Double-channel heating furnace waste heat recycling boiler

By installing flue gas baffles inside the flue gas boiler to separate the superheater, evaporator, and economizer of the heating furnace into independent channels, two heating furnaces can share one waste heat boiler and one electrical control system, solving the problems of high investment and high maintenance in the existing technology and improving the efficiency and stability of waste heat recovery.

CN225017143UActive Publication Date: 2026-11-24JIANGSU DONGJIU HEAVY IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522681238.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-18
Publication Date
2026-11-24
Estimated Expiration
2035-12-18

AI Technical Summary

Technical Problem

In the existing technology, the utilization of waste heat from steel rolling heating furnaces in steel plants requires two separate waste heat boilers, resulting in high investment costs, high operating and maintenance costs, and the small amount of flue gas makes it sensitive to furnace pressure.

Method used

Design a dual-channel waste heat recovery boiler. By setting a flue gas baffle in the flue gas boiler, the superheater, evaporator and economizer are separated into independent channels, so that the two heating furnaces share a waste heat boiler and a set of electrical control systems, ensuring that the flue gas does not interfere with each other.

Benefits of technology

It significantly reduces equipment investment and operating costs, while improving waste heat recovery efficiency and stability, and reducing sensitivity to furnace pressure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225017143U_ABST
    Figure CN225017143U_ABST
Patent Text Reader

Abstract

This utility model relates to the field of waste heat utilization technology for steel rolling heating furnaces, specifically to a dual-channel heating furnace waste heat recovery boiler. The boiler drum of this design, in conjunction with two flue gas boilers and a boiler heating surface with built-in flue gas baffles, enables two heating furnaces to share a single waste heat boiler and an electrical control system for waste heat recovery. Specifically, the left and right superheaters, the first-stage left and right evaporators, the second-stage left and right evaporators, and the left and right economizers are all separated into independent channels by baffles, ensuring that the flue gas does not interfere with each other. Simultaneously, both sets of economizers and superheaters are equipped with shut-off valves at their inlet and outlet, facilitating switching when a single heating furnace is operating, significantly reducing equipment investment and operating costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of waste heat utilization technology of steel rolling heating furnaces, and in particular to a boiler for waste heat recovery and utilization of dual-channel heating furnaces. Background Technology

[0002] In the steel rolling production process of steel plants, the rolling furnace is a key piece of equipment that generates a large amount of waste heat during operation. Existing technologies have explored and implemented numerous methods for utilizing this waste heat. Some technologies involve setting up waste heat boilers to recover and reuse the waste heat from the flue gas generated by the furnace, achieving energy reuse. This reduces energy consumption in steel plants to a certain extent, improves energy efficiency, saves production costs, and also reduces waste heat emissions into the environment, thus playing a positive role in environmental protection.

[0003] However, the characteristics of waste heat utilization in steel mill rolling heating furnaces are that the flue gas volume is not large and it is extremely sensitive to furnace pressure. Dual rolling heating furnaces are generally equipped with two separate waste heat boilers for heat recovery, which consumes a large amount of steel. At the same time, the two boilers need to be equipped with two sets of electrical control systems, which not only increases the investment cost but also increases the operation and maintenance costs. Utility Model Content

[0004] The purpose of this utility model is to provide a dual-channel heating furnace waste heat recovery boiler, which aims to solve the technical problems of existing steel mill rolling heating furnace waste heat recovery, which is characterized by small flue gas volume and extreme sensitivity to furnace pressure. Dual rolling heating furnaces are generally equipped with two separate waste heat boilers for heat recovery, resulting in large steel consumption. At the same time, the two boilers require two sets of electrical control systems, which not only increases investment costs but also increases operation and maintenance costs.

[0005] To achieve the above objectives, this utility model employs a dual-channel heating furnace waste heat recovery boiler, comprising a boiler drum, two flue gas boilers, and a flue gas boiler. Each flue gas boiler is equipped with, from top to bottom, two superheaters, two primary evaporators, two secondary evaporators, and two economizers. Two flue gas outlets are located below each flue gas boiler. The boiler drum is positioned on top of the two flue gas boilers. Both flue gas boilers are fixedly connected to and located above the flue gas boilers. Both superheaters are connected to the boiler drum and are also externally connected to the main steam supply. The inlet and outlet ends of both primary evaporators are connected to the boiler drum. The inlet and outlet ends of both secondary evaporators are also connected to the boiler drum. Both economizers are connected to the boiler drum and are externally connected to feedwater from a deaerator.

[0006] The flue gas boiler is equipped with a flue gas baffle, which is located between the two superheaters, the two primary evaporators, the two secondary evaporators, and the two economizers.

[0007] The two superheaters are divided into a left superheater and a right superheater; the two primary evaporators are divided into a primary left evaporator and a primary right superheater; the two secondary evaporators are divided into a secondary left evaporator and a secondary right evaporator; and the two economizers are divided into a left economizer and a right economizer. All heating surfaces are arranged in the two flue gas boilers of the same flue gas boiler and separated by partitions to ensure that the flue gas in the two channels does not affect each other.

[0008] This utility model discloses a dual-channel heating furnace waste heat recovery boiler. The boiler drum of this design is coordinated with two flue gas boilers and a flue gas boiler with built-in flue gas baffles (the flue gas baffles are located between the two superheaters, two primary evaporators, two secondary evaporators, and two economizers). This allows the flue gas from two heating furnaces to share a single waste heat boiler and a single electrical control system for waste heat recovery. The left and right superheaters, the primary left and primary right evaporators, the secondary left and secondary right evaporators, and the left and right economizers are all separated into independent channels by baffles to ensure that the flue gas does not interfere with each other. At the same time, the inlet and outlet of the two sets of economizers and superheaters are equipped with shut-off valves, which facilitates switching when a single heating furnace is working, significantly reducing equipment investment and operating costs. Attached Figure Description

[0009] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0010] Figure 1 This is a front view of the flue gas side of the dual-channel heating furnace waste heat recovery boiler of this utility model.

[0011] Figure 2 This is a front view of the steam-water side structure of the dual-channel heating furnace waste heat recovery boiler of this utility model.

[0012] 1-Boiler drum, 2-Flue gas boiler, 3-Left superheater, 4-Right superheater, 5-First-stage left evaporator, 6-First-stage right evaporator, 7-Second-stage left evaporator, 8-Second-stage right evaporator, 9-Left economizer, 10-Right economizer, 11-Flue gas outlet, 12-Flue gas baffle, 13-First-stage flue gas inlet, 14-Second-stage flue gas inlet, 15-Main steam external supply end, 16-Feedwater from deaerator. Detailed Implementation

[0013] The embodiments of this utility model are described in detail below. Examples of these embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain this utility model, and should not be construed as limiting this utility model.

[0014] Please see Figures 1 to 2 This utility model provides a dual-channel heating furnace waste heat recovery boiler, including a boiler drum 1, two flue gas boilers 2, and a flue gas boiler. The flue gas boilers are equipped with two superheaters, two primary evaporators, two secondary evaporators, and two economizers arranged sequentially from top to bottom. Two flue gas outlets 11 are located below the flue gas boilers. The boiler drum 1 is located on top of the two flue gas boilers 2, and both flue gas boilers 2 are fixedly connected to and located above the flue gas boilers. Both superheaters are connected to the boiler drum 1 and are also externally connected to a main steam supply terminal 15. The inlet and outlet ends of the two primary evaporators are connected to the boiler drum 1, as are the inlet and outlet ends of the two secondary evaporators. Both economizers are connected to the boiler drum 1 and are also externally connected to feedwater from a deaerator 16.

[0015] In this embodiment, a highly efficient waste heat recovery system is formed by the boiler drum 1, the two flue gas boilers 2, the left superheater 3 and right superheater 4 arranged sequentially from top to bottom inside the flue gas boilers, the first-stage left evaporator 5 and first-stage right evaporator 6, the second-stage left evaporator 7 and second-stage right evaporator 8, and the left economizer 9 and right economizer 10. The boiler drum 1 is located above the two flue gas boilers 2 and is tightly connected to each heating surface component, realizing the effective transfer and conversion of heat energy. The two flue gas boilers 2 are fixedly connected to the flue gas boiler, ensuring smooth flow of flue gas. This design allows the flue gas from the two heating furnaces to share a single waste heat boiler for heat recovery, eliminating the need for two independent boiler systems, thereby significantly reducing steel consumption, investment costs, and subsequent operation and maintenance expenses.

[0016] Furthermore, the flue gas boiler is provided with a flue gas baffle 12, and the flue gas baffle 12 is also located between the two superheaters, the two primary evaporators, the two secondary evaporators and the two economizers.

[0017] In this embodiment, by adding the flue gas baffle 12 inside the flue gas boiler, and the baffle penetrating between the left superheater 3 and the right superheater 4, the first-stage left evaporator 5 and the first-stage right evaporator 6, the second-stage left evaporator 7 and the second-stage right evaporator 8, and the left economizer 9 and the right economizer 10, this innovative design achieves complete isolation of the flue gas boiler. Each heating surface component is divided into two independent parts by the baffle, corresponding to the flue gas paths of the two heating furnaces respectively, ensuring that the flue gas does not interfere with each other during the recovery process, and improving the efficiency and stability of waste heat recovery.

[0018] Furthermore, the two superheaters are divided into a left superheater 3 and a right superheater 4, the two primary evaporators are divided into a primary left evaporator 5 and a primary right superheater 4, the two secondary evaporators are divided into a secondary left evaporator 7 and a secondary right evaporator 8, and the two economizers are divided into a left economizer 9 and a right economizer 10. All heating surfaces are arranged in the two flue gas boilers of the same flue gas boiler and separated by partitions to ensure that the flue gas in the two channels does not affect each other.

[0019] In this utility model, when using the dual-channel heating furnace waste heat recovery boiler, the high-temperature flue gas generated by the two heating furnaces enters the flue gas boilers through the two flue gas boilers 2 respectively. The flue gas is divided into two independent channels by the flue gas baffle 12 in the flue gas boilers, and flows sequentially through the left superheater 3 and right superheater 4, the first-stage left evaporator 5 and first-stage right evaporator 6, the second-stage left evaporator 7 and second-stage right evaporator 8, and the left economizer 9 and right economizer 10 for heat exchange. At the same time, 104℃ deoxygenated water enters the left economizer 9 and right economizer 10 through two paths by the feed water pump. After being heated, it flows into the boiler drum 1. The generated saturated steam is then sent to the left superheater 3 and right superheater 4 for further superheating, and finally output through the main steam external supply terminal 15. Throughout the process, the shut-off valves set at the inlet and outlet of the two sets of economizers and superheaters can be switched according to the operating status of a single heating furnace.

[0020] The above-disclosed embodiments are merely preferred embodiments of the present utility model and should not be construed as limiting the scope of the present utility model. Those skilled in the art can understand that implementing all or part of the above-described embodiments and making equivalent changes in accordance with the claims of the present utility model are still within the scope of the utility model.

Claims

1. A dual-channel heating furnace waste heat recovery boiler, characterized in that, The system includes a boiler drum, two flue gas boilers, and a flue gas boiler. Each flue gas boiler contains, from top to bottom, two superheaters, two primary evaporators, two secondary evaporators, and two economizers. Two flue gas outlets are located below each flue gas boiler. The boiler drum is positioned on top of the two flue gas boilers. Both flue gas boilers are fixedly connected to and located above the boilers. Both superheaters are connected to the boiler drum and are also externally connected to the main steam supply. The inlet and outlet ends of both primary evaporators are connected to the boiler drum. The inlet and outlet ends of both secondary evaporators are connected to the boiler drum. Both economizers are connected to the boiler drum and are also externally connected to feedwater from a deaerator.

2. The dual-channel heating furnace waste heat recovery boiler as described in claim 1, characterized in that, The flue gas boiler is equipped with a flue gas baffle, which is located between the two superheaters, the two primary evaporators, the two secondary evaporators, and the two economizers.

3. The dual-channel heating furnace waste heat recovery boiler as described in claim 2, characterized in that, The two superheaters are divided into a left superheater and a right superheater; the two primary evaporators are divided into a primary left evaporator and a primary right superheater; the two secondary evaporators are divided into a secondary left evaporator and a secondary right evaporator; and the two economizers are divided into a left economizer and a right economizer. All heating surfaces are arranged in the two flue gas boilers of the same flue gas boiler and separated by partitions to ensure that the flue gas in the two channels does not affect each other.