A new type of uHPC substation support
The novel support design, which combines UHPC material with a steel mesh skeleton, solves the problems of long construction cycle and durability of substation supports, and achieves efficient and environmentally friendly construction and improved durability.
Patent Information
- Application Number
- CN202522676862.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-17
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-17
AI Technical Summary
Existing substation support structures have long construction cycles, complex node connections, difficulty in guaranteeing welding quality, and potential safety hazards in long-term durability.
A novel support structure combining UHPC material and steel mesh skeleton is adopted. It is prefabricated in the factory and installed on site. The structure of round steel pipe and top steel plate simplifies the construction process and reduces welding.
Shorten the construction period, reduce steel consumption, improve the rigidity and durability of the support structure, protect the environment and save energy, and reduce construction complexity and safety hazards.
Smart Images

Figure CN225019875U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to a novel UHPC substation support, which is applicable to supports in substations of various voltage levels. Background Technology
[0002] Currently, substation supports both domestically and internationally typically consist of either an independent concrete foundation with a steel superstructure or an independent concrete foundation with a reinforced concrete superstructure. Pure reinforced concrete supports offer good rigidity and flexible cross-sectional dimensions, allowing for arbitrary arrangement on the plane according to design requirements. However, the construction process involves numerous steps and a long construction period, requiring the sequential completion of multiple processes such as formwork erection, reinforcement cage tying, concrete pouring, and concrete curing before the installation of upper equipment and conductors. While an independent concrete foundation with a steel superstructure can save some construction time, steel supports consume a large amount of steel at once, resulting in high initial costs. The joint connections are complex, and the small cross-sectional dimensions and low stiffness of the steel structure often lead to significant deformation at higher heights. Connections between steel structures are usually made by welding, which is difficult to guarantee in terms of welding quality and also causes environmental pollution. Furthermore, steel supports are prone to corrosion over long-term use, compromising long-term durability and posing certain safety hazards. Utility Model Content
[0003] The technical problem to be solved by this utility model is: how to solve the problems of long construction cycle, complex node connection, high construction process requirements, difficulty in guaranteeing welding quality, and safety hazards in long-term durability of existing substation supports, and to provide a new type of UHPC substation support.
[0004] To achieve the above objectives, this utility model is implemented through the following technical solution: A novel UHPC substation support includes an independent foundation, an upper support on top of the independent foundation, the upper support including a UHPC outer tube, high-strength concrete poured inside the UHPC outer tube, and a steel mesh arranged inside the high-strength concrete; a top steel plate is installed on top of the upper support.
[0005] A round steel pipe is welded below the top steel plate and inserted into the upper support.
[0006] Pre-reserved foundation piles are installed at the top of the independent foundation, and the pre-reserved foundation piles are inserted into the bottom of the upper support.
[0007] The cross-section of the upper support is circular or square.
[0008] Compared with the prior art, the present invention has the following advantages: the cross-section of the new UHPC integrated substation support can be circular or square. The support uses a new UHPC material in combination with a steel mesh frame, which has greater rigidity and durability. The support and the upper structure are prefabricated in the factory. On site, the new UHPC support only needs to be fixed to the pre-cast independent foundation, which can greatly shorten the construction period, save energy and protect the environment, reduce the amount of steel used, and improve the durability of the equipment. Attached Figure Description
[0009] Figure 1 This is an overall structural diagram of the present invention. Detailed Implementation
[0010] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0011] In the description of this utility model, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.
[0012] like Figure 1 As shown, a new type of UHPC substation support includes an independent foundation 5, an upper support is provided on top of the independent foundation 5, the upper support includes a UHPC outer pipe 4, high-strength concrete 7 is poured inside the UHPC outer pipe 4, and a steel mesh 3 is arranged inside the high-strength concrete 7; a top steel plate 1 is provided on top of the upper support.
[0013] Furthermore, a round steel pipe 2 is welded below the top steel plate 1, and the round steel pipe 2 is inserted into the upper support.
[0014] Furthermore, a reserved foundation pile 6 is provided on the top of the independent foundation 5, and the reserved foundation pile 6 is inserted into the bottom of the upper support.
[0015] Furthermore, the cross-section of the upper support is circular or square.
[0016] The construction method of this utility model is as follows: 1. First, pour the independent foundation 5, and set the reserved foundation column 6 on the top of the independent foundation 5; 2. Tie the steel mesh 3 and pour high-strength concrete 7 and UHPC outer pipe 4 in the factory. The UHPC outer pipe 4 is slightly larger than the foundation column to form the upper support. 3. Transport the prefabricated upper support to the site, insert the upper support into the reserved foundation pile 6 above the independent foundation 5, drill holes on site, drive in studs for fixation, and backfill with soil. 4. The round steel pipe 2 is welded to the top steel plate 1, leveled, and fixed by drilling holes and driving in studs on site; thus completing the construction of the new UHPC substation support.
[0017] The cross-section of this new UHPC integrated substation support can be circular or square. The support uses new UHPC material in combination with a steel mesh frame, which has greater rigidity and durability. The support and the superstructure are prefabricated in the factory. On site, the new UHPC support only needs to be fixed to the pre-cast independent foundation, which can greatly shorten the construction period, save energy and protect the environment, reduce the amount of steel used, and improve the durability of the equipment.
[0018] The above description is only a preferred embodiment of the present utility model. It should be noted that those skilled in the art can make several changes and improvements without departing from the overall concept of the present utility model, and these should also be considered within the protection scope of the present utility model.
Claims
1. A novel UHPC substation support structure, characterized in that: It includes an independent foundation (5), an upper support is provided on the top of the independent foundation (5), the upper support includes a UHPC outer pipe (4), high-strength concrete (7) is poured inside the UHPC outer pipe (4), and a steel mesh (3) is arranged inside the high-strength concrete (7); a top steel plate (1) is provided on the top of the upper support.
2. The novel UHPC substation support according to claim 1, characterized in that: A round steel pipe (2) is welded below the top steel plate (1), and the round steel pipe (2) is inserted into the upper support.
3. The novel UHPC substation support according to claim 1, characterized in that: A reserved foundation pile (6) is provided on the top of the independent foundation (5), and the reserved foundation pile (6) is inserted into the bottom of the upper support.
4. A novel UHPC substation support according to claim 1, characterized in that: The cross-section of the upper support is circular or square.