A lateral water supply debris flow simulation experiment device
By designing a debris flow simulation experimental device with lateral water supply, the impact of lateral water runoff on debris flow was accurately simulated, solving the problem of inaccurate lateral water runoff simulation in existing technologies, improving the repeatability of experiments and data accuracy, and supporting the study of debris flow initiation mechanism.
Patent Information
- Application Number
- CN202620063869.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2026-01-19
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2036-01-19
AI Technical Summary
Existing debris flow simulation experimental devices lack equipment specifically designed for lateral water inflow, making it impossible to accurately control the location, flow rate, and time of lateral inflow, thus affecting experimental repeatability and data accuracy.
A debris flow simulation experimental device with lateral water supply was designed, including a trench module, multiple lateral water supply modules, a monitoring module, and a central control module. The lateral water supply modules accurately simulate the water collection on the side of the debris flow gully, the monitoring modules monitor the soil and water supply parameters in real time, and the central control module achieves precise control of flow rate and slope.
It achieves accurate simulation of lateral water runoff during debris flow initiation, improves experimental repeatability and data reliability, supports comprehensive parameter analysis, reveals the debris flow initiation mechanism, and is suitable for debris flow initiation mechanism research and early warning model verification.
Smart Images

Figure CN225017679U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the technical field of geological disaster simulation experimental equipment, and in particular to a debris flow simulation experimental device with lateral water supply. Background Technology
[0002] Debris flow initiation is significantly influenced by water source conditions, with lateral runoff (such as from tributaries or overland flow) being a crucial triggering factor. Existing debris flow simulation devices mostly focus on simulating upstream inflows or overall rainfall, lacking specialized equipment for the effects of lateral runoff. This makes it impossible to quantitatively study the contribution of lateral runoff to debris flow initiation. For example, traditional devices struggle to precisely control the location, flow rate, and time of lateral inflows, and monitoring methods are insufficient, affecting experimental repeatability and data accuracy. Utility Model Content
[0003] This invention provides a debris flow simulation experimental device with lateral water supply to accurately simulate debris flows caused by lateral water collection and to quantitatively analyze the impact of lateral water collection on the initiation of debris flows.
[0004] To solve the above-mentioned technical problems, the technical solution of this utility model is as follows:
[0005] A debris flow simulation experimental device with lateral water supply includes:
[0006] A trench module includes a trench body and a height adjustment device disposed at the bottom of the trench body;
[0007] Multiple lateral water supply modules are installed on the side of the trench body to supply water into the trench body along the side of the trench body, so as to simulate the effect of water runoff on the side of the debris flow valley on the initiation of the debris flow.
[0008] The monitoring module is set at a preset position on the trench body to monitor the simulated soil parameters and the water supply parameters of the lateral water supply module in real time.
[0009] The central control module is communicatively connected to the height adjustment device, the lateral water supply module, and the monitoring module, respectively, and is used to control and adjust the slope of the trench body, control and adjust the water supply flow rate of the lateral water supply module, and collect simulated soil parameters and water supply parameters monitored by the monitoring module; and
[0010] The material supply module is used to provide the simulated soil and water required for debris flow simulation experiments.
[0011] In one embodiment, a plurality of the lateral water supply modules are longitudinally and evenly distributed along the sidewall of the trench body; each lateral water supply module includes:
[0012] A porous infiltration unit, one side of which is detachably connected to the sidewall of the trench body and communicates with the main channel of the trench body; the other side of the porous infiltration unit is provided with a water inlet and communicates with the water source in the material supply module through the water inlet chamber; and
[0013] A flow control unit is located on the other side of the water inlet chamber and is connected to the water source in the material supply module; the flow control unit is communicatively connected to the central control module and is used to control and adjust the water supply flow rate entering the porous permeation unit through the water inlet chamber.
[0014] In one embodiment, the porous permeation unit includes:
[0015] Support, detachably connected to the sidewall of the trench body; and
[0016] A porous plate is detachably connected to the support frame. The porous plate has a first lateral water injection hole and a second lateral water injection hole. The water inlet chamber is located on the other side of the porous plate and covers the first lateral water injection hole and the second lateral water injection hole. The porous permeation unit is connected to the main channel of the trench body through the first lateral water injection hole and the second lateral water injection hole.
[0017] In one embodiment, the flow control unit includes:
[0018] An electric valve is located on the other side of the water inlet chamber and connected to the water source in the material supply module, and the electric valve is communicatively connected to the central control module; and
[0019] An electromagnetic flow meter is fixed to the electric valve and communicates with the central control module to monitor the water supply flow of the electric valve in real time and feed it back to the central control module.
[0020] In one embodiment, a water injection control box is provided at one end of the trench body, and the water injection control box is connected to the trench body through the main channel water injection hole. An accumulation observation point is provided at the other end of the trench body.
[0021] In one embodiment, the slope adjustment range of the trench body is 0° to 30°.
[0022] In one embodiment, the height control device includes:
[0023] The hydraulic unit, one end of which is fixedly connected to the bottom of the trench body; and
[0024] The output end of the servo motor is rotatably connected to the hydraulic pump in the hydraulic unit via a coupling.
[0025] In one embodiment, a base bed is detachably connected to the bottom of the trench body, and an opening for installing the lateral water supply module is provided on the side wall of the trench body.
[0026] In one embodiment, the sidewall of the trench body is a glass sidewall.
[0027] In one embodiment, the monitoring module is embedded along a predetermined port on the inner bottom wall and side wall of the trench body; the monitoring module includes at least one of the following:
[0028] Pressure sensor;
[0029] Moisture content probe;
[0030] Laser scanner;
[0031] Camera unit.
[0032] The above-described solution of this utility model has at least the following beneficial effects:
[0033] 1. This utility model achieves accurate simulation of lateral water collection during debris flow initiation through a lateral water supply module, improving experimental repeatability and data reliability; furthermore, the aperture and opening ratio of the lateral water injection holes on the perforated plate in the lateral water supply module can be replaced to simulate different water collection boundary conditions, further improving the accuracy of the simulation.
[0034] 2. The multiphysics field monitoring module supports comprehensive parameter analysis, which helps to reveal the debris flow initiation mechanism and makes the entire simulation experimental device suitable for debris flow initiation mechanism research and early warning model verification. Attached Figure Description
[0035] Figure 1 This is a front view of the simulation experimental device provided in an embodiment of this utility model;
[0036] Figure 2 This is a three-dimensional structural diagram of a simulation experimental device provided in an optional embodiment of the present invention;
[0037] Figure 3 This is a schematic diagram of the specific structure of the porous permeation unit in the lateral water supply module provided in an optional embodiment of this utility model.
[0038] The following are the reference numerals: 1. Trench body; 2. Height control equipment; 3. Lateral water supply module; 4. Support frame; 5. Perforated plate; 6. First lateral water injection hole; 7. Second lateral water injection hole; 8. Water injection main control box; 9. Main channel water injection hole; 10. Accumulation observation area. Detailed Implementation
[0039] Exemplary embodiments of the present disclosure will now be described in more detail with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be implemented in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art.
[0040] like Figures 1 to 2 As shown, this utility model provides a debris flow simulation experimental device with lateral water supply, including a trench module, multiple lateral water supply modules 3, a monitoring module, a central control module, and a material supply module. The trench module includes a trench body 1 and a height adjustment device 2 located at the bottom of the trench body 1. Multiple lateral water supply modules 3 are evenly arranged on the sides of the trench body 1 to supply water into the trench body 1 along the sides, simulating the impact of lateral water flow on the initiation of a debris flow. The monitoring module is located at a preset position on the trench body 1 to monitor the simulated soil parameters and the water supply parameters of the lateral water supply modules 3 in real time. The central control module is communicatively connected to the height adjustment device 2, the lateral water supply modules 3, and the monitoring module, and is used to control and adjust the slope of the trench body 1, control and adjust the water flow rate of the lateral water supply modules 3, and collect the simulated soil parameters and water supply parameters monitored by the monitoring module. The material supply module provides the simulated soil and simulated water required for the debris flow simulation experiment.
[0041] In this embodiment, the height adjustment device 2 is located at one end of the bottom of the trench body 1 to adjust the height of one end of the trench body 1, thereby simulating the slope of the debris flow gully surface. The central control module can be a PLC or LabVIEW-based control system located in the control terminal, such as a host computer.
[0042] Here, multiple lateral water supply modules 3 are longitudinally and evenly distributed along the sidewall of the trench body 1. These lateral water supply modules 3 can be evenly distributed along two opposite sidewalls of the trench body 1, or they can be installed on only one sidewall of the trench body 1. Each lateral water supply module 3 may include a porous infiltration unit and a flow control unit. By setting a flow control unit in each lateral water supply module 3, the water supply flow rate of each lateral water supply module 3 and the position of the lateral water supply on the sidewall of the trench body 1 can be independently controlled to simulate natural lateral inflow, thereby ensuring the accuracy of the simulation. One side of the porous infiltration unit is detachably connected to the sidewall of the trench body 1 and communicates with the main channel of the trench body 1. The other side of the porous infiltration unit is provided with an inlet chamber, which communicates with the water source in the material supply module. The flow control unit is located on the other side of the water inlet chamber and is connected to the water source in the material supply module; the flow control unit is connected to the central control module to control and adjust the water supply flow rate entering the porous permeation unit through the water inlet chamber; here, the water inlet chamber can serve as the water inlet tank of the porous permeation unit for lateral water supply.
[0043] Here, the porous permeation unit includes a support frame 4 and a porous plate 5. The support frame 4 is detachably connected to the side wall of the trench body 1; the porous plate 5 is detachably connected to the support frame 4, and the porous plate 5 has a first lateral water injection hole 6 and a second lateral water injection hole 7. The water inlet chamber is located on the other side of the porous plate 5 and covers the first lateral water injection hole 6 and the second lateral water injection hole 7. The porous permeation unit is connected to the main channel of the trench body 1 through the first lateral water injection hole 6 and the second lateral water injection hole 7.
[0044] like Figure 3 As shown, preferably, the perforated plate 5 may have multiple first lateral water injection holes 6, which are distributed around the second lateral water injection hole 7; more preferably, the diameter of the second lateral water injection hole 7 is larger than the diameter of the first lateral water injection hole 6. Here, the multiple first lateral water injection holes 6 serve as seepage holes to simulate lateral multi-layer overflow seepage; the second lateral water injection hole 7 serves as the main water injection hole to simulate lateral flow water injection.
[0045] Preferably, an opening for mounting a lateral support frame 4 is provided on the side wall of the trench body 1. One side of the support frame 4 is attached to and detachably connected to the outer side of the side wall of the trench body 1, and the other side is detachably connected to the perforated plate 5. Here, there can be multiple candidate perforated plates 5. The number and diameter of the first lateral water injection holes 6 and the diameter of the second lateral water injection holes 7 on the multiple candidate perforated plates 5 are different, so as to simulate different water collection boundary conditions and thus ensure the accuracy of the simulation. More preferably, the multiple first lateral water injection holes 6 can be arranged in an array on the perforated plate 5.
[0046] In an optional embodiment of this invention, the flow control unit includes an electric valve and an electromagnetic flow meter. The electric valve is located on the other side of the inlet chamber and communicates with the water source in the material supply module, and is also communicatively connected to the central control module. The electromagnetic flow meter is fixed to the electric valve and communicates with the central control module to monitor the water supply flow of the electric valve in real time and feed it back to the central control module. Here, the electric valve can be a PID-controlled electric valve to facilitate programmable control of the water supply flow.
[0047] In an optional embodiment of this utility model, a water injection main control box 8 is provided at one end of the trench body 1. The water injection main control box 8 is connected to the trench body 1 through the main channel water injection hole 9. An accumulation observation area 10 is provided at the other end of the trench body 1.
[0048] Here, the trench body 1 may include a base plate and sidewalls disposed on a pair of opposite sides of the base plate; preferably, the sidewalls may be made of tempered glass, the length of the base plate and sidewalls may be 6 meters to 10 meters, the width of the base plate may be 0.3 meters to 0.5 meters, and the width of the sidewalls may be 0.4 meters to 0.6 meters. Preferably, a base bed is detachably connected to the bottom of the trench body 1, that is, a base bed is detachably connected to the upper surface of the base plate, so as to facilitate the replacement of base beds with different roughness to simulate trenches with different roughness.
[0049] Here, the main water injection control box 8 can be supplied with water through the material supply module. The main water injection control box 8 is also equipped with an electric valve to control the water supply of the main channel.
[0050] The other end of the trench body 1 is movably connected to the accumulation observation area 10. Preferably, this connection can be made by rotating a shaft, so that the slope of the trench body 1 can be adjusted by the height adjustment device 2 at one end of the trench body 1. Preferably, the slope adjustment range of the trench body 1 is 0° to 30°.
[0051] In an optional embodiment of this utility model, the height adjustment device 2 includes a hydraulic unit and a servo motor. One end of the hydraulic unit is fixedly connected to the bottom of the trench body 1. The output end of the servo motor is rotatably connected to the hydraulic pump in the hydraulic unit via a coupling.
[0052] Here, the hydraulic unit may include a hydraulic pump, a hydraulic cylinder, a control valve, and a piston rod; one end of the piston rod is fixedly connected to the bottom of the trench body 1, and the servo motor and the control valve are respectively connected to the central control module for communication. The central control module outputs control commands to adjust the pushing length of the piston rod, thereby adjusting the slope of the trench body 1.
[0053] In an optional embodiment of this utility model, the monitoring module is embedded along the inner bottom wall and the side wall of the trench body 1 through a preset port; the monitoring module includes at least one of the following: a pressure sensor, a moisture content probe, a laser scanner, and a camera unit.
[0054] Here, pressure sensors and moisture content probes can be installed on the upper surface of the bottom plate of the trench body 1 to monitor the moisture content of the deposits in the main channel of the trench body 1 and the water pressure exerted on the deposits; laser scanners and camera units can be mounted above the trench body 1 to monitor the appearance of the deposits in the main channel of the trench body 1. Preferably, the camera unit can be a high-speed camera to accurately capture the shape of the deposits.
[0055] When implementing the above-mentioned simulation experimental setup, the trench module is first assembled. The trench body 1 has tempered glass sidewalls. The length of the sidewalls and bottom of the trench body 1 is set to 6-10 meters, the bottom width to 0.3-0.5 meters, and the sidewall width to 0.4-0.6 meters. The slope of the trench body 1 is adjusted from 0° to 30° via a height control device 2. A lateral water supply module 3 is installed every 0.5 meters along the sidewalls. Each module is connected to the material supply module via an inlet chamber. A perforated plate 5 (the diameter of its water injection holes can be changed according to the experiment) is connected to the main channel of the trench body 1. The flow control unit regulates the flow rate (flow range 0.5 L / s to 10 L / s) via an electromagnetic flow meter and a PID-controlled electric valve. The material supply module lays the simulated soil in the main channel, and the initial moisture content of the simulated soil is controlled at a preset value. The pressure sensor and moisture content probe in the monitoring module are buried in the simulated soil, while the laser scanner and camera unit are mounted above the main trench 1. The central control module synchronously controls the slope, flow rate, and data acquisition. During the experiment, the lateral water supply module 3 is programmed to simulate different water collection patterns (such as incremental flow rate or pulsed water collection) to monitor the debris flow initiation process.
[0056] By arraying lateral water supply modules along the sidewalls of the gully body, each lateral water supply module can independently control its flow rate, thus accurately simulating the impact of lateral water runoff on debris flow initiation. This solves the problem that existing technologies cannot quantitatively study the effect of lateral water runoff. The simulation experimental device described above has strong parameter controllability, comprehensive data acquisition, and high experimental repeatability during use, making it suitable for debris flow initiation mechanism research and early warning model verification.
[0057] The above description is the preferred embodiment of this utility model. It should be noted that for those skilled in the art, several improvements and modifications can be made without departing from the principle of this utility model, and these improvements and modifications should also be considered within the protection scope of this utility model.
Claims
1. A debris flow simulation experimental device with lateral water supply, characterized in that, include: The trench module includes a trench body (1) and a height adjustment device (2) disposed at the bottom of the trench body (1). Multiple side water supply modules (3) are set on the side of the trench body (1) to supply water to the trench body (1) along the side of the trench body (1) to simulate the effect of water collection on the side of the debris flow valley on the initiation of the debris flow; The monitoring module is set at a preset position on the trench body (1) and is used to monitor the simulated soil parameters in the trench body (1) and the water supply parameters of the lateral water supply module (3) in real time. The central control module is communicatively connected to the height regulation device (2), the lateral water supply module (3), and the monitoring module, respectively, and is used to control and adjust the slope of the trench body (1), control and adjust the water supply flow of the lateral water supply module (3), and collect the simulated soil parameters and water supply parameters monitored by the monitoring module; and The material supply module is used to provide the simulated soil and water required for debris flow simulation experiments.
2. The debris flow simulation experimental device with lateral water supply according to claim 1, characterized in that, Multiple lateral water supply modules (3) are longitudinally and evenly distributed along the sidewall of the trench body (1); each lateral water supply module (3) includes: A porous permeation unit, one side of which is detachably connected to the sidewall of the trench body (1) and communicates with the main channel of the trench body (1), and the other side of which is provided with a water inlet chamber and communicates with the water source in the material supply module through the water inlet chamber; and A flow control unit is located on the other side of the water inlet chamber and is connected to the water source in the material supply module; the flow control unit is communicatively connected to the central control module and is used to control and adjust the water supply flow rate entering the porous permeation unit through the water inlet chamber.
3. The debris flow simulation experimental device with lateral water supply according to claim 2, characterized in that, The porous permeation unit includes: The support frame (4) is detachably connected to the side wall of the trench body (1); and The porous plate (5) is detachably connected to the support frame (4). The porous plate (5) has a first lateral water injection hole (6) and a second lateral water injection hole (7). The water inlet chamber is located on the other side of the porous plate (5) and covers the first lateral water injection hole (6) and the second lateral water injection hole (7). The porous permeation unit is connected to the main channel of the trench body (1) through the first lateral water injection hole (6) and the second lateral water injection hole (7).
4. The debris flow simulation experimental device with lateral water supply according to claim 2, characterized in that, The flow control unit includes: An electric valve is located on the other side of the water inlet chamber and connected to the water source in the material supply module, and the electric valve is communicatively connected to the central control module; and An electromagnetic flow meter is fixed to the electric valve and communicates with the central control module to monitor the water supply flow of the electric valve in real time and feed it back to the central control module.
5. The debris flow simulation experimental device with lateral water supply according to claim 1, characterized in that, One end of the trench body (1) is provided with a water injection main control box (8), which is connected to the trench body (1) through the main channel water injection hole (9). The other end of the trench body (1) is provided with an accumulation observation area (10).
6. The debris flow simulation experimental device with lateral water supply according to claim 1, characterized in that, The slope adjustment range of the main body of the trench (1) is 0° to 30°.
7. The debris flow simulation experimental device with lateral water supply according to claim 1, characterized in that, The height control device (2) includes: The hydraulic unit, one end of which is fixedly connected to the bottom of the trench body (1); and The output end of the servo motor is rotatably connected to the hydraulic pump in the hydraulic unit via a coupling.
8. The debris flow simulation experimental device with lateral water supply according to claim 1, characterized in that, The bottom of the trench body (1) is detachably connected to a base bed, and an opening for installing the lateral water supply module (3) is provided on the side wall of the trench body (1).
9. The debris flow simulation experimental device with lateral water supply according to claim 1, characterized in that, The sidewall of the trench body (1) is a glass sidewall.
10. The debris flow simulation experimental device with lateral water supply according to claim 1, characterized in that, The monitoring module is embedded along the inner bottom wall and side wall of the trench body (1) via a pre-set port; the monitoring module includes at least one of the following: Pressure sensor; Moisture content probe; Laser scanner; Camera unit.
