Integrated gas cylinder inflation and gas quality synchronous analysis and detection device

By integrating a gas cylinder filling and gas quality synchronous analysis and detection device, the problems of untimely detection and safety hazards during the gas cylinder filling process are solved, realizing real-time online detection and safety protection of gas quality, and improving the reliability and purification efficiency of the filling process.

CN225018124UActive Publication Date: 2026-11-24CAMA LUOYANG GAS SUPPLY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522646590.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-12
Publication Date
2026-11-24
Estimated Expiration
2035-12-12

AI Technical Summary

Technical Problem

The existing gas cylinder filling process is separated from gas quality testing, resulting in untimely testing, numerous safety hazards, and a lack of effective safety protection measures, which can easily lead to misjudgments and safety accidents.

Method used

The integrated gas cylinder filling and gas quality simultaneous analysis and detection device includes a gas detection device, a purification device and an explosion-proof cylinder, realizing the integration of gas purification, detection and filling, and is equipped with a multi-stage purification structure and safety protection components to ensure gas purity and operational safety.

Benefits of technology

It enables real-time online detection of gas quality, improves the reliability and efficiency of the inflation process, reduces human error, enhances safety and purification efficiency, and prevents equipment corrosion and safety accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225018124U_ABST
    Figure CN225018124U_ABST
Patent Text Reader

Abstract

An integrated gas cylinder inflation and gas quality synchronous analysis and detection device relates to the technical field of gas cylinder inflation, comprising a box body, a gas detection device mounted on the front side of the box body, a gas purification device built-in the box body, a purification gas path formed by the gas purification device, and an explosion-proof cylinder installed obliquely and with an opening upward. The purification gas path comprises a ball valve, a pressure gauge, a pressure reducing valve, a safety valve, a replaceable molecular sieve gas purification cylinder and other components. The output end of the purification gas path is divided into a detection branch and an inflation branch. The former ensures that the gas quality meets the standard before starting the inflation process, and the latter is provided with a gas discharge channel to empty the residual pressure and improve the sealing reliability. The utility model protects the gas purity and the operation safety through multi-stage safety protection and adjustment measures, reduces the risk of equipment corrosion or safety accidents caused by impure gas, and improves the reliability and efficiency of the inflation operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of gas cylinder filling technology, and in particular to an integrated gas cylinder filling and gas quality synchronous analysis and detection device. Background Technology

[0002] In existing technologies, the gas cylinder filling process and gas quality testing are usually performed as two separate steps. Traditional filling equipment often focuses only on the process of filling the cylinder with gas, lacking the testing of gas purity and quality. This can lead to problems such as equipment corrosion, safety accidents, or product defects due to impurities in the gas. Furthermore, gas purification treatments are mostly simple filtration or single pressure reduction measures, which cannot effectively remove trace impurities such as moisture, oil, and particulate matter from inert gases like nitrogen, thus affecting the purity and performance of the final gas.

[0003] For gas quality testing, the traditional method usually involves manually collecting samples and sending them to the laboratory for analysis. This method is not only time-consuming but also cannot provide timely feedback on gas quality information, resulting in potential safety hazards going undetected and unaddressed. Furthermore, the separation of testing and gas filling operations increases the possibility of human intervention, leading to misjudgments or operational errors, and reducing the reliability and efficiency of the entire process.

[0004] Furthermore, when high-pressure gas filling is involved, the lack of effective safety measures could lead to serious explosions in the event of an accident. While some existing equipment is equipped with certain safety protection devices, their designs are often not comprehensive enough, especially in terms of explosion protection. There is a lack of specially designed explosion-proof structures to limit the spread of blast waves and debris, thus failing to ensure the safety of personnel and equipment on site.

[0005] To address the aforementioned issues, it is necessary to develop an integrated gas cylinder filling and gas quality simultaneous analysis and detection device. This device can achieve online real-time monitoring of gas quality before filling and ensure gas purity through a series of efficient purification measures. At the same time, it adopts a special design to improve operational safety and avoids many defects existing in traditional methods. Utility Model Content

[0006] To overcome the shortcomings of the prior art, this utility model discloses an integrated gas cylinder filling and gas quality synchronous analysis and detection device.

[0007] To achieve the above-mentioned objectives, the present invention adopts the following technical solution:

[0008] An integrated device for simultaneous analysis and detection of gas cylinder filling and gas quality includes:

[0009] Box;

[0010] Gas detection device, installed on the front side of the enclosure;

[0011] The gas purification device is installed inside the box; after the gas purification device is connected to the gas source, it forms a purified gas path. The output end of the purified gas path is split into two parallel branches, one of which is a detection branch, which is connected to the gas detection device, and the other is an inflation branch.

[0012] The explosion-proof cylinder is installed at an angle inside the enclosure, with its open end facing upwards and extending out of the enclosure.

[0013] Preferably, the gas detection device includes a dew point meter LA1 and an oxygen analyzer YF1 connected in parallel.

[0014] Preferably, the purified gas path includes a ball valve QF1, a pressure gauge Y1, a pressure reducing valve JY1, a safety valve A1, a pressure gauge Y2, and a gas purification cylinder JH with a replaceable molecular sieve, connected in series.

[0015] Preferably, the gas purification cylinders JH are multiple units connected in series.

[0016] Preferably, the detection branch includes a switching valve J1, a pressure reducing valve JY2, a safety valve A2, and a pressure gauge Y3 connected in series.

[0017] Preferably, a switching valve J2 is installed on the inflation branch, and a venting branch is connected in parallel to the output end of the switching valve J2, and a ball valve QF2 is installed on the venting branch.

[0018] Preferably, a filter G1 is installed at the input end of the purified gas path, and a filter G2 is installed at the output end.

[0019] Preferably, casters are installed at all four corners of the bottom of the housing.

[0020] By adopting the technical solution described above, this utility model has the following beneficial effects:

[0021] (1) This utility model has a simple structure. By integrating gas purification, detection and filling functions into a unified box, it achieves compact structure and integrated operation. The gas detection device is set on the front of the box for easy real-time data reading; the gas purification device is built-in, which effectively utilizes space and reduces external pipeline connections; the explosion-proof cylinder is installed at an angle with its opening facing upward and extends out of the box, which not only facilitates the loading of gas cylinders, but also limits the spread of explosion shock waves and debris in the event of an abnormality, significantly improving operational safety.

[0022] (2) In the inflation process of this invention, high-pressure nitrogen is first depressurized and purified before being diverted to the detection branch and the inflation branch. Inflation is only allowed to start after the gas detection device determines that the gas quality meets the standards, thereby avoiding repeated filling, equipment corrosion, or safety accidents caused by impure gas. The gas detection device adopts a parallel structure of a dew point meter and an oxygen analyzer, which can simultaneously obtain two key indicators, moisture and oxygen content, without the need to switch channels, shortening the detection time, and supporting automatic judgment on whether inflation is allowed, reducing the risk of human error.

[0023] (3) The purification gas circuit of this utility model is equipped with a complete pressure control and safety protection component, including an adjustable pressure reducing valve, dual pressure gauges, a safety valve, and a purification cylinder with a replaceable molecular sieve. The pressure reducing valve can stabilize the output pressure and is not affected by inlet fluctuations, effectively protecting the safety of downstream equipment and personnel; the safety valve provides overpressure relief function; the replaceable molecular sieve design facilitates maintenance and extends the service life of the device. The gas filling branch is equipped with an independent venting channel, which can empty residual pressure before connecting the gas cylinder to prevent leakage or interface damage caused by pressurized operation and improve sealing reliability. The detection branch is equipped with an independent switch valve, a dedicated pressure reducing valve, a safety valve, and a pressure gauge to ensure that the gas pressure entering the precision instrument is moderate and stable, avoid high pressure impact damaging the detection element, and at the same time ensure the accuracy and repeatability of the detection results. Multi-level safety and adjustment measures make the detection process more reliable and provide an accurate basis for gas filling decisions.

[0024] (4) This utility model further adopts a multi-stage series gas purification cylinder structure, which can remove different types of impurities in stages, improve the overall purification efficiency and gas purity; together with the filters at the input and output ends, a dual protection mechanism of "front-end coarse filtration + back-end fine filtration" is formed, which effectively prevents particulate matter from contaminating the core components or mixing into the gas cylinder, enhances the system's adaptability to complex gas sources and reduces the maintenance frequency. Attached Figure Description

[0025] Figure 1 This is a three-dimensional structural diagram of the present invention;

[0026] Figure 2 This is a schematic diagram of the internal structure of the box;

[0027] Figure 3 This is a schematic diagram of the front side of the enclosure;

[0028] Figure 4 This is a simplified diagram of the air passage inside the housing.

[0029] In the diagram: 1. Box body; 2. Gas detection device; 3. Gas purification device; 4. Explosion-proof cylinder; 5. Casters. Detailed Implementation

[0030] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present utility model without creative effort are within the scope of protection of the present utility model.

[0031] In the description of this utility model, it should be noted that the terms "upper" and "lower" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship in which the utility model product is usually placed during use. They are only used to facilitate the description of this utility model and to simplify the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.

[0032] In this application, unless otherwise expressly specified and limited, the terms "installation," "connection," "joining," "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this application according to the specific circumstances.

[0033] Example 1:

[0034] Combined with appendix Figures 1-4 An integrated gas cylinder filling and gas quality simultaneous analysis and detection device is disclosed, comprising a housing 1, a gas detection device 2, a gas purification device 3, and an explosion-proof cylinder 4. The housing 1 serves as the mounting carrier for the entire device, centrally arranging and fixing the other functional components, achieving a compact structure and facilitating operation and maintenance. The gas detection device 2 is installed on the front of the housing 1 for easy observation of gas detection data; the gas purification device 3 is installed inside the housing 1 for depressurizing and purifying the input gas; the explosion-proof cylinder 4 is installed at an angle inside the housing 1, with its open end facing upwards and extending outside the housing 1, to accommodate the gas cylinder to be filled. In the event of an abnormal situation, it can effectively limit the spread of the explosion shock wave and debris, improving operational safety.

[0035] When gas cylinders need to be filled, the nitrogen source is first connected to the gas purification device 3 via a pipeline. After entering the gas purification device 3, the high-pressure nitrogen undergoes pressure reduction and purification processes to remove any impurities such as moisture, oil, particulate matter, and trace amounts of oxygen, preventing a decrease in gas purity or potential safety hazards after filling the cylinder. The purified nitrogen is then divided into two paths: one path enters the detection branch, where the gas detection device 2 performs online detection; the other path is the filling branch, used to supply gas to the cylinder. If the gas detection device 2 determines that the current nitrogen quality meets the preset standard, the filling branch is opened, the cylinder to be filled is connected to this branch, and it is securely placed inside the explosion-proof cylinder 4 before the filling operation begins. This process automatically verifies the gas quality before filling, avoiding repeated filling, equipment corrosion, or safety accidents caused by substandard gas, thus improving the reliability and efficiency of the filling operation.

[0036] Specifically, the gas detection device 2 includes a dew point meter LA1 and an oxygen analyzer YF1 connected in parallel. Both the dew point meter LA1 and the oxygen analyzer YF1 are commercially available devices. The dew point meter LA1 is used to detect the dew point temperature corresponding to the moisture content in the gas, thereby determining the degree of dryness; the oxygen analyzer YF1 is used to measure the oxygen content in the gas to ensure that the nitrogen purity meets the usage requirements. The parallel connection of the two devices allows for the simultaneous acquisition of multiple key gas parameters without the need to switch detection channels, shortening the detection time and improving the response speed. In addition, since the detection signal is directly fed back to the control system, automatic determination of whether gas filling is permitted can be achieved, reducing human intervention errors.

[0037] The purified gas path includes a ball valve QF1, a pressure gauge Y1, a pressure reducing valve JY1, a safety valve A1, a pressure gauge Y2, and a gas purification cartridge JH with a replaceable molecular sieve, connected in series. The gas purification cartridge JH is a commercially available device. Ball valve QF1 controls the gas supply; pressure gauge Y1 monitors the inlet pressure; pressure reducing valve JY1 adjusts the high-pressure nitrogen to the required working pressure range, and its outlet pressure is continuously adjustable within the range of 0.35–42 MPa. Once the output pressure is set, regardless of fluctuations in the inlet pressure, pressure reducing valve JY1 maintains a stable outlet pressure, not exceeding the set value, thus effectively protecting downstream equipment, pipelines, and operators. Safety valve A1 acts as an overpressure protection element, automatically releasing pressure when the system pressure abnormally increases to prevent equipment damage. Pressure gauge Y2 monitors the actual output pressure after pressure reduction, allowing operators to confirm the operating status. The gas purification cartridge JH is filled with replaceable molecular sieves to adsorb moisture and other impurities. When the test results show that the gas quality is unqualified, the purification capacity can be restored by replacing the molecular sieves, thus extending the service life of the device and reducing maintenance costs.

[0038] A switch valve J2 is installed on the inflation branch to control the start and stop of the inflation process. A venting branch is connected in parallel to the output of switch valve J2, and a ball valve QF2 is installed on this venting branch. Before each inflation, ball valve QF2 can be opened to purge any residual gas in the inflation pipeline, eliminating residual pressure and preventing leaks or damage to the connection points caused by connecting the gas cylinder under pressure, thus improving operational safety and sealing reliability.

[0039] The detection branch includes a switching valve J1, a pressure reducing valve JY2, a safety valve A2, and a pressure gauge Y3 connected in series. Switching valve J1 independently controls the on / off state of the detection branch, facilitating gas sampling and detection without interfering with the main gas charging process. Pressure reducing valve JY2 further adjusts the pressure before it enters the detection instruments to a safe range suitable for the operation of the dew point meter LA1 and the oxygen analyzer YF1, preventing high pressure damage to precision detection components. Safety valve A2 provides secondary overpressure protection. Pressure gauge Y3 displays the working pressure of the detection branch in real time, ensuring stable detection conditions and improving the accuracy and repeatability of the detection results.

[0040] Example 2:

[0041] Combined with appendix Figure 4 An integrated gas cylinder filling and gas quality simultaneous analysis and detection device is disclosed. The difference between this device and Embodiment 1 is that, based on Embodiment 1, the gas purification cylinder JH is configured as two or more connected in series. The multi-stage series gas purification cylinders JH can remove different types of impurities stage by stage. For example, the first stage mainly adsorbs moisture, and the second stage removes trace amounts of oxygen or organic matter, thereby significantly improving the overall purification efficiency and gas purity. When the single-stage purification capacity is insufficient or when handling gas sources with high humidity and high impurity content, the series structure can effectively extend the service life of the molecular sieve, reduce the replacement frequency, and ensure that the outlet gas always meets high purity requirements. Furthermore, each purification cylinder can use different specifications or types of adsorbents to achieve targeted purification and enhance the device's adaptability to different gas source conditions.

[0042] Meanwhile, a filter G1 is installed at the input end of the purified gas path to intercept large particulate impurities such as solid particles and oil mist carried in the gas source, preventing them from entering the pressure reducing valve JY1 or clogging subsequent purification components; a filter G2 is installed at the output end to capture molecular sieve dust or other particles that may fall off during the purification process, preventing contamination of downstream detection instruments or filling of the gas cylinder, and ensuring gas cleanliness and equipment operational stability. The two-stage filter setup forms a dual protection mechanism of "front-end coarse filtration + back-end fine filtration," effectively extending the life of core components and reducing maintenance frequency.

[0043] Example 3:

[0044] Combined with appendix Figures 1-3An integrated gas cylinder filling and gas quality simultaneous analysis and detection device is disclosed. Based on Embodiment 1 or Embodiment 2, the gas detection device 2, gas purification device 3, and explosion-proof cylinder 4 are all rigidly fixed to the housing 1 by bolts, brackets, or other fastening methods. This structural design effectively improves the shock resistance of the entire machine during transportation, movement, or operation, preventing pipeline loosening, joint leakage, or instrument inaccuracy caused by vibration. It is particularly suitable for environments such as laboratories and workshops where mechanical vibration may exist, ensuring the reliability and safety of long-term operation.

[0045] In addition, casters 5 are installed at all four corners of the bottom of the housing 1, with at least two casters equipped with braking devices. The casters 5 provide excellent mobility, facilitating rapid movement between different workstations indoors and adapting to multi-point inflation needs. The braking devices lock the casters after positioning, preventing accidental slippage and ensuring stability during inflation. This design balances portability and stability, improving the practicality and ease of operation of the equipment.

[0046] The parts of this utility model not described in detail are prior art. It is obvious to those skilled in the art that this utility model is not limited to the details of the above exemplary embodiments, and that this utility model can be implemented in other specific forms without departing from the spirit or basic characteristics of this utility model. Therefore, the embodiments should be regarded as exemplary and non-limiting in all respects, and are intended to include all changes that fall within the meaning and scope of equivalents within this utility model.

Claims

1. An integrated device for simultaneous analysis and detection of gas cylinder filling and gas quality, characterized in that, include: Box (1); Gas detection device (2) is installed on the front side of the housing (1); Gas purification device (3) is installed inside the housing (1); after the gas purification device (3) is connected to the gas source, it forms a purified gas path. The output end of the purified gas path is split into two parallel branches, one of which is a detection branch, which is connected to the gas detection device (2), and the other is an inflation branch. An explosion-proof cylinder (4) is installed at an angle inside the housing (1), with its open end facing upward and extending out of the housing (1).

2. The integrated gas cylinder filling and gas quality synchronous analysis and detection device as described in claim 1, characterized in that, The gas detection device (2) includes a dew point meter LA1 and an oxygen analyzer YF1 connected in parallel.

3. The integrated gas cylinder filling and gas quality synchronous analysis and detection device as described in claim 1, characterized in that, The purified gas path includes a ball valve QF1, a pressure gauge Y1, a pressure reducing valve JY1, a safety valve A1, a pressure gauge Y2, and a gas purification cylinder JH with a replaceable molecular sieve, all connected in series.

4. The integrated gas cylinder filling and gas quality synchronous analysis and detection device as described in claim 3, characterized in that, The gas purification cylinders JH are multiple units connected in series.

5. The integrated gas cylinder filling and gas quality synchronous analysis and detection device as described in claim 1, characterized in that, The detection branch includes a switching valve J1, a pressure reducing valve JY2, a safety valve A2, and a pressure gauge Y3 connected in series.

6. The integrated gas cylinder filling and gas quality synchronous analysis and detection device as described in claim 1, characterized in that, A switching valve J2 is installed on the inflation branch, and a venting branch is connected in parallel to the output end of the switching valve J2. A ball valve QF2 is installed on the venting branch.

7. The integrated gas cylinder filling and gas quality synchronous analysis and detection device as described in claim 1, characterized in that, The input end of the purified gas path is equipped with filter G1, and the output end is equipped with filter G2.

8. The integrated gas cylinder filling and gas quality synchronous analysis and detection device as described in claim 1, characterized in that, Casters (5) are installed at the four corners of the bottom of the box (1).