Buffer tank and vacuum phase change heat transfer system
By designing a buffer tank in the vacuum phase change direct heat evaporator and using filters and liquid-gas pipelines to separate the slag-water mixture from the level gauge, the problem of the level gauge getting stuck due to floating scum particles and silt impurities was solved, thus achieving accurate level gauge measurement and stable system operation.
Patent Information
- Application Number
- CN202521698856.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-08-11
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-08-11
AI Technical Summary
The level gauge of the vacuum phase change direct heat evaporator becomes stuck and distorted due to the inclusion of scum particles and silt impurities, affecting the stable operation of the system.
Design a buffer tank, including a tank body, a filter element, a liquid pipe, and a gas pipe. The filter element divides the inner cavity of the tank into a pre-filter chamber and a post-filter chamber. The liquid pipe is connected to the evaporator and the level gauge, and the gas pipe is connected to the vacuum zone to filter out scum particles and ensure accurate level gauge measurement.
It effectively intercepts scum particles and silt in the slag water, ensuring accurate level display and guaranteeing stable and efficient operation of the direct-heating system.
Smart Images

Figure CN225017265U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of liquid level measurement technology, and in particular to a buffer tank and a vacuum phase change heat exchange system. Background Technology
[0002] As feedforward information for the upstream evaporator slag water inlet electric valve and the downstream return water pump, the liquid level of the vacuum phase change direct heat exchanger evaporator is of great significance for the interlocking control of the direct heat exchanger system, ensuring the recycling of slag water and precise heat exchange.
[0003] During the high-temperature slag flushing water cold extraction process, a large amount of slag particles and silt impurities are carried in. The particles enter the magnetic float level gauge with the slag flushing water, directly hindering the free up and down floating of the internal magnetic float. The silt will settle at the lower inlet end of the magnetic float level gauge until it blocks the pipeline connected to the lower inlet end. This will affect the accuracy of the level display and thus affect the stable operation of the entire direct heat exchanger system. Utility Model Content
[0004] To address the aforementioned problems, this application provides a buffer tank and a vacuum phase change heat transfer system.
[0005] This application provides a buffer tank, including a tank body, a filter element, a first liquid pipe, a first gas pipe, a second liquid pipe, and a second gas pipe. The filter element is vertically connected to the tank body and is used to divide the inner cavity of the tank body into a pre-filter chamber and a post-filter chamber. The first liquid pipe and the first gas pipe are both connected to the pre-filter chamber. Both the first liquid pipe and the first gas pipe are equipped with valves to control the on / off state. The first liquid pipe is closer to the bottom of the tank body than the first gas pipe. The first liquid pipe and the first gas pipe are used to connect to the sludge-water zone and the vacuum zone of the direct-heat evaporator, respectively. The second liquid pipe and the second gas pipe are both connected to the post-filter chamber. The second liquid pipe is closer to the bottom of the tank body than the second gas pipe. Both the second liquid pipe and the second gas pipe are used to connect to the liquid chamber of a level gauge.
[0006] In some embodiments, the pore size of the filter element is not larger than the particle size of the scum particles contained in the scum water in the scum water zone.
[0007] In some implementations, the filter element includes, but is not limited to, a mesh structure.
[0008] In some embodiments, the filter elements are distributed along the axial direction of the tank, extending between the top and bottom of the tank.
[0009] In some implementations, the filter element is detachably installed in the tank.
[0010] In some embodiments, the first liquid pipe includes a variable diameter section connected to the tank body, the inner diameter of which gradually increases in the direction close to the tank body.
[0011] In some embodiments, the first liquid pipe and the second liquid pipe are distributed on the same distribution plane perpendicular to the axis of the tank.
[0012] In some embodiments, the first and second air pipes are distributed on the same distribution plane perpendicular to the axis of the tank.
[0013] A vacuum phase change heat exchange system includes a direct-heating evaporator, the aforementioned buffer tank and level gauge. The buffer tank is vertically distributed. A first liquid pipe is connected to the slag-water zone of the direct-heating evaporator, and a first gas pipe is connected to the vacuum zone of the direct-heating evaporator. The level gauge is vertically distributed, and the liquid chamber of the level gauge is connected to both the second liquid pipe and the second gas pipe.
[0014] In some embodiments, the vacuum phase change heat exchange system is further provided with a backwashing assembly, which includes a first drain pipe, a second drain pipe, a third drain pipe, and a backwashing pipe. The first drain pipe is connected to the bottom of the tank and communicates with the pre-filter chamber. The second drain pipe is connected to the bottom of the tank and communicates with the post-filter chamber. The third drain pipe is connected to the bottom of the liquid chamber of the level gauge. The backwashing pipe is connected to the top of the liquid chamber of the level gauge and is used to connect to the backwashing water source. The first drain pipe, the second drain pipe, the third drain pipe, and the backwashing pipe are all equipped with control valves.
[0015] The beneficial effects of this application are as follows: A buffer tank is provided, connected between the evaporator of a direct-heating machine and a level gauge. The buffer tank includes a tank body, a filter element, a first liquid pipe, a first gas pipe, a second liquid pipe, and a second gas pipe. The filter element divides the inner cavity of the tank body into a pre-filter chamber and a post-filter chamber. The first liquid pipe and the first gas pipe are both connected to the pre-filter chamber, and the second liquid pipe and the second gas pipe are both connected to the post-filter chamber. The first liquid pipe is connected to the sludge-water zone of the direct-heating machine evaporator, and the first gas pipe is connected to the vacuum zone of the direct-heating machine evaporator. The second liquid pipe and the second gas pipe are both connected to the liquid chamber of the level gauge. When the direct-heating machine evaporator is running, flushing water enters the buffer tank body through the first liquid pipe. The scum particles in the sludge are effectively intercepted by the filter element, and the silt in the sludge water settles at the bottom of the pre-filter chamber. The filtered sludge water enters the level gauge through the second liquid pipe. The magnetic levitation inside the level gauge floats up and down with the change of liquid level. It is connected to the liquid chamber of the level gauge, the second air pipe, the inner cavity of the tank, the first air pipe and the vacuum zone of the direct heat engine evaporator, so that the level gauge can accurately measure the sludge water level of the direct heat engine evaporator. This application can improve the phenomenon of level gauge jamming and distortion caused by scum particles and silt impurities, reduce the adverse effect of high impurity content of flushing sludge water on accurate liquid level display, and thus ensure the stable and efficient operation of the entire direct heat engine flushing heat exchange system. Attached Figure Description
[0016] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model.
[0017] Figure 1 This is an installation diagram of a buffer tank provided in this application.
[0018] Attached diagram labels: 10-Buffer tank, 100-Tank body, 110-Pre-filter chamber, 120-Post-filter chamber, 200-Filter element, 300-First liquid pipe, 310-First valve, 320-Reducing diameter section, 400-First gas pipe, 410-Second valve, 500-Second liquid pipe, 600-Second gas pipe, 710-First drain pipe, 711-Third valve, 720-Second drain pipe, 721-Fourth valve, 730-Third drain pipe, 731-Fifth valve, 740-Backwash pipe, 741-Sixth valve, 20-Direct heat evaporator, 21-Slag-water zone, 22-Vacuum zone, 30-Level gauge. Detailed Implementation
[0019] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of the embodiments. Based on the embodiments of this application, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of this application.
[0020] Furthermore, reference numerals and / or reference letters may be repeated in different examples in this application. Such repetition is for simplification and clarity purposes and does not in itself indicate a relationship between the various embodiments and / or settings discussed. In addition, this application provides examples of various specific processes and materials; however, those skilled in the art will recognize the application of other processes and / or the use of other materials.
[0021] Please refer to Figure 1 This application provides a buffer tank 10, including a tank body 100, a filter element 200, a first liquid pipe 300, a first air pipe 400, a second liquid pipe 500, and a second air pipe 600.
[0022] The tank body 100 is the main structure of the buffer tank 10, and it has an internal cavity. Because liquid level measurement is involved, the buffer tank 10 is designed as a long strip and is placed vertically during use. (See reference...) Figure 1 The filter element 200 is vertically connected inside the tank body 100. The filter element 200 divides the tank cavity into two parts: a pre-filter chamber 110 corresponding to the direct heat evaporator 20 and a post-filter chamber 120 corresponding to the level gauge 30.
[0023] The first liquid pipe 300 is connected to the pre-filter chamber 110 and the sludge-water zone 21 of the direct-heat evaporator 20. The first gas pipe 400 is connected to the pre-filter chamber 110 and the vacuum zone 22 of the direct-heat evaporator 20. The second liquid pipe 500 and the second gas pipe 600 are both connected to the post-filter chamber 120 and the liquid chamber 30. Since the liquid is below the gas, the first liquid pipe 300 is lower than the first gas pipe 400, and the second liquid pipe 500 is lower than the second gas pipe 600. Similarly, the first liquid pipe 300 is lower than the second gas pipe 600, and the second liquid pipe 500 is lower than the first gas pipe 400. Based on the structure of the tank 100 of this application, the first liquid pipe 300 is closer to the bottom of the tank 100 than the first gas pipe 400, and the second liquid pipe 500 is closer to the bottom of the tank 100 than the second gas pipe 600.
[0024] Please refer to Figure 1 Both the first liquid pipe 300 and the first gas pipe 400 are equipped with valves to control their on / off state. Figure 1 The diagram shows that the first liquid pipe 300 is equipped with a first valve 310, and the first gas pipe 400 is equipped with a second valve 410. The first valve 310 is a liquid valve, and the second valve 410 is a gas valve. The valves are designed for purposes including, but not limited to, replacing or maintaining the buffer tank 10. When the buffer tank 10 is repaired or replaced, the valves are closed to disconnect the mass exchange between the buffer tank 10 and the direct-heater evaporator 20.
[0025] When the direct-heating evaporator 20 is running, the flushing water enters the buffer tank 100 through the first liquid pipe 300. The floating slag particles in the slag water are effectively intercepted by the filter element 200, and the mud and sand in the slag water settle at the bottom of the pre-filter chamber 110. The filtered slag water enters the level gauge 30 through the second liquid pipe 500. The magnetic levitation inside the level gauge 30 floats up and down with the change of liquid level. It is connected to the liquid chamber of the level gauge 30, the second air pipe 600, the inner cavity of the tank 100, the first air pipe 400 and the vacuum zone 22 of the direct-heating evaporator 20, so that the level gauge 30 can accurately measure the slag water level of the direct-heating evaporator 20.
[0026] This application can improve the distorted display of the liquid level gauge 30 caused by scum particles and silt impurities, reduce the adverse effects of flushing water with high impurity content on the accurate display of liquid level, and thus ensure the stable and efficient operation of the entire direct heat exchanger flushing system.
[0027] In some embodiments, the filtration capacity of the filter element 200 is limited. To fully filter scum particles in the sludge water of the direct-heater evaporator 20, the pore size of the filter element 200 is not larger than the particle size of the scum particles contained in the sludge water in the sludge water zone 21. The filter element 200 generally adopts a mesh structure, which is often described as a filter screen. In more feasible embodiments, the filter element 200 can also be in other forms such as a cloth.
[0028] In some implementation methods, please refer to Figure 1 The filter element 200 is distributed along the axial direction of the tank 100. The filter element 200 extends between the top and bottom of the tank 100. The vertical sides of the filter element 200 are connected to the inner wall of the tank 100, dividing the left and right halves of the tank 100 into a pre-filter chamber 110 and a post-filter chamber 120.
[0029] In some embodiments, the filter element 200 is detachably mounted to the tank 100, allowing maintenance of the filter element 200 within the tank 100 after operation. Detachable connections include, but are not limited to, bolted connections, with mounting plate bases within the tank 100 for implementing bolted connections.
[0030] In some implementation methods, please refer to Figure 1 The first liquid pipe 300 includes a reducing section 320 connected to the tank body 100. The inner diameter of the reducing section 320 gradually increases in the direction close to the tank body 100. When the sludge enters the tank body 100 along the first liquid pipe 300, the flow velocity of the sludge in the sludge gradually decreases as the inner diameter of the reducing section 320 changes. The sludge preferentially settles at the outlet of the reducing section 320, and the filtered sludge flows into the level gauge 30 from the second liquid pipe 500.
[0031] In some implementation methods, please refer to Figure 1 The first liquid pipe 300 and the second liquid pipe 500 are designed with equal height. Taking into account the structural characteristics of the tank body 100, the first liquid pipe 300 and the second liquid pipe 500 are distributed on the same plane perpendicular to the axis of the tank body 100. Similarly, the first air pipe 400 and the second air pipe 600 are designed with equal height, and the first air pipe 400 and the second air pipe 600 are distributed on the same plane perpendicular to the axis of the tank body 100.
[0032] Based on the aforementioned buffer tank 10, this application also provides a vacuum phase change heat exchange system, which relates to a slag flushing water direct heat exchanger. This system utilizes the high-temperature waste heat slag water produced during blast furnace slag flushing and employs vacuum phase change technology to achieve flash evaporation of the slag water and gas-water heat exchange with heating water. The core equipment of the slag flushing water direct heat exchanger is the direct heat exchanger evaporator 20. The direct heat exchanger evaporator 20 ensures the negative pressure vacuum conditions required for the flash evaporation of the slag water, allowing the slag water to quickly and fully flash-evaporate after passing through from top to bottom. After dehumidification by a demister, it enters a matching plate heat exchanger for gas-water heat exchange. The slag flushing water intercepted by the demister's condensation and dehumidification, as well as some slag flushing water that has not evaporated in time, collects at the bottom of the direct heat exchanger evaporator 20, and the liquid level is displayed by a magnetic level gauge 30. The evaporator liquid level serves as feedforward information for the upstream evaporator slag water inlet electric valve and the downstream return water pump, which is crucial for the interlocking control of the direct heat exchanger system, ensuring the recycling and precise heat exchange of the slag flushing water.
[0033] Specifically, please refer to Figure 1 The vacuum phase change heat exchange system includes a direct-heating evaporator 20, the aforementioned buffer tank 10, and a level gauge 30. The buffer tank 10 is vertically distributed. The first liquid pipe 300 is connected to the slag-water zone 21 of the direct-heating evaporator 20, and the first gas pipe 400 is connected to the vacuum zone 22 of the direct-heating evaporator 20. The level gauge 30 is vertically distributed, and its liquid chamber is connected to both the second liquid pipe 500 and the second gas pipe 600. The vacuum phase change heat exchange system can improve the phenomenon of level gauge 30 jamming and distorted display caused by scum particles and silt impurities, and reduce the adverse effects of flushing water with high impurity content on accurate level display, thereby ensuring the stable and efficient operation of the entire direct-heating slag flushing heat exchange system.
[0034] In some embodiments, the vacuum phase change heat transfer system also includes a backwashing assembly that provides backwashing functionality to improve the operating time and detection accuracy of the level gauge 30. Please refer to... Figure 1 The backwashing assembly includes a first drain pipe 710, a second drain pipe 720, a third drain pipe 730, and a backwashing pipe 740.
[0035] The first drain pipe 710 is connected to the bottom of the tank 100 and is connected to the pre-filter chamber 110. The first drain pipe 710 is used to discharge the sludge, water and impurities in the pre-filter chamber 110. The first drain pipe 710 is equipped with a third valve 711 as a control valve. The third valve 711 can be a drain valve.
[0036] The second drain pipe 720 is connected to the bottom of the tank 100 and is connected to the filter chamber 120. The second drain pipe 720 is used to discharge the sludge and water in the filter chamber 120. The second drain pipe 720 is equipped with a fourth valve 721 as a control valve. The fourth valve 721 can be a drain valve.
[0037] The third drain pipe 730 is connected to the bottom of the liquid chamber of the level gauge 30. The third drain pipe 730 is equipped with a fifth valve 731, which serves as a control valve. When the fifth valve 731 is opened, the sludge and water in the level gauge 30 are discharged.
[0038] The backwash pipe 740 is connected to the top of the liquid chamber of the level gauge 30. The backwash pipe 740 is used to connect to the backwash water source. The backwash pipe 740 is equipped with a sixth valve 741 as a control valve. When the sixth valve 741 is opened, the flushing water provided by the backwash water source enters the liquid chamber of the level gauge 30 along the backwash pipe 740. With the cooperation of other structures, the backwashing function of the level gauge 30 and the buffer tank 10 is realized.
[0039] Over time, the filter buffer device accumulates a large amount of floating scum and sediment, requiring regular backwashing to maintain its filtration efficiency. This document provides a specific backwashing operation method based on the aforementioned backwashing components. Please refer to... Figure 1 To understand.
[0040] First, since the evaporator is in a vacuum state, the first valve 310 and the second valve 410 are closed during cleaning, and the fifth valve 731 is opened. While draining the sludge and water inside the level gauge 30, check whether there are particulate matter in the sludge and water inside the level gauge 30 to ensure that the filter element 200 of the buffer tank 10 can achieve the predetermined filtration effect.
[0041] After drainage is completed, close the fifth valve 731, connect the backwash pipe 740 to the backwash water source, open the sixth valve 741, and introduce flushing water into the level gauge 30 and the buffer tank 10.
[0042] After the flushing water is introduced, the sixth valve 741 is closed and the first valve 310 is opened. Taking advantage of the large negative pressure inside the evaporator, the gas-water mixture in the buffer tank 10 is drawn into the evaporator the moment the first valve 310 is opened. At this time, the rapidly flowing gas-water mixture will instantly disperse the sediment at the bottom of the buffer tank 10. Subsequently, close the first valve 310, and open the third valve 711, the fourth valve 721 and the sixth valve 741 in sequence to introduce backwash water back into the level gauge 30 and the buffer tank 10. The backwash water flows out from the third valve 711 and the fourth valve 721 until there are no impurities in the discharged backwash water, indicating that the flushing process is complete.
[0043] After backwashing is complete, adjust the status of each valve, close the sixth valve 741, the third valve 711 and the fourth valve 721 in sequence, and open the second valve 410 and the first valve 310 in sequence to restore the level gauge 30 to the normal level display state.
[0044] In this application, unless otherwise expressly specified and limited, "above" or "below" the second feature can include direct contact between the first and second features, or contact between the first and second features through another feature between them. Furthermore, "above," "over," and "on top" of the second feature includes the first feature being directly above or diagonally above the second feature, or simply indicates that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature includes the first feature being directly below or diagonally below the second feature, or simply indicates that the first feature is at a lower horizontal level than the second feature.
[0045] Although preferred embodiments of the present invention have been described, those skilled in the art, upon learning the basic inventive concept, can make other changes and modifications to these embodiments. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments as well as all changes and modifications falling within the scope of the present invention.
[0046] Obviously, those skilled in the art can make various modifications and variations to this utility model without departing from its spirit and scope. Therefore, if these modifications and variations fall within the scope of the claims of this utility model and their equivalents, this utility model also intends to include these modifications and variations.
Claims
1. A surge tank characterized in that, Comprising: a tank body; a filter vertically connected in the tank body for dividing an inner cavity of the tank body into a pre-filtering chamber and a post-filtering chamber; a first liquid pipe and a first gas pipe both in communication with the pre-filtering chamber, both provided with a valve for controlling on-off, the first liquid pipe being closer to the bottom of the tank body than the first gas pipe, the first liquid pipe and the first gas pipe being used for communicating with a sludge water area and a vacuum area of a direct heating machine evaporator respectively; a second liquid pipe and a second gas pipe both in communication with the post-filtering chamber, the second liquid pipe being closer to the bottom of the tank body than the second gas pipe, the second liquid pipe and the second gas pipe both being used for communicating with a liquid cavity of a liquid level meter.
2. The buffer tank according to claim 1, wherein: a filter hole diameter of the filter is not greater than a particle size of sludge particles contained in the sludge water in the sludge water area.
3. The buffer tank according to claim 2, wherein: the filter comprises but is not limited to a mesh structure.
4. The buffer tank according to claim 3, wherein: the filter is distributed along an axial direction of the tank body, and the filter is distributed between a top portion and a bottom portion of the tank body.
5. The buffer tank according to any one of claims 1-4, wherein: the filter is detachably installed in the tank body.
6. The buffer tank according to claim 1, wherein: the first liquid pipe comprises a variable diameter section connected to the tank body, an inner diameter of the variable diameter section gradually increases along a direction close to the tank body.
7. The buffer tank according to claim 1, wherein: the first liquid pipe and the second liquid pipe are distributed on a same distribution plane of the tank body perpendicular to an axial line.
8. The buffer tank according to claim 7, wherein: the first gas pipe and the second gas pipe are distributed on the same distribution plane of the tank body perpendicular to the axial line.
9. A vacuum phase change heat transfer system, characterized by, Comprising: a direct heating machine evaporator; the buffer tank according to any one of claims 1-8, vertically distributed, the first liquid pipe being in communication with a sludge water area of the direct heating machine evaporator, the first gas pipe being in communication with a vacuum area of the direct heating machine evaporator; and a liquid level meter, vertically distributed, a liquid cavity of the liquid level meter being in communication with the second liquid pipe and the second gas pipe.
