Photovoltaic pile body arrangement power transmission line construction trench installation structure
The photovoltaic pile arrangement structure and fixing device solved the problem of power transmission lines swinging in the cable trench, and made secondary excavation of the construction site more convenient.
Patent Information
- Application Number
- CN202522591239.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-05
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-05
AI Technical Summary
The transmission lines for photovoltaic power generation are prone to displacement and swaying after being laid in cable trenches, resulting in curved paths that are difficult to avoid during secondary excavation of the construction site.
The system employs a photovoltaic pile layout structure, using photovoltaic piles and support feet to support the cable trench. Bricks are used to press down the transmission lines, and the transmission lines are fixed with a covering layer and sleeves to restrict their sway. The laying path is a straight line.
It effectively limits the swing of transmission lines in cable trenches, ensures a straight path during secondary excavation of the construction site, and reduces construction complexity.
Smart Images

Figure CN225020049U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to an installation structure in a construction trench for photovoltaic piles and power transmission lines, belonging to the field of photovoltaic power station construction technology. Background Technology
[0002] The electricity generated by the photovoltaic panels needs to be transmitted to inverters and other equipment via transmission lines; therefore, cable trenches need to be dug in the construction site to lay and bury the transmission lines (see Chinese Patent Publication No. CN221989423U).
[0003] After the cable trench is excavated and formed, the path for laying the transmission line is relatively long. The transmission line is prone to displacement and swinging when laid directly in the cable trench, resulting in a curved path in the cable trench after the transmission line is laid. It is not easy to avoid this path when the site is excavated again in the later stage. Utility Model Content
[0004] To solve the above-mentioned technical problems, this utility model provides an installation structure for photovoltaic piles arranged in the construction trench for power transmission lines.
[0005] This utility model is achieved through the following technical solution.
[0006] This utility model provides an installation structure for photovoltaic piles arranged in a power transmission line trench, comprising: The cable trench has photovoltaic piles on both inner sides, and power transmission lines are laid in the cable trench. The cable trench contains a covering layer for the power transmission lines, and the covering layer has bricks spaced apart to press down on the power transmission lines.
[0007] The covering layer is flush with the top of the power transmission line.
[0008] The photovoltaic piles on the inner sides of the cable trench are supported by opposing support feet. Sleeves are fixed on the support feet, and cable sleeves for the transmission lines to pass through are fixedly connected to the sleeves.
[0009] The sleeve is fixed to the support leg by bolts and nuts.
[0010] A photovoltaic frame is fixed to the top of the photovoltaic pile.
[0011] The photovoltaic frame is fixedly equipped with photovoltaic panels that absorb solar energy to generate electricity.
[0012] The beneficial effects of this utility model are as follows: the bricks are spaced apart to hold down the power transmission line, which limits the power transmission line from being laid too long in the cable trench and swinging into a curved path without restraint. This makes it easier to avoid the power transmission line when it is laid directly in the cable trench, thus solving the problem that the power transmission line is easy to shift and swing into a curved path when laid directly in the cable trench, which makes it difficult to avoid the power transmission line when it is laid in the cable trench. Attached Figure Description
[0013] Figure 1 This is a schematic diagram of the structure of the construction site where a cable trench is excavated according to this utility model; Figure 2 This is a schematic diagram of the structure of the utility model, showing two photovoltaic piles supported by opposing support legs; Figure 3 This is a schematic diagram of the structure of the support leg of this utility model; Figure 4 This is a schematic diagram of the structure of the present invention for arranging power transmission lines by installing a cable tray on the support leg; In the diagram: 1-Construction site; 11-Cable trench; 12-Photovoltaic frame; 13-Photovoltaic panel; 2-Supporting feet; 21-Arc clip; 22-Auxiliary plate; 23-Friction strip; 31-Transmission line; 32-Covering layer; 33-Brick body; 41-Bolt; 42-Nut; 43-Sleeve; 44-Cable sleeve; 4-Photovoltaic pile. Detailed Implementation
[0014] The technical solution of this utility model is further described below, but the scope of protection is not limited to what is described.
[0015] like Figures 1 to 4 As shown.
[0016] This application discloses a method for excavating a photovoltaic pile across a power transmission line, comprising: Excavating machinery dug a cable trench 11 in the construction site 1 in the Gobi Desert environment. The bottom of the photovoltaic piles 4 on both sides of the inner side of the cable trench 11 lost the soil support and was exposed.
[0017] The arc-shaped clips 21 at both ends of the support legs 2 are used to fit tightly against the photovoltaic piles 4 on both sides of the inner side of the cable trench 11, ensuring that the position of the photovoltaic piles 4 does not tilt into the cable trench 11. At this time, a counter-support structure for the photovoltaic piles and power transmission lines is presented.
[0018] The middle part of the support leg 2 is shaped like a plate with multiple through holes. The purpose of setting multiple through holes at intervals is to allow the sandy soil, which is mainly mobile sandy soil, to flow through the through holes of the plate during backfilling, thus avoiding the sandy soil from causing lateral loads on the support leg 2 during backfilling.
[0019] The arc-shaped clip 21 is integrally fixedly connected to an auxiliary plate 22 extending into the inner side of the cable trench 11. A friction strip 23 extending into the construction site 1 is integrally fixedly connected to the auxiliary plate 22. The friction strip 23 contacts and rubs against the construction site 1 on the inner side of the cable trench 11, thereby limiting the arc-shaped clip 21.
[0020] A photovoltaic frame 12 is fixed to the top of the photovoltaic pile 4, and a photovoltaic panel 13 is fixedly installed on the photovoltaic frame 12. The photovoltaic panel 13 absorbs solar energy to generate electricity.
[0021] After the support feet 2 have completed the installation of the photovoltaic piles 4 on both sides of the inner side of the cable trench 11, the transmission lines 31 are laid in the cable trench 11. The transmission lines 31 converge and are arranged upwards along the photovoltaic piles 4 for connection with the inverters to be installed later. After the transmission lines 31 have been laid for a distance of one to three meters in the cable trench 11, the covering layer 32 is immediately backfilled into the cable trench 11 and level with the top of the transmission lines 31. Then, bricks 33 are used to press down the transmission lines 31. At this time, an installation structure of photovoltaic piles and transmission lines is presented in the construction trench. An installation structure for photovoltaic piles within a construction trench for power transmission lines includes: There are cable trenches 11 with photovoltaic piles 4 on both sides of the inner side, and power transmission lines 31 are laid in the cable trenches 11; The cable trench 11 contains a covering layer 32 that covers the power transmission line 31, and the covering layer 32 has bricks 33 spaced apart to press down the power transmission line 31.
[0022] The cover layer 32 is flush with the top of the power transmission line 31.
[0023] The photovoltaic piles 4 on the inner sides of both sides of the cable trench 11 are supported by opposing support feet 2. The support feet 2 are fixed with sleeve feet 43, and the sleeve feet 43 are fixedly connected with cable sleeves 44 for the transmission line 31 to pass through.
[0024] The sleeve 43 is fixed to the support leg 2 by bolts 41 and nuts 42.
[0025] A photovoltaic frame 12 is fixed to the top of the photovoltaic pile 4.
[0026] The photovoltaic frame 12 is fixedly installed with photovoltaic panels 13 that absorb solar energy to generate electricity.
[0027] The bricks 33 are spaced about 30 centimeters apart to hold down the power transmission line 31, preventing the power transmission line 31 from being too long and swinging out of the cable trench 11 without restraint, thus making it easier to avoid during secondary excavation of the construction site. This solves the problem that when the power transmission line is directly laid in the cable trench, it is easy to shift and swing out into a curved path, which makes it difficult to avoid during secondary excavation of the construction site.
[0028] The support leg 2 is fixed with a sleeve 43 by bolts 41 and nuts 42. The bolts 41 pass through the through hole in the plate of the support leg 2. A cable sleeve 44 for the transmission line 31 to pass through is fixedly connected to the sleeve 43. When the transmission line 31 is laid upward along the photovoltaic pile 4, it first passes through the cable sleeve 44. After the transmission line 31 is laid, the sleeve 43 is fixed to the through hole in the plate of the support leg 2 by bolts 41 and nuts 42 to ensure that the position of the transmission line 31 is fixed.
[0029] After the inverter installed on the power transmission line 31 and the photovoltaic pile 4 is connected, the cable trench 11 is backfilled as a whole, and the support foot 2 is directly in the cable trench 11 and is backfilled together.
Claims
1. An installation structure for photovoltaic piles within a construction trench for power transmission lines, characterized in that, include: Cable trenches (11) with photovoltaic piles (4) on both sides are laid inside the cable trenches (11) and power transmission lines (31) are laid inside the cable trenches (11); The cable trench (11) contains a covering layer (32) covering the power transmission line (31), and the covering layer (32) has bricks (33) spaced apart to press down on the power transmission line (31).
2. The installation structure within the construction trench for photovoltaic pile arrangement and power transmission lines as described in claim 1, characterized in that: The cover layer (32) is flush with the top of the power transmission line (31).
3. The installation structure within the construction trench for photovoltaic pile arrangement and power transmission lines as described in claim 1, characterized in that: The photovoltaic piles (4) on the inner sides of the cable trench (11) are supported by opposing support feet (2). The support feet (2) are fixed with sleeve feet (43), and the sleeve feet (43) are fixedly connected with cable sleeves (44) for the transmission line (31) to pass through.
4. The installation structure within the construction trench for photovoltaic pile arrangement and power transmission lines as described in claim 3, characterized in that: The sleeve (43) is fixed to the support (2) by bolts (41) and nuts (42).
5. The installation structure within the construction trench for photovoltaic pile arrangement and power transmission lines as described in claim 1, characterized in that: A photovoltaic frame (12) is fixed to the top of the photovoltaic pile (4).
6. The installation structure within the construction trench for photovoltaic pile arrangement and power transmission lines as described in claim 5, characterized in that: The photovoltaic frame (12) is fixedly installed with photovoltaic panels (13) that absorb solar energy to generate electricity.
Citation Information
Patent Citations
Automatic sand laying device for directly-buried cable trench
CN221989423U
