A liquid cooling test system for servers
By combining integrated equipment with a junction box, the problem of frequent equipment switching in traditional server liquid cooling testing is solved, enabling efficient parallel testing of multiple servers and improving testing efficiency and process smoothness.
Patent Information
- Application Number
- CN202522658495.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-15
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-15
AI Technical Summary
Traditional server liquid cooling testing methods require repeated plugging and unplugging of connecting components and frequent switching of device connections, resulting in a cumbersome and inefficient testing process that cannot meet the needs of batch testing of liquid-cooled servers.
The system employs an integrated device combined with at least two sets of adapter boxes. The supply unit provides air, liquid, and negative pressure power, while the detection unit is set up in correspondence with the supply unit. This enables parallel testing of multiple servers, avoiding frequent device switching and plug-and-play operations.
It improves the overall smoothness and efficiency of server liquid cooling testing, enabling efficient and convenient cleaning and testing of multiple servers, and ensuring the orderly progress of testing work.
Smart Images

Figure CN225018734U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the technical field, and more specifically to a server liquid cooling testing system. Background Technology
[0002] After assembly, liquid-cooled servers need to address issues such as oil contamination, dust particles, metal particles, pipe damage, leaky interfaces, substandard component lifespan, and low-temperature transportation. Therefore, cleaning and testing are essential after assembly before the server can be put into use. Traditional liquid-cooling testing methods often rely on distributed, independent equipment, with different specialized testing devices for different functionalities.
[0003] In the process of realizing this utility model, the inventors discovered that the prior art has at least the following problems: when different tests are required on the server, it is necessary to repeatedly plug and unplug the connection components to switch between different test requirements, which makes the test process cumbersome; when facing the scenario of testing multiple servers at the same time, it is usually necessary to frequently switch device connections to adapt to different test requirements, resulting in low overall test efficiency, making it difficult to meet the actual needs of batch testing of liquid-cooled servers, and causing inconvenience to the orderly progress of the test work. Utility Model Content
[0004] The purpose of this invention is to overcome the shortcomings of the prior art and provide a server liquid cooling test system that can solve the technical problem of low overall test efficiency caused by the need to repeatedly plug and unplug connecting components and frequently switch device connections in traditional server liquid cooling test methods.
[0005] To achieve the above objectives, the present invention adopts the following technical solution:
[0006] A server liquid cooling testing system includes an integrated device and at least two sets of adapter boxes;
[0007] The integrated device includes at least one set of supply units for providing one or more of the following to the transfer box: air source, liquid source, and negative pressure power; wherein, each set of supply units includes at least two sets of transfer channels, and the number of transfer channels in each set of supply units corresponds to the number of transfer boxes;
[0008] The adapter box includes at least one set of testing units for performing performance tests on the server; the testing units are configured corresponding to the supply units; wherein the input terminal of each set of testing units is connected to one of the adapter channels of its corresponding supply unit.
[0009] In one embodiment, the supply unit includes one or more of a negative pressure unit, an air intake unit, a pressurization unit, a nitrogen intake unit, and a liquid intake unit, wherein each of the negative pressure unit, the air intake unit, the pressurization unit, the nitrogen intake unit, and the liquid intake unit includes at least two sets of transfer channels.
[0010] In one embodiment, the negative pressure unit includes a negative pressure channel and four sets of negative pressure conversion channels, each of the four sets of negative pressure conversion channels being connected to one end of the negative pressure channel, and the other end of the negative pressure channel being a first exhaust port;
[0011] The negative pressure channel is provided with a first negative pressure valve, a first water-gas separator and a vacuum pump in sequence from the negative pressure transfer channel along the exhaust direction to the first exhaust port, and each group of negative pressure transfer channels is provided with a negative pressure transfer valve.
[0012] In one embodiment, the air intake unit includes an air intake channel and four sets of air intake transition channels. The four sets of air intake transition channels are all connected to one end of the air intake channel, and the other end of the air intake channel is a first air intake port, which is connected to a compressed air source.
[0013] The intake channel is provided with an intake valve, a first safety valve, a first air filter and a heating device in sequence from the first intake port along the intake direction to the intake transfer channel. Each intake transfer channel is provided with a pressure reducing transfer valve.
[0014] In one embodiment, the boosting unit includes a boosting channel and four sets of pressure holding transition channels. The four sets of pressure holding transition channels are all connected to one end of the boosting channel, and the other end of the boosting channel is a second air inlet, which is connected to a compressed air source.
[0015] The pressurization channel is provided with an air valve, a second air filter, a first pressure reducing valve, a pressurization valve, an air storage tank, a third air filter, a second pressure reducing valve, and a second safety valve in sequence from the second air inlet along the air intake direction to the pressure holding transition channel. Each pressure holding transition channel is provided with a pressure holding transition valve.
[0016] In one embodiment, the nitrogen inlet unit includes a nitrogen inlet channel and four sets of nitrogen inlet transfer channels. The four sets of nitrogen inlet transfer channels are all connected to one end of the nitrogen inlet channel, and the other end of the nitrogen inlet channel is a third air inlet, which is connected to a nitrogen source.
[0017] The nitrogen inlet channel is provided with a nitrogen inlet valve, a fourth air filter, a third pressure reducing valve and a third safety valve in sequence from the third air inlet along the air inlet direction to the nitrogen inlet transfer channel. Each nitrogen inlet transfer channel is provided with a nitrogen inlet transfer valve.
[0018] In one embodiment, the liquid inlet unit includes a liquid inlet channel and four sets of liquid inlet transition channels. The four sets of liquid inlet transition channels are all connected to one end of the liquid inlet channel, and the other end of the liquid inlet channel is a liquid inlet connected to a liquid source.
[0019] The inlet channel is provided with a first inlet valve, a first filter, a second inlet valve, a first pressure monitor, a water pump, a second pressure monitor, a fourth safety valve, and a first water quality monitor in sequence from the inlet port to the inlet transfer channel. Each inlet transfer channel is provided with an inlet transfer valve.
[0020] In one embodiment, the detection unit includes one or more of a vacuum unit, a gas injection unit, a pressure holding unit, a nitrogen injection unit, and a liquid injection unit, wherein the vacuum unit is connected to a transfer channel of the negative pressure unit, the gas injection unit is connected to a transfer channel of the air inlet unit, the pressure holding unit is connected to a transfer channel of the pressurization unit, the nitrogen injection unit is connected to a transfer channel of the nitrogen inlet unit, and the liquid injection unit is connected to a transfer channel of the liquid inlet unit.
[0021] In one embodiment, the vacuum unit includes a vacuum channel, one end of which is connected to a transfer channel of the negative pressure unit and the other end is connected to a server input terminal. A vacuum gauge and a first vacuum valve are sequentially arranged on the vacuum channel from the negative pressure unit to the server input terminal.
[0022] In one embodiment, the nitrogen injection unit includes a nitrogen injection channel, one end of which is connected to a transfer channel of the nitrogen inlet unit, and the other end is connected to a server input terminal; a first nitrogen injection valve, a fourth pressure monitor, and a second nitrogen injection valve are sequentially arranged on the nitrogen injection channel from the transfer channel of the nitrogen inlet unit to the server input terminal.
[0023] In one embodiment, the injection unit includes:
[0024] The liquid injection channel has one end connected to a transfer channel of the liquid inlet unit and the other end connected to the server input terminal; the liquid injection channel is equipped with a liquid injection valve;
[0025] A flushing channel is provided, with one end connected to the server output and the other end being a second drain outlet. A flushing valve and a second water quality monitor are sequentially installed on the flushing channel from the server output to the second drain outlet.
[0026] In one embodiment, the gas injection unit includes:
[0027] An air injection channel is provided, with one end connected to a transfer channel of the air intake unit and the other end connected to the server input terminal; a first temperature and humidity monitor and an air injection valve are sequentially installed on the air injection channel from the transfer channel of the air intake unit to the server input terminal.
[0028] A drainage channel, one end of which is connected to the server output, and the other end is the first drainage port; a drainage valve is provided on the drainage channel;
[0029] An exhaust channel is provided, with one end connected to the server output and the other end being a second exhaust port. From the server output to the second exhaust port, the exhaust channel is provided with a first exhaust valve, a second temperature and humidity monitor, a second exhaust valve, and a second water vapor separator in sequence.
[0030] In one embodiment, the pressure holding unit includes a pressure holding channel, one end of which is connected to a transfer channel of the pressure boosting unit, and the other end is connected to a server input terminal; a third pressure monitor and a pressure holding valve are sequentially arranged on the pressure holding channel from the transfer channel of the pressure boosting unit to the server input terminal, and the server output terminal is connected to the exhaust channel.
[0031] In one embodiment, the liquid injection channel, the gas injection channel, and the pressure holding channel are all connected to the server input terminal through a first common channel; wherein, a second channel connecting the liquid injection valve, the gas injection valve, and the pressure holding valve on the first common channel to the server input terminal is provided, and a first adapter valve is provided on the second channel;
[0032] The flushing channel, the exhaust channel, and the drain channel are connected to the server output end through a second common channel; wherein, a third channel connecting the flushing valve, the exhaust valve, and the drain valve on the second common channel to the server output end is provided, and a second transfer valve is provided on the third channel.
[0033] As can be seen from the above technical solutions, this utility model has the following advantages:
[0034] By setting up an integrated device and at least two sets of adapter boxes, the integrated device's supply unit provides one or more of the following: air source, liquid source, and negative pressure power. The number of adapter channels in each supply unit corresponds to the number of adapter boxes. The testing units in each adapter box are correspondingly set up and connected to the corresponding adapter channels. This allows each adapter box to independently conduct server performance testing under the unified support of the integrated device, eliminating the need for multiple supply devices and avoiding frequent switching of devices and plugging / unplugging of connecting components during testing. This achieves a parallel and non-interfering testing mode for multiple servers, improving the overall smoothness of the server liquid cooling testing process. Simultaneously, the combination of integrated supply and parallel testing with multiple adapter boxes significantly improves the efficiency of server liquid cooling testing, providing an efficient and convenient method for cleaning and testing after liquid-cooled server assembly, ensuring the orderly progress of testing.
[0035] The above description is only an overview of the technical solution of this utility model. In order to better understand the technical means of this utility model, it can be implemented according to the contents of the specification. In order to make the above and other objects, features and advantages of this utility model more obvious and easy to understand, the following are preferred embodiments, which are described in detail below. Attached Figure Description
[0036] To more clearly illustrate the technical solutions in this utility model, the drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in this application. For those skilled in the art, other drawings can be obtained based on these drawings.
[0037] Figure 1 A schematic diagram of the overall structure of a testing system provided by this utility model;
[0038] Figure 2 A partial frame diagram of a testing system provided by this utility model;
[0039] Figure 3 A schematic diagram of the structure of an integrated device for a testing system provided by this utility model;
[0040] Figure 4 A schematic diagram of the structure of the testing box of the testing system provided by this utility model;
[0041] Figure 5 A partial structural diagram of an integrated device for a testing system provided by this utility model;
[0042] Figure 6 A partial structural diagram of an integrated device for a testing system provided by this utility model;
[0043] Figure 7A partial structural diagram of an integrated device for a testing system provided by this utility model;
[0044] Figure 8 A partial structural schematic diagram of the testing box of a testing system provided by this utility model;
[0045] Figure 9 This is a partial structural diagram of the testing box of a testing system provided by this utility model.
[0046] Figure Labels
[0047] 100. Integrated equipment;
[0048] 110. Negative pressure unit; 111. Negative pressure channel; 1111. First negative pressure valve; 1112. First water-air separator; 1113. Vacuum pump; 1114. First exhaust port; 112. Negative pressure transfer channel; 1121. Negative pressure transfer valve;
[0049] 120. Intake unit; 121. Intake passage; 1211. First air inlet; 1212. Intake valve; 1213. First safety valve; 1214. First air filter; 1215. Heating device; 122. Intake transfer passage; 1221. Pressure reducing transfer valve; 123. Air source;
[0050] 130. Boosting unit; 131. Boosting channel; 1311. Second air inlet; 1312. Air valve; 1313. Second air filter; 1314. First pressure reducing valve; 1315. Boosting valve; 1316. Air tank; 1317. Third air filter; 1318. Second pressure reducing valve; 1319. Second safety valve; 132. Pressure holding transition channel; 1321. Pressure holding transition valve;
[0051] 140. Nitrogen inlet unit; 141. Nitrogen inlet channel; 1411. Third air inlet; 1412. Nitrogen inlet valve; 1413. Fourth air filter; 1414. Third pressure reducing valve; 1415. Third safety valve; 142. Nitrogen inlet transfer channel; 1421. Nitrogen inlet transfer valve; 143. Nitrogen source;
[0052] 150. Liquid inlet unit; 151. Liquid inlet channel; 1511. Liquid inlet port; 1519. First liquid inlet valve; 1512. First filter; 1513. Second liquid inlet valve; 1514. First pressure monitor; 1515. Water pump; 1516. Second pressure monitor; 1517. Fourth safety valve; 1518. First water quality monitor; 152. Liquid inlet transfer channel; 1521. Liquid inlet transfer valve; 153. Liquid source;
[0053] 200. Adapter box;
[0054] 210. Vacuum unit; 211. Vacuum channel; 2111. Vacuum gauge; 2112. First vacuum valve; 212. First channel; 2121. Second vacuum valve;
[0055] 220. Gas injection unit; 221. Gas injection channel; 2211. First temperature and humidity monitor; 2212. Gas injection valve; 222. Drainage channel; 2221. Drainage valve; 2222. First drain port; 223. Exhaust channel; 2231. First exhaust valve; 2232. Second temperature and humidity monitor; 2233. Second exhaust valve; 2234. Second water-gas separator; 2235. Exhaust port;
[0056] 230. Pressure holding unit; 231. Pressure holding channel; 2311. Third pressure monitor; 2312. Pressure holding valve;
[0057] 240. Nitrogen injection unit; 241. Nitrogen injection channel; 2411. First nitrogen injection valve; 2412. Fourth pressure monitor; 2413. Second nitrogen injection valve;
[0058] 250. Injection unit; 251. Injection channel; 2511. Injection valve; 252. Flushing channel; 2521. Flushing valve; 2522. Second water quality monitor; 2523. Second drain port;
[0059] 260. First public passageway;
[0060] 270. Second public passageway;
[0061] 280. Second channel; 281. First transfer valve;
[0062] 290. Third channel; 291. Second transfer valve;
[0063] 300, Server; 310, Server Input; 320, Server Output. Detailed Implementation
[0064] The embodiments of the present invention will now be described in detail with reference to the accompanying drawings. These embodiments are merely illustrative of the present invention and should not be construed as limiting the scope of protection of the present invention.
[0065] In the description of this utility model, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.
[0066] In the description of this utility model, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "joining" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances.
[0067] See Figures 1 to 9 As shown, Figure 1 A schematic diagram of the overall structure of a testing system provided by this utility model; Figure 2 A partial frame diagram of a testing system provided by this utility model; Figure 3 A schematic diagram of the structure of an integrated device for a testing system provided by this utility model; Figure 4 A schematic diagram of the structure of the testing box of the testing system provided by this utility model; Figure 5 A partial structural diagram of an integrated device for a testing system provided by this utility model; Figure 6 A partial structural diagram of an integrated device for a testing system provided by this utility model; Figure 7 A partial structural diagram of an integrated device for a testing system provided by this utility model; Figure 8 A partial structural schematic diagram of the testing box of a testing system provided by this utility model; Figure 9 This is a partial structural diagram of the testing box of a testing system provided by this utility model.
[0068] See Figure 1 As shown, this utility model provides a server liquid cooling testing system, which includes an integrated device 100 and at least two sets of adapter boxes 200. The integrated device 100 includes at least one set of supply units, which are used to provide the adapter boxes 200 with one or more of the following: air source, liquid source 153, and negative pressure power. Each set of supply units is provided with at least two sets of adapter channels, and the number of adapter channels in each set of supply units corresponds to the number of adapter boxes 200. The adapter box 200 is equipped with at least one set of detection units, which are used to perform performance testing on the server 300. The detection units and supply units are set in a corresponding relationship, and the input end of each set of detection units is connected to one of the adapter channels of the corresponding supply unit.
[0069] In this embodiment, the basic support functions required for testing, such as gas source, liquid source 153, and negative pressure power, are integrated into the integrated device 100. At the same time, at least two independent adapter boxes 200 are provided. By utilizing the corresponding settings of the supply unit and the detection unit, and the matching design of the number of adapter channels and adapter boxes 200, multiple adapter boxes 200 can independently carry out testing under the support of the same integrated device 100. This avoids the configuration requirements of multiple independent devices and frequent switching and plugging operations, thereby realizing a testing mode in which multiple servers 300 run in parallel without interference, improving the smoothness of the testing process and the overall efficiency. During operation, the supply unit of the integrated device 100 is used to supply one or more of the gas source, liquid source 153 and negative pressure power required for testing. Since the number of transfer channels of each supply unit corresponds to the number of transfer boxes 200, and the detection unit is connected to the supply unit, after the system is started, the detection unit of each transfer box 200 can obtain the required gas source, liquid source 153 or negative pressure power through the corresponding transfer channel, and then simultaneously perform performance testing on the server 300 connected to each group. The testing processes of each group do not affect each other, and there is no need to switch equipment or adjust the connection relationship.
[0070] It should be noted that the server liquid cooling test system in this embodiment is used for performance testing of the liquid cooling equipment, and this performance testing process is controlled by a control unit. This control unit can be any controller or control device with data processing capabilities, such as an industrial computer. The supply unit and the detection unit are respectively connected to the control unit to exchange data, enabling the control unit to receive supply status from the supply unit, test data from the detection unit, and for the detection unit to receive test commands from the control unit, and for the supply unit to receive operating commands from the control unit, etc. It is understood that the test data includes, but is not limited to, performance-related data that reflects the performance test results, such as pressure data, temperature data, humidity data, and water quality data. Water quality data includes, but is not limited to, solution pH data, solution turbidity data, and conductivity data, which reflect the solution state. Furthermore, the performance test includes, but is not limited to, pressure holding tests, flushing tests, vacuum tests, liquid draining and drying tests, nitrogen injection tests, and gas-liquid discharge tests on the server 300.
[0071] It should be noted that the types and quantities of supply units and testing units can be flexibly configured and designed based on actual testing needs. For example, when there are a large number of batch testing servers 300, the number of supply unit groups can be increased and the number of adapter boxes 200 can be added accordingly. The types and quantities of functional units in the supply units should also be set according to the supply sources required in the actual testing needs. The types and quantities of functional units included in the testing units in the adapter boxes 200 can also be adjusted according to the number of performance items that need to be tested on the servers 300. That is to say, in this embodiment, before conducting performance testing, the user can select the performance to be tested. Since the testing system modularizes each testing unit, the user can make personalized selections according to the performance of the test, realizing flexible customization of the testing process. This configuration design method based on actual needs makes it unnecessary for the testing system to configure redundant units beyond the requirements, reducing the system construction cost. At the same time, it can accurately match the needs of different batches and different testing items, avoiding low testing efficiency due to insufficient units or resource waste due to excessive units, further improving the system's adaptability and cost-effectiveness, and ensuring that the testing work is carried out efficiently and at low cost while meeting the requirements.
[0072] It should be noted that, in this embodiment, preferably, four sets of adapter boxes 200 are connected through one integrated device 100, so that the four sets of server 300 can be tested simultaneously through the four sets of adapter boxes 200 respectively. However, it is understood that in practical applications, the number of adapter boxes 200 can be increased or decreased according to actual needs. The limitation on the number here is only for illustrative purposes to facilitate the explanation of the overall working principle.
[0073] See Figures 1 to 3 As shown, the supply unit includes one or more of a negative pressure unit 110, an air intake unit 120, a booster unit 130, a nitrogen intake unit 140, and a liquid intake unit 150, wherein each of the negative pressure unit 110, the air intake unit 120, the booster unit 130, the nitrogen intake unit 140, and the liquid intake unit 150 includes at least two sets of transfer channels.
[0074] It should be noted that, in this embodiment, the negative pressure unit 110 is used to provide stable negative pressure power for the testing system, the air intake unit 120 is used to provide compressed air that meets the pressure and purity requirements, the booster unit 130 is used to provide high-pressure gas, the nitrogen intake unit 140 is used to transport nitrogen, and the liquid intake unit 150 is responsible for transporting liquid. In order to adapt to the parallel testing requirements of multiple sets of adapter boxes 200, the negative pressure unit 110, air intake unit 120, booster unit 130, nitrogen intake unit 140, and liquid intake unit 150 are each independently provided with at least two sets of adapter channels.
[0075] Specifically, in this embodiment, the supply unit is further subdivided into multiple functional units. Each functional unit provides different types of test resources, such as negative pressure power, air source, pressurized air source, nitrogen source 143, and liquid source 153. Each functional unit is equipped with at least two sets of transfer channels to adapt to the connection requirements of the corresponding number of detection units in the transfer box 200, realizing a flexible combination supply of multiple test resources to meet the diverse needs of different performance testing items in the liquid cooling test of the server 300. During operation, the corresponding functional unit in the supply unit is selected according to the specific performance test item of the server 300. For example, the negative pressure unit 110 is activated when performing a vacuum test on the server 300, and the air intake unit 120 is activated when performing a gas injection test on the server 300. Or, when different test functions need to be performed on different servers 300, multiple corresponding functional units can be activated simultaneously. Each functional unit delivers the corresponding test resources to the detection unit of the transfer box 200 through its own transfer channel, providing targeted support for various performance tests of the server 300.
[0076] It is understood that, in this embodiment, the supply unit preferably includes all units of the negative pressure unit 110, the air intake unit 120, the pressurization unit 130, the nitrogen intake unit 140, and the liquid intake unit 150, thereby enabling the integrated device 100 in this embodiment to have complete testing resources to adapt to the complete testing process of the server 300. In other embodiments, the types and number of supply units can be increased or decreased according to actual testing needs to adapt to testing requirements in specific scenarios, and no specific limitations are made here.
[0077] See Figures 1 to 4 As shown, the detection unit includes one or more of the following: vacuum unit 210, gas injection unit 220, pressure holding unit 230, nitrogen injection unit 240, and liquid injection unit 250. The vacuum unit 210 is connected to a transfer channel of the negative pressure unit 110, the gas injection unit 220 is connected to a transfer channel of the air intake unit 120, the pressure holding unit 230 is connected to a transfer channel of the pressure boosting unit 130, the nitrogen injection unit 240 is connected to a transfer channel of the nitrogen intake unit 140, and the liquid injection unit 250 is connected to a transfer channel of the liquid intake unit 150.
[0078] Understandably, the vacuum unit 210 uses the negative pressure provided by the negative pressure unit 110 to perform a vacuum test on the server 300, the gas injection unit 220 uses the compressed air provided by the air intake unit 120 to perform a drying, draining, and exhaust test on the server 300, the pressure holding unit 230 uses the high-pressure gas provided by the pressurization unit 130 to perform a pressure holding test on the server 300, the nitrogen injection unit 240 uses the nitrogen provided by the nitrogen intake unit 140 to perform a nitrogen injection protection test on the server 300, and the liquid injection unit 250 uses the liquid provided by the liquid intake unit 150 to perform a rinsing test on the server 300. To achieve precise matching and supply of testing resources, vacuum unit 210 is connected to a corresponding negative pressure transfer channel 112 in negative pressure unit 110 via a sealed pipe; gas injection unit 220 is connected to a corresponding gas injection transfer channel in gas inlet unit 120 via a sealed pipe; pressure holding unit 230 is connected to a corresponding pressure boosting transfer channel in pressurization unit 130 via a sealed pipe; nitrogen injection unit 240 is connected to a corresponding nitrogen inlet transfer channel 142 in nitrogen inlet unit 140 via a sealed pipe; and liquid injection unit 250 is connected to a corresponding liquid inlet transfer channel 152 in liquid inlet unit 150 via a sealed pipe. Each testing unit is connected to its corresponding supply unit via an independent sealed pipe to ensure the independence and stability of resource transmission.
[0079] After all pipelines are connected, the corresponding supply and testing units are activated sequentially according to the test sequence. For example, first, the liquid inlet unit 150 and the liquid injection unit 250 are activated to perform a flushing test on the server 300. After flushing, the liquid inlet unit 150 and the liquid injection unit 250 are shut down. Next, the air inlet unit 120 and the air injection unit 220 are activated to perform a drying test on the server 300. After drying, the air inlet unit 120 and the air injection unit 220 are shut down. Then, the negative pressure unit 110 and the vacuum unit 210 are activated to perform a vacuum test on the server 300. Finally, the nitrogen inlet unit 140 and the nitrogen injection unit 240 are activated to provide nitrogen protection for the interior of the server 300. During each test, the testing unit receives a stable resource supply from the corresponding supply unit. After the test is completed, each testing unit and supply unit is shut down sequentially, and the connection is disconnected.
[0080] Specifically, based on the functional division of the supply unit, the testing unit is set up with multiple functional units. Each functional unit is connected to the corresponding functional unit in the supply unit through a transfer channel to achieve precise matching and supply of test resources. This allows the testing unit to carry out different types of performance tests, such as vacuuming test, draining test, pressure holding test, nitrogen injection test, and rinsing test, to meet the diverse needs of the 300 liquid cooling test of the server. At the same time, the one-to-one connection method ensures the stability and accuracy of the testing process.
[0081] It is understood that, in this embodiment, the detection unit preferably includes five functional units: a vacuum unit 210, a gas injection unit 220, a pressure holding unit 230, a nitrogen injection unit 240, and a liquid injection unit 250. These units are respectively connected to the transfer channels of the negative pressure unit 110, the air intake unit 120, the pressurization unit 130, the nitrogen intake unit 140, and the liquid intake unit 150 of the supply unit, thereby fulfilling the comprehensive performance testing requirements of the server 300. In other embodiments, the number and types of detection units can be increased or decreased according to actual testing needs to adapt to testing requirements in specific scenarios; no specific limitations are made here.
[0082] See Figure 3 and Figure 5 As shown, in one feasible implementation, the negative pressure unit 110 serves as a functional unit providing negative pressure power within the supply unit. The negative pressure unit 110 includes a main negative pressure channel 111 and four sets of branch negative pressure transfer channels 112. Specifically, one end of each of the four sets of negative pressure transfer channels 112 is connected to one end of the negative pressure channel 111, forming a centralized input structure. The other end of the negative pressure channel 111 is configured as a first exhaust port 1114 for discharging the extracted gas. It is understood that in this embodiment, the four sets of negative pressure transfer channels 112 are respectively connected to the vacuum units 210 in the four sets of transfer boxes 200. In other embodiments, the number of negative pressure transfer channels 112 is adaptively set according to actual needs and is not specifically limited here.
[0083] To ensure stable output of negative pressure power and system safety, a first negative pressure valve 1111, a first water-gas separator 1112, and a vacuum pump 1113 are sequentially fixed on the negative pressure channel 111, from the connection point between the negative pressure transfer channel 112 and the negative pressure channel 111 along the exhaust direction to the first exhaust port 1114. By setting up a centralized main negative pressure channel 111 in conjunction with four branch negative pressure transfer channels 112, a single vacuum pump 1113 can supply negative pressure power to multiple transfer boxes 200, eliminating the need to configure a separate vacuum pump 1113 for each transfer box 200, significantly reducing equipment costs. The first negative pressure valve 1111 serves as the main control valve, controlling the on / off state of the entire negative pressure channel 111, enabling rapid start / stop control of the entire negative pressure unit 110. The first water-gas separator 1112 effectively filters water vapor from the extracted gas, preventing corrosion or damage to the internal components of the vacuum pump 1113 and extending its service life. The vacuum pump 1113 provides the power source for generating negative pressure. Each negative pressure transfer channel 112 is equipped with an independent negative pressure transfer valve 1121, allowing flexible control of the on / off state of each channel according to testing requirements. This enables simultaneous opening of all four channels for parallel vacuum testing of multiple servers 300, or individual opening of a single channel for testing a single server 300, effectively improving the flexibility and reliability of the negative pressure unit 110.
[0084] It is understood that in other embodiments, a pressure regulating device may be added between the first water-air separator 1112 and the vacuum pump 1113 on the negative pressure channel 111. The negative pressure value in the negative pressure channel 111 can be precisely controlled by adjusting the pressure regulating device to adapt to the pressure requirements of different servers 300 for vacuum testing. No specific limitation is made here.
[0085] Further, see Figure 4 and Figure 8 As shown, in an optional embodiment, the vacuum unit 210 serves as a functional unit in the detection unit for performing vacuum testing. The vacuum unit 210 includes a vacuum channel 211, one end of which is connected to a negative pressure transfer channel 112 of the negative pressure unit 110, and the other end is connected to the server input terminal 310. The vacuum channel 211 serves as a transmission carrier for negative pressure power, establishing a vacuum path between the negative pressure unit 110 and the server input terminal 310, ensuring that the negative pressure power can be accurately applied to the inside of the server 300 to achieve the purpose of vacuuming.
[0086] To achieve precise control and parameter monitoring of the vacuuming process, a vacuum gauge 2111 and a first vacuum valve 2112 are sequentially fixed on the vacuum channel 211 from the negative pressure unit 110 to the server input terminal 310. The vacuum gauge 2111 monitors the vacuum level parameters within the vacuum channel 211 in real time during the vacuuming process, allowing for timely understanding of the vacuum status inside the server 300 and providing data support for vacuuming control. The first vacuum valve 2112 controls the opening and closing of the vacuum channel 211. Through the real-time monitoring feedback from the vacuum gauge 2111 and the on / off control of the first vacuum valve 2112, the degree and timing of vacuuming of the server 300 are controlled based on actual data, avoiding insufficient or excessive vacuuming, and preventing negative pressure from entering the server 300 during non-testing periods, thus ensuring the accuracy and safety of the vacuuming test.
[0087] Understandably, during operation, the relevant valves on the negative pressure unit 110 and the vacuum pump 1113 are first opened. The negative pressure unit 110 begins to generate negative pressure and delivers it to the vacuum channel 211. When the vacuum level in the vacuum channel 211 reaches the initial requirements for the vacuum test, the first vacuum valve 2112 is opened. The negative pressure continues to act on the inside of the server 300 through the vacuum channel 211 to perform vacuuming. During the vacuuming process, the vacuum level changes are monitored in real time by the vacuum gauge 2111. When the vacuum level inside the server 300 reaches the test target value, the first vacuum valve 2112 is closed by the control unit, and the operation of the negative pressure unit 110 is stopped, completing the vacuum test.
[0088] See Figure 3 and Figure 5 As shown, in one optional embodiment, the intake unit 120 serves as a functional unit for providing compressed air within the supply unit. The intake unit 120 includes a main intake channel 121 and four sets of branch intake transition channels 122. One end of each of the four sets of intake transition channels 122 is centrally connected to one end of the intake channel 121, forming a centralized output structure. The other end of the intake channel 121 is configured as a first intake port 1211, which is connected to an external compressed air source 123 to ensure a stable input of compressed air. It is understood that in this embodiment, the four sets of intake transition channels 122 are respectively connected to the air injection units 220 in the four sets of transition boxes 200. In other embodiments, the number of intake transition channels 122 is adaptively set according to actual needs and is not specifically limited here.
[0089] To ensure that the input compressed air meets the test requirements, an intake valve 1212, a first safety valve 1213, a first air filter 1214 and a heating device 1215 are sequentially fixed on the intake channel 121 from the first intake port 1211 along the intake direction to the connection point of the intake transfer channel 122. The intake valve 1212 controls the opening and closing of the entire intake channel 121, the first safety valve 1213 automatically releases pressure when the pressure in the intake channel 121 exceeds the safe range, the first air filter 1214 filters impurities and particulate matter in the compressed air, and the heating device 1215 heats the compressed air according to the test requirements. In order to achieve independent adjustment of the output pressure of each group of intake transfer channels 122, a pressure reducing transfer valve 1221 is provided on each group of intake transfer channels 122. This valve controls the opening and closing of the intake transfer channel 122 and reduces the pressure of the compressed air delivered by the intake channel 121 to the pressure required for the test. This allows different test items or different models of servers 300 to obtain suitable compressed air pressure, improving the system's adaptability.
[0090] It is understood that in this embodiment, the heating device 1215 is in the form of a hot air gun, which heats the compressed air passing through the heating device 1215 to achieve the subsequent drying process of the server 300. In other embodiments, the heating device 1215 may also take other forms, which are not specifically limited here.
[0091] In one embodiment, only one heating device 1215 is provided on the air intake channel 121. This heating device 1215 needs to supply heated compressed air to all air intake transition channels 122. In this embodiment, the method of setting only one heating device 1215 makes the air intake unit 120 simple in structure and lower in initial deployment cost. However, it is understood that this embodiment can only achieve uniform heating control and cannot meet the differentiated testing needs of some servers 300 that require heating and others that require room temperature compressed air. The energy utilization efficiency is also low. Even if only some channels need to be heated, the entire heating device 1215 needs to be started. At the same time, using only one heating device 1215 makes the workload of the heating device 1215 heavy. When there are many air intake transition channels 122, it is easy to have problems with inaccurate temperature regulation and large fluctuations.
[0092] In another embodiment, two heating devices 1215 are connected in parallel on the intake channel 121, with each heating device 1215 corresponding to two intake transition channels 122. In this embodiment, by adding a set of heating devices 1215, the differentiated heating requirements of different channels can be met. Only the heating device 1215 corresponding to the intake transition channel 122 that needs to be heated needs to be activated, reducing unnecessary energy consumption. At the same time, adding a set of heating devices 1215 can effectively reduce the workload of the heating devices 1215, making the temperature control accuracy of the heating devices 1215 better than that of a single set of heating devices 1215. Furthermore, if a single heating device 1215 fails, it only affects the two sets of intake transition channels 122 corresponding to it, while the other heating device 1215 and its corresponding channel can work normally, reducing maintenance costs.
[0093] In another embodiment, four heating devices 1215 are connected in parallel on the air intake channel 121, with each heating device 1215 corresponding to an air intake transfer channel 122. In this embodiment, independent heating control of each air intake transfer channel 122 can be achieved, precisely adapting to the personalized heating needs of each air intake transfer channel 122 corresponding to the server 300. This results in the most balanced heating load, the highest temperature control accuracy, and the optimal energy utilization efficiency. Only the corresponding device needs to be activated for the single channel requiring heating, and a failure of a single heating device 1215 only affects the single channel it is connected to, minimizing the impact on the overall testing process. However, the structure in this embodiment is relatively complex, and the four heating devices 1215 need to be controlled and maintained separately during operation, leading to higher deployment and maintenance costs.
[0094] It is understandable that the number of heating devices 1215 can be adapted to actual needs, and no specific limit is made here.
[0095] Further, see Figure 4 , Figure 8 and Figure 9 As shown, in an optional embodiment, the gas injection unit 220 serves as a functional unit in the detection unit for performing drying, liquid drainage, and exhaust testing. The gas injection unit 220 includes a gas injection channel 221, a liquid drainage channel 222, and an exhaust channel 223.
[0096] Specifically, one end of the gas injection channel 221 is connected to an air intake transition channel 122 of the air intake unit 120, and the other end is connected to the server input terminal 310. A first temperature and humidity monitor 2211 and a gas injection valve 2212 are sequentially installed on the gas injection channel 221 from the air intake transition channel 122 of the air intake unit 120 to the server input terminal 310. The gas injection channel 221 is used to deliver the gas provided by the air intake unit 120 to the server input terminal 310. The first temperature and humidity monitor 2211 monitors the temperature and humidity of the injected gas to ensure that the gas parameters meet the test requirements. The gas injection valve 2212 controls the opening and closing of the gas injection channel 221.
[0097] One end of the drainage channel 222 is connected to the server output terminal 320, and the other end is set as the first drainage port 2222. A drainage valve 2221 is provided on the drainage channel 222. The drainage channel 222 is used to drain any liquid that may be present inside the server 300, and the drainage valve 2221 controls the opening and closing of the drainage channel 222.
[0098] One end of the exhaust channel 223 is connected to the server output terminal 320, and the other end is set as a second exhaust port 2235. From the server output terminal 320 to the second exhaust port 2235, the exhaust channel 223 is sequentially equipped with a first exhaust valve 2231, a second temperature and humidity monitor 2232, a second exhaust valve 2233, and a second water vapor separator 2234. The exhaust channel 223 is used to exhaust gas from inside the server 300. The first exhaust valve 2231 and the second exhaust valve 2233 achieve two-stage control of the exhaust channel 223, improving controllability. The second temperature and humidity monitor 2232 monitors the temperature and humidity of the exhaust gas. The control unit compares the data from the second temperature and humidity monitor 2232 with the data from the first temperature and humidity monitor 2211 to determine the test results. The second water vapor separator 2234 separates water vapor from the exhaust gas, preventing direct water vapor emission from causing adverse effects.
[0099] In other words, in this embodiment, the coordinated design of the gas injection channel 221, the liquid drainage channel 222, and the exhaust channel 223 realizes the integration of gas injection, liquid drainage, and exhaust functions, meeting the complete process requirements of the server 300 gas injection test.
[0100] During operation, the relevant valves of the air intake unit 120 are first opened, allowing compressed air or heated compressed air to enter the air injection channel 221 through the air intake transfer channel 122. When it is necessary to drain the liquid from the server 300, the air injection valve 2212, the liquid drain valve 2221, the first exhaust valve 2231, and the second exhaust valve 2233 are opened. Compressed air enters the server 300 through the air injection channel 221, and the gas pressure pushes the liquid out through the liquid drain channel 222. The gas is discharged through the exhaust channel 223. The first temperature and humidity monitor 2211 and the second temperature and humidity monitor 2232 measure the air intake and exhaust parameters. Water vapor is separated by the second water vapor separator 2234. When the second temperature and humidity monitor 2232 detects that the exhaust temperature and humidity meet the standards, all relevant valves are closed, and the air intake unit 120 is shut down, completing the liquid drain test of the server 300.
[0101] See Figure 3 and Figure 6As shown, in one feasible implementation, the pressurization unit 130 serves as a functional unit for providing high-pressure gas within the supply unit. It includes a main pressurization channel 131 and four sets of branch pressure-holding transition channels 132. One end of each of the four pressure-holding transition channels 132 is centrally connected to one end of the pressurization channel 131, forming a centralized output structure. The other end of the pressurization channel 131 is configured as a second air inlet 1311, which is connected to an external compressed air source 123 to ensure a stable input of the high-pressure gas source. It is understood that in this embodiment, the four sets of pressure-holding transition channels 132 are respectively connected to the pressure-holding units 230 in the four sets of transition boxes 200. In other embodiments, the number of pressure-holding transition channels 132 is adaptively set according to actual needs and is not specifically limited here.
[0102] To ensure that the high-pressure gas meets the testing standards, the following components are sequentially installed on the pressurization channel 131: a gas valve 1312, a second air filter 1313, a first pressure reducing valve 1314, a pressurization valve 1315, a gas storage tank 1316, a third air filter 1317, a second pressure reducing valve 1318, and a second safety valve 1319, from the second air inlet 1311 along the air intake direction to the connection point of the pressure holding transfer channel 132. Among them, the air valve 1312 is used to control the opening and closing of the entire pressurization channel 131; the second air filter 1313 is used to initially filter impurities in the compressed air; the first pressure reducing valve 1314 is used to reduce the pressure of the input compressed air to the pressure matched by the pressurization valve 1315; the pressurization valve 1315 is used to pressurize the compressed air to the high pressure required for the pressure holding test; the air storage tank 1316 is used to store the pressurized high-pressure gas to maintain pressure stability; the third air filter 1317 is used to perform secondary filtration on the high-pressure gas to further improve the gas purity; the second pressure reducing valve 1318 is used to reduce the pressure of the high-pressure gas to the precise pressure required for the test; and the second safety valve 1319 is used to automatically release pressure when the pressure in the pressurization channel 131 exceeds the safe range. In order to realize the independent control of the four sets of pressure holding transition channels 132, each set of pressure holding transition channels 132 is provided with a pressure holding transition valve 1321, which is used to control the opening and closing of the corresponding channel individually.
[0103] Further, see Figure 4 , Figure 8 and Figure 9 As shown, in an optional embodiment, the pressure holding unit 230 serves as a functional unit in the detection unit to perform pressure holding tests. It includes a pressure holding channel 231, one end of which is connected to a pressure holding transition channel 132 of the pressurization unit 130 to ensure stable input of high-pressure gas. The other end of the pressure holding channel 231 is connected to the server input terminal 310.
[0104] Specifically, in order to achieve precise control and pressure monitoring of the pressure holding process, a third pressure monitor 2311 and a pressure holding valve 2312 are fixedly installed on the pressure holding channel 231 in the direction from the pressure holding transfer channel 132 of the booster unit 130 to the server input end 310. At the same time, the server output end 320 is connected to the exhaust channel 223 of the air injection unit 220 to achieve pressure balance and pressure relief during the pressure holding test. The pressure holding channel 231 serves as the transmission path for high-pressure gas, accurately delivering the high-pressure gas provided by the pressurization unit 130 to the server input terminal 310. The pressure holding valve 2312 controls the on / off of the gas input to ensure the sealing of the pressure holding process. The third pressure monitor 2311 monitors the pressure changes in the pressure holding channel 231 and inside the server 300 in real time, accurately capturing pressure drops and promptly determining whether there is a leak in the server 300. The server output terminal 320 is connected to the exhaust channel 223, which allows air to be discharged from inside the server 300 before pressure holding, preventing air from affecting the accuracy of the pressure holding test. At the same time, after pressure holding is completed, pressure is released through the exhaust channel 223 to ensure test safety.
[0105] During operation, firstly, the first exhaust valve 2231 and the second exhaust valve 2233 of the exhaust channel 223 are opened to expel air from the server 300. After exhaust, the first exhaust valve 2231 and the second exhaust valve 2233 are closed. Next, the relevant valves on the pressurization unit 130 are opened to start the pressurization unit 130. The pressure holding valve 2312 is opened, and the high-pressure gas enters the pressure holding channel 231 through the pressure holding transfer channel 132 and then enters the server 300. The third pressure monitor 2311 measures the pressure in real time. When the pressure reaches the target value, the pressure holding valve 2312 and the pressurization unit 130 are closed, and the server 300 enters the pressure holding stage, continuously monitoring the pressure. When the pressure holding time is reached, if the pressure is stable, the sealing is qualified; if the pressure drops, there is a leak. After the pressure holding is completed, the first exhaust valve 2231 and the second exhaust valve 2233 are opened to release pressure. After releasing pressure, the first exhaust valve 2231 and the second exhaust valve 2233 are closed, and the connection is disconnected.
[0106] See Figure 3 and Figure 6As shown, in an optional embodiment, the nitrogen inlet unit 140 serves as a functional unit providing high-purity nitrogen in the supply unit. It includes a main nitrogen inlet channel 141 and four sets of branch nitrogen inlet transfer channels 142. One end of each of the four sets of transfer channels 142 is centrally connected to one end of the nitrogen inlet channel 141, forming a centralized output structure. The other end of the nitrogen inlet channel 141 is configured as a third air inlet 1411, which is connected to an external nitrogen source 143 to ensure a stable nitrogen input. The inert nature of nitrogen effectively prevents oxidation of internal components of the server 300 during testing, ensuring stable performance of the server 300 after testing. It is understood that in this embodiment, the four sets of nitrogen inlet transfer channels 142 are respectively connected to the nitrogen injection units 240 in the four transfer boxes 200. In other embodiments, the number of nitrogen inlet transfer channels 142 is adaptively set according to actual needs and is not specifically limited here.
[0107] To ensure that the output nitrogen meets the system testing requirements, a nitrogen inlet valve 1412, a fourth air filter 1413, a third pressure reducing valve 1414, and a third safety valve 1415 are sequentially installed on the nitrogen inlet channel 141 from the third air inlet 1411 along the air inlet direction to the connection point of the nitrogen inlet transfer channel 142. The system includes a nitrogen inlet channel 141 connected to an external nitrogen source 143, providing high-purity nitrogen for the nitrogen injection protection test of the server 300. The inert nature of nitrogen effectively prevents oxidation of internal components during testing, ensuring stable performance of the server 300 after testing. The fourth air filter 1413 filters impurities and trace amounts of moisture from the nitrogen, further improving its purity and preventing impurities or moisture from entering the server 300 and affecting component lifespan or test accuracy. The third pressure reducing valve 1414 precisely adjusts the nitrogen pressure to the stable pressure required for testing, ensuring a smooth nitrogen injection process and preventing damage to the server 300 due to excessive pressure or inadequate pressure from affecting the injection effect. The third safety valve 1415 effectively ensures the safe operation of the nitrogen inlet channel 141, preventing equipment damage due to abnormal pressure. To achieve independent control of the four nitrogen inlet transfer channels 142, each nitrogen inlet transfer channel 142 is equipped with a nitrogen inlet transfer valve 1421 for individually controlling the opening and closing of the corresponding channel.
[0108] Further, see Figure 4 , Figure 8 and Figure 9 As shown, in an optional embodiment, the nitrogen injection unit 240 serves as a functional unit in the detection unit to implement nitrogen injection protection testing. It includes a nitrogen injection channel 241, one end of which is connected to a nitrogen injection transfer channel 142 of the nitrogen injection unit 140 to ensure a stable input of high-purity nitrogen. The other end of the nitrogen injection channel 241 is connected to the server input terminal 310.
[0109] To achieve precise control and pressure monitoring of the nitrogen injection process, a first nitrogen injection valve 2411, a fourth pressure monitor 2412, and a second nitrogen injection valve 2413 are sequentially fixed on the nitrogen injection channel 241 from the transfer channel of the nitrogen inlet unit 140 to the server input terminal 310. The nitrogen injection channel 241 serves as the transmission path for high-purity nitrogen, accurately and stably delivering the high-purity nitrogen provided by the nitrogen inlet unit 140 to the server input terminal 310, preventing contamination or leakage during transmission. The two-stage valve control design of the first nitrogen injection valve 2411 and the second nitrogen injection valve 2413 significantly improves the safety and controllability of the nitrogen injection process. Before nitrogen injection, the first nitrogen injection valve 2411 can be opened, and the pressure change within the nitrogen injection channel 241 can be observed through the fourth pressure monitor 2412. Once the pressure stabilizes, the second nitrogen injection valve 2413 can be opened to inject nitrogen into the server 300, preventing a sudden influx of nitrogen into the server 300 and causing pressure shock. Meanwhile, if an abnormal pressure occurs during nitrogen injection, one of the first nitrogen injection valve 2411 and the second nitrogen injection valve 2413 can be quickly closed for emergency handling to prevent a large amount of nitrogen leakage; the fourth pressure monitor 2412 monitors the nitrogen pressure in the nitrogen injection channel 241 in real time, allowing operators to keep track of the nitrogen injection progress and pressure status in a timely manner, ensuring that the nitrogen pressure always meets the test requirements of the server 300 nitrogen injection protection, and ensuring the stability of the test process and the accuracy of the test results.
[0110] During operation, the nitrogen inlet unit 140 is first activated, and it begins to supply nitrogen to the nitrogen injection channel 241. At this time, the first nitrogen injection valve 2411 is opened, and nitrogen enters the nitrogen injection channel 241 and gradually fills it. The fourth pressure monitor 2412 displays the pressure changes in the channel in real time. After the pressure stabilizes at the preset value, the second nitrogen injection valve 2413 is opened, and nitrogen is smoothly delivered to the server input terminal 310 through the nitrogen injection channel 241, and then injected into the server 300. During the nitrogen injection process, the operator continuously monitors the pressure changes through the fourth pressure monitor 2412 to ensure that the pressure is always kept within the test requirements. If an abnormal pressure occurs, the output pressure of the nitrogen inlet unit 140 is adjusted in time or the valve is closed for handling. When the nitrogen injection volume reaches the test requirements, the second nitrogen injection valve 2413, the first nitrogen injection valve 2411, and the relevant valves on the nitrogen inlet unit 140 are closed in sequence to complete the nitrogen injection protection test.
[0111] Understandably, in an optional embodiment, a first channel 212 connected to the vacuum channel 211 is provided between the first nitrogen injection valve 2411 and the second nitrogen injection valve 2413. The first channel 212 is located between the first vacuum valve 2112 and the vacuum gauge 2111, and a second vacuum valve 2121 is provided on the first channel 212. The first channel 212 establishes the connection between the nitrogen injection channel 241 and the vacuum channel 211. Utilizing the vacuuming function of the negative pressure unit 110, the nitrogen injection channel 241 can be evacuated through the vacuum channel 211 and the first channel 212 before nitrogen injection, removing air impurities from the nitrogen injection channel 241 and ensuring that the purity of the nitrogen injected into the server 300 is not affected by residual air in the channel. Simultaneously, after nitrogen injection is completed, excess nitrogen can be extracted from the server 300 through the vacuum channel 211 and the first channel 212, achieving nitrogen recovery or venting. Meanwhile, the first channel 212 is located between the first vacuum valve 2112 and the vacuum gauge 2111. The vacuum gauge 2111 can monitor the vacuum parameters of the nitrogen injection channel 241 in real time during the vacuuming process to ensure that the vacuuming effect meets the requirements. The second vacuum valve 2121 can control the opening and closing of the first channel 212 and the main road of the vacuum channel 211 to prevent nitrogen from flowing back into the negative pressure unit 110 during the nitrogen injection process.
[0112] See Figure 3 and Figure 7 As shown, in one optional embodiment, the liquid inlet unit 150 serves as a functional unit for providing cleaning liquid within the supply unit. It includes a main liquid inlet channel 151 and four sets of branch liquid inlet transfer channels 152. One end of each of the four sets of transfer channels 152 is centrally connected to one end of the liquid inlet channel 151, forming a centralized output structure. The other end of the liquid inlet channel 151 is configured as a liquid inlet 1511, which is connected to an external liquid source 153 to ensure a stable input of cleaning liquid. It is understood that in this embodiment, the four sets of transfer channels 152 are respectively connected to the four sets of injection units 250 in the transfer boxes 200. In other embodiments, the number of liquid inlet transfer channels 152 is adaptively set according to actual needs and is not specifically limited here.
[0113] To ensure that the output liquid meets the testing requirements, the following components are fixedly installed on the liquid inlet channel 151: a first liquid inlet valve 1519, a first filter 1512, a second liquid inlet valve 1513, a first pressure monitor 1514, a water pump 1515, a second pressure monitor 1516, a fourth safety valve 1517, and a first water quality monitor 1518, from the liquid inlet 1511 along the liquid inlet direction to the connection point of the liquid inlet transfer channel 152. The system is connected to an external liquid source 153 via a main inlet channel 151. A first inlet valve 1519 controls the opening and closing of the inlet channel 151, while a water pump 1515 provides sufficient power for liquid delivery, ensuring the cleaning liquid can smoothly enter the server 300 for rinsing. A first filter 1512 effectively filters impurities and particulate matter from the liquid, preventing these contaminants from clogging internal pipes or damaging components during rinsing. A first pressure monitor 1514 and a second pressure monitor 1516 monitor the liquid pressure before and after the water pump 1515, allowing for timely monitoring of the pump's operating status and liquid delivery during testing. If abnormal pressure occurs, the system can be stopped immediately for inspection. A fourth safety valve 1517 effectively prevents excessive pressure in the inlet channel 151 from causing pipe rupture or damage to the water pump 1515, ensuring safe system operation. A first water quality monitor 1518 monitors the output liquid's water quality in real time, ensuring the liquid cleanliness meets rinsing requirements and preventing substandard water quality from affecting the rinsing effect. Understandably, placing the first filter 1512 between the first inlet valve 1519 and the second inlet valve 1513 is to effectively prevent liquid backflow when the first filter 1512 needs to be disassembled. Specifically, when the first filter 1512 needs to be disassembled or replaced, the first inlet valve 1519 and the second inlet valve 1513 are closed to ensure that the liquid at the inlet 1511 and the liquid remaining in the inlet channel 151 are blocked, reducing possible liquid contamination during the disassembly or installation of the first filter 1512. To achieve independent control of the four sets of inlet transfer channels 152, each set of inlet transfer channels 152 is equipped with an inlet transfer valve 1521 for individually controlling the opening and closing of the corresponding channel.
[0114] Further, see Figure 4 , Figure 8 and Figure 9 As shown, in an optional embodiment, the injection unit 250 serves as a functional unit in the detection unit for implementing the flushing test, and includes two parts: an injection channel 251 and a flushing channel 252.
[0115] The liquid injection channel 251 is used to deliver cleaning liquid into the server 300. One end of the liquid injection channel 251 is connected to a liquid inlet adapter channel 152 of the liquid inlet unit 150 to ensure a stable input of cleaning liquid. The other end of the liquid injection channel 251 is connected to the server input terminal 310. A liquid injection valve 2511 is provided on the liquid injection channel 251 to control the opening and closing of the liquid injection channel 251, and the timing and amount of liquid input can be flexibly adjusted according to the flushing requirements.
[0116] The flushing channel 252 serves as the discharge path for the flushed liquid, forming a complete flushing loop in conjunction with the injection channel 251 to ensure that impurities inside the server 300 are thoroughly flushed and discharged. One end of the flushing channel 252 is connected to the server output end 320, and the other end is configured as a second drain port 2523 for discharging the flushed liquid. A flushing valve 2521 and a second water quality monitor 2522 are sequentially fixed on the flushing channel 252 from the server output end 320 to the second drain port 2523. The flushing valve 2521 controls the opening and closing of the flushing channel 252, while the second water quality monitor 2522 monitors the water quality parameters of the discharged liquid in real time. By comparing the water quality parameters of the discharged liquid and the injected liquid, the cleanliness level inside the server 300 can be directly determined. When the water quality of the discharged liquid is consistent with that of the injected liquid, it indicates that the flushing has achieved the expected effect, and further flushing is unnecessary, avoiding resource waste caused by over-flushing and ensuring the effectiveness of the flushing test.
[0117] During operation, firstly, the relevant valves on the liquid inlet unit 150 and the liquid injection valve 2511 are opened, and the flushing valve 2521 is closed. The cleaning liquid enters the liquid injection channel 251 through the liquid inlet transfer channel 152 and is injected into the server 300. After filling, the liquid injection valve 2511 is closed to soak the server 300 for a preset time. After soaking, the flushing valve 2521 is opened, and the relevant valves on the liquid inlet unit 150 and the liquid injection valve 2511 are started to continue supplying liquid to the server 300. The cleaning liquid flows inside the server 300 and carries impurities out through the flushing channel 252. The second water quality monitor 2522 monitors the water quality of the discharged liquid in real time. When the water quality of the discharged liquid is consistent with the water quality of the injected liquid, the liquid injection valve 2511 and the flushing valve 2521 are closed, the liquid inlet unit 150 is stopped, the connection is disconnected, and the collected waste liquid is treated.
[0118] It is understood that both the first water quality monitor 1518 and the second water quality monitor 2522 in this embodiment include pH detection and turbidity detection. The pH detection of the first water quality monitor 1518 can determine whether the chemical characteristics of the input cleaning liquid meet the server rinsing requirements, avoiding corrosion of internal server components due to abnormal pH of the liquid. The turbidity detection can confirm the cleanliness of the input liquid, preventing impurities from entering the server and causing pipe blockage or component damage. The pH detection of the second water quality monitor 2522 can reflect whether corrosive substances are released inside the server during the rinsing process, while the turbidity detection can directly reflect the content of impurities in the liquid after rinsing. By comparing the detection results of the first and second water quality monitors, the cleaning effect inside the server can be accurately judged, and problems such as liquid deterioration or abnormalities inside the server can be detected in a timely manner, providing dual protection for the effectiveness and safety of the rinsing test.
[0119] See Figure 4 , Figure 8 and Figure 9 As shown, in an optional embodiment, the liquid injection channel 251, the gas injection channel 221, and the pressure holding channel 231 are all connected to the server input terminal 310 through a first common channel 260. The liquid injection channel 251, the gas injection channel 221, and the pressure holding channel 231 are respectively connected to the first common channel 260 through branch connectors. The flushing channel 252, the venting channel 223, and the draining channel 222 are connected to the server output terminal 320 through a second common channel 270. The flushing channel 252, the venting channel 223, and the draining channel 222 are respectively connected to the second common channel 270 through branch connectors. Through the integrated design of the first common channel 260 and the second common channel 270, the number of interfaces at the server input terminal 310 and the output terminal is reduced, the connection structure of the test system is simplified, and the operational complexity is reduced.
[0120] Furthermore, a second channel 280 connecting the server output terminal 320 is provided between the liquid injection valve 2511, air injection valve 2212, and pressure holding valve 2312 on the first common channel 260 and the server input terminal 310. A first transfer valve 281 is provided on the second channel 280, with the first transfer valve 281's conduction direction from the first common channel 260 to the server input terminal 310. A third channel 290 connecting the server input terminal 310 is provided between the flushing valve 2521, air vent valve 1312, and liquid drain valve 2221 on the second common channel 270 and the server output terminal 320. A second transfer valve 291 is provided on the third channel 290, with the second transfer valve 291's conduction direction from the server input terminal 310 to the second common channel 270. It can be understood that the first transfer valve 281 and the second transfer valve 291 are designed to achieve reverse flushing, reverse liquid draining, and reverse drying within the server 300.
[0121] Specifically, when the server 300 is flushed in the forward direction, the injection valve 2511 and the flushing valve 2521 are opened, and the valves of other functions are closed. The cleaning liquid enters the server input terminal 310 through the injection channel 251 and the first common channel 260, flows through the inside of the server 300, and is discharged from the output terminal to the second common channel 270 and the flushing channel 252, thus completing the forward flushing. When the server 300 is flushed in the reverse direction, the injection valve 2511, the flushing valve 2521, and the first transfer valve 281 are opened. The cleaning liquid enters the server output terminal 320 through the injection channel 251, the first common channel 260, the second channel 280, and the first transfer valve 281, flows in the reverse direction through the inside of the server 300, is discharged from the input terminal, enters the drain channel 222 through the third channel 290 and the second transfer valve 291, and is then discharged through the drain channel 222, thus realizing the reverse flushing of the server 300.
[0122] When the server 300 is being drained or dried in the forward direction, the relevant valves on the gas injection channel 221, the liquid drainage channel 222, and the exhaust channel 223 are opened, while the relevant valves for other functions are closed. Compressed gas enters the server input terminal 310 through the gas injection channel 221 and the first common channel 260, flows through the inside of the server 300, and is then discharged from the output terminal to the second common channel 270, the liquid drainage channel 222, and the exhaust channel 223, completing the forward draining. When the server 300 is being drained or dried in the reverse direction, the gas injection channel 221, the liquid drainage channel 222, and the exhaust channel are opened. The relevant valve body on 223 is opened simultaneously, and the first transfer valve 281 is opened, so that the compressed gas enters the server output terminal 320 through the gas injection channel 221, the first common channel 260, the second channel 280, and the first transfer valve 281. The compressed gas pushes the residual liquid inside the server 300 to flow in reverse and then discharges it from the input terminal. It enters the drain channel 222 and the exhaust channel 223 through the third channel 290 and the second transfer valve 291. The residual liquid is discharged through the drain channel 222, and the compressed gas is discharged through the exhaust channel 223, realizing the reverse drainage or drying of the server 300.
[0123] In other words, by changing the settings of the output connection terminals of the gas injection channel 221 and the liquid injection channel 251, the first transfer valve 281 and the second transfer valve 291 break the limitations of traditional unidirectional testing, enabling the test medium to flow in reverse inside the server 300. This satisfies the testing requirements for reverse flushing, reverse drainage, and reverse drying. Reverse flushing can more thoroughly clean the dead corners of the internal pipes of the server 300 through the reverse flow of liquid; reverse drainage can use the reverse pressure of the medium to completely remove residual liquid; and reverse drying can use the reverse flow of gas to remove residual moisture inside the server 300, thereby improving the comprehensiveness and thoroughness of the testing results.
[0124] It should be noted that the control unit and its control method mentioned in this application are easily implemented by those skilled in the art. The main description of this application is of the structure of the integrated device 100 and the adapter box 200 in the test system, not the control method. The mention of the control unit is only for the convenience of explaining the working principle of the test system. The control unit includes, but is not limited to, the PLC control system.
[0125] It is understood that the valve body structure involved in this application generally adopts the form of an electromagnetic control valve, which has fast response speed, high control accuracy, and can efficiently link with the control unit to quickly switch on and off states through electrical signals, adapting to the multi-functional dynamic control requirements of the test system. In some scenarios requiring precise flow or pressure adjustment, electromagnetic proportional valves can be used. However, in other embodiments, pneumatic control valves or manual control valves can also be selected according to actual needs. In addition, for channels requiring precise flow or pressure adjustment, electric regulating valves can also be selected to achieve precise control of medium flow or pressure, adapting to scenarios with stringent requirements for test parameters. These valve body forms can be flexibly selected according to the test environment, automation requirements, and cost budget, and work with the control unit to realize the on / off and parameter adjustment functions of each channel. No specific limitations are made in this application.
[0126] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this utility model, and not to limit it. Although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of this utility model, and they should all be covered within the scope of the claims and specification of this utility model.
Claims
1. A server liquid cooling testing system, characterized in that, Includes integrated equipment and at least two sets of adapter boxes; The integrated device includes at least one set of supply units for providing one or more of the following to the transfer box: air source, liquid source, and negative pressure power; wherein, each set of supply units includes at least two sets of transfer channels, and the number of transfer channels in each set of supply units corresponds to the number of transfer boxes; The adapter box includes at least one set of testing units for performing performance tests on the server; the testing units are configured corresponding to the supply units; wherein the input terminal of each set of testing units is connected to one of the adapter channels of its corresponding supply unit.
2. The server liquid cooling testing system according to claim 1, characterized in that, The supply unit includes one or more of the following: a negative pressure unit, an air intake unit, a booster unit, a nitrogen intake unit, and a liquid intake unit, wherein each of the negative pressure unit, the air intake unit, the booster unit, the nitrogen intake unit, and the liquid intake unit includes at least two sets of transfer channels.
3. The server liquid cooling testing system according to claim 2, characterized in that, The negative pressure unit includes a negative pressure channel and four sets of negative pressure conversion channels. The four sets of negative pressure conversion channels are all connected to one end of the negative pressure channel, and the other end of the negative pressure channel is the first exhaust port. The negative pressure channel is provided with a first negative pressure valve, a first water-gas separator and a vacuum pump in sequence from the negative pressure transfer channel along the exhaust direction to the first exhaust port, and each group of negative pressure transfer channels is provided with a negative pressure transfer valve.
4. The server liquid cooling testing system according to claim 2, characterized in that, The air intake unit includes an air intake channel and four sets of air intake transition channels. The four sets of air intake transition channels are all connected to one end of the air intake channel, and the other end of the air intake channel is a first air intake port, which is connected to a compressed air source. The intake channel is provided with an intake valve, a first safety valve, a first air filter and a heating device in sequence from the first intake port along the intake direction to the intake transfer channel. Each intake transfer channel is provided with a pressure reducing transfer valve.
5. The server liquid cooling testing system according to claim 2, characterized in that, The boosting unit includes a boosting channel and four sets of pressure holding transition channels. The four sets of pressure holding transition channels are all connected to one end of the boosting channel. The other end of the boosting channel is a second air inlet, which is connected to a compressed air source. The pressurization channel is provided with an air valve, a second air filter, a first pressure reducing valve, a pressurization valve, an air storage tank, a third air filter, a second pressure reducing valve, and a second safety valve in sequence from the second air inlet along the air intake direction to the pressure holding transition channel. Each pressure holding transition channel is provided with a pressure holding transition valve.
6. The server liquid cooling testing system according to claim 2, characterized in that, The nitrogen inlet unit includes a nitrogen inlet channel and four sets of nitrogen inlet transfer channels. The four sets of nitrogen inlet transfer channels are all connected to one end of the nitrogen inlet channel. The other end of the nitrogen inlet channel is a third air inlet, which is connected to a nitrogen source. The nitrogen inlet channel is provided with a nitrogen inlet valve, a fourth air filter, a third pressure reducing valve and a third safety valve in sequence from the third air inlet along the air inlet direction to the nitrogen inlet transfer channel. Each nitrogen inlet transfer channel is provided with a nitrogen inlet transfer valve.
7. The server liquid cooling testing system according to claim 2, characterized in that, The liquid inlet unit includes a liquid inlet channel and four sets of liquid inlet transfer channels. The four sets of liquid inlet transfer channels are all connected to one end of the liquid inlet channel, and the other end of the liquid inlet channel is a liquid inlet, which is connected to a liquid source. The inlet channel is provided with a first inlet valve, a first filter, a second inlet valve, a first pressure monitor, a water pump, a second pressure monitor, a fourth safety valve, and a first water quality monitor in sequence from the inlet port to the inlet transfer channel. Each inlet transfer channel is provided with an inlet transfer valve.
8. The server liquid cooling testing system according to claim 2, characterized in that, The detection unit includes one or more of the following: a vacuum unit, a gas injection unit, a pressure holding unit, a nitrogen injection unit, and a liquid injection unit. The vacuum unit is connected to a transfer channel of the negative pressure unit, the gas injection unit is connected to a transfer channel of the air inlet unit, the pressure holding unit is connected to a transfer channel of the pressurization unit, the nitrogen injection unit is connected to a transfer channel of the nitrogen inlet unit, and the liquid injection unit is connected to a transfer channel of the liquid inlet unit.
9. The server liquid cooling testing system according to claim 8, characterized in that, The vacuum unit includes a vacuum channel, one end of which is connected to a transfer channel of the negative pressure unit, and the other end is connected to the server input terminal. A vacuum gauge and a first vacuum valve are sequentially arranged on the vacuum channel from the negative pressure unit to the server input terminal.
10. The server liquid cooling testing system according to claim 8, characterized in that, The nitrogen injection unit includes a nitrogen injection channel, one end of which is connected to a transfer channel of the nitrogen inlet unit, and the other end is connected to the server input terminal. A first nitrogen injection valve, a fourth pressure monitor, and a second nitrogen injection valve are sequentially arranged on the nitrogen injection channel from the transfer channel of the nitrogen inlet unit to the server input terminal.
11. The server liquid cooling testing system according to claim 8, characterized in that, The injection unit includes: The liquid injection channel has one end connected to a transfer channel of the liquid inlet unit and the other end connected to the server input terminal; the liquid injection channel is equipped with a liquid injection valve; A flushing channel is provided, with one end connected to the server output and the other end being a second drain outlet. A flushing valve and a second water quality monitor are sequentially installed on the flushing channel from the server output to the second drain outlet.
12. The server liquid cooling testing system according to claim 11, characterized in that, The gas injection unit includes: An air injection channel is provided, with one end connected to a transfer channel of the air intake unit and the other end connected to the server input terminal; a first temperature and humidity monitor and an air injection valve are sequentially installed on the air injection channel from the transfer channel of the air intake unit to the server input terminal. A drainage channel, one end of which is connected to the server output, and the other end is the first drainage port; a drainage valve is provided on the drainage channel; An exhaust channel is provided, with one end connected to the server output and the other end being a second exhaust port. From the server output to the second exhaust port, the exhaust channel is provided with a first exhaust valve, a second temperature and humidity monitor, a second exhaust valve, and a second water vapor separator in sequence.
13. The server liquid cooling testing system according to claim 12, characterized in that, The pressure holding unit includes a pressure holding channel, one end of which is connected to a transfer channel of the pressure boosting unit, and the other end is connected to the server input terminal. A third pressure monitor and a pressure holding valve are sequentially installed on the pressure holding channel from the transfer channel of the pressure boosting unit to the server input terminal. The server output terminal is connected to the exhaust channel.
14. The server liquid cooling testing system according to claim 13, characterized in that, The liquid injection channel, the gas injection channel, and the pressure holding channel are all connected to the server input end through a first common channel; wherein, the liquid injection valve, the gas injection valve, and the pressure holding valve on the first common channel are provided with a second channel connecting to the server output end, and a first adapter valve is provided on the second channel; The flushing channel, the exhaust channel, and the drain channel are connected to the server output end through a second common channel; wherein, a third channel connecting the flushing valve, the exhaust valve, and the drain valve on the second common channel to the server output end is provided, and a second transfer valve is provided on the third channel.