A furnace door system for a vertical furnace installation
By adopting a furnace door sealing flange assembly and multiple sealing rings in the vertical furnace equipment, the sealing and particulate contamination problems during wafer transport are solved, ensuring film quality and uniformity, and achieving stable wafer transport and efficient film formation.
Patent Information
- Application Number
- CN202522678595.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-17
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-17
AI Technical Summary
The existing vertical LPCVD equipment's boat-pushing system suffers from precision errors, friction-induced particle contamination, and poor film formation on the wafer surface during wafer transport. Furthermore, the vacuum furnace door system is not suitable for structures with moving process tubes and reaction chambers, affecting film quality and uniformity.
The system employs a furnace door sealing flange assembly, a crystal boat assembly, and a sealing assembly, including multiple sealing rings and a cooling flange. By fixing the crystal boat to the end face support flange, a stable closed reaction chamber is formed through the cooperation of multiple sealing rings with the process pipes and the reaction chamber. The cooling flange extends the life of the sealing rings and prevents gas leakage.
It improves the sealing and stability during wafer transport, reduces particulate contamination, ensures the quality and uniformity of film formation, extends the service life of the sealing ring, and prevents wafer damage.
Smart Images

Figure CN225017117U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of semiconductor manufacturing equipment technology, and in particular to a furnace door system for a vertical furnace. Background Technology
[0002] In the field of semiconductor manufacturing equipment technology, vertical furnace equipment is a commonly used process equipment. Taking vertical LPCVD equipment as an example, vertical LPCVD (Low Pressure Chemical Vapor Deposition) equipment is a process equipment used to prepare thin film materials and is widely used in semiconductor manufacturing, microelectronics, optoelectronics and photovoltaic fields.
[0003] Existing conventional vertical LPCVD equipment mainly employs a stationary reaction chamber at the top, with a boat-pushing system carrying the wafer boat vertically to ensure wafer loading and unloading in and out of the reaction chamber. However, due to the inherent precision errors in each movement of the boat-pushing system, the front-end robotic arm experiences errors each time it inserts or removes wafers from the cassette onto the boat, resulting in a high breakage rate during wafer transfer. Secondly, due to inertia, friction inevitably occurs between the wafer and the boat's grooves during each vertical movement of the boat-pushing system, leading to increased surface particle size and contamination. Thirdly, for ultra-thin oxide deposition equipment with high uniformity requirements, the furnace body in the reaction chamber is typically kept heated during wafer transfer on the production line to reduce energy consumption and mitigate the poor film formation caused by frequent high-temperature gradient heating and cooling. Conventional boat-pushing systems, during the wafer delivery process, carry air from the transfer area into the reaction chamber, causing the formation of a natural oxide layer on the wafer surface, affecting the quality and uniformity of the film formation.
[0004] The above problems can be solved by adopting a structure that allows for the movement of process tubes and reaction chambers. The sealing method between the vacuum furnace door system and the reaction chamber, as well as the cooling method of the sealing components, are essential for ensuring the vacuum conditions of the low-pressure oxidation / thin film deposition equipment. This directly affects the quality and uniformity of the film formation. Existing vacuum furnace door systems are not suitable for this structure. Utility Model Content
[0005] The technical problem to be solved by this utility model is to overcome the shortcomings of the prior art and provide a furnace door system for a vertical furnace with good sealing performance, suitable for the movement of process tubes and reaction chambers.
[0006] To solve the above-mentioned technical problems, the present invention adopts the following technical solution: A furnace door system for a vertical furnace includes a furnace door sealing flange assembly, a crystal boat assembly, and a sealing assembly. The sealing assembly includes a first sealing ring. The furnace door sealing flange assembly includes an end face support flange and an annular cooling flange. The crystal boat assembly includes a crystal boat base and a crystal boat. The crystal boat is mounted on the crystal boat base, and the crystal boat base is mounted on the end face support flange. The annular cooling flange is mounted on the end face support flange and located inside the end face support flange between the end face support flange and the crystal boat base. The first sealing ring abuts against the annular cooling flange and the crystal boat base. The annular cooling flange is used to cool the first sealing ring. When the process tube moves to the end face support flange, the first sealing ring abuts against the process tube to seal the crystal boat base and the process tube, forming a closed reaction chamber.
[0007] As a further improvement to the above technical solution: The first sealing ring is an L-shaped sealing ring, which includes a first upper sealing surface and a second upper sealing surface that is higher than the first upper sealing surface. The L-shaped sealing ring is installed on the crystal boat base. The first upper sealing surface abuts against the annular cooling flange. The bottom of the process tube is provided with a process tube sealing end face for abutting against and cooperating with the second upper sealing surface.
[0008] The sealing assembly also includes a second sealing ring. The bottom of the process pipe is provided with a process pipe flange. The process pipe flange is sealed to the end face support flange through the second sealing ring. The sealing end face of the process pipe protrudes from the process pipe flange.
[0009] The furnace door sealing flange assembly also includes a bottom evacuation flange connected to the lower end of the end face support flange. The bottom evacuation flange is used to connect with the vacuum pipeline system for evacuation. The vacuum pipeline system includes a cold trap. The upper flange of the cold trap is connected to the bottom evacuation flange. The crystal boat base extends through the end face support flange and the bottom evacuation flange into the cold trap.
[0010] The sealing assembly further includes a third sealing ring. The cold trap has a cold trap sealing end face. The lower part of the crystal boat base has a heat insulation ring. The third sealing ring is sleeved on the heat insulation ring and abuts against the lower end face of the crystal boat base, the cold trap sealing end face, and the heat insulation ring, respectively.
[0011] The sealing assembly also includes a fifth sealing ring, and the bottom extraction flange is sealed to the end face support flange through the fifth sealing ring.
[0012] The sealing assembly also includes multiple sixth sealing rings. The upper end of the bottom extraction flange is provided with multiple sealing ring support blocks and multiple annular cooling air knives. The sealing ring support blocks and annular cooling air knives are located inside the fifth sealing ring. The sixth sealing ring is sleeved outside the sealing ring support blocks and abuts against the crystal boat base so that a cooling cavity is formed between the crystal boat base and the upper end face of the bottom extraction flange. The annular cooling air knife is sleeved outside the sixth sealing ring.
[0013] The furnace door system of the vertical furnace equipment also includes a process air inlet pipe and a thermocouple pipe. The sealing ring support block has an installation hole inside. The process air inlet pipe or thermocouple pipe passes through the installation hole and extends into the process pipe through the crystal boat base.
[0014] The sealing assembly further includes a fourth sealing ring, and the inner side of the end face support flange is provided with a stepped surface. The crystal boat base is installed on the stepped surface, and the fourth sealing ring abuts between the crystal boat base and the stepped surface.
[0015] The lower end face of the annular cooling flange is provided with an annular cooling flange air inlet and an annular cooling flange air outlet. The inner side of the annular cooling flange is provided with multiple annular air holes, and the annular cooling flange air inlet and annular cooling flange air outlet are respectively connected to the annular air holes.
[0016] Compared with the prior art, the advantages of this utility model are: 1. The furnace door system of the vertical furnace equipment of this utility model, by installing the crystal boat on the end face support flange, keeps the crystal boat stationary and is suitable for vertical furnace equipment where the process tube and reaction chamber move; during the process, the first sealing ring is pressed tightly against the annular cooling flange, the crystal boat base and the process tube to form a closed reaction chamber, ensuring the sealing performance of the wafer when the reaction occurs during vacuum coating; the annular cooling flange cools the first sealing ring, extending the service life of the first sealing ring under high temperature conditions.
[0017] 2. In the furnace door system of the vertical furnace equipment of this utility model, after the process pipe is moved into place, the sealing end face of the bottom process pipe is tightly fitted with the second upper sealing surface of the L-shaped sealing ring, while the first upper sealing surface abuts against the annular cooling flange, forming a double sealing guarantee, which improves the sealing performance of the reaction chamber. Furthermore, since the first upper sealing surface abuts against the annular cooling flange, the L-shaped sealing ring is pressed between the annular cooling flange and the crystal boat base regardless of whether it is in the process state. This ensures that the position of the L-shaped sealing ring is fixed and will not be displaced due to the movement of the process pipe or the vibration of the crystal boat assembly, thus ensuring the stability and durability of the seal.
[0018] 3. The furnace door system of this utility model's vertical furnace equipment features a process pipe sealing end face that protrudes from the process pipe flange. This ensures that after the process pipe flange is connected to the end face support flange, the process pipe sealing end face always abuts against the first sealing ring, guaranteeing the sealing performance of the reaction chamber after the process pipe and end face support flange are connected. The second sealing ring further enhances the sealing effect between the process pipe flange and the end face support flange, preventing gas leakage and ensuring the stability and reliability of the process. Furthermore, the protruding design of the process pipe sealing end face can compensate to some extent for unevenness of the sealing surface caused by manufacturing or installation errors, further improving sealing performance.
[0019] 4. The furnace door system of the vertical furnace equipment of this utility model has a third sealing ring that seals the crystal boat base and the cold trap, which can isolate the crystal boat base from the outside. The third sealing ring can buffer the crystal boat base and prevent the crystal boat base from directly contacting the metal sealing end face of the cold trap. This prevents the crystal boat base from vibrating and colliding with the cold trap during evacuation, thus preventing damage. In addition, the inner side of the third sealing ring is pressed against the heat insulation ring, which can prevent hot process waste gas from directly impacting the third sealing ring and extend the service life of the third sealing ring.
[0020] 5. The furnace door system of this utility model, because the crystal boat base abuts against the sixth sealing ring, prevents the crystal boat base from directly contacting the upper surface of the bottom exhaust flange. The sixth sealing ring can buffer the crystal boat base, avoiding direct contact between the crystal boat base and the metal bottom exhaust flange, and preventing the crystal boat base from vibrating and colliding with the bottom exhaust flange during exhaust, thus preventing damage. Furthermore, a cooling cavity can be formed between the crystal boat base and the upper surface of the bottom exhaust flange. The outer periphery of the cooling cavity is sealed by the fifth sealing ring. Cooling gas enters from the air knife inlet, passes through the cooling cavity to cool the fifth sealing ring, the sixth sealing ring, and the crystal boat base, and finally exits from the air knife exhaust port. The structure is simple and reasonable, and the cooling effect is good.
[0021] 6. The furnace door system of the vertical furnace equipment of this utility model has a process air inlet pipe or thermocouple pipe installed in the mounting hole of the sealing ring support block. The process air inlet pipe or thermocouple pipe can pass through the mounting hole and penetrate the crystal boat base to extend into the process pipe. Since the sixth sealing ring is sleeved outside the sealing ring support block, the sealing between the crystal boat base and the process air inlet pipe or thermocouple pipe is achieved. The structure is simple and the layout is reasonable. Attached Figure Description
[0022] Figure 1 This is a sectional view of the furnace door system of the vertical furnace equipment of this utility model.
[0023] Figure 2 This is an enlarged sectional view of the furnace door system of the vertical furnace equipment of this utility model.
[0024] Figure 3 This is a schematic diagram of the furnace door sealing flange assembly in the furnace door system of the vertical furnace equipment of this utility model.
[0025] Figure 4 This is a schematic diagram of the crystal boat assembly in the furnace door system of the vertical furnace equipment of this utility model.
[0026] Figure 5 This is a schematic diagram of the annular cooling flange in the furnace door system of the vertical furnace equipment of this utility model.
[0027] Figure 6 This is a schematic diagram of the bottom extraction flange in the furnace door system of the vertical furnace equipment of this utility model.
[0028] Figure 7 This is a structural schematic diagram of the bottom exhaust flange in the furnace door system of the vertical furnace equipment of this utility model from another perspective.
[0029] The labels in the diagram represent: 1. Furnace door sealing flange assembly; 11. End face support flange; 12. Annular cooling flange; 121. Annular cooling flange air inlet; 122. Annular cooling flange air outlet; 123. Annular vent; 13. Bottom extraction flange; 131. Sealing ring support block; 132. Annular cooling air knife; 133. Air knife air inlet; 134. Air knife exhaust port; 135. Annular cooling flange second air inlet; 136. Annular cooling flange second air outlet; 137. Thermocouple detection port; 138. Air-cooled ring; 139. Water-cooled ring; 2. Crystal boat assembly; 21. Crystal boat base; 22. Crystal boat; 23. Thermal insulation ring; 3. Process pipe; 31. Process pipe sealing end face; 32. Process pipe flange; 4. Cold trap; 41. Cold trap sealing end face; 51. First sealing ring; 511. First upper sealing surface; 512. Second upper sealing surface; 52. Second sealing ring; 53. Third sealing ring; 54. Fourth sealing ring; 55. Fifth sealing ring; 56. Sixth sealing ring; 57. Seventh sealing ring; 6. Process inlet pipe; 7. Thermocouple tube. Detailed Implementation
[0030] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0031] In the description of this utility model, it should be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.
[0032] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this utility model, "a plurality of" means two or more, unless otherwise explicitly specified.
[0033] In this utility model, unless otherwise explicitly specified and limited, the terms "assembly," "connection," "joining," and "fixing" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model according to the specific circumstances.
[0034] like Figures 1 to 7 As shown, the furnace door system of the vertical furnace equipment in this embodiment includes a furnace door sealing flange assembly 1, a crystal boat assembly 2, and a sealing assembly. The sealing assembly includes a first sealing ring 51. The furnace door sealing flange assembly 1 includes an end face support flange 11 and an annular cooling flange 12. The crystal boat assembly 2 includes a crystal boat base 21 and a crystal boat 22. The crystal boat 22 is mounted on the crystal boat base 21, and the crystal boat base 21 is mounted on the end face support flange 11. The annular cooling flange 12 is mounted on the end face support flange 11 and is located between the end face support flange 11 and the crystal boat base 21. The first sealing ring 51 abuts against the annular cooling flange 12 and the crystal boat base 21. The annular cooling flange 12 is used to cool the first sealing ring 51. When the process tube 3 moves to the end face support flange 11, the first sealing ring 51 abuts against the process tube 3 to seal the crystal boat base 21 and the process tube 3 to form a closed reaction chamber.
[0035] In this embodiment of the vertical furnace equipment, during operation, the process tube 3 and the reaction chamber move to the end-face support flange 11. The end-face support flange 11 supports the process tube 3 and the furnace door. The crystal boat base 21 is fitted into the process tube 3, and the first sealing ring 51 abuts against the process tube 3, sealing the crystal boat base 21 and the process tube 3 to form a closed reaction chamber, allowing for process operations. In this embodiment of the vertical furnace equipment, the furnace door system, by mounting the crystal boat 22 on the end-face support flange 11 and keeping the crystal boat 22 stationary, is suitable for vertical furnace equipment where the process tube and reaction chamber move. During the process, the first sealing ring 51 abuts against the annular cooling flange 12, the crystal boat base 21, and the process tube 3 to form a closed reaction chamber, ensuring the sealing performance of the wafer during the vacuum deposition reaction. The annular cooling flange 12 cools the first sealing ring 51, extending its service life at high temperatures.
[0036] Furthermore, in this embodiment, the first sealing ring 51 is an L-shaped sealing ring, which includes a first upper sealing surface 511 and a second upper sealing surface 512 that is higher than the first upper sealing surface 511. The L-shaped sealing ring is installed on the crystal boat base 21. The first upper sealing surface 511 abuts against the annular cooling flange 12. The bottom of the process pipe 3 is provided with a process pipe sealing end face 31 for abutting and cooperating with the second upper sealing surface 512. After the process tube 3 is moved into place, the bottom process tube sealing end face 31 is tightly fitted with the second upper sealing surface 512 of the L-shaped sealing ring, while the first upper sealing surface 511 abuts against the annular cooling flange 12, forming a double sealing guarantee, which improves the sealing performance of the reaction chamber. Furthermore, since the first upper sealing surface 511 abuts against the annular cooling flange 12, the L-shaped sealing ring is pressed between the annular cooling flange 12 and the crystal boat base 21 regardless of whether it is in the process state. This ensures that the position of the L-shaped sealing ring is fixed and will not be displaced due to the movement of the process tube 3 or the vibration of the crystal boat assembly, thus ensuring the stability and durability of the seal.
[0037] Furthermore, in this embodiment, the sealing assembly also includes a second sealing ring 52. A process pipe flange 32 is provided at the bottom of the process pipe 3. The process pipe flange 32 is sealed to the end face support flange 11 via the second sealing ring 52. The process pipe sealing end face 31 protrudes from the process pipe flange 32. Because the process pipe sealing end face 31 protrudes from the process pipe flange 32, after the process pipe flange 32 is connected to the end face support flange 11, the process pipe sealing end face 31 can always abut against the first sealing ring 51, ensuring the sealing performance of the reaction chamber after the process pipe 3 is connected to the end face support flange 11. The second sealing ring 52 further enhances the sealing effect between the process pipe flange 32 and the end face support flange 11, preventing gas leakage and ensuring the stability and reliability of the process. In addition, the protruding design of the process pipe sealing end face 31 can also compensate for uneven sealing surfaces caused by manufacturing or installation errors to a certain extent, further improving the sealing performance.
[0038] Furthermore, in this embodiment, a water ring (not shown in the figure) for cooling water is provided at the lower end of the end face support flange 11 to cool the second sealing ring 52 and extend the service life of the second sealing ring 52.
[0039] Furthermore, in this embodiment, the furnace door sealing flange assembly 1 also includes a bottom evacuation flange 13 connected to the lower end of the end face support flange 11. The bottom evacuation flange 13 is used to dock with the vacuum pipeline system for evacuation. The vacuum pipeline system includes a cold trap 4, and the upper flange of the cold trap 4 is connected to the bottom evacuation flange 13. The crystal boat base 21 extends through the end face support flange 11 and the bottom evacuation flange 13 into the cold trap 4. Since the process pipe 3 needs to move from top to bottom to the end face support flange 11 for docking, by placing the bottom evacuation flange 13 at the lower end of the end face support flange 11, interference between the movement of the vacuum pipeline system and the process pipe 3 is avoided, resulting in a reasonable layout.
[0040] Furthermore, in this embodiment, the sealing assembly also includes a third sealing ring 53. A cold trap sealing end face 41 is provided inside the cold trap 4, and a heat insulation ring 23 is provided at the lower part of the crystal boat base 21. The third sealing ring 53 is sleeved on the heat insulation ring 23 and abuts against the lower end face of the crystal boat base 21, the cold trap sealing end face 41, and the heat insulation ring 23, respectively. The third sealing ring 53 seals the crystal boat base 21 and the cold trap 4, achieving isolation between the crystal boat base 21 and the outside. The third sealing ring 53 buffers the crystal boat base 21, preventing direct contact between the crystal boat base 21 (preferably made of non-metallic material) and the metallic cold trap sealing end face 41, preventing vibration and collision with the cold trap 4 during evacuation, thus preventing damage. Furthermore, the inner side of the third sealing ring 53 abuts against the heat insulation ring 23, preventing hot process waste gas from directly impacting the third sealing ring 53 and extending its service life.
[0041] Furthermore, in this embodiment, the lower end of the cold trap 4 is connected to other vacuum components to ensure that the equipment can form a negative pressure state for the process and discharge process waste gas.
[0042] Furthermore, in this embodiment, the sealing assembly also includes a fourth sealing ring 54. The inner side of the end-face support flange 11 has a stepped surface, and the crystal boat base 21 is mounted on the stepped surface. The fourth sealing ring 54 abuts against the crystal boat base 21 and the stepped surface. By abutting between the crystal boat base 21 and the end-face support flange 11, the fourth sealing ring 54 can buffer the crystal boat base 21, preventing direct contact between the crystal boat base 21 and the metal end-face support flange 11. This prevents the crystal boat base 21 from vibrating and colliding with the end-face support flange 11 during air extraction, thus preventing damage.
[0043] Furthermore, in this embodiment, the stepped surfaces on the inner sides of both the crystal boat base 21 and the end face support flange 11 are inclined funnel-shaped, which facilitates the installation of the crystal boat base 21 on the end face support flange 11.
[0044] Furthermore, in this embodiment, the lower end face of the annular cooling flange 12 is provided with an annular cooling flange inlet 121 and an annular cooling flange outlet 122. The inner side of the annular cooling flange 12 is provided with multiple annular vents 123, and the annular cooling flange inlet 121 and the annular cooling flange outlet 122 are respectively connected to the annular vents 123. Cooling gas enters the annular cooling flange 12 through the annular cooling flange inlet 121, and the cooling gas is blown out from the annular vents 123 on the inner side of the annular cooling flange 12 to cool the first sealing ring 51. Finally, it is discharged from the annular cooling flange outlet 122. The structure is simple and reliable.
[0045] Preferably, in this embodiment, the bottom exhaust flange 13 is provided with a second air inlet 135 of the annular cooling flange connected to the air inlet 121 of the annular cooling flange, and a second air outlet 136 of the annular cooling flange connected to the air outlet 122 of the annular cooling flange. A seventh sealing ring 57 is provided at the connection between the air inlet 121 and the second air inlet 135 of the annular cooling flange, and between the air outlet 122 and the second air outlet 136 of the annular cooling flange. The structure is simple and reliable.
[0046] Furthermore, in this embodiment, the sealing assembly also includes a fifth sealing ring 55. The bottom extraction flange 13 is sealed to the end face support flange 11 through the fifth sealing ring 55 to prevent gas from escaping and external atmosphere from damaging the sealing performance of the furnace door flange.
[0047] Furthermore, in this embodiment, the sealing assembly also includes multiple sixth sealing rings 56. The upper end of the bottom extraction flange 13 is provided with multiple sealing ring support blocks 131 and multiple annular cooling air knives 132. The sealing ring support blocks 131 and annular cooling air knives 132 are located inside the fifth sealing ring 55. The sixth sealing ring 56 is sleeved on the sealing ring support blocks 131 and abuts against the crystal boat base 21 so that a cooling cavity is formed between the crystal boat base 21 and the upper end face of the bottom extraction flange 13. The annular cooling air knives 132 are sleeved on the sixth sealing rings 56. The lower end of the bottom extraction flange 13 is provided with an air knife inlet 133 and an air knife exhaust port 134. The air knife inlet 133 is connected to the annular cooling air knife 132, and the air knife exhaust port 134 is connected to the cooling cavity. Because the crystal boat base 21 abuts against the sixth sealing ring 56, the crystal boat base 21 does not directly contact the upper end face of the bottom extraction flange 13. The sixth sealing ring 56 can buffer the crystal boat base 21, preventing the crystal boat base 21 from directly contacting the metal bottom extraction flange 13, and preventing the crystal boat base 21 from vibrating and colliding with the bottom extraction flange 13 during extraction, thus preventing damage. In addition, a cooling cavity can be formed between the crystal boat base 21 and the upper end face of the bottom extraction flange 13. The outer periphery of the cooling cavity is sealed by the fifth sealing ring 55. Cooling gas enters from the air knife inlet 133, and after passing through the cooling cavity to cool the fifth sealing ring 55, the sixth sealing ring 56 and the crystal boat base 21, it is finally discharged from the air knife exhaust port 134. The structure is simple and reasonable, and the cooling effect is good.
[0048] Preferably, in this embodiment, the lower end of the bottom extraction flange 13 is provided with a thermocouple detection port 137 that communicates with the cooling cavity. The cooling effect in the cooling cavity can be detected through the thermocouple detection port.
[0049] Preferably, in this embodiment, at least one air-cooling ring 138 and at least one water-cooling ring are provided at the lower end of the bottom extraction flange 13 to cool the sealing assembly and further extend the service life of the sealing assembly.
[0050] Furthermore, this embodiment also includes a process inlet pipe 6 and a thermocouple pipe 7. The sealing ring support block 131 has an internal mounting hole. The process inlet pipe 6 or the thermocouple pipe 7 passes through the mounting hole and extends through the crystal boat base 21 into the process tube 3. In a horizontal projection, the sealing ring support block 131 is located inside the sealing end face 31 of the process tube. The process inlet pipe 6 or the thermocouple pipe 7 can be installed in the mounting hole of the sealing ring support block 131. The process inlet pipe 6 or the thermocouple pipe 7 can pass through the mounting hole and extend through the crystal boat base 21 into the process tube 3. Since the sixth sealing ring 56 is sleeved on the outside of the sealing ring support block 131, the crystal boat base 21 is sealed to the process inlet pipe 6 or the thermocouple pipe 7. The structure is simple and the layout is reasonable. The process inlet pipe 6 is used to supply process gas to the process tube 3, and the thermocouple pipe 7 is used to detect the process temperature in the process tube 3.
[0051] The above description is merely a preferred embodiment of the present utility model and is not intended to limit the present utility model in any way. Although the present utility model has been disclosed above with reference to preferred embodiments, it is not intended to limit the present utility model. Any person skilled in the art can make many possible variations and modifications to the technical solution of the present utility model using the methods and techniques disclosed above, or modify it into equivalent embodiments with equivalent changes, without departing from the spirit and technical solution of the present utility model. Therefore, any simple modifications, equivalent substitutions, equivalent changes and modifications made to the above embodiments based on the technical essence of the present utility model without departing from the content of the technical solution of the present utility model shall still fall within the protection scope of the technical solution of the present utility model.
Claims
1. A furnace door system for a vertical furnace, characterized in that: The system includes a furnace door sealing flange assembly (1), a crystal boat assembly (2), and a sealing assembly. The sealing assembly includes a first sealing ring (51). The furnace door sealing flange assembly (1) includes an end face support flange (11) and an annular cooling flange (12). The crystal boat assembly (2) includes a crystal boat base (21) and a crystal boat (22). The crystal boat (22) is mounted on the crystal boat base (21), and the crystal boat base (21) is mounted on the end face support flange (11). The annular cooling flange (12) is mounted on the end face support flange (11). The first sealing ring (51) is located on the flange (11) and between the inner side of the end face support flange (11) and the crystal boat base (21). The first sealing ring (51) abuts between the annular cooling flange (12) and the crystal boat base (21). The annular cooling flange (12) is used to cool the first sealing ring (51). When the process tube (3) moves to the end face support flange (11), the first sealing ring (51) abuts against the process tube (3) to seal the crystal boat base (21) and the process tube (3) to form a closed reaction chamber.
2. The furnace door system of the vertical furnace equipment according to claim 1, characterized in that: The first sealing ring (51) is an L-shaped sealing ring. The L-shaped sealing ring includes a first upper sealing surface (511) and a second upper sealing surface (512) that is higher than the first upper sealing surface (511). The L-shaped sealing ring is installed on the crystal boat base (21). The first upper sealing surface (511) abuts against the annular cooling flange (12). The bottom of the process pipe (3) is provided with a process pipe sealing end face (31) for abutting against the second upper sealing surface (512).
3. The furnace door system of the vertical furnace equipment according to claim 2, characterized in that: The sealing assembly also includes a second sealing ring (52), and the bottom of the process pipe (3) is provided with a process pipe flange (32). The process pipe flange (32) is sealed to the end face support flange (11) through the second sealing ring (52), and the sealing end face (31) of the process pipe protrudes from the process pipe flange (32).
4. The furnace door system of the vertical furnace equipment according to claim 1, characterized in that: The furnace door sealing flange assembly (1) also includes a bottom evacuation flange (13) connected to the lower end of the end face support flange (11). The bottom evacuation flange (13) is used to dock with the vacuum pipeline system for evacuation. The vacuum pipeline system includes a cold trap (4). The upper flange of the cold trap (4) is connected to the bottom evacuation flange (13). The crystal boat base (21) extends through the end face support flange (11) and the bottom evacuation flange (13) into the cold trap (4).
5. The furnace door system of the vertical furnace equipment according to claim 4, characterized in that: The sealing assembly also includes a third sealing ring (53), a cold trap sealing end face (41) is provided inside the cold trap (4), a heat insulation baffle (23) is provided at the lower part of the crystal boat base (21), the third sealing ring (53) is sleeved on the outside of the heat insulation baffle (23), and abuts against the lower end face of the crystal boat base (21), the cold trap sealing end face (41) and the heat insulation baffle (23) respectively.
6. The furnace door system of the vertical furnace equipment according to claim 4, characterized in that: The sealing assembly also includes a fifth sealing ring (55), and the bottom extraction flange (13) is sealed to the end face support flange (11) through the fifth sealing ring (55).
7. The furnace door system of the vertical furnace equipment according to claim 6, characterized in that: The sealing assembly also includes a plurality of sixth sealing rings (56). The upper end of the bottom exhaust flange (13) is provided with a plurality of sealing ring support blocks (131) and a plurality of annular cooling air knives (132). The sealing ring support blocks (131) and the annular cooling air knives (132) are located inside the fifth sealing ring (55). The sixth sealing ring (56) is sleeved on the sealing ring support blocks (131) and abuts against the crystal boat base (21) so that a cooling cavity is formed between the crystal boat base (21) and the upper end face of the bottom exhaust flange (13). The annular cooling air knives (132) are sleeved on the sixth sealing ring (56).
8. The furnace door system of the vertical furnace equipment according to claim 7, characterized in that: The furnace door system of the vertical furnace equipment also includes a process air inlet pipe (6) and a thermocouple pipe (7). The sealing ring support block (131) has an installation hole inside. The process air inlet pipe (6) or thermocouple pipe (7) passes through the installation hole and extends into the process pipe (3) through the crystal boat base (21).
9. The furnace door system of the vertical furnace equipment according to claim 1, characterized in that: The sealing assembly also includes a fourth sealing ring (54), the inner side of the end face support flange (11) is provided with a stepped surface, the crystal boat base (21) is installed on the stepped surface, and the fourth sealing ring (54) abuts against the crystal boat base (21) and the stepped surface.
10. The furnace door system of the vertical furnace equipment according to any one of claims 1 to 9, characterized in that: The lower end face of the annular cooling flange (12) is provided with an annular cooling flange air inlet (121) and an annular cooling flange air outlet (122). The inner side of the annular cooling flange (12) is provided with a plurality of annular air holes (123). The annular cooling flange air inlet (121) and the annular cooling flange air outlet (122) are respectively connected to the annular air holes (123).