Line fixing device for replacing straight-through electric energy meter
By designing a wiring device for direct-connection energy meters, and utilizing an insulating clamp and spring structure, the problems of misaligned wiring and wire contact are solved, enabling efficient and safe energy meter replacement without power outages.
Patent Information
- Application Number
- CN202522438400.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-18
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-11-18
AI Technical Summary
During the replacement of direct-connection energy meters, equipment failures and personal safety threats can occur due to messy wiring and wire contact, and the operation requires power outages, affecting work efficiency.
A line-fixing device including an upper insulating plate and a lower insulating plate was designed. The device uses an insulating clamp and a compression spring structure to fix the line and prevent the wire ends from contacting each other. The insulating clamp fixes the incoming line during the installation and removal of the electricity meter, and the spring ejection structure prevents the wire ends from contacting each other during live work.
It avoids wiring tangles, improves work efficiency, reduces the risk of equipment failure, ensures the safety of operators, and enables efficient replacement without power outages.
Smart Images

Figure CN225018330U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to a locating device for replacing direct-flow energy meters, belonging to the field of power engineering safety technology. Background Technology
[0002] Replacement and periodic rotation of electricity meters are crucial for ensuring power safety. Direct-through electricity meters are relatively common during annual meter rotations. However, due to the large number of wires and thick wiring in direct-through meters, and the lack of a connector in the meter box, replacement typically requires a power outage to disconnect the wiring sequentially and then connect the wire ends to the new meter. This process presents the following drawbacks: Firstly, since the power supply to customers is directly delivered through the electricity meter without the need for a junction box, the replacement of the electricity meter must be carried out with a power outage. Moreover, during the process of removing the electricity meter, the incoming wires are easily misaligned after being disconnected from the wiring hole, which leads to the need to rewire during the meter installation process, making the meter installation difficult.
[0003] Secondly, when a direct-connection energy meter cannot be de-energized on the incoming side, it is necessary to perform meter replacement work while the line is energized. If the wire ends are not handled properly, a serious short circuit fault may occur once the wire ends come into contact, especially when the phase wire and the neutral wire come into contact, which may even threaten the personal safety of the workers. Utility Model Content
[0004] In view of the shortcomings of the prior art, the problem to be solved by this utility model is to provide a locating device for replacing direct-flow energy meters that has a reasonable structural design, is easy to use, can avoid wiring misalignment and equipment failure caused by wire contact during the disassembly and assembly of energy meters, improve work efficiency, and ensure the personal safety of operators.
[0005] The technical solution adopted by this utility model to solve its technical problem is: The aforementioned locating device for replacing a direct-flow energy meter includes a lower insulating plate. Both ends of the lower insulating plate are fixedly connected to the bottom of an end groove. An upper insulating plate is slidably connected to the lower insulating plate above the end groove. The upper and lower insulating plates are supported and fixed by a compression spring. Insulating isolation clips are evenly arranged on the upper insulating plate. Locking pieces are respectively provided at the bottom ends of the upper insulating plate for the insulating isolation clips at both ends of the upper insulating plate. A spring lock is provided on the lower insulating plate below the locking pieces. The spring lock is connected to a eject button provided on the side wall of the lower insulating plate.
[0006] The wiring device used for replacing direct-connection energy meters can fix the incoming line during the disassembly and assembly of the energy meter through an insulating clamp, avoiding sequence disorder, preventing wire contact that could cause equipment failure, improving the work efficiency of operators, and ensuring the personal safety of operators, thus having strong practicality.
[0007] In a further preferred embodiment, the insulating isolation clips at both ends of the upper insulating plate are fixed connections, while the insulating isolation clips in the middle area of the upper insulating plate are movable connections. The fixed connections at both ends facilitate the cooperation of the locking plate and the spring lock, while the movable connections in the middle area allow for adjustments based on the circuits of different energy meters, thus improving the applicability.
[0008] In a further preferred embodiment, multiple adjustment slots are evenly arranged in the middle area of the upper insulating plate, and the insulating isolation clip is positioned above the adjustment slots and cooperates with the adjustment slots to facilitate the adjustment of the insulating isolation clip.
[0009] In a further preferred embodiment, the bottom of the insulating clamp in the middle area of the upper insulating plate is connected to an adjusting rod, and the bottom of the adjusting rod is connected to a retaining seat. The retaining seat is installed in the adjusting groove and can maintain lateral movement, which facilitates the adjustment of the insulating clamp.
[0010] In a further preferred embodiment, the locking piece is fixed below the upper insulating plate by an adjusting plate. The top of the adjusting plate is fixedly connected to the upper insulating plate. The adjusting plate is provided with a slot, and a buckle is provided on the locking piece to cooperate with the slot. The adjusting plate and the locking piece are connected by the cooperation of the slot and the buckle. The bottom buckle of the locking piece cooperates with the buckle of the spring lock, which facilitates the adjustment of the height of the locking piece, thereby facilitating the adjustment of the lifting height of the upper insulating plate and the insulating isolation clamp.
[0011] Further optimization involves providing an insulating silicone brush on the upper inner wall of the clamping part of the insulating isolation clamp, and an insulating rubber claw on the bottom of the clamping part. This effectively wraps and isolates the wire ends, preventing them from contacting each other and improving the safety factor of live-line work.
[0012] In a further optimization, the two ends of the compression spring extend out of the upper and lower insulating plates and are fixed by spring fixing nuts. The outer walls of both the compression spring and the spring fixing nuts are coated with insulating paint to ensure operational safety.
[0013] The beneficial effects of this utility model are as follows: 1. The wiring device for replacing a direct-through energy meter described in this utility model, through the insulating isolation clamp set on the upper insulating plate, can fix the incoming wire on the energy meter during the disassembly and assembly of the energy meter, fix the spacing between the wires, prevent the wire ends from being disordered, facilitate the installation of the new energy meter, reduce the difficulty of operation, and improve the efficiency of operation.
[0014] 2. The positioning device for replacing a direct-flow energy meter described in this utility model forms a spring ejection structure through a compression spring, an upper insulating plate, and a lower insulating plate. When the old energy meter detaches from the wire end during live-line work, pressing the ejection button will quickly eject the insulating isolation clip using the elastic force of the compression spring, wrapping and isolating the wire end to prevent contact between the wire ends. This eliminates the safety hazard of short circuits caused by disordered wire end sequence and improves the safety factor of live-line work. Attached Figure Description
[0015] Figure 1 This is a schematic diagram of the structure of this utility model; Figure 2 This is a top view of the present invention; Figure 3 This is a left-side view of the present invention; Figure 4 for Figure 3 Enlarged structural diagram at point A in the middle.
[0016] The components include: 1. End groove; 2. Lower insulating plate; 3. Upper insulating plate; 4. Insulating isolation clamp; 5. Compression spring; 6. Locking piece; 7. Ejection button; 8. Spring lock; 9. Adjustment groove; 10. Adjustment rod; 11. Card seat; 12. Adjustment plate; 13. Insulating silicone brush; 14. Insulating rubber claw; 15. Spring fixing nut. Detailed Implementation
[0017] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0018] like Figure 1As shown, the locating device for replacing a direct-flow energy meter according to this utility model includes a lower insulating plate 2. Both ends of the lower insulating plate 2 are fixedly connected to the bottom of the end slide groove 1. An upper insulating plate 3 is slidably connected to the upper part of the end slide groove 1 corresponding to the lower insulating plate 2. The upper insulating plate 3 and the lower insulating plate 2 are supported and fixed by a compression spring 5. The two ends of the compression spring 5 extend out of the upper insulating plate 3 and the lower insulating plate 2 and are fixed by spring fixing nuts 15. The outer walls of the compression spring 5 and the spring fixing nuts 15 are coated with insulating paint. Multiple insulating isolation clips 4 are evenly arranged on the upper insulating plate 3. An insulating silicone brush 13 is provided on the upper inner wall of the clamping part of the insulating isolation clip 4 to facilitate the concealment of the exposed part of the insulation at the inlet end, preventing the exposed wire at the inlet end from being exposed and causing a short circuit hazard. An insulating rubber claw 14 is provided at the bottom of the clamping part of the insulating isolation clip 4 to facilitate the clamping of the insulation at the inlet end, preventing the exposed wire at the inlet end of the energy meter from being exposed from the bottom of the insulating isolation clip 4. The insulating isolation clips 4 at both ends of the upper insulating plate 3 are respectively provided with locking pieces 6 at the bottom ends of the upper insulating plate 3. A spring lock 8 is provided on the lower insulating plate 2 below the locking piece 6. The spring lock 8 is connected to the eject button 7 provided on the side wall of the lower insulating plate 2. The eject button 7 is inserted into the side wall of the lower insulating plate 2 and passes through the side wall before connecting to the spring lock 8.
[0019] like Figure 2 As shown, the insulating clamps 4 at both ends of the upper insulating plate 3 are fixedly connected, while the insulating clamps 4 in the middle area of the upper insulating plate 3 are movably connected. Multiple adjusting grooves 9 are evenly arranged in the middle area of the upper insulating plate 3. The insulating clamps 4 are positioned above and cooperate with the adjusting grooves 9, suitable for energy meters with different wiring hole spacings. Figure 4 As shown, an adjusting rod 10 is fused to the bottom of the insulating isolation clip 4 in the middle area of the upper insulating plate 3, and a card seat 11 is fused to the bottom of the adjusting rod 10. The card seat 11 is installed in the adjusting groove 9 and can maintain lateral movement.
[0020] like Figure 3 As shown, the locking piece 6 is fixed below the upper insulating plate 3 by the adjusting plate 12. The top of the adjusting plate 12 is fixedly connected to the upper insulating plate 3. The adjusting plate 12 is provided with a slot, and a buckle is provided on the locking piece 6 to cooperate with the slot. The adjusting plate 12 and the locking piece 6 are connected by the cooperation of the slot and the buckle. Multiple slots are provided from top to bottom to facilitate the adjustment of the height of the locking piece 6, thereby facilitating the adjustment of the lifting height of the upper insulating plate 3 and the lifting height of the insulating isolation clamp 4. The bottom buckle of the locking piece 6 cooperates with the buckle of the spring lock 8, so that when the upper insulating plate 3 is lowered, the cooperation of the locking piece 6 and the spring lock 8 can overcome the elastic force of the compression spring 5 and fix the upper insulating plate 3.
[0021] The opening and closing spring of the insulating isolation clamp 4 is wrapped with insulating skin, the ejection button 7 is made of insulating plastic, the outer wall of the spring lock 8 is coated with insulating paint, and the outer walls of the adjusting plate 12 and the locking piece 6 are coated with insulating paint to ensure the insulation effect of the entire aligning device.
[0022] The working principle and usage process of this utility model: In use, first press down both ends of the upper insulating plate 3. At this time, the compression spring 5 is compressed until the locking piece 6 and the spring lock 8 are locked. Place the insulating isolation clip 4 at the bottom of the power meter wiring hole to clamp the power meter inlet wire. Then disconnect the power meter wiring. When the direct-connection power meter is disconnected from the wiring, press the eject button 7 at the same time. The spring lock 8 is unlocked and the spring lock 8 and the locking piece 6 are separated. At this time, under the elastic force of the compression spring 5, the upper insulating plate 3 is pushed up quickly, and the insulating isolation clip 4 is lifted up synchronously. The insulating isolation clip 4 fixes and isolates the exposed metal wire end at the inlet wire end, so that the exposed metal wire end at the inlet wire end is located at the bottom of the insulating silicone brush 13. At the same time, the insulating skin of the inlet wire end is clamped and protected by the insulating rubber claw 14 to prevent the metal wire end at the inlet wire end from being too long and extending out of the bottom of the insulating isolation clip 4.
[0023] When installing a new electricity meter, align the wiring hole of the new electricity meter with the clamp hole of the insulating clamp 4, then press down on the new meter, causing the upper insulating plate 3 to descend, so that the wire end of the inlet extends out of the insulating clamp 4 and enters the wiring hole of the new meter. At the same time, the compression spring 5 is compressed until the locking plate 6 and the spring lock 8 are locked again. After the electricity meter wiring is completely fixed, open the insulating clamp 4 and remove the entire device.
[0024] In use, this utility model uses the insulating clamp 4 on the upper insulating plate 3 to fix the incoming wires on the energy meter, thus fixing the spacing between the wires. This facilitates the installation of new energy meters for operators and prevents the wire ends from being confused, reducing the difficulty of the operation and improving efficiency. A spring-launching structure is formed by the compression spring 5, the upper insulating plate 3, and the lower insulating plate 2. During live-line work, when the old energy meter detaches from the wire ends, pressing the ejection button 7 uses the elasticity of the compression spring 5 to quickly eject the insulating clamp 4, wrapping and isolating the wire ends to prevent them from contacting each other. This eliminates the safety hazard of short circuits caused by incorrect wire end sequence and improves the safety factor of live-line work.
[0025] The above description is merely a preferred embodiment of this utility model and is not intended to limit the utility model in any other way. Any person skilled in the art may make changes or modifications to the above-disclosed technical content to create equivalent embodiments. However, any simple modifications, equivalent changes, and modifications made to the above embodiments based on the technical essence of this utility model without departing from its technical solution shall still fall within the protection scope of this utility model.
Claims
1. A locating device for replacing direct-flow energy meters, characterized in that, The device includes a lower insulating plate (2), with both ends of the lower insulating plate (2) fixedly connected to the bottom of the end slide groove (1). A corresponding upper insulating plate (3) is slidably connected to the lower insulating plate (2) at the top of the end slide groove (1). The upper insulating plate (3) and the lower insulating plate (2) are supported and fixed by a compression spring (5). Insulating isolation clips (4) are evenly arranged on the upper insulating plate (3). Locking pieces (6) are respectively arranged at the bottom ends of the insulating isolation clips (4) at both ends of the upper insulating plate (3). A spring lock (8) is arranged on the lower insulating plate (2) below the locking piece (6). The spring lock (8) is connected to the eject button (7) arranged on the side wall of the lower insulating plate (2).
2. The locating device for replacing a direct-flow energy meter according to claim 1, characterized in that, The insulating isolation clips (4) at both ends of the upper insulating plate (3) are fixedly connected, while the insulating isolation clips (4) in the middle area of the upper insulating plate (3) are movably connected.
3. The locating device for replacing a direct-flow energy meter according to claim 2, characterized in that, The upper insulating plate (3) has a plurality of adjusting grooves (9) evenly arranged in the middle area, and the insulating isolation clamp (4) is arranged above the adjusting grooves (9) and cooperates with the adjusting grooves (9).
4. The locating device for replacing a direct-flow energy meter according to claim 3, characterized in that, The bottom of the insulating isolation clip (4) in the middle area of the upper insulating plate (3) is connected to an adjusting rod (10), and the bottom of the adjusting rod (10) is connected to a card seat (11). The card seat (11) is installed in the adjusting groove (9) and can maintain lateral movement.
5. The locating device for replacing a direct-flow energy meter according to claim 1, characterized in that, The locking piece (6) is fixed below the upper insulating plate (3) by the adjusting plate (12). The top of the adjusting plate (12) is fixedly connected to the upper insulating plate (3). The adjusting plate (12) is provided with a slot, and a buckle is provided on the locking piece (6) in cooperation with the slot. The adjusting plate (12) and the locking piece (6) are connected by the cooperation of the slot and the buckle. The bottom buckle of the locking piece (6) cooperates with the buckle of the spring lock (8).
6. The locating device for replacing a direct-flow energy meter according to claim 1, characterized in that, An insulating silicone brush (13) is provided on the upper inner wall of the clamping part of the insulating isolation clamp (4), and an insulating rubber claw (14) is provided on the bottom of the clamping part of the insulating isolation clamp (4).
7. The locating device for replacing a direct-flow energy meter according to claim 1, characterized in that, The compression spring (5) is fixed by spring fixing nuts (15) after both ends extend out of the upper insulating plate (3) and the lower insulating plate (2). The outer walls of the compression spring (5) and the spring fixing nuts (15) are coated with insulating paint.