Test system for energy storage devices
By constructing a composite architecture that includes an isolation transformer and three test branches, combined with an automated control system, the problems of limited functionality and safety risks in existing energy storage testing platforms have been solved. This enables flexible testing of various system types and voltage levels, improving testing efficiency and safety.
Patent Information
- Application Number
- CN202522568408.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-02
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-02
AI Technical Summary
Existing energy storage testing platforms have limited functionality, cannot be compatible with multiple system types and voltage levels, and rely on manual operation, resulting in low efficiency and safety risks.
Design a composite architecture that includes an isolation transformer and three test branches with different functions. By controlling the on/off control unit, flexible switching of various system types and voltage levels can be achieved. Combined with an automated control system, it can replace manual operation.
It achieves comprehensive testing coverage of energy storage devices, improves testing efficiency and platform versatility, reduces safety risks, and increases testing workflow efficiency and equipment utilization.
Smart Images

Figure CN225018418U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of energy storage testing technology, and in particular to a testing system for energy storage devices. Background Technology
[0002] With the rapid development of the new energy industry, the application scenarios of energy storage systems are becoming increasingly widespread, covering various forms from residential energy storage to industrial and commercial energy storage and large-scale containerized energy storage power stations. In order to ensure the safety and reliability of energy storage products before grid connection, comprehensive performance testing (such as charge and discharge efficiency, overload capacity, grid adaptability, etc.) is an essential step.
[0003] However, existing testing platforms in related technologies often have certain limitations. On the one hand, existing testing platforms are often relatively single-function, for example, they can only test a single DC system or a single AC system, making it difficult to flexibly accommodate the diverse testing needs of DC-side equipment, AC-side equipment, and AC / DC integrated machines on a single platform. On the other hand, existing testing platforms typically only support single tests of conventional low-voltage levels (such as 400V or 690V) or medium-to-high voltage levels (such as 33kV medium-voltage energy storage systems), and cannot simultaneously perform cross-connection tests on low-voltage and medium-to-high voltage level equipment. Utility Model Content
[0004] The purpose of this utility model embodiment is to provide a testing system for energy storage devices, thereby solving the problems of incomplete voltage level coverage and incompatibility with multiple system types in related technologies.
[0005] To address the aforementioned technical problems, embodiments of this utility model provide a testing system for an energy storage device, comprising: a power access circuit including an isolation transformer, the secondary side of which is connected to a common AC bus; a first test branch connected to the common AC bus, the first test branch including a first on / off control unit and a first physical access port connected in series; or, including a first on / off control unit, a power conversion system, and a first physical access port connected in series; a second test branch connected to the primary side of the isolation transformer, including a second on / off control unit and a second physical access port connected in series; a third on / off control unit, one end of which is connected to the common AC bus; the other end of which is connected to the second physical access port; a third test branch connected to the common AC bus; the third test branch including a step-up transformer, a fourth on / off control unit, and a third physical access port connected in series; wherein the first physical access port, the second physical access port, and the third physical access port are all used to connect at least one device under test.
[0006] In this embodiment of the invention, a composite architecture comprising an isolation transformer and three test branches with different functions is constructed to achieve comprehensive testing coverage of energy storage devices. Specifically, the first test branch is directly connected to the common AC bus (secondary side of the isolation transformer), suitable for conventional low-voltage AC testing scenarios or DC testing scenarios requiring PCS conversion; the third test branch integrates a step-up transformer, providing a medium- and high-voltage testing environment, thus enabling a single platform to cover multi-voltage level testing needs from low to medium voltage. More importantly, the second test branch is connected to the primary side of the isolation transformer and, together with the third on / off control unit connected between the common AC bus and the second physical access port, forms a flexible switching network for AC testing scenarios. By controlling the opening and closing states of the second and third on / off control units, the access position of the second physical access port can be flexibly changed (direct connection to the primary grid or connection to the secondary bus), thereby supporting the access of different types of devices under test or rapid switching between different testing modes (such as parallel testing and grid-connected testing). This design breaks through the limitations of traditional test benches with their single function, meeting diverse testing needs without the need for frequent manual disconnection and reconnection, significantly improving testing efficiency and platform versatility.
[0007] In addition, it includes control equipment, which is electrically connected to the first on / off control unit, the second on / off control unit, the third on / off control unit, and the fourth on / off control unit. Thus, through unified control by the host computer program, the traditional manual opening and closing operations are replaced, achieving automation of the testing process. This not only further improves testing efficiency but also fundamentally eliminates the high-voltage safety risks caused by human error, ensuring the safety of the testing process.
[0008] In addition, at least one of the first physical access port, the second physical access port, and the third physical access port is configured as a dual-station interface. This supports a "one-test-one-backup" or dual-machine parallel operation mode, meaning that while testing the energy storage device at one station, wiring preparation or cooling can be performed at the other station, or the two stations can be directly used for parallel testing, greatly improving the throughput and utilization rate of the test bench.
[0009] In addition, it also includes an auxiliary power supply branch, which includes a power frequency power supply circuit and a variable frequency power supply circuit. The power frequency power supply circuit includes a fifth on / off control unit, one end of which is connected to the auxiliary power supply, and the other end is connected to the first auxiliary power supply port. The variable frequency power supply circuit is connected in parallel with the power frequency power supply circuit to the auxiliary power supply. The variable frequency power supply circuit includes a variable frequency power supply, a sixth on / off control unit, and a second auxiliary power supply port connected in series. The first auxiliary power supply port or the second auxiliary power supply port is used to provide auxiliary power to the device under test. Thus, it can not only provide standard power frequency auxiliary power, but also provide frequency / voltage adjustable auxiliary power (such as 60Hz standard) through the variable frequency power supply, solving the power supply matching problem of internal auxiliary systems (such as BMS, fans, etc.) of energy storage devices with different regional standards, realizing full frequency domain coverage, and ensuring that the energy storage device can be powered on and operated normally during testing.
[0010] In addition, the third test branch also includes a medium-voltage side on / off control unit located on the primary side of the step-up transformer; the input terminal of the medium-voltage side on / off control unit is connected to the common AC bus. Thus, a control node is added at the front end of the medium-voltage test branch, allowing the input of the step-up transformer to be completely disconnected when no medium-voltage testing is being performed. This reduces no-load losses, facilitates independent inspection and maintenance of the equipment, and improves the energy efficiency and maintainability of the system.
[0011] Furthermore, the second on / off control unit is configured to disconnect when the third on / off control unit is closed; the third on / off control unit is configured to disconnect when the second on / off control unit is closed; and / or, the first on / off control unit is configured to disconnect when the third on / off control unit is closed, and the third on / off control unit is configured to disconnect when the first on / off control unit is closed. Thus, through strict interlocking logic, short-circuit faults caused by the second physical access port simultaneously connecting to nodes at different potentials (the primary and secondary sides of the isolation transformer) are prevented, as are direct connections between the first and second physical access ports in unexpected modes. This effectively avoids equipment damage or grid impact caused by misoperation, ensuring system safety under complex switching logic. Attached Figure Description
[0012] One or more embodiments are illustrated by way of example with reference numerals in the accompanying drawings. These illustrations do not constitute a limitation on the embodiments. Elements with the same reference numerals in the drawings are denoted as similar elements. Unless otherwise stated, the figures in the drawings are not to be limited by scale.
[0013] Figure 1 This is a structural diagram of a test system for energy storage devices provided in this application, used for testing the device under test; Figure 2This is a device architecture diagram of a test system for an energy storage device provided in this application; Figure 3 This is a structural diagram of a test system for an energy storage device provided in this application, used to supply power to the device under test.
[0014] Explanation of reference numerals in the attached figures: Power supply access circuit-100, simulated power grid power supply-101, fifth on / off control unit-102, isolation transformer-103, first test branch-200, first on / off control unit-201, power conversion system-202, first physical access port-203, second test branch-300, second on / off control unit-301, second physical access port-302, third test branch-400, step-up transformer-401, fourth on / off control unit-402, third physical access port-403, common AC bus-500, third on / off control unit-600, medium voltage side on / off control unit-700, auxiliary power supply-800, power frequency power supply circuit-900, fifth on / off control unit-901, first auxiliary power supply port-902, frequency converter power supply circuit-1000, frequency converter power supply-1001, sixth on / off control unit-1002, second auxiliary power supply port-1003, sixth on / off control unit-1100. Detailed Implementation
[0015] As described in the background section, related technologies suffer from problems such as limited testing platform functionality, incomplete voltage level coverage, and reliance on manual operation leading to low efficiency and high risk. Research has revealed that the root cause of this problem lies in the fact that traditional testing platforms typically employ a fixed "point-to-point" electrical topology. The connection path between the power access point and the test port is rigidly locked, lacking a flexible bus switching network and a multi-stage transformer isolation architecture. For example, to meet the needs of conventional low-voltage (e.g., 400V) testing, the main circuit of existing platforms is often designed as a single-voltage-level straight-through bus, lacking integrated boost or voltage regulation units, making it unable to dynamically adapt to the access requirements of medium- and high-voltage (e.g., 33kV) equipment. Furthermore, DC-side and AC-side equipment typically require completely different electrical isolation schemes and grounding systems, making it difficult for traditional single topologies to simultaneously accommodate these two drastically different electrical environments without altering the physical wiring. Furthermore, at the control level, the circuit breakers, contactors and other switching elements in traditional platforms usually exist independently as "information islands". The lack of a unified central logic control unit to connect them through a communication bus makes it impossible for the system to realize complex interlocking logic across branches (such as short-circuit protection interlocking) and remote automated program control. This forces testers to go deep into high-voltage areas to manually open and close the circuit, which limits the testing efficiency and brings significant personal safety hazards.
[0016] To make the objectives, technical solutions, and advantages of the embodiments of this utility model clearer, the various embodiments of this utility model will be described in detail below with reference to the accompanying drawings. However, those skilled in the art will understand that many technical details have been provided in the various embodiments of this utility model to help readers better understand this application. However, the technical solutions claimed in this application can be implemented even without these technical details and various changes and modifications based on the following embodiments. The division of the various embodiments below is for the convenience of description and should not constitute any limitation on the specific implementation of this utility model. The various embodiments can be combined with and referenced by each other without contradiction.
[0017] One embodiment of this utility model relates to a testing system for energy storage devices, which can be applied to scenarios such as energy storage product R&D laboratories, factory testing production lines, or containerized mobile testing stations. Specifically, the execution entity of this system—the control device—can be an industrial personal computer, a programmable logic controller (PLC), an edge computing server, or a distributed control system. It interacts with and controls various actuators in the system (such as on / off control units, power converters, and frequency converters) via industrial Ethernet or fieldbus. This includes: The power access circuit includes an isolation transformer, the secondary side of which is connected to a common AC bus; a first test branch connected to the common AC bus, the first test branch including a first on / off control unit and a first physical access port connected in series; or, including a first on / off control unit, a power conversion system, and a first physical access port connected in series; a second test branch connected to the primary side of the isolation transformer, including a second on / off control unit and a second physical access port connected in series; a third on / off control unit, one end of which is connected to the common AC bus; the other end of which is connected to the second physical access port; a third test branch connected to the common AC bus; the third test branch including a step-up transformer, a fourth on / off control unit, and a third physical access port connected in series; wherein, the first physical access port, the second physical access port, and the third physical access port are all used to connect at least one device under test. In this embodiment of the invention, by constructing a composite architecture including an isolation transformer and three test branches with different functions, comprehensive testing coverage of energy storage devices is achieved. Specifically, the first test branch connects directly to the common AC bus (secondary side of the isolation transformer), suitable for conventional low-voltage AC testing scenarios or DC testing scenarios requiring PCS conversion. The third test branch integrates a step-up transformer, providing a medium-to-high voltage testing environment, thus enabling a single platform to cover multi-voltage level testing needs from low to medium voltage. More importantly, the second test branch connects to the primary side of the isolation transformer and, together with the third on / off control unit connected between the common AC bus and the second physical access port, forms a flexible switching network for AC testing scenarios. By controlling the opening and closing states of the second and third on / off control units, the access position of the second physical access port can be flexibly changed (direct connection to the primary grid or connection to the secondary bus), thus supporting the access of different types of devices under test or rapid switching between different testing modes (such as parallel testing and grid-connected testing). This design breaks the limitations of traditional test benches with their single function, meeting diverse testing needs without frequent manual disconnection and reconnection, significantly improving testing efficiency and platform versatility.
[0018] The following is a detailed description of the implementation details of the test system for the energy storage device according to an embodiment of this utility model. The following content is only for the convenience of understanding and is not necessary for implementing this solution.
[0019] One embodiment of this utility model relates to a testing system for an energy storage device, the overall electrical topology of which is as follows: Figure 1 As shown, this test system adopts a multi-branch parallel composite architecture, which aims to meet the testing needs of various energy storage devices such as low-voltage / medium-voltage and AC / DC on a single physical platform through a flexible switching network.
[0020] Specifically, such as Figure 1 As shown, the testing system for this energy storage device mainly includes a power access circuit 100, a first test branch 200, a second test branch 300, a third on / off control unit 600, and a third test branch 400.
[0021] Regarding the power input circuit 100, it is the energy entry point for the entire test system. This unit includes the isolation transformer 103 (see reference). Figure 2 The isolation transformer 103 (marked IT1) has its primary side connected to the simulated mains power supply 101, while its secondary side is connected to the common AC bus 500 within the system. The isolation transformer 103 not only achieves electrical isolation between the test system and the simulated mains power supply 101, ensuring the safety of the mains side, but also provides the voltage level required for the test through transformer ratio adjustments (e.g., 5500 / 0.69 / 0.69kV).
[0022] The first test branch 200 is connected to the common AC bus 500 (i.e. Figure 2 The secondary side of the intermediate isolation transformer IT1 is mainly used to construct low-voltage DC or AC test circuits. In a specific example, such as... Figure 1 As shown on the left, the first test branch 200 includes a first on / off control unit 201 connected in series. Figure 2 The circuit breaker is identified as CB2 (e.g., a 690V / 5000A circuit breaker) and has a first physical access port 203. The first physical access port 203 is configured to connect at least one device under test (e.g., a DC energy storage device or an AC energy storage device).
[0023] In an optional embodiment, to support DC testing, the first test branch 200 may further include a power conversion system 202 connected in series between the first on / off control unit 201 and the first physical access port 203. Figure 2 The PCS is designated as PCS1 (e.g., a self-developed 5.5MW PCS). In this structure, the power conversion system 202 converts the AC power on the common AC bus 500 into DC power, which is then supplied to the DC energy storage device through the first physical access port 203, thereby constructing an electrical circuit for "single DC system test" or "dual DC system test".
[0024] The second test branch 300 is connected to the primary side of the isolation transformer 103 (i.e., the side directly connected to the power grid side), and includes a second on / off control unit 301 connected in series. Figure 2The circuit breaker is designated CB4 (e.g., a 690V / 2500A circuit breaker) and has a second physical access port 302. The second test branch 300 is designed to provide an access channel without secondary isolation transformation, or at a specific potential point, for specific AC grid-connected tests or as an energy feedback channel in parallel-connected tests.
[0025] Third on / off control unit 600 ( Figure 2 The circuit breaker (identified as CB3, such as a 690V / 2500A circuit breaker) serves as a key switching component connecting nodes at different potentials. One end of the CB3 is connected to the common AC bus 500 (from the same source as the first test branch 200), and the other end is connected to the second physical access port 302. Through the cooperation of the third on / off control unit 600 and the second on / off control unit 301, the second physical access port 302 can be flexibly configured to connect to the primary side of the isolation transformer 103 (when the second on / off control unit 301 is closed and the third on / off control unit 600 is open) or to the secondary side of the isolation transformer 103 (when the third on / off control unit 601 is closed and the second on / off control unit 301 is open). This structural design allows the second physical access port 302 to be reused, supporting the access of devices with different voltage references or different testing purposes.
[0026] The first physical access port 203, the second physical access port 302, and the third physical access port 403 are all used to access at least one device under test.
[0027] In a specific example, to further improve the reusability of the test interface, at least one of the first physical access port 203, the second physical access port 302, and the third physical access port 403 is configured as a duplex interface (e.g., Figure 2 (As shown in the diagram, two parallel access boxes). For example, two sets of DC contactors can be installed at the lower end of the power conversion system 202, connecting to two test stations respectively. In this way, two devices under test can be connected to the same access port simultaneously, enabling cross-connection testing of similar devices. In addition, this dual-station structure also allows technicians to perform wiring preparation or troubleshooting at the other station while the device under test at one station is undergoing long-term aging testing, thus achieving efficient testing.
[0028] Furthermore, regarding the connection of the main power supply, the primary side of the isolation transformer 103 is connected via the fifth on / off control unit 102 ( Figure 2 The fifth on / off control unit 102 (identified as CB1, such as the system main power switch) is connected to the simulated mains power supply 101. During testing, this fifth on / off control unit 102 is normally kept closed to maintain the energy path between the simulated mains power supply and the test platform.
[0029] Based on the above hardware structure, the test system in this embodiment can form a variety of different electrical connection topologies by controlling the state of each on / off control unit to support different test conditions.
[0030] (1) Single / Dual DC System Test Configuration: The system is configured to close the first on / off control unit 201 while simultaneously disconnecting the second on / off control unit 301 and the third on / off control unit 600. At this time, the first test branch 200 is turned on, connecting the DC energy storage device at the lower end of the power conversion system 202 to the common AC bus 500, thus constructing a single DC system test topology for charge and discharge testing. In addition, if two DC energy storage devices are connected to the power conversion system 202 at this time, then a dual DC system test topology is constructed, enabling the mutual drag testing of the two DC energy storage devices.
[0031] (2) Single / Dual AC System Test Configuration: The system is configured to close the second on / off control unit 301 and the first on / off control unit 201, while simultaneously disconnecting the third on / off control unit 600. At this time, the AC energy storage device located at the second physical access port 302 and the power conversion system 202 (or another AC energy storage device) located at the first physical access port 203 achieve energy interaction through the coupling effect of the isolation transformer 103 or the bus connection, and perform a pull-out test.
[0032] (3) Single / Dual AC / DC Integrated Unit Test Configuration: The system is configured to close the second on / off control unit 301 and the first on / off control unit 201, and disconnect the third on / off control unit 600. The AC / DC integrated energy storage device under test is connected to the second physical access port 302, and the accompanying DC energy storage device is connected to the first physical access port 203 through the power conversion system 202. The two are connected to each other through the system loop. Alternatively, if two AC / DC integrated energy storage devices under test are connected to the second physical access port 302 at this time, two accompanying DC energy storage devices can be connected to the first physical access port 203 through the power conversion system 202, thereby realizing the mutual connection test of dual AC / DC integrated units.
[0033] (4) AC / DC Interconnection Test Configuration: The system is configured to close the third on / off control unit 600 while simultaneously disconnecting the first on / off control unit 201 and the second on / off control unit 301. At this time, the second physical access port 302 is directly connected to the common AC bus 500. By connecting the AC PCS device under test and the DC energy storage device under test in series at the second physical access port 302, a series topology of the third on / off control unit 600, the AC PCS device under test, and the DC energy storage device under test is constructed for system interconnection testing.
[0034] (5) Single Medium-Voltage System Test Configuration: The system is configured to close the fourth on / off control unit 402 and the first on / off control unit 201, and disconnect the second on / off control unit 301 and the third on / off control unit 600. At this time, the third test branch 400 is turned on, and the single medium-voltage integrated unit connected to the third physical access port 403 is connected to the common AC bus 500 through the step-up transformer 401, as well as the auxiliary test equipment connected to other branches, such as the power conversion system 202 and the corresponding connected auxiliary DC energy storage equipment, to perform a drag test.
[0035] (6) Dual medium-voltage system test configuration: The system is configured to close the fourth on / off control unit 402, disconnect the first on / off control unit 201, the second on / off control unit 301 and the third on / off control unit 600, and at this time the third test branch 400 is on, and the two medium-voltage integrated machines connected to the third physical access port 403 form a mutual drag test.
[0036] In an optional embodiment, such as Figure 1 As shown, the third test branch 400 also includes a medium-voltage side on / off control unit 700 disposed on the primary side (low-voltage input side) of the step-up transformer 401. The medium-voltage side on / off control unit 700 ( Figure 2 The input terminal of the medium-voltage side control unit 700 (identified as CB5, 690V / 2500A) is connected to the common AC bus 500. The configuration of this medium-voltage side on / off control unit 700 allows the step-up transformer 401 to be completely disconnected from the common AC bus 500 when not in use, avoiding no-load losses and potential resonance risks, while also facilitating independent inspection and maintenance of the step-up branch.
[0037] To meet the power supply requirements of auxiliary systems (such as BMS, fans, etc.) within energy storage devices of different regional standards, such as Figure 3 As shown, the test system also includes an auxiliary power supply branch. This auxiliary power supply branch is designed as a dual-power supply structure, specifically including a power frequency power supply circuit 900 connected in parallel to the auxiliary power supply 800 (e.g., 400V station power) and a frequency converter power supply circuit 1000. Specifically, the power frequency power supply circuit 900 is mainly used for powering conventional national standard equipment, and it includes a fifth on / off control unit 901 (… Figure 2 The circuit is marked CB7, for example, a 400V / 100A*2 dual-circuit switch. One end of the fifth on / off control unit 901 is connected to the auxiliary power supply 800, and the other end is connected to the first auxiliary power supply port 902, used to directly provide power frequency (e.g., 50Hz) to the energy storage devices connected to the test system. The frequency converter power supply circuit 1000 is used to provide power of a special standard (e.g., 480V / 60Hz from abroad). This circuit includes a seventh on / off control unit 1100 connected in series (…). Figure 2 The markings include CB8, such as a 400V / 250A switch, and frequency converter 1001 ( Figure 2 The sixth on / off control unit 1002 (marked as G1) Figure 2 The circuit is marked CB9 (e.g., a dual-circuit switch with 480V / 100A*2) and has a second auxiliary power supply port 1003. The frequency converter 1001, as the core voltage and frequency regulating component, has its input connected to the auxiliary power supply 800, and its output connected to the second auxiliary power supply port 1003 via the sixth on / off control unit 1002. This dual-circuit design allows testers to flexibly choose to connect to either the first auxiliary power supply port 902 or the second auxiliary power supply port 1003 based on the parameters of the energy storage device. This solves the problem of energy storage devices failing to power on and start due to voltage or frequency mismatch, achieving full-frequency auxiliary power supply coverage.
[0038] In a specific example, to prevent short-circuit accidents caused by misoperation, especially to prevent direct short circuits between the primary and secondary sides of the isolation transformer 103, or to prevent unintended parallel connection of different test circuits, this system is configured with a strict interlocking mechanism in hardware or controller logic. The second on / off control unit 301 is configured to open when the third on / off control unit 600 is closed; the third on / off control unit 600 is configured to open when the second on / off control unit 301 is closed; and / or, the first on / off control unit 201 is configured to open when the third on / off control unit 600 is closed, and the third on / off control unit 600 is configured to open when the first on / off control unit 201 is closed; specifically, the second on / off control unit 301 and the third on / off control unit 600 are configured in an interlocked state: when the third on / off control unit 600 is closed, the second on / off control unit 301 remains open or is forcibly opened; conversely, when the second on / off control unit 301 is closed, the third on / off control unit 600 remains open or is forcibly opened. This ensures that the second physical access port 302 can only be connected to one side of the isolation transformer 103 at any given time (either the primary side or the secondary side), avoiding short-circuit loop currents across the transformer. Similarly, the first on / off control unit 201 and the third on / off control unit 600 are also configured to be interlocked. When the third on / off control unit 600 is closed, the first on / off control unit 201 remains open or is forcibly disconnected; conversely, when the first on / off control unit 201 is closed, the third on / off control unit 600 remains open or is forcibly disconnected. This prevents circuit logic chaos or equipment damage caused by accidental conduction with the first test branch 200 when the third on / off control unit 600 is closed.
[0039] In an alternative example, in terms of hardware selection, considering the current level and breaking capacity requirements of different branches, the first on / off control unit 201, as the main test circuit switch, carries a large current (e.g., 5000A) and is configured as a frame circuit breaker to provide higher short-circuit breaking capacity and thermal stability; while the second on / off control unit 301 and the third on / off control unit 600 have relatively smaller currents (e.g., 2500A) and are configured as molded case circuit breakers to balance economy and compactness.
[0040] To achieve full system-wide programmable control and replace manual high-voltage operation, the testing system also includes control equipment. The control equipment adopts a hierarchical distributed architecture, including a host computer at the upper level and execution terminals at the lower level. Specifically, the control equipment is electrically connected to key switching components in the system, such as the first on / off control unit 201, the second on / off control unit 301, the third on / off control unit 600, and the fourth on / off control unit 402.
[0041] In an optional example, a comprehensive protection device is specifically installed in the third test branch 400 (medium-high voltage branch) to enhance safety. This comprehensive protection device is electrically connected to the fourth on / off control unit 402 and communicates with the control equipment. The control equipment is configured to monitor the electrical status (such as current and voltage) of the third test branch 400 in real time via the comprehensive protection device, and to control the fourth on / off control unit 402 to trip when an abnormality is detected, thereby protecting the medium-voltage energy storage equipment and the test equipment.
[0042] In an optional example, temperature monitoring units are provided on both the isolation transformer 103 and the step-up transformer 401, which are critical magnetic components in the system. The data output terminal of the temperature monitoring unit is connected to the control device to monitor the temperature rise of the transformer in real time and prevent overheating.
[0043] In this embodiment of the invention, a composite architecture comprising an isolation transformer and three test branches with different functions is constructed to achieve comprehensive testing coverage of energy storage devices. Specifically, the first test branch is directly connected to the common AC bus (secondary side of the isolation transformer), suitable for conventional low-voltage AC testing scenarios or DC testing scenarios requiring PCS conversion; the third test branch integrates a step-up transformer, providing a medium- and high-voltage testing environment, thus enabling a single platform to cover multi-voltage level testing needs from low to medium voltage. More importantly, the second test branch is connected to the primary side of the isolation transformer and, together with the third on / off control unit connected between the common AC bus and the second physical access port, forms a flexible switching network for AC testing scenarios. By controlling the opening and closing states of the second and third on / off control units, the access position of the second physical access port can be flexibly changed (direct connection to the primary grid or connection to the secondary bus), thereby supporting the access of different types of devices under test or rapid switching between different testing modes (such as parallel testing and grid-connected testing). This design breaks through the limitations of traditional test benches with their single function, meeting diverse testing needs without the need for frequent manual disconnection and reconnection, significantly improving testing efficiency and platform versatility.
[0044] In the description of the embodiments of this application, technical terms such as "first" and "second" are used only to distinguish different objects and should not be construed as indicating or implying relative importance or implicitly specifying the number, specific order, or primary and secondary relationship of the indicated technical features. In the description of the embodiments of this application, "multiple" means two or more, unless otherwise explicitly defined.
[0045] In the description of the embodiments in this application, the term "and / or" is merely a description of the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent three cases: A exists, A and B exist simultaneously, and B exists. In addition, the character " / " in this document generally indicates that the related objects before and after it have an "or" relationship.
[0046] In the description of the embodiments of this application, unless otherwise expressly specified and limited, technical terms such as "installation," "connection," "joining," and "fixing" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. For those skilled in the art, the specific meaning of the above terms in the embodiments of this application can be understood according to the specific circumstances.
[0047] It is worth mentioning that all modules involved in this embodiment are logical modules. In practical applications, a logical unit can be a physical unit, a part of a physical unit, or a combination of multiple physical units. Furthermore, to highlight the innovative aspects of this invention, this embodiment does not introduce units that are not closely related to solving the technical problem proposed by this invention; however, this does not mean that other units are absent in this embodiment.
[0048] Furthermore, the examples mentioned in the above embodiments can be freely combined, and any combination can be understood as an embodiment. The terms "embodiment" or "example" appearing in various locations in the specification do not necessarily refer to the same embodiment, nor are they independent or alternative embodiments mutually exclusive with other embodiments. Those skilled in the art will understand that the embodiments described herein can be combined with other embodiments.
[0049] Those skilled in the art will understand that the above embodiments are specific embodiments for implementing the present invention, and in practical applications, various changes can be made to them in form and detail without departing from the spirit and scope of the present invention.
Claims
1. A test system for an energy storage device, characterized by, include: The power supply circuit includes an isolation transformer, the secondary side of which is connected to a common AC bus. A first test branch connected to the common AC bus, the first test branch including a first on / off control unit and a first physical access port connected in series; or, including a first on / off control unit, a power conversion system and a first physical access port connected in series; The second test branch is connected to the primary side of the isolation transformer and includes a second on / off control unit and a second physical access port connected in series. The third on / off control unit is connected at one end to the common AC bus; the other end of the third on / off control unit is connected to the second physical access port. The third test branch is connected to the common AC bus; the third test branch includes a step-up transformer, a fourth on / off control unit, and a third physical access port connected in series. The first physical access port, the second physical access port, and the third physical access port are all used to connect at least one device under test.
2. The test system of claim 1, wherein, It also includes a control device, which is electrically connected to the first on / off control unit, the second on / off control unit, the third on / off control unit, and the fourth on / off control unit.
3. The test system of claim 2, wherein, At least one of the first physical access port, the second physical access port, and the third physical access port is configured as a duplex interface.
4. The test system of claim 1, wherein, It also includes an auxiliary power supply branch, which includes a power frequency power supply circuit and a frequency converter power supply circuit; The power frequency power supply circuit includes a fifth on / off control unit, one end of which is connected to the auxiliary power supply and the other end is connected to the first auxiliary power supply port; The variable frequency power supply circuit is connected in parallel with the power frequency power supply circuit to the auxiliary power supply. The variable frequency power supply circuit includes a variable frequency power supply, a sixth on / off control unit and a second auxiliary power supply port connected in series. The first auxiliary power supply port or the second auxiliary power supply port is used to provide auxiliary power to the device under test.
5. The testing system for energy storage devices according to claim 1, characterized in that, The third test branch also includes a medium-voltage side on / off control unit located on the primary side of the step-up transformer; The input terminal of the medium-voltage side on / off control unit is connected to the common AC bus.
6. The testing system for energy storage devices according to claim 1, characterized in that, The second on / off control unit is configured to disconnect when the third on / off control unit is closed; the third on / off control unit is configured to disconnect when the second on / off control unit is closed; and / or, The first on / off control unit is configured to disconnect when the third on / off control unit is closed, and the third on / off control unit is configured to disconnect when the first on / off control unit is closed.
7. The testing system for energy storage devices according to claim 2, characterized in that, The third test branch also includes a comprehensive protection device, which is electrically connected to the fourth on / off control unit. The control device is used to monitor the electrical status of the third test branch through the integrated protection device and control the operation of the fourth on / off control unit.
8. The testing system for energy storage devices according to claim 2, characterized in that, Both the isolation transformer and the step-up transformer are equipped with temperature monitoring units, and the data from the temperature monitoring units is output to the control device.
9. The testing system for energy storage devices according to claim 2, characterized in that, The first on / off control unit is a frame circuit breaker, and the second and third on / off control units are molded case circuit breakers.
10. The testing system for energy storage devices according to claim 2, characterized in that, The power supply access circuit also includes a fifth on / off control unit and a simulated power grid power supply; The primary side of the isolation transformer is connected to the simulated power grid via the fifth on / off control unit.