A post-buried plate pre-anchoring post-welding steel bar pulling detection auxiliary device
By welding L-shaped steel bars to the embedded plate and connecting them to the jack to form a reaction beam structure, the problem of data error in the tensile strength test of rebar in the existing technology is solved. This enables the overall tensile strength test of the components composed of the embedded plate and the rebar, improving the accuracy and efficiency of the test.
Patent Information
- Application Number
- CN202522709231.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-22
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-22
AI Technical Summary
In the existing technology, the data obtained by pre-testing the tensile strength of the rebar in the embedded plate has an error with the actual tensile strength of the embedded plate, and cannot represent the overall tensile strength of the component composed of the rebar and the embedded plate.
A reaction beam and auxiliary steel reinforcement structure are adopted. The first and second L-shaped steel bars are welded to the embedded plate to be tested and connected to the jack to form an integral structure for pull-out testing. This avoids testing multiple steel bars individually and directly reflects the overall tensile strength of the component consisting of the embedded plate and steel bars.
The test results more accurately reflect the overall tensile strength of the components consisting of the embedded plate and the rebar, reducing the testing time and improving the accuracy of the test results.
Smart Images

Figure CN225017916U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of embedded plate rebar detection technology, and in particular to an auxiliary device for rebar pull-out detection in which rebar is first embedded in a post-mounted plate and then welded. Background Technology
[0002] Post-installed embedded plates, where rebar is installed first and then welded, are a construction method specifically used for structural reinforcement, connection, or equipment installation. It involves first installing anchor rods (rebars) on an existing concrete structure, and then welding the anchor rods to the embedded plate (steel plate) to ultimately form a complete post-installed component.
[0003] To ensure the strength of the rebar, tensile testing is required after the rebar installation is completed. However, since multiple rebars are often connected to a single embedded plate, tensile testing is required for multiple rebars. This test can only measure the tensile strength of a single rebar and cannot represent the overall tensile strength of the rebar and the embedded plate as a whole. The data obtained from the test will have errors compared to the actual tensile strength of the embedded plate. Utility Model Content
[0004] To address the shortcomings of existing technologies, this utility model provides an auxiliary device for detecting the pull-out of reinforcing bars by first installing the reinforcing bars in a post-embedded plate and then welding them. This device solves the problem in existing technologies where the data obtained from pre-installing tensile strength tests on the reinforcing bars in the embedded plate differs from the actual tensile strength of the embedded plate.
[0005] According to an embodiment of this utility model, a rebar pull-out detection auxiliary device with a post-embedded plate for first planting and then welding rebar includes a reaction beam and auxiliary rebar. There are two reaction beams, which are symmetrically arranged. Each reaction beam has two support columns at its bottom. A jack is detachably provided between the two reaction beams. The auxiliary rebar includes a first rebar and a second rebar. Both the first and second rebars are L-shaped. One end of the first and second rebars is welded to the embedded plate to be tested, and the other ends of the first and second rebars are welded and fixed to each other. The second rebar is used to connect to the jack.
[0006] Compared to existing technologies, this invention offers the following advantages: By employing a support column and a reaction beam to support one side of the embedded plate to be tested, and welding an L-shaped first and second reinforcing bar onto the embedded plate, the first and second reinforcing bars are fixed to the sidewalls of their ends away from the embedded plate, thus forming a unified whole with the embedded plate. The end of the second reinforcing bar away from the embedded plate is then fixed to a jack, allowing for pull-out testing. With this device, it is unnecessary to perform pull-out tests on multiple reinforcing bars individually; only the second reinforcing bar needs to be tested. Furthermore, since the side of the embedded plate away from the jack is connected to multiple reinforcing bars, the tested data represents the overall tensile strength of the component formed by the embedded plate and the reinforcing bars, resulting in more accurate data.
[0007] Furthermore, each reaction beam has a groove at its bottom, and each support column has a slider at one end facing the reaction beam, with the slider slidingly positioned within the groove.
[0008] Furthermore, each support column is detachably equipped with a support foot at the end opposite to the reaction beam.
[0009] Furthermore, a first telescopic cylinder is provided between the two opposing support columns, and a second telescopic cylinder is provided at both ends of each first telescopic cylinder in a sliding telescopic manner. The ends of the two second telescopic cylinders away from the first telescopic cylinder are respectively fixedly connected to the side wall of the corresponding support column.
[0010] Furthermore, a connecting plate is fixedly installed on the jack, and the connecting plate has multiple connecting holes. Each reaction beam has a threaded hole corresponding to the connecting hole at its top.
[0011] Furthermore, it also includes a support plate, with connecting rods at both ends of the support plate, and locking components on the connecting rods to press the support plate against the building structure.
[0012] Furthermore, the locking assembly includes a locking plate with a through hole for the connecting rod to pass through. The end of the connecting rod away from the support plate has a threaded section with a nut screwed onto it. Attached Figure Description
[0013] Figure 1 This is a schematic diagram of the overall structure of an embodiment of the present utility model.
[0014] Figure 2 This is a side view of an embodiment of the present utility model.
[0015] Figure 3 This is a cross-sectional view of an embodiment of the present utility model.
[0016] Figure 4 This is a schematic diagram of the support leg connection in an embodiment of the present utility model.
[0017] In the above attached diagram: 1. Reaction beam; 2. Support column; 3. Jack; 4. First reinforcing bar; 5. Second reinforcing bar; 6. Sliding block; 7. Support foot; 8. First telescopic cylinder; 9. Second telescopic cylinder; 10. Connecting plate; 11. Support plate; 12. Connecting rod; 13. Locking plate; 14. Nut. Detailed Implementation
[0018] The technical solution of this utility model will be further described below with reference to the accompanying drawings and embodiments.
[0019] like Figures 1 to 3As shown in the figure, this utility model embodiment proposes a rebar pull-out detection auxiliary device with post-embedded plate, which involves first planting the rebar and then welding it. It includes a reaction beam 1 and auxiliary rebars. There are two reaction beams 1, which are symmetrically arranged. Each reaction beam 1 has two support columns 2 at its bottom. A jack 3 is detachably provided between the two reaction beams 1. The auxiliary rebars include a first rebar 4 and a second rebar 5. Both the first rebar 4 and the second rebar 5 are L-shaped. One end of the first rebar 4 and the second rebar 5 are welded to the embedded plate to be tested. The other ends of the first rebar 4 and the second rebar 5 are welded and fixed to each other. The second rebar 5 is used to connect to the jack 3. Specifically, the jack 3 is a through-hole jack 3. During the pull-out test, the support column 2 is supported on both ends of the embedded plate to be tested. Then, the first reinforcing bar 4 and the second reinforcing bar 5 are welded to the embedded plate. In this embodiment, the embedded plate is set on the surface of the building structure by anchoring reinforcing bars. Both the first reinforcing bar 4 and the second reinforcing bar 5 are L-shaped. The length of the end of the first reinforcing bar 4 away from the embedded plate is shorter than the length of the end of the second reinforcing bar 5 away from the embedded plate. The end of the second reinforcing bar 5 away from the embedded plate extends towards the reaction beam 1 and then extends out of the reaction beam 1, so that the jack 3 has a pull-out point. After the jack 3 is installed on the reaction beam 1, the position of the support column 2 is temporarily fixed. Then, the end of the second reinforcing bar 5 passes through the jack 3 and is connected to the jack 3. At this time, the jack 3 applies a certain pressure to pull out the second reinforcing bar 5. Since the jack 3 and the second reinforcing bar 5 are already connected, the support column 2 can support the side wall of the building component without moving. The subsequent testing personnel can change the pulling force of the jack 3 according to the testing needs. This device welds L-shaped first reinforcing bars 4 and second reinforcing bars 5 onto the embedded plate to be tested. The combination of the first and second reinforcing bars 4 and 5 not only increases the contact area with the embedded plate, but also ensures that the first and second reinforcing bars 4 and 5 are connected to opposite sides of the embedded plate's end face, resulting in more even stress distribution and more accurate test results. This device eliminates the need to individually test the tensile strength of each reinforcing bar, saving time, and provides a more accurate assessment of the overall tensile strength of the structure comprised of the embedded plate and multiple reinforcing bars.
[0020] like Figure 2 and Figure 3 As shown, each reaction beam 1 has a groove at its bottom, and each support column 2 has a slider 6 at one end facing the reaction beam 1. The slider 6 is slidably disposed in the groove. In this embodiment, the support column 2 is slidably connected to the reaction beam 1 through the slider 6. When testing embedded plates of different widths or sizes, the support column 2 can be slid as needed to provide stable support for the reaction beam 1. At the same time, the support column 2 is supported on both sides of the embedded plate rather than on the embedded plate during operation. In this way, the data obtained is the tensile strength of the component composed of the embedded plate and the rebar, ensuring the accuracy of the test results.
[0021] like Figure 4As shown, furthermore, each support column 2 is detachably equipped with a support foot 7 at one end away from the reaction beam 1. The support foot 7 improves the support strength of the support column 2. Specifically, the support column 2 can be made of steel rectangular tubes commonly used on construction sites. Since the steel rectangular tube is a hollow structure, in order to improve its support strength when supported on the building structure on both sides of the embedded plate, a support foot 7 is set on the support column 2. One end of the support foot 7 is square and can be inserted into the steel rectangular tube. It can be interference-fitted with the steel rectangular tube or directly welded to the support column 2 into a whole. The other end of the support foot 7 has a trapezoidal cross section, which increases the support area between the support column 2 and the building structure, so as to smoothly transfer the load it receives to the building structure and avoid fatigue cracks in the support column 2 during long-term use.
[0022] like Figure 1 and Figure 2 As shown, furthermore, a first telescopic cylinder 8 is provided between the two opposing support columns 2. Each first telescopic cylinder 8 has a second telescopic cylinder 9 slidably telescopically mounted at both ends. The ends of the two second telescopic cylinders 9 furthest from the first telescopic cylinder 8 are fixedly connected to the sidewalls of the corresponding support column 2. Specifically, each of the two reaction beams 1 has two support columns 2. The support column 2 on one reaction beam 1 is connected to the support column 2 on the other opposing reaction beam 1 via the first telescopic cylinder 8 and the second telescopic cylinder 9. The sliding of the first telescopic cylinder 8 and the second telescopic cylinder 9 facilitates changing the distance between the two reaction beams 1, while also connecting the two reaction beams 1, improving the overall strength and facilitating the integration of the device for convenient storage.
[0023] like Figure 1 and Figure 2 As shown, a connecting plate 10 is further fixedly mounted on the jack 3. The connecting plate 10 has multiple connecting holes, and each reaction beam 1 has a threaded hole corresponding to one of the connecting holes at its top. Specifically, the connecting plate 10 is fixedly fitted onto the circumferential outer wall of the jack 3. When installing the jack 3 onto the reaction beam 1, bolts are passed through the connecting holes on the connecting plate 10 and then screwed into the threaded holes on the reaction beam 1 to complete the installation of the jack 3. The size of the connecting plate 10 can be customized as needed.
[0024] like Figure 1 and Figure 2As shown, furthermore, it also includes a support plate 11, with connecting rods 12 at both ends of the support plate 11. The connecting rods 12 are equipped with locking components that press the support plate 11 against the building structure. Specifically, the support plate 11 has support blocks that support the bottom side of the support column 2. By having the two connecting rods 12 respectively clamped at both ends of the building structure, and using the locking components to press the support plate 11 against the side wall of the building structure, the support position of the support column 2 is positioned. It also provides auxiliary support for the support column 2 and the jack 3 during installation, making the installation process convenient.
[0025] like Figure 1 and Figure 2 As shown, the locking assembly further includes a locking plate 13, which has a through hole for the connecting rod 12 to pass through. The end of the connecting rod 12 away from the support plate 11 has a threaded section, and a nut 14 is screwed onto the threaded section. Specifically, the nut 14 is first removed, the locking plate 13 is inserted onto the connecting rod 12, and then the nut 14 is screwed onto the threaded section of the connecting rod 12. Tightening the nut 14 allows the locking plate 13 to engage with the support plate 11, thus positioning the support plate 11. Preferably, a rubber pad can be provided on the side of the locking plate 13 facing the support plate 11 to accommodate the roughness of the building structure surface.
[0026] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this utility model and are not intended to limit it. Although this utility model has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of this utility model without departing from the spirit and scope of the technical solutions of this utility model, and all such modifications or substitutions should be covered within the scope of the claims of this utility model.
Claims
1. An auxiliary device for detecting rebar pull-out after rebar installation and welding using a post-embedded plate, characterized in that, include: The reaction beam (1) consists of two beams, which are symmetrically arranged. Each reaction beam (1) has two support columns (2) at its bottom, and a jack (3) is detachably provided between the two reaction beams (1). The auxiliary reinforcing bars include a first reinforcing bar (4) and a second reinforcing bar (5). Both the first reinforcing bar (4) and the second reinforcing bar (5) are L-shaped. One end of the first reinforcing bar (4) and the second reinforcing bar (5) are welded to the embedded plate to be tested. The other ends of the first reinforcing bar (4) and the second reinforcing bar (5) are welded to each other and fixed. The second reinforcing bar (5) is used to connect with the jack (3).
2. The auxiliary device for detecting rebar pull-out after post-installation of embedded plate and subsequent welding as described in claim 1, characterized in that: Each reaction beam (1) has a groove at its bottom, and each support column (2) has a slider (6) at one end facing the reaction beam (1). The slider (6) is slidably disposed in the groove.
3. The auxiliary device for detecting rebar pull-out after post-installation of embedded plate and subsequent welding as described in claim 1, characterized in that: Each support column (2) has a detachable support foot (7) at one end away from the reaction beam (1).
4. The auxiliary device for detecting rebar pull-out after post-installation of embedded plate and subsequent welding as described in claim 1, characterized in that: A first telescopic cylinder (8) is provided between two opposing support columns (2). Each first telescopic cylinder (8) has a second telescopic cylinder (9) that is slidably telescopically provided at both ends. The ends of the two second telescopic cylinders (9) that are away from the first telescopic cylinder (8) are respectively fixedly connected to the side wall of the corresponding support column (2).
5. The auxiliary device for detecting rebar pull-out after post-installation of embedded plate and subsequent welding as described in claim 1, characterized in that: A connecting plate (10) is fixed on the jack (3). The connecting plate (10) has multiple connecting holes. Each reaction beam (1) has a threaded hole corresponding to the connecting hole at its top.
6. The auxiliary device for detecting rebar pull-out after post-installation of embedded plate and subsequent welding as described in claim 1, characterized in that: It also includes a support plate (11), both ends of which are provided with connecting rods (12), and the connecting rods (12) are provided with locking components to press the support plate (11) against the building structure.
7. The auxiliary device for detecting rebar pull-out after post-installation of embedded plate and subsequent welding as described in claim 6, characterized in that: The locking assembly includes a locking plate (13), which has a through hole for the connecting rod (12) to pass through. The end of the connecting rod (12) away from the support plate (11) has a threaded section, and a nut (14) is screwed onto the threaded section.
