A supercharger cold and hot shock experimental device

By designing a thermal shock test device with dual boosters for parallel testing, and utilizing the alternating operation of heating and cooling pipes, combined with a compressed air unit and a control unit, the problems of low efficiency and single mode of existing equipment are solved, and efficient and flexible thermal shock testing is achieved.

CN225017874UActive Publication Date: 2026-11-24NINGBO FENGWO TURBOCHARGING SYST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522483928.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-24
Publication Date
2026-11-24
Estimated Expiration
2035-11-24

AI Technical Summary

Technical Problem

Existing turbocharger thermal shock testing equipment is inefficient and has a limited testing mode, resulting in a long research and development cycle.

Method used

Design a turbocharger thermal shock test device, comprising two turbocharger connection units, a heating unit and a cooling unit, and alternately subjecting thermal shock or cold shock through heating pipes and cooling pipes. Combined with a compressed air unit, combustion chamber, fuel supply unit and control unit, it realizes parallel testing of dual turbochargers and diverse thermal shock combination modes.

Benefits of technology

It improves testing efficiency, shortens the R&D cycle, supports diverse combinations of thermal shock modes, and enhances the flexibility and accuracy of experiments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225017874U_ABST
    Figure CN225017874U_ABST
Patent Text Reader

Abstract

This invention proposes a thermal shock testing device for a booster. By setting up two independent booster connection units and corresponding heating and cooling pipes, it achieves parallel testing of two boosters, avoiding the idle time caused by waiting for thermal conversion in traditional single-device testing, thereby improving testing efficiency. Simultaneously, through the independent configuration and alternating operation mechanism of the heating and cooling pipes, it supports diverse thermal shock combination modes, solving the problem of limited testing modes in existing technologies.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of turbocharging technology, specifically to a turbocharger thermal shock test device. Background Technology

[0002] In cold external environments, turbochargers typically go from a low temperature state to a high temperature state during use, and then quickly return to a low temperature state when shut down. With repeated use, components such as the turbine housing and impeller are prone to cracks due to thermal shock, leading to turbocharger failure.

[0003] Due to the hazards caused by thermal shock, turbochargers need to undergo thermal shock testing after the design is finalized in order to identify product defects in advance and provide a reference for research and development. Existing thermal shock testing equipment only has independent thermal shock units and cold shock units, which work alternately and independently to conduct thermal shock on a turbocharger. The testing efficiency is low, and the number of test modes provided is limited, resulting in a long research and development cycle. Utility Model Content

[0004] The problem this invention aims to solve is to provide a turbocharger thermal shock test device with high testing efficiency and multiple testing modes.

[0005] The technical solution adopted by this utility model to solve the above problems is: a thermal shock test device for a turbocharger, comprising: Two turbocharger connection units, wherein the turbocharger connection unit is used to install the turbocharger under test; the turbocharger connection unit includes a first turbocharger connection unit and a second turbocharger connection unit; A heating unit, wherein the heating unit includes two heating pipes, the two heating pipes being respectively connected to the input terminals of the first booster connection unit and the second booster connection unit; and A cooling unit, wherein the cooling unit includes two cooling pipes, the two cooling pipes being respectively connected to the input terminals of the first turbocharger connection unit and the second turbocharger connection unit; The two heating pipes and the two cooling pipes alternately subject the first turbocharger connection unit and the second turbocharger connection unit to thermal or cold shock, respectively.

[0006] Compared with existing technologies, this invention achieves parallel testing of dual boosters by setting up two independent booster connection units and corresponding heating and cooling pipes, avoiding the idle time caused by waiting for heat-cooling conversion in traditional single-device testing, thereby improving testing efficiency. Simultaneously, through the independent configuration and alternating operation mechanism of the heating and cooling pipes, it supports diverse combinations of thermal shock modes, solving the problem of limited testing modes in existing technologies.

[0007] The present invention provides a thermal shock test device for a booster, which further includes a compressed air unit; the heating unit is connected to the compressed air unit; and the cooling unit is connected to the compressed air unit.

[0008] This utility model discloses a thermal shock test device for a turbocharger, wherein the heating unit includes a combustion chamber and a fuel supply unit connected to the input end of the combustion chamber; the compressed air unit is located at the input end of the combustion chamber, and two heating pipes are located at the output end of the combustion chamber; the fuel provided by the fuel supply unit and the air provided by the compressed air unit, under the action of the combustion chamber, output hot gas to the two heating pipes.

[0009] This utility model discloses a thermal shock test device for a booster, wherein the heating unit includes two hot gas switching valves; the two hot gas switching valves are respectively installed on two heating pipes.

[0010] The present invention relates to a thermal shock test device for a turbocharger, wherein the cooling unit includes a cooling section; the air supplied by the compressed air unit passes through the cooling section and then enters two cooling pipes.

[0011] The present invention relates to a thermal shock test device for a turbocharger, wherein the cooling unit includes two cooling gas switching valves; the two cooling gas switching valves are respectively disposed on two cooling pipes.

[0012] The present invention provides a thermal shock test apparatus for a booster, which further includes a bypass temperature control unit, wherein one end of the bypass temperature control unit is connected to the compressed air unit, and the other end is connected to the input end of one of the first booster connection unit and the second booster connection unit, so as to adjust the temperature of the gas entering the first booster connection unit or the second booster connection unit.

[0013] This utility model discloses a thermal shock test device for a turbocharger, wherein the bypass temperature control unit includes a bypass pipe and a switch valve, a manual flow regulating valve, a pneumatic control valve and a check valve sequentially arranged in the bypass pipe.

[0014] The present invention provides a thermal shock test device for a turbocharger, which further includes a control unit; the compressed air unit, the heating unit, the cooling unit and the bypass temperature control unit are controlled by the control unit. Attached Figure Description

[0015] Figure 1 This is a schematic diagram of the overall structure of the thermal shock test apparatus for a booster according to a preferred embodiment of the present invention. Figure 2This is a schematic diagram illustrating the working conditions of a first turbocharger connection unit subjected to thermal shock and a second turbocharger connection unit subjected to cold shock according to a preferred embodiment of the present invention. Figure 3 This is a schematic diagram illustrating the working conditions of a first turbocharger connection unit subjected to thermal shock and a second turbocharger connection unit subjected to cold shock according to a preferred embodiment of the present invention. Figure 4 This is a schematic diagram illustrating the working condition of the bypass temperature control unit acting on the second booster connection unit according to a preferred embodiment of the present invention. Figure 5 This is a schematic diagram of the bypass temperature control unit acting on the first booster connection unit according to a preferred embodiment of the present invention. In the figure, turbocharger connection unit 1; first turbocharger connection unit 1a, second turbocharger connection unit 1b; Compressed air unit 2; Heating unit 3; heating pipe 31, combustion chamber 32, fuel supply unit 33, hot gas switch valve 34; Cooling unit 4; cooling pipe 41, air conditioning section 42, air conditioning switch valve 43; Bypass temperature control unit 5; bypass pipe 51, on / off valve 52, manual flow regulating valve 53, pneumatic valve 54, check valve 55; Control Unit 6. Detailed Implementation

[0016] Before describing any embodiment of this invention in detail, it should be understood that the invention is not limited in its application to the details of the construction and arrangement of the components set forth in the following description or illustrated in the following figures. The invention is capable of other embodiments and can be practiced or carried out in various ways. Furthermore, it should be understood that the wording and terminology used herein are for descriptive purposes and should not be considered limiting. The use of “comprising” or “having” and variations thereof herein is intended to cover the items set forth below and their equivalents, as well as any additional items. Unless otherwise specified or limited, the terms “installation,” “connection,” “support,” and “linkage,” and variations thereof are used broadly and cover both direct and indirect installation, connection, support, and linking. Moreover, “connection” and “linkage” are not limited to physical or mechanical connections or links.

[0017] Furthermore, firstly, in the disclosure of this utility model, the terms "longitudinal," "lateral," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," and "outer," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, the above terms should not be construed as a limitation on this utility model. Secondly, the term "a" should be understood as "at least one" or "one or more," that is, in one embodiment, the number of an element can be one, while in another embodiment, the number of the element can be multiple. The term "a" should not be construed as a limitation on the quantity.

[0018] Those skilled in the art should understand that the embodiments of the present invention described above and shown in the accompanying drawings are merely examples and do not limit the present invention. The purpose of the present invention has been fully and effectively achieved. The functions and structural principles of the present invention have been shown and explained in the embodiments. Without departing from the stated principles, the implementation of the present invention may have any variations or modifications.

[0019] The embodiments of this utility model will be further described below with reference to the accompanying drawings.

[0020] Please see Figure 1-5 The apparatus shown is a thermal shock test device for a turbocharger, comprising two turbocharger connection units 1, a heating unit 3, and a cooling unit 4. The turbocharger connection units 1 are used to mount the turbocharger under test. Each turbocharger connection unit 1 includes a first turbocharger connection unit 1a and a second turbocharger connection unit 1b. The heating unit 3 includes two heating pipes 31, which are respectively connected to the input ends of the first turbocharger connection unit 1a and the second turbocharger connection unit 1b. The cooling unit 4 includes two cooling pipes 41, which are respectively connected to the input ends of the first turbocharger connection unit 1a and the second turbocharger connection unit 1b. The two heating pipes 31 and the two cooling pipes 41 alternately subject the first turbocharger connection unit 1a and the second turbocharger connection unit 1b to thermal or cold shock.

[0021] In some embodiments, the booster connection unit 1 can be understood as a structure for fixing and connecting the booster under test. It can be implemented using mechanical clamps, bolt fixing devices, or quick-connect mechanisms, such as an adjustable clamping force robotic arm or a mounting platform with locating pins. Its main purpose is to achieve stable installation and quick replacement of the booster under test. The heating pipe 31 in the heating unit 3 is mainly for providing the required thermal shock heat source to the booster under test. The cooling pipe 41 in the cooling unit 4 is mainly for providing the required cold shock conditions to the booster under test. Furthermore, the alternating operation of the heating pipe 31 and the cooling pipe 41 can be implemented through time relay control, manual valve switching, or an automated control system. For example, a timer can be set to control the supply interval between hot and cold air, or the valve state can be switched manually. This is mainly to achieve orderly switching between thermal and cold shocks.

[0022] In practical use, this invention achieves parallel testing of dual boosters by setting up two independent booster connection units 1 and corresponding heating pipes 31 and cooling pipes 41. This avoids the idle time caused by waiting for heat-cooling conversion in traditional single-device testing, thereby improving testing efficiency. Simultaneously, the independent configuration and alternating operation mechanism of the heating pipes 31 and cooling pipes 41 support diverse thermal shock combination modes, solving the problem of limited testing modes in existing technologies.

[0023] Please continue reading. Figure 1 The unit further includes a compressed air unit 2; the heating unit 3 is connected to the compressed air unit 2; and the cooling unit 4 is connected to the compressed air unit 2.

[0024] Specifically, compressed air unit 2 refers to a device that can provide a stable air source, which can be implemented using equipment such as an air compressor and an air storage tank. Heating unit 3 is connected to compressed air unit 2, and this connection can be achieved through pipes or air lines, with the aim of ensuring that heating unit 3 can directly utilize the air source provided by compressed air unit 2 to generate heat. Cooling unit 4 is also connected to compressed air unit 2, similarly through pipes or air lines, with the aim of enabling cooling unit 4 to complete cooling processes based on the same air source.

[0025] In detail, this scheme effectively solves the problem of low efficiency in alternating thermal and cold shock tests by introducing compressed air unit 2 as a shared air source. Compressed air unit 2 provides a unified and stable air source foundation for the entire experimental device, avoiding redundancy and switching delays caused by independent air sources. Heating unit 3 generates hot air based on the air source provided by compressed air unit 2, without the need for additional air source path switching, thus simplifying the thermal shock start-up process and accelerating hot air output. Cooling unit 4 also relies on the air source provided by compressed air unit 2 for cooling, ensuring that cold air generation and hot air generation share the same gas medium, reducing intermediate steps in mode switching. The above design not only improves the smoothness of the testing process but also enhances the flexibility of the testing modes, enabling the experimental device to simulate actual thermal shock environments more efficiently. In addition, the connection method between compressed air unit 2 and heating unit 3 and cooling unit 4, combined with the alternating working mode of two heating pipes 31 and two cooling pipes 41, further optimizes the efficiency and versatility of thermal shock experiments.

[0026] Please continue reading. Figure 1-3 The heating unit 3 includes a combustion chamber 32 and a fuel supply unit 33 connected to the input end of the combustion chamber 32; the compressed air unit 2 is located at the input end of the combustion chamber 32, and the two heating pipes 31 are located at the output end of the combustion chamber 32; the fuel provided by the fuel supply unit 33 and the air provided by the compressed air unit 2 are used to output hot air to the two heating pipes 31 under the action of the combustion chamber 32.

[0027] In some embodiments, the combustion chamber 32 refers to the core component for converting the chemical energy of fuel into thermal energy. It can be implemented using a cavity structure made of high-temperature resistant alloy material, with the aim of providing a stable and efficient high-temperature gas generation environment. The fuel supply unit 33 can be understood as a device for precisely controlling the fuel flow rate. It can be implemented through a combination of a solenoid valve and a flow meter or an adjustable nozzle structure, with the aim of dynamically adjusting the fuel supply according to experimental requirements to ensure precise temperature control. The compressed air unit 2 is located at the input end of the combustion chamber 32. Its function is to provide sufficient combustion air flow to support complete combustion and avoid incomplete combustion due to insufficient oxygen.

[0028] In detail, this technical solution uses combustion chamber 32 as the core heat source, mixing and burning fuel supplied by fuel supply unit 33 with air supplied by compressed air unit 2 to generate high-temperature hot gas. The design of combustion chamber 32 ensures that fuel can be efficiently converted into heat energy, while the precise adjustment of fuel flow by fuel supply unit 33 enables flexible temperature control. Two heating pipes 31 are directly connected to the output end of combustion chamber 32, rapidly delivering the generated hot gas to the first turbocharger connection unit 1a and the second turbocharger connection unit 1b, reducing heat loss during transmission. In addition, compressed air unit 2 not only provides the necessary oxygen for combustion but also ensures the uniformity of the combustion process through a stable airflow, thereby improving the stability of hot gas output. The above design, combined with the specific structure of heating unit 3, solves the problems of insufficient hot gas generation and inflexible temperature regulation, significantly improving the efficiency and accuracy of thermal shock experiments.

[0029] In summary, through the above technical solutions, heating unit 3 achieves efficient generation and precise control of hot gas, meeting the requirements for rapid temperature changes and stable heat sources in thermal shock experiments, and providing strong support for the reliability testing of turbochargers.

[0030] Please continue reading. Figure 1-3 The heating unit 3 includes two hot gas switching valves 34; the two hot gas switching valves 34 are respectively installed on the two heating pipes 31.

[0031] Specifically, the hot gas switching valve 34 is a device used to control the flow of hot gas, which can be implemented using a solenoid valve, pneumatic valve, or manual valve. In practical applications, the purpose of introducing the hot gas switching valve 34 is to ensure the timeliness and accuracy of temperature switching during thermal shock experiments by independently controlling the flow of hot gas in each heating pipe 31.

[0032] In detail, the heating unit 3 achieves independent control of the hot gas supply by setting hot gas switching valves 34 on each of the two heating pipes 31. Since each heating pipe 31 corresponds to a booster connection unit 1, this layout allows each booster connection unit 1 to receive or interrupt the hot gas supply independently, avoiding response delays or system interference that may be caused by centralized control. When it is necessary to switch from a hot state to a cold state, closing the hot gas switching valve 34 on the corresponding heating pipe 31 can quickly cut off the hot gas flow, while the cooling unit 4 can seamlessly intervene to provide cold gas; conversely, when recovering from thermal shock, opening the hot gas switching valve 34 can quickly restore the hot gas supply. This configuration not only optimizes the temperature switching efficiency in thermal shock experiments but also improves the flexibility of the test mode and the overall reliability of the experiment. In addition, this scheme, together with the compressed air unit 2, the combustion chamber 32, and the fuel supply unit 33, forms a complete hot gas supply and control system, thereby effectively solving the problem of temperature switching delay caused by inaccurate hot gas flow control.

[0033] Please continue reading. Figure 1-3 The cooling unit 4 includes a cooling section 42; the air supplied by the compressed air unit 2 enters the two cooling pipes 41 after passing through the cooling section 42.

[0034] The cooling unit 42 is a device used to actively cool ambient air to generate low-temperature cold air. It can be implemented using a refrigeration unit, a liquid nitrogen cooling device, or a thermoelectric refrigeration module, with the aim of providing a stable low-temperature environment for cold shock. Specifically, this solution achieves refined management of cold air generation and control by introducing a series structure of the cooling unit 42 into the cooling unit 4. The cooling unit 42 first fully cools the ambient air supplied by the compressed air unit 2 to ensure that the output cold air has stable low-temperature characteristics. This pre-cooling design avoids the temperature fluctuation problems that may be caused by directly using untreated air.

[0035] Please continue reading. Figure 1-3 The cooling unit 4 includes two air supply valves 43; the two air supply valves 43 are respectively installed on the two cooling pipes 41.

[0036] Specifically, the cold air switching valve 43 refers to a control device capable of quickly cutting off or opening gas flow, which can be implemented using a solenoid valve, pneumatic valve, or other valve structure with rapid response characteristics. The purpose of this design is to improve the switching efficiency in thermal shock experiments through rapid on / off capability. The cooling pipe 41, as the channel for cold air delivery, ensures that the cold air flow can be independently controlled through its layout and connection method, thereby meeting the experimental requirements for precise temperature management.

[0037] In detail, this scheme provides independent and rapid cold air supply control for both the first booster connection unit 1a and the second booster connection unit 1b by installing a cold air switching valve 43 on each cooling pipe 41. When a cold shock is required, the cold air switching valve 43 can open instantly, introducing cold air into the corresponding booster connection unit 1; while when switching to a thermal shock, the cold air switching valve 43 can close immediately to prevent residual cold air from affecting the changes in test conditions, thereby optimizing the performance of the entire system. In addition, since the two cold air switching valves 43 correspond to the two cooling pipes 41 respectively, the cold shock operation for a single booster can be flexibly selected according to actual needs, or the two boosters can be tested in different modes simultaneously, significantly improving the versatility and efficiency of the experimental setup.

[0038] In summary, the above technical solutions not only solve the problem of slow response during cold shock switching, but also support more complex testing modes, shorten the R&D cycle, and provide a more efficient and flexible solution for thermal shock testing of turbochargers.

[0039] Please continue reading. Figure 1 , Figure 4 , Figure 5 The system further includes a bypass temperature control unit 5, one end of which is connected to the compressed air unit 2, and the other end is connected to the input end of one of the first booster connection unit 1a and the second booster connection unit 1b, so as to adjust the temperature of the gas entering the first booster connection unit 1a or the second booster connection unit 1b.

[0040] Specifically, the bypass temperature control unit 5 refers to an auxiliary device for regulating gas temperature, which can be implemented using a pipeline system with flow control functionality. In practical applications, the bypass temperature control unit 5 is designed to improve the control capability of the input gas temperature of a single booster connection unit 1 during thermal shock testing by introducing an independent temperature regulation mechanism. The compressed air unit 2 provides a pre-treated neutral gas, which provides a stable gas source for temperature regulation.

[0041] In detail, the bypass temperature control unit 5 is connected to the compressed air unit 2 at one end to obtain gas with a relatively stable temperature, and selectively connected to the input end of the first booster connection unit 1a or the second booster connection unit 1b at the other end to achieve independent temperature adjustment of a specific booster connection unit 1. This design allows for precise temperature fine-tuning of a specific booster connection unit 1 during thermal shock testing without interfering with the testing process of another unit. Furthermore, by adjusting the temperature of the gas entering the booster connection unit 1, a smooth temperature transition can be achieved during thermal shock, reducing test deviations caused by sudden temperature changes, thereby improving the fit of test conditions and test efficiency.

[0042] Building upon this, the bypass temperature control unit 5 is designed to effectively coordinate with the heating unit 3 and the cooling unit 4. The heating unit 3 and cooling unit 4 supply gas at extreme temperatures to the turbocharger connection unit 1 via heating pipe 31 and cooling pipe 41, respectively, while the bypass temperature control unit 5 provides flexible transitional adjustment between these extreme temperatures. This design not only expands the diversity of testing modes but also significantly improves the flexibility and accuracy of testing, solving the problem of low testing efficiency caused by the lack of independent adjustment capabilities. Through the above technical solution, the accuracy and adaptability of temperature regulation during thermal shock testing are achieved, providing more reliable experimental support for the development of turbochargers.

[0043] Please continue reading. Figure 1 , Figure 4 , Figure 5 The bypass temperature control unit 5 includes a bypass pipe 51 and a switching valve 52, a manual flow regulating valve 53, a pneumatic control valve 54 and a one-way valve 55 sequentially disposed in the bypass pipe 51.

[0044] Specifically, by setting multiple control components such as the on / off valve 52, the manual flow regulating valve 53, and the pneumatic control valve 54 in the bypass pipe 51, the entire bypass temperature control unit 5 can have more and more precise adjustment means when facing actual working conditions. This is beneficial for accurately simulating different degrees of thermal shock and improving the accuracy of the experiment while meeting multiple experimental modes. The one-way valve 55 prevents the backflow of cold or hot air, ensuring the stability of the experiment. It also allows for fine-tuning of the gas temperature according to real-time testing requirements, expanding the temperature adjustment range and improving the flexibility of the shock mode.

[0045] The present invention provides a thermal shock test device for a booster, which further includes a control unit 6; the compressed air unit 2, the heating unit 3, the cooling unit 4 and the bypass temperature control unit 5 are controlled by the control unit 6.

[0046] Specifically, control unit 6 refers to a control device capable of centralized management and automated coordination of multiple functional units in the experimental setup. It can be implemented using a programmable logic controller (PLC), an industrial computer, or an embedded control system. In practical applications, control unit 6 ensures seamless operation between functional units through preset control logic and real-time feedback mechanisms. Its purpose is to improve the efficiency and mode diversity of thermal shock testing, while reducing the uncertainty caused by human intervention.

[0047] In detail, the control unit 6, through unified management of the compressed air unit 2, ensures the stability and responsiveness of the air supply, providing a reliable basic air source for subsequent thermal and cold shocks, and avoiding test interruptions caused by airflow fluctuations. In the operation of the heating unit 3, the control unit 6 precisely directs the working states of the fuel supply section 33 and the combustion chamber 32, enabling the rapid initiation and maintenance of the hot gas generation and delivery process at the target temperature, eliminating the delay caused by manual parameter adjustments. For the cooling unit 4, the control unit 6 efficiently coordinates the working states of the cooling section 42 and the cooling gas switching valve 43, achieving instant switching and precise temperature control for cold shocks, overcoming the shortcomings of the discontinuous operation of the independent cooling gas switching valve 43. Furthermore, the control unit 6 integrates the bypass temperature control unit 5, dynamically adjusting the coordination of the switching valve 52, the manual flow control valve 53, the pneumatic control valve 54, and the check valve 55, fine-tuning the gas temperature according to real-time test requirements, expanding the temperature adjustment range, and improving the flexibility of the shock mode. This centralized control method based on the characteristics of each unit not only enables seamless connection of the alternating hot and cold shock process, but also significantly improves testing efficiency and mode diversity, meeting the reliability verification requirements of turbochargers in complex hot and cold environments.

[0048] Based on this, the combination of control unit 6 with compressed air unit 2, heating unit 3, cooling unit 4, and bypass temperature control unit 5 forms a complete thermal shock test system. Through the above technical solution, the core problems of low efficiency and limited modes in thermal shock testing are solved, providing a more efficient and diversified testing method for turbocharger development.

[0049] The above description only illustrates the preferred embodiment of this utility model and should not be construed as limiting the scope of the claims. This utility model is not limited to the above embodiments, and variations in its specific structure are permitted. All changes made within the scope of the independent claims of this utility model are also within the scope of protection of this utility model.

Claims

1. A thermal shock test apparatus for a turbocharger, characterized in that, include: Two turbocharger connection units (1), wherein the turbocharger connection unit (1) is used to install the turbocharger under test; the turbocharger connection unit (1) includes a first turbocharger connection unit (1a) and a second turbocharger connection unit (1b). A heating unit (3), wherein the heating unit (3) includes two heating pipes (31), the two heating pipes (31) being respectively connected to the input ends of the first booster connection unit (1a) and the second booster connection unit (1b); and A cooling unit (4), wherein the cooling unit (4) includes two cooling pipes (41), the two cooling pipes (41) being connected to the input ends of the first turbocharger connection unit (1a) and the second turbocharger connection unit (1b), respectively; The two heating pipes (31) and the two cooling pipes (41) alternately subject the first booster connection unit (1a) and the second booster connection unit (1b) to thermal shock or cold shock, respectively.

2. The thermal shock test apparatus for a turbocharger according to claim 1, characterized in that: It further includes a compressed air unit (2); the heating unit (3) is connected to the compressed air unit (2); wherein the cooling unit (4) is connected to the compressed air unit (2).

3. The thermal shock test apparatus for a turbocharger according to claim 2, characterized in that: The heating unit (3) includes a combustion chamber (32) and a fuel supply unit (33) connected to the input end of the combustion chamber (32); the compressed air unit (2) is located at the input end of the combustion chamber (32), and the two heating pipes (31) are located at the output end of the combustion chamber (32); the fuel supplied by the fuel supply unit (33) and the air supplied by the compressed air unit (2) are used to output hot air to the two heating pipes (31) under the action of the combustion chamber (32).

4. The thermal shock test apparatus for a turbocharger according to claim 3, characterized in that: The heating unit (3) includes two hot gas switching valves (34); the two hot gas switching valves (34) are respectively installed on the two heating pipes (31).

5. The thermal shock test apparatus for a turbocharger according to claim 2, characterized in that: The cooling unit (4) includes a cooling section (42); the air supplied by the compressed air unit (2) enters the two cooling pipes (41) after passing through the cooling section (42).

6. The thermal shock test apparatus for a turbocharger according to claim 5, characterized in that: The cooling unit (4) includes two air supply valves (43); the two air supply valves (43) are respectively installed on the two cooling pipes (41).

7. The thermal shock test apparatus for a turbocharger according to claim 2, characterized in that: It further includes a bypass temperature control unit (5), wherein one end of the bypass temperature control unit (5) is connected to the compressed air unit (2), and the other end is connected to the input end of one of the first booster connection unit (1a) and the second booster connection unit (1b) in order to adjust the gas temperature entering the first booster connection unit (1a) or the second booster connection unit (1b).

8. The thermal shock test apparatus for a turbocharger according to claim 7, characterized in that: The bypass temperature control unit (5) includes a bypass pipe (51) and a switch valve (52), a manual flow regulating valve (53), a pneumatic valve (54) and a check valve (55) sequentially disposed in the bypass pipe (51).

9. The thermal shock test apparatus for a turbocharger according to any one of claims 7-8, characterized in that: It further includes a control unit (6); the compressed air unit (2), the heating unit (3), the cooling unit (4) and the bypass temperature control unit (5) are controlled by the control unit (6).