems.
[0007] The solution adopted by this utility model to solve the technical problem is a waste incineration power plant ash removal machine anti-sewage backflow system, characterized in that a balance pipe is installed outside the ash removal machine tank, and the two ports of the balance pipe are respectively connected to the front cavity and the rear cavity of the ash removal machine tank and are located below the normal water level of the ash removal machine. During the reciprocating operation of the slide, the balance pipe keeps the water level in the front cavity and the rear cavity of the tank balanced.
[0008] Preferably, a sewage discharge pipe and a pipeline control valve are also provided, with the inlet of the sewage discharge pipe connected to the bottom of the rear cavity and the outlet of the sewage discharge pipe connected to the slag pool.
[0009] Preferably, a sewage pump is also installed on the sewage pipe.
[0010] Preferably, a sewage discharge pipe and a pipe control valve are also provided, and a sewage pump is also provided on the sewage discharge pipe. The inlet of the sewage discharge pipe is connected to the bottom of the rear cavity, and the outlet of the sewage discharge pipe is connected to the front cavity.
[0011] The beneficial effects of this utility model are as follows: This utility model proposes a system to prevent sewage backflow in a waste incineration power plant ash removal machine. By setting a balance pipe outside the ash removal machine tank, the balance pipe keeps the water level in the front and rear chambers of the tank balanced, reduces water level fluctuations in the front and rear chambers during the operation of the slide block, and reduces or avoids sewage from the rear chamber flowing back into the water replenishment tank, effectively solving the problems of the prior art. Attached Figure Description
[0012] Figure 1-3 This is a schematic diagram of one embodiment of a slag removal machine for a waste incinerator. Figure 1 This is a schematic diagram of the overall structure. Figure 2 This is an internal diagram illustrating the slide's retraction process. Figure 3 This is an internal diagram illustrating the forward movement of the ram.
[0013] Figures 4-6 This is a schematic diagram of the structure of one embodiment of the present invention. Figure 4 This is a schematic diagram of the overall structure. Figure 5 This is an internal diagram illustrating the slide's retraction process. Figure 6 This is an internal diagram illustrating the forward movement of the ram.
[0014] Figure 7 This is a structural schematic diagram of another embodiment of the present invention.
[0015] In the picture:
[0016] 1. Slag remover, 1.1 trough, 1.1A front chamber, 1.1B rear chamber, 1.2 slag discharge pipe, 1.3 hydraulic cylinder piston, 1.4 sliding ram, 1.4A sliding ram slag pusher head, 1.5 slag discharge pipe, 1.6 baffle plate;
[0017] 2 water;
[0018] 3. Mechanical float water replenishment device;
[0019] 4. Balance tube, 4A front cavity inlet, 4B rear cavity inlet;
[0020] 5. Sewage pipes. Detailed Implementation
[0021] Figure 1-3 This is a schematic diagram of an embodiment of a slag remover for a waste incinerator. The diagram shows that in the prior art, during the operation of the slag remover 1, the slide 1.4 reciprocates, causing significant fluctuations in the water level in the tank 1.1. The diagram also shows that in the tank 1.1, the baffle plate 1.6 and the slide 1.4 divide the tank 1.1 into a front chamber 1.1A and a rear chamber 1.1B. The front chamber 1.1A is connected to the slag discharge pipe 1.5, and the slide 1.4 enters the tank 1.1 from the rear chamber 1.1BF.
[0022] The water replenishment tank of the water replenishment device is connected to the rear chamber 1.1B via a connecting pipe. During the operation of the slag remover, due to continuous water loss, the water replenishment device continuously replenishes the tank via the connecting pipe to maintain a stable water level.
[0023] Figure 3 The display shows that during the process of the slide 1.4 pushing the slag forward, the water level in the front chamber 1.1A of the tank 1.1 gradually rises while the water level in the rear chamber 1.1B gradually falls; conversely, Figure 2 The data shows that during the retraction of the slide 1.4, the water level in the front chamber 1.1A of the tank 1.1 gradually decreases while the water level in the rear chamber 1.1B gradually increases. During this retraction, as the water level in the rear chamber 1.1B gradually rises and exceeds the normal level, a small amount of wastewater in the rear chamber 1.1B flows back into the water replenishment tank of the water replenishment device through the connecting pipe. This process repeats continuously, causing the water quality in the water replenishment tank to gradually deteriorate. After a period of time, a large amount of sludge will accumulate at the bottom of the water replenishment tank, causing blockage of the connecting pipe. Furthermore, sediment in the water easily forms scale on the surface of the water level monitoring elements (such as floats or water level monitoring elements), ultimately preventing the water replenishment device from replenishing water normally, thus affecting the normal operation of the entire waste incinerator system.
[0024] Figures 4-6 This is a schematic diagram of an embodiment of the present invention. Unlike the prior art, as shown in the figure, in this example, a balance pipe 4 is also provided outside the slag removal machine tank 1.1. The two ports 4A and 4B of the balance pipe 4 are respectively connected to the front cavity 1.1A and the rear cavity 1.1B of the slag removal machine tank and are located below the normal water level of the slag removal machine. Figure 6The display shows that, due to the installation of the balance pipe 4, during the process of the slide ram 1.4 pushing slag forward, when the water level in the front chamber 1.1A of the tank 1.1 gradually rises, the water in that chamber will flow into the rear chamber 1.1B through the balance pipe 4, thereby balancing the water levels in the two chambers. Conversely, Figure 5 The display shows that during the retraction of the slide 1.4, the water level in the rear chamber 1.1B of the tank 1.1 gradually rises, and the water in that chamber flows into the front chamber 1.1A through the balance pipe 4, thus balancing the water levels in the two chambers. During the operation of the slag remover, because the water levels in the front chamber 1.1A and the rear chamber 1.1B of the tank remain balanced without significant fluctuations, wastewater cannot flow back into the water replenishment tank through the connecting pipe, further ensuring the cleanliness and hygiene of the water in the water replenishment tank and ensuring the water replenishment device maintains normal operation for an extended period.
[0025] Figure 7 This is a schematic diagram of another embodiment of the present invention. Unlike the first embodiment, the diagram shows that in this example, a sewage discharge pipe 5 and a pipeline control valve are also provided. The inlet of the sewage discharge pipe 5 is connected to the bottom of the rear chamber 1.1B, and the outlet of the sewage discharge pipe is connected to the sludge pool. During the daily operation of the sludge remover, sludge deposition in the rear chamber 1.1B is unavoidable. The purpose of providing the sewage discharge pipe is to drain the sludge deposited in the rear chamber 1.1B. Since the elevation of the sludge remover's installation location exceeds the ground elevation of the sludge pool, the sludge in the rear chamber 1.1B can be discharged naturally.
[0026] This utility model suggests that, in other embodiments, a sewage pump is also provided on the sewage pipe 5 so that the sludge in the rear chamber 1.1B can be discharged into the sludge pool using the sewage pump.
[0027] This utility model suggests that, in other embodiments, the outlet of the sewage pipe 5 can also be connected to the rear cavity 1.1B of the tank. Since the front cavity 1.1A and the rear cavity 1.1B are at the same elevation, a sewage pump should be used to discharge the sludge from the rear cavity 1.1B into the front cavity 1.1A.
Claims
1. A system for preventing wastewater backflow in a waste-to-energy incineration plant's ash removal machine, characterized in that... A balance pipe is installed on the outside of the slag removal machine tank. The two ends of the balance pipe are connected to the front cavity and the rear cavity of the slag removal machine tank, respectively. During the reciprocating operation of the slide, the balance pipe keeps the water level in the front cavity and the rear cavity of the tank balanced.
2. The wastewater backflow prevention system for the ash removal machine in a waste incineration power plant according to claim 1, characterized in that, It is also equipped with a sewage discharge pipe and pipeline control valve. The inlet of the sewage discharge pipe is connected to the bottom of the rear cavity, and the outlet of the sewage discharge pipe is connected to the slag pool.
3. The wastewater backflow prevention system for the ash removal machine in a waste incineration power plant according to claim 2, characterized in that, A sewage pump is also installed on the sewage pipe.
4. The wastewater backflow prevention system for the ash removal machine in a waste incineration power plant according to claim 1, characterized in that, Sewage pipes and pipeline control valves are also installed, and a sewage pump is also installed on the sewage pipes; The inlet of the sewage pipe is connected to the bottom of the rear cavity, and the outlet of the sewage pipe is connected to the front cavity.