A semi coke preheating and drying system
The semi-coke preheating and drying system, which combines a three-cylinder dryer with a gas-fired hot air furnace, solves the problems of temperature control and dust collection, and achieves efficient drying and environmentally friendly production.
Patent Information
- Application Number
- CN202522540582.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-29
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-11-29
AI Technical Summary
The temperature control of the dryer in the existing preheating and drying system is poor, which affects the drying effect of semi-coke and cannot effectively collect the dust generated during the drying process, resulting in raw material waste and environmental pollution.
The system combines a three-cylinder dryer with a gas-fired hot air furnace, regulates the temperature using a combustion fan and a distribution fan, and collects dust using a cyclone dust collector and a pulse dust collector, thus achieving temperature control and dust treatment.
This technology enables efficient drying of semi-coke, reducing raw material waste and environmental pollution, and improving production safety and energy efficiency.
Smart Images

Figure CN225016947U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of calcium carbide production and application technology, and in particular to a semi-coke preheating and drying system. Background Technology
[0002] Semi-coke serves not only as a carbon source in calcium carbide (calcium carbide) production but also as an ideal carbon material with high reactivity, high resistivity, and low impurity content. Its use directly impacts energy consumption, efficiency, product quality, and cost in calcium carbide production. Therefore, in the calcium carbide industry, semi-coke has largely replaced metallurgical coke as the preferred carbon raw material.
[0003] Because semi-coke has high porosity, it absorbs a large amount of moisture during production. In subsequent use (such as in blast furnaces, calcium carbide furnaces, and gasifiers), the high temperatures inside the furnace first require evaporating this moisture into steam. This process consumes a significant amount of heat energy, leading to a decrease in effective calorific value. Furthermore, directly adding undried, wet semi-coke to a high-temperature calcium carbide furnace poses a high risk of physical explosion. Therefore, to ensure production safety, improve production efficiency, and reduce energy consumption, preheating and drying semi-coke is an essential step in calcium carbide production.
[0004] However, the temperature control effect of the dryer in the existing preheating and drying system is poor, which affects the drying effect of semi-coke. Furthermore, it is impossible to collect and treat the dust generated during the drying process, resulting in raw material waste and environmental pollution. Utility Model Content
[0005] The purpose of this application is to provide a semi-coke preheating and drying system to solve the problems of poor temperature control of the dryer in the existing preheating and drying system, which affects the drying effect of semi-coke, and the inability to collect and treat the dust generated during the drying process, resulting in raw material waste and environmental pollution.
[0006] To address the aforementioned technical problems, this application provides a semi-coke preheating and drying system, comprising: A three-cylinder dryer and a hopper connected to the upper part of the kiln head of the three-cylinder dryer via a belt scale; One end of the three-cylinder dryer is connected to a gas-fired hot air furnace, one end of the gas-fired hot air furnace is connected to a gas inlet pipe, one end of the gas inlet pipe is connected to a gas holder via a gas delivery pipe and a gas compressor, a combustion air pipe and a nitrogen pipe are connected to the gas delivery pipe, one end of the combustion air pipe is connected to a combustion air fan, an ignition valve and a first shut-off valve are installed on the gas delivery pipe, a regulating valve is installed on the combustion air pipe, a nitrogen valve is installed on the nitrogen pipe, and a distribution fan is connected to the bottom side of the gas-fired hot air furnace via an air distribution pipe; The upper side of the kiln tail of the three-cylinder dryer is connected to a cyclone dust collector and a pulse dust collector via a dust collection pipe. The bottom of the cyclone dust collector is connected to an ash collection bin via an ash discharge pipe. The bottom of the pulse dust collector is connected to the ash collection bin via a bin pump and an ash conveying pipe. The exhaust end of the pulse dust collector is connected to an exhaust pipe via an induced draft fan. The lower side of the kiln tail of the three-cylinder dryer is connected to a discharge belt via a discharge pipe.
[0007] In a preferred embodiment, a semi-coke preheating and drying system is provided, wherein a vent pipe is provided near the combustion air pipe of the gas conveying pipe, and a vent valve is provided on the vent pipe; Correspondingly, a second shut-off valve is also provided on the combustion-supporting air duct.
[0008] The solution requires detailed explanation of a semi-coke preheating and drying system, wherein the bottom of the pulse dust collector is provided with multiple ash discharge hoppers, and each ash discharge hopper is also provided with an air cannon at its discharge end.
[0009] In a preferred embodiment, a semi-coke preheating and drying system is provided in which the discharge ends of each of the ash discharge hoppers on the same side are also provided with a scraper conveyor, and one end of each scraper conveyor is connected to the silo pump through a pipe.
[0010] In a preferred embodiment, a semi-coke preheating and drying system is provided, wherein the discharge end of the cyclone dust collector is further provided with a main scraper, and the lower side of one end of the main scraper is connected to the ash discharge pipe.
[0011] The solution requires further detailed explanation of a semi-coke preheating and drying system, wherein an air cannon is also installed at the unloading end of the ash collection silo.
[0012] In a preferred embodiment, a semi-coke preheating and drying system includes a feeding conveyor belt on one side of the silo.
[0013] Compared with the prior art, the present invention provides a semi-coke preheating and drying system, including a three-cylinder dryer and a silo connected to the upper part of the kiln head of the three-cylinder dryer via a belt scale. In use, the material in the silo can be accurately fed into the three-cylinder dryer via the belt scale. One end of the three-cylinder dryer is connected to a gas-fired hot air furnace, and one end of the gas-fired hot air furnace is connected to a gas inlet pipe. One end of the gas inlet pipe is connected to a gas holder via a gas delivery pipe and a gas compressor. A combustion air pipe and a nitrogen pipe are connected to the gas delivery pipe, and one end of the gas delivery pipe is connected to a combustion fan. An ignition valve and a shut-off valve are installed on the gas delivery pipe. A regulating valve is installed on the combustion air pipe, and a nitrogen valve is installed on the nitrogen pipe. A distribution fan is connected to the bottom of the gas-fired hot air furnace via an air distribution pipe. The gas-fired hot air furnace provides a heat source to dry the material in the three-cylinder dryer, and the combustion fan provides combustion air to the gas-fired hot air furnace to ensure… The gas can be fully combusted, generating sufficient high-temperature hot airflow to meet the heat requirements of the dried materials. A blower regulates the airflow ratio within the gas-fired hot air furnace to ensure complete combustion, thus effectively controlling the temperature of the three-cylinder dryer. A cyclone dust collector and a pulse jet dust collector are connected to the upper side of the kiln tail of the three-cylinder dryer via a dust collection pipe. The bottom of the cyclone dust collector is connected to an ash collection hopper via an ash discharge pipe, and the bottom of the pulse jet dust collector is connected to an ash collection hopper via a hopper pump and an ash conveying pipe. The exhaust end of the pulse jet dust collector is connected to an exhaust pipe via an induced draft fan. A discharge belt is connected to the lower side of the kiln tail of the three-cylinder dryer via a discharge pipe, and the dried material is transported to subsequent processes via the discharge belt. Simultaneously, dust generated during the drying process is treated by the cyclone dust collector and then enters the pulse jet dust collector for further dust removal. Finally, the ash falls into the ash collection hopper through the ash discharge pipe and ash conveying pipe, while the gas is discharged from the exhaust pipe by the induced draft fan. This allows for the recycling of raw materials, avoiding environmental pollution. Attached Figure Description
[0014] To more clearly illustrate the technical solution of this application, the drawings used in the embodiments will be briefly introduced below. Obviously, for those skilled in the art, other drawings can be obtained based on these drawings without any creative effort.
[0015] Figure 1 This is a schematic diagram of a semi-coke preheating and drying system provided in an embodiment of this application; Figure 2 This is a schematic diagram of another semi-coke preheating and drying system provided in an embodiment of this application; In the diagram: 1. Three-cylinder dryer; 2. Belt scale; 3. Silo; 4. Gas-fired hot air furnace; 5. Gas inlet pipe; 6. Gas transmission pipe; 7. Gas compressor; 8. Gas holder; 9. Combustion air duct; 10. Nitrogen pipe; 11. Combustion fan; 12. Ignition valve; 13. First shut-off valve; 14. Regulating valve; 15. Nitrogen valve; 16. Air distribution duct; 160. Distribution regulating valve; 17. Air distribution fan. ; 18. Dust collection pipe; 19. Second shut-off valve; 20. Cyclone dust collector; 200. Ladder; 21. Pulse dust collector; 210. Silo pump; 211. Ash conveying pipe; 22. Ash discharge pipe; 23. Ash collection silo; 24. Exhaust fan; 25. Exhaust pipe; 26. Discharge pipe; 27. Venting pipe; 28. Venting valve; 29. Ash discharge hopper; 30. Branch scraper conveyor; 31. Pipeline; 32. Main scraper conveyor. Detailed Implementation
[0016] To enable those skilled in the art to better understand the technical solutions in this application, the technical solutions in the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings.
[0017] The core of this application is to provide a semi-coke preheating and drying system, which solves the problems of poor temperature control of the dryer in the existing preheating and drying system, which affects the drying effect of semi-coke, and the inability to collect and treat the dust generated during the drying process, resulting in raw material waste and environmental pollution.
[0018] Figure 1 This is a schematic diagram of a semi-coke preheating and drying system provided in an embodiment of this application. Figure 2 For another structural diagram of the semi-coke preheating and drying system provided in this application embodiment, see [link to diagram]. Figures 1 to 2 As shown.
[0019] Example 1 A semi-coke preheating and drying system includes a three-cylinder dryer 1 and a silo 3. The lower end of the silo 3 is connected to the upper part of the kiln head of the three-cylinder dryer 1 via a belt scale 2. In use, the semi-coke can be fed into the silo 3 by a feeding belt or a loader, and then accurately weighed by the belt scale 2 before being lowered to the kiln head of the three-cylinder dryer 1. The structure and working principle of the three-cylinder dryer 1 can be found in existing technology. One end of the three-cylinder dryer 1 is connected to a gas-fired hot air furnace 4, and one end of the gas-fired hot air furnace 4 is connected to a gas inlet pipe 5. One end of the gas inlet pipe 5 is connected to a gas holder 8 via a gas delivery pipe 6 and a gas compressor 7. The gas in the gas holder 8 is pressurized by the gas compressor 7 and then enters the gas-fired hot air furnace 4 through the gas inlet pipe 5. The gas is burned in the gas-fired hot air furnace 4, generating a high-temperature hot airflow. The high-temperature hot airflow enters the three-cylinder dryer 1 from the gas-fired hot air furnace 4, and transfers heat to the material through heat conduction and convection, causing the moisture in the material to evaporate. The gas delivery pipe 6 is connected to a combustion air pipe 9 and a nitrogen pipe 10. A nitrogen valve 15 is installed on the nitrogen pipe 10. The cooperation of the nitrogen pipe 10 and the nitrogen valve 15 allows for the replacement of air and combustible gases in the pipeline with nitrogen during system maintenance, reducing the risk of explosion and ensuring maintenance safety. One end of the combustion air pipe 9 is connected to a combustion air fan 11. The gas delivery pipe 6 is equipped with an ignition valve 12 and a first shut-off valve 13. The ignition valve 12 precisely controls the gas supply required for ignition. In the event of a system anomaly, the first shut-off valve 13 can be used to urgently cut off the gas supply, preventing gas leaks that could lead to explosions, fires, or other safety accidents.
[0020] A regulating valve 14 is installed on the combustion air duct 9. A distribution fan 17 is connected to the bottom of the gas-fired hot air furnace 4 via a distribution air duct 16, and a distribution regulating valve 160 is installed on the distribution air duct 16. The combustion air fan 11 provides combustion air to the gas in the gas-fired hot air furnace 4, ensuring complete combustion of the gas and generating sufficient high-temperature hot airflow to meet the heat requirements of the dried materials. The regulating valve 14 adjusts the airflow of the combustion air fan 11, controlling the intensity of combustion and thus adjusting the heating capacity of the gas-fired hot air furnace 4, controlling the temperature of the three-cylinder dryer 1. The distribution fan 17 is used to adjust the airflow ratio within the gas-fired hot air furnace 4, optimizing the mixing ratio of gas and air, making the gas combustion more complete and efficient, improving thermal efficiency, and reducing the generation of harmful gases. The distribution regulating valve 160 adjusts the airflow of the distribution fan 17, working in conjunction with the combustion air fan 11 to control the combustion state of the gas-fired hot air furnace 4, ensuring stable temperature and flow of the hot airflow, and providing a stable heat source for the three-cylinder dryer 1.
[0021] The upper side of the kiln tail of the three-cylinder dryer 1 is connected to a cyclone dust collector 20 and a pulse dust collector 21 via a dust collection pipe 18. A maintenance ladder 200 is also installed on the outside of the cyclone dust collector 20. The exhaust gas or dust generated during the drying process can enter the cyclone dust collector 20 through the dust collection pipe 18 for treatment, and then pass through the pulse dust collector 21 for dust removal. The bottom of the cyclone dust collector 20 is connected to an ash collection bin 23 via an ash discharge pipe 22. The ash in the cyclone dust collector 20 enters the ash collection bin 23 for temporary storage via the ash discharge pipe 22. The bottom of the pulse dust collector 21 is connected to an ash collection silo 23 via a silo pump 210 and an ash conveying pipe 211. The exhaust end of the pulse dust collector 21 is connected to an exhaust pipe 25 via an induced draft fan 24. The ash in the pulse dust collector 21 is pumped into the ash collection silo 23 for temporary storage via the ash conveying pipe 211 under the action of the silo pump 210. The treated gas is discharged through the exhaust pipe 25 under the action of the induced draft fan 24. The lower side of the kiln tail of the three-cylinder dryer 1 is connected to a discharge belt via a discharge pipe 26. The dried material can fall onto the discharge belt via the discharge pipe 26 and be transported to the subsequent stage. The discharge belt is not shown in the figure.
[0022] Example 2 Based on Example 1, in a preferred embodiment of a semi-coke preheating and drying system, a vent pipe 27 is also provided near the combustion air duct 9 on the gas delivery pipe 6, and a vent valve 28 is provided on the vent pipe 27; correspondingly, a second shut-off valve 19 is also provided on the combustion air duct 9. When the system experiences abnormal gas supply, valve failure, or excessively high pipeline pressure, the vent pipe 27 can serve as an emergency discharge channel to quickly discharge dangerous gas and prevent the accident from escalating. In this case, the first shut-off valve 13 and the second shut-off valve 19 need to be closed.
[0023] Based on Example 1, in a semi-coke preheating and drying system, to avoid material blockage, preferably, multiple ash discharge hoppers 29 are provided at the bottom of the pulse dust collector 21, and an air cannon is also provided at the discharge end of each ash discharge hopper 29. Based on Example 1, in a semi-coke preheating and drying system, an air cannon is also provided at the discharge end of the ash collection silo 23. The air cannon generates a strong impact force by instantaneously releasing high-pressure gas, breaking up the accumulated material and allowing it to fall smoothly. The air cannon is not shown in the figure.
[0024] In this embodiment, a semi-coke preheating and drying system is preferably equipped with a scraper conveyor 30 at the discharge end of each ash hopper 29 on the same side in order to adapt to the actual factory space requirements. The lower side of one end of each scraper conveyor 30 is connected to the silo pump 210 through a pipe 31.
[0025] Based on Example 1, a semi-coke preheating and drying system is provided, in which a main scraper conveyor 32 is also provided at the discharge end of the cyclone dust collector 20, and one end of the main scraper conveyor 32 is connected to the ash discharge pipe 22. Under the action of the main scraper conveyor 32, the ash in the cyclone dust collector 20 can fall into the ash collection bin 23 through the ash discharge pipe 22 for temporary storage.
[0026] Based on Example 1, a semi-coke preheating and drying system is provided. To improve the convenience of feeding, a feeding belt is preferably provided on one side of the hopper 3. The feeding belt is not shown in the figure.
[0027] This utility model provides a semi-coke preheating and drying system, including a three-cylinder dryer 1 and a hopper 3 connected to the upper part of the kiln head of the three-cylinder dryer 1 via a belt scale 2. In use, the material in the hopper 3 can be accurately fed into the three-cylinder dryer 1 via the belt scale 2. One end of the three-cylinder dryer 1 is connected to a gas-fired hot air furnace 4, and one end of the gas-fired hot air furnace 4 is connected to a gas inlet pipe 5. One end of the gas inlet pipe 5 is connected to a gas holder 8 via a gas delivery pipe 6 and a gas compressor 7. A gas delivery pipe 6 is connected to... Combustion-supporting air duct 9 and nitrogen pipe 10 are connected to the gas delivery pipe 6. One end of the gas delivery pipe 6 is connected to a combustion-supporting blower 11. An ignition valve 12 and a first shut-off valve 13 are installed on the gas delivery pipe 6. A regulating valve 14 is installed on the combustion-supporting air duct 9, and a nitrogen valve 15 is installed on the nitrogen pipe 10. A distribution fan 17 is connected to the bottom side of the gas-fired hot air furnace 4 through a distribution air duct 16. The gas-fired hot air furnace 4 provides a heat source to dry the materials in the three-cylinder dryer 1. The combustion-supporting blower 11 provides combustion-supporting air to the gas-fired hot air furnace 4 to ensure that the gas can be fully supplied with combustion air. Combustion generates sufficient high-temperature hot airflow to meet the heat requirements of the dried materials. The fan 17 adjusts the airflow ratio in the gas-fired hot air furnace 4 to ensure complete combustion, thereby effectively controlling the temperature of the three-cylinder dryer 1. A cyclone dust collector 20 and a pulse dust collector 21 are connected to the upper side of the kiln tail of the three-cylinder dryer 1 via a dust collection pipe 18. The bottom of the cyclone dust collector 20 is connected to an ash collection bin 23 via an ash discharge pipe 22. The bottom of the pulse dust collector 21 is connected to a bin pump 210 and an ash conveying pipe 211. The system includes an ash collection silo 23, and an exhaust pipe 25 connected to the exhaust end of the pulse dust collector 21 via an induced draft fan 24. A discharge belt is connected to the lower side of the kiln tail of the three-cylinder dryer 1 via a discharge pipe 26. The dried material is then conveyed to subsequent processes via the discharge belt. Simultaneously, dust generated during the drying process is treated by a cyclone dust collector 20 and then enters the pulse dust collector 21 for further dust removal. Finally, the ash falls into the ash collection silo 23 through the ash discharge pipe 22 and ash conveying pipe 211, and the gas is discharged from the exhaust pipe 25 under the action of the induced draft fan 24. This system enables the recycling of raw materials and avoids environmental pollution.
[0028] Other embodiments of this application will readily occur to those skilled in the art upon consideration of the specification and practice of the application disclosed herein. This application is intended to cover any variations, uses, or adaptations of this application that follow the general principles of this application and incorporate common knowledge or customary techniques in the art disclosed herein. The specification and examples are to be considered exemplary only, and the true scope of this application is indicated by the claims.
[0029] It should be understood that this application is not limited to the precise structure described above and shown in the accompanying drawings, and various modifications and changes can be made without departing from its scope. The embodiments of this application described above do not constitute a limitation on the scope of protection of this application.
Claims
1. A semi-coke preheating and drying system, characterized in that, include: The three-cylinder dryer (1) and the hopper (3) connected to the upper side of the kiln head of the three-cylinder dryer (1) via a belt scale (2). One end of the three-cylinder dryer (1) is connected to a gas-fired hot air furnace (4), one end of the gas-fired hot air furnace (4) is connected to a gas inlet pipe (5), one end of the gas inlet pipe (5) is connected to a gas holder (8) through a gas delivery pipe (6) and a gas compressor (7), a combustion air pipe (9) and a nitrogen pipe (10) are connected to the gas delivery pipe (6), a combustion air blower (11) is connected to one end of the combustion air pipe (9), an ignition valve (12) and a first shut-off valve (13) are provided on the gas delivery pipe (6), a regulating valve (14) is provided on the combustion air pipe (9), a nitrogen valve (15) is provided on the nitrogen pipe (10), and a blower (17) is connected to the bottom side of the gas-fired hot air furnace (4) through a distribution pipe (16). The upper side of the kiln tail of the three-cylinder dryer (1) is connected to a cyclone dust collector (20) and a pulse dust collector (21) through a dust collection pipe (18). The bottom of the cyclone dust collector (20) is connected to an ash collection bin (23) through an ash discharge pipe (22). The bottom of the pulse dust collector (21) is connected to the ash collection bin (23) through a bin pump (210) and an ash conveying pipe (211). The exhaust end of the pulse dust collector (21) is connected to an exhaust pipe (25) through an induced draft fan (24). The lower side of the kiln tail of the three-cylinder dryer (1) is connected to a discharge belt through a discharge pipe (26).
2. The semi-coke preheating and drying system according to claim 1, characterized in that, A vent pipe (27) is also provided near the combustion air pipe (9) of the gas transmission pipe (6), and a vent valve (28) is provided on the vent pipe (27). Correspondingly, a second shut-off valve (19) is also provided on the combustion-supporting air duct (9).
3. The semi-coke preheating and drying system according to claim 1, characterized in that, The bottom of the pulse dust collector (21) is provided with multiple ash discharge hoppers (29), and each ash discharge hopper (29) is also provided with an air cannon at its discharge end.
4. The semi-coke preheating and drying system according to claim 3, characterized in that, Each of the ash discharge hoppers (29) on the same side is also provided with a scraper conveyor (30) at its discharge end. The lower side of one end of each scraper conveyor (30) is connected to the silo pump (210) through a pipe (31).
5. The semi-coke preheating and drying system according to claim 1, characterized in that, The discharge end of the cyclone dust collector (20) is also equipped with a main scraper (32), and one end of the main scraper (32) is connected to the ash discharge pipe (22).
6. The semi-coke preheating and drying system according to claim 1, characterized in that, An air cannon is also installed at the unloading end of the ash collection silo (23).
7. The semi-coke preheating and drying system according to claim 1, characterized in that, A feeding conveyor belt is also provided on one side of the hopper (3).