A power generation circuit to which a post-turbine generator is easily added
By adding a rear-mounted turbine generator in parallel connection without modifying the back-pressure turbine, the problem of equipment modification in the existing technology is solved, and the safety of equipment operation and system scalability are improved.
Patent Information
- Application Number
- CN202520796743.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-24
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-04-24
AI Technical Summary
Existing technologies require modifications to existing back-pressure turbine equipment when adding a rear-mounted steam turbine generator, resulting in low efficiency, potentially affecting the use of the back-pressure turbine, and impacting electrical equipment.
By adding a rear-mounted turbine generator in parallel connection without modifying the back-pressure turbine, and using a gas-insulated busbar and main transformer, the rear-mounted turbine generator is independently connected to the original equipment, reducing mutual interference.
It reduced the difficulty of modification, improved the safety of equipment operation and the scalability of the system, reduced investment costs and maintenance difficulties, and ensured the stable operation of the original equipment.
Smart Images

Figure CN225020098U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of power generation system technology, and in particular to a power generation circuit that is easy to add a rear-mounted steam turbine generator. Background Technology
[0002] As my country has successively built gas turbine generator sets for combined heat and power, the turbines are configured as back-pressure units in order to maximize heat supply. In recent years, due to changes in industrial structure, market demand for heat supply has changed, but electricity supply remains tight.
[0003] When the heating supply is insufficient, the gas turbine back-compression unit operates to generate electricity, requiring the emission of steam. This results in economic losses and energy waste, as well as noise pollution that impacts the lives of surrounding residents.
[0004] To avoid shutdowns of back-pressure steam turbine generator sets and alleviate power shortages, the back-pressure steam turbines were modified into steam turbine generator sets capable of generating electricity and heat. Through the connection of the condensate system, the steam discharged from the back-pressure turbine was used to generate electricity via a downstream generator. Utilizing the discharged steam to generate electricity improves energy efficiency.
[0005] Currently, all gas turbine generator sets are in operation and production. Adding a back-mounted turbine presents the challenge of modifying the electrical equipment of the existing back-pressure turbine units.
[0006] Existing technologies require modifications to the existing back-pressure turbine equipment before adding a rear-mounted turbine generator. This not only results in lower efficiency but may also negatively impact the back-pressure turbine, thus affecting its operation. For example, a back-pressure turbine generator set connected to a plant power system is disclosed on the China Patent Network (application number CN200920288263.1). Adding a rear-mounted turbine generator to the system covered by this patent would necessitate modifications to the back-pressure turbine generator set, potentially affecting its operation. Utility Model Content
[0007] The purpose of this invention is to add a rear-mounted turbine generator to the power generation system without modifying the back-pressure turbine, thereby reducing the mutual influence between the newly added rear-mounted turbine generator set and the original back-pressure turbine generator set and lowering the difficulty of modification.
[0008] Another objective of this invention is to reduce the impact on the wiring of existing steam turbine generator sets and improve the safety of equipment operation. Another objective of this utility model is to enable the parallel operation of the added rear-mounted steam turbine generator and the gas turbine generator without changing the original wiring of the gas turbine generator. Another objective of this invention is to provide a simplified wiring structure and an easily expandable solution for adding a rear-mounted steam turbine generator, thereby reducing the investment cost and maintenance difficulty of the power generation system.
[0009] To achieve the above objectives, this utility model provides a power generation circuit that is easy to add a rear-mounted steam turbine generator. The circuit has at least a back-pressure steam turbine generator and a rear-mounted steam turbine generator; the back-pressure steam turbine is connected to the gas turbine main transformer; the rear-mounted steam turbine generator or the added rear-mounted steam turbine generator is connected to the rear-mounted main transformer; the rear-mounted steam turbine generator and the back-pressure steam turbine, or the added rear-mounted steam turbine generator and the back-pressure steam turbine, are respectively connected to a gas-insulated busbar through the rear-mounted main transformer and the gas turbine main transformer.
[0010] Preferably, the gas turbine main transformer is connected to the gas turbine generator, and the gas turbine generator is connected to the gas-insulated busbar through the gas turbine main transformer.
[0011] Preferably, the gas turbine main transformer is connected to the high-voltage plant transformer, and the high-voltage plant transformer is connected to the gas-insulated busbar through the gas turbine main transformer.
[0012] Preferably, the gas-insulated busbar includes: gas-insulated busbar I and gas-insulated busbar II, wherein gas-insulated busbar I and gas-insulated busbar II are connected by at least one resistor.
[0013] Preferably, at least one generator circuit breaker is connected between the back-pressure steam turbine and the gas turbine main transformer.
[0014] Preferably, the gas turbine main transformer is connected to the high-voltage plant transformer, and the high-voltage plant transformer is connected to the gas-insulated busbar through the gas turbine main transformer.
[0015] Preferably, the rear-mounted steam turbine generator and the back-pressure steam turbine are connected in parallel between the gas-insulated bus I and the gas-insulated bus II via the rear-mounted main transformer and the gas turbine main transformer, respectively.
[0016] Preferably, at least one generator circuit breaker is connected between the gas turbine generator and the gas turbine main transformer.
[0017] The beneficial effects of this utility model are that, after adopting the wiring of the rear-mounted generator-transformer unit, the wiring of the original back-pressure turbine generator-transformer unit does not need to be modified, which simplifies the wiring of the rear-mounted generator-transformer unit, reduces the mutual influence with the wiring of the existing back-pressure turbine generator unit, thereby saving investment and improving the operational safety of existing equipment. Attached Figure Description
[0018] Figure 1 This is a wiring diagram of a power generation system related to this utility model.
[0019] Figure 2 This is a schematic diagram of the power generation system involved in this utility model.
[0020] exist Figure 1 In the identification, 1 indicates a back-pressure steam turbine generator; 2 indicates a rear-mounted steam turbine generator; 3 indicates a gas turbine main transformer; 4 indicates a rear-mounted main transformer; 5 indicates a gas turbine generator; and 6 indicates a high-voltage plant transformer. Detailed Implementation
[0021] Example 1 discloses the wiring method of the power generation system and the connection method of the added rear turbine to the power generation system of this embodiment. (See attached document.) Figure 1 .
[0022] In this embodiment, the power generation system includes: a gas-insulated busbar, a gas turbine main transformer 3, a rear turbine main transformer 4, a back-pressure steam turbine generator 1, a gas turbine generator 5, a high-voltage plant transformer 6, a generator circuit breaker, a new energy generator, and a rear turbine generator 2.
[0023] It should be noted that the rear-mounted steam turbine generator 2 also includes: the additional rear-mounted steam turbine generator 2; the gas-insulated busbars include: gas-insulated busbar I and gas-insulated busbar II.
[0024] The wiring method of the power generation system and the connection of the added rear-mounted steam turbine generator 2 to the power generation system in this embodiment are described below.
[0025] The input terminal of the back-pressure steam turbine generator 1 is connected to the first terminal of the back-pressure steam turbine generator 1 circuit breaker, and the second terminal of the generator circuit breaker is connected to the second terminal of the gas turbine main transformer 3; the input terminal of the gas turbine generator 5 is connected to the first terminal of the gas turbine generator 5 circuit breaker, and the second terminal of the gas turbine generator 5 circuit breaker is connected to the third terminal of the gas turbine main transformer 3; the input terminal of the high-voltage plant transformer 6 is connected to the third terminal of the gas turbine main transformer 3; the first terminal of the gas turbine main transformer 3 is connected to the gas-insulated busbar, specifically: the first terminal of the gas turbine main transformer 3 extends to two input terminals, referred to as the first input terminal and the second input terminal, the first input terminal is connected to the gas-insulated busbar I, and the second input terminal is connected to the gas-insulated busbar II.
[0026] The input terminal of the second-generation turbine generator set 2 is connected to the second terminal of the second-generation main transformer 4. The first terminal of the second-generation main transformer 4 is connected to the gas-insulated bus. Specifically, the first terminal of the second-generation main transformer 4 extends to two input terminals, referred to as the first input terminal and the second input terminal. The first input terminal is connected to the gas-insulated bus I, and the second input terminal is connected to the gas-insulated bus II.
[0027] When it is necessary to add a rear-mounted steam turbine generator 2, the access terminal of the added rear-mounted steam turbine generator 2 is connected to the second terminal of the rear-mounted main transformer 4, and the first terminal of the rear-mounted main transformer 4 is connected to the gas-insulated bus. Specifically, the first terminal of the rear-mounted main transformer 4 extends to two access terminals, referred to as the first access terminal and the second access terminal. The first access terminal is connected to the gas-insulated bus I, and the second access terminal is connected to the gas-insulated bus II.
[0028] The rear-mounted turbine generator 2 is connected to the gas-insulated bus via the rear-mounted main transformer 4 in the following manner: it is connected to the gas-insulated bus independently of the back-pressure turbine generator 1, as described below.
[0029] The rear-mounted steam turbine generator 2 and the back-pressure steam turbine generator 1 are connected in parallel between gas-insulated busbar I and gas-insulated busbar II via the rear-mounted main transformer 4 and the gas turbine main transformer 3, respectively. When the newly added rear-mounted steam turbine generator 2 is connected to the power generation system, the newly added rear-mounted steam turbine generator 2, which is independent of the original rear-mounted steam turbine generator 2 and the original back-pressure steam turbine generator 1, is connected in parallel with the back-pressure steam turbine generator 1, which is connected via the gas turbine main transformer 3 and the gas-insulated busbar, and with the original rear-mounted steam turbine generator 2, which is connected via the rear-mounted main transformer 4 and the gas-insulated busbar.
[0030] Therefore, the connection between the newly added rear-mounted turbine generator 2 and the original back-pressure turbine generator 1 and the original rear-mounted turbine generator 2 is a parallel connection.
[0031] Furthermore, since the original back-pressure turbine generator 1, the original rear-mounted turbine generator 2, and the newly added rear-mounted turbine generator 2 are connected in parallel, the mutual influence between the original back-pressure turbine generator 1, the original rear-mounted turbine generator 2, and the newly added rear-mounted turbine generator 2 is relatively small. This means that when the power plant connects to the new rear-mounted turbine generator 2, the impact on the original power generation system is minimal, thus balancing the scalability and stability of the power generation system.
[0032] When the newly added rear-mounted steam turbine generator 2 is connected to the power generation system, the connection relationship between the rear-mounted steam turbine generator 2 and the original gas turbine generator 5 is parallel. Specifically, the added rear-mounted steam turbine generator 2 and gas turbine generator 5 are connected to the gas-insulated busbar through the rear-mounted main transformer 4 and the gas turbine main transformer 3. The added rear-mounted steam turbine generator 2 and gas turbine generator 5 are connected in parallel between the gas-insulated busbar I and the gas-insulated busbar II through the rear-mounted main transformer 4 and the gas turbine main transformer 3.
[0033] Therefore, when connecting the new rear-mounted steam turbine generator 2, there is no need to change the wiring method of the gas turbine generator 5, and the impact on the gas turbine generator 5 is small, as is the impact on the operational stability of the gas turbine generator 5.
[0034] If the added rear-mounted steam turbine generator 2 malfunctions, since the added rear-mounted steam turbine generator 2 and the gas turbine generator 5 are connected in parallel, the malfunction of the added rear-mounted steam turbine generator 2 will not affect the normal operation of the gas turbine generator 5.
[0035] If the newly added rear turbine generator 2 malfunctions, since the newly added rear turbine generator 2 is connected in parallel with the original rear turbine generator 2, the malfunction of the newly added rear turbine generator 2 will not affect the normal operation of the original rear turbine generator 2.
[0036] If the added rear-mounted turbine generator 2 malfunctions, since the added rear-mounted turbine generator 2 is connected in parallel with the original back-pressure turbine generator 1, the malfunction of the added rear-mounted turbine generator 2 will not affect the normal operation of the original back-pressure turbine generator 1.
[0037] Thus, when adding a new rear-mounted turbine generator 2, there is no need to change the wiring configuration between the original rear-mounted turbine generator 2 and the original back-pressure turbine generator 1. Therefore, there is no need to redesign the wiring configuration in the power generation system, greatly improving the scalability of the power generation system. The fact that there is no need to change the wiring configuration of the original back-pressure turbine generator 1 significantly reduces the difficulty of connecting the new rear-mounted turbine generator 2 to the power generation system.
[0038] When the new back-pressure turbine generator 1 is connected, the stability of the original back-pressure turbine generator 1, the original gas turbine generator 5, and the original rear-mounted turbine generator 2 in the power generation system can be guaranteed.
[0039] If the utilization rate of steam heat generated by gas turbine generator 5 is not high, it is necessary to add a new back-pressure turbine generator 1 to the power generation area to further improve the utilization rate of steam heat generated by gas turbine generator 5. When the added back-pressure turbine generator 1 is connected to the power generation system, its connection end is connected to the gas turbine main transformer 3. When the added back-pressure turbine generator 1 is working, it has little impact on the original back-pressure turbine generator 1 connected to the gas turbine main transformer 3, and its connection relationship with the original rear turbine generator 2 is in parallel. Therefore, when the added back-pressure turbine generator 1 is working, it has little impact on the original rear turbine generator 2, and there is no need to add a new high-voltage plant transformer 6.
[0040] Thus, when adding a new back-pressure turbine generator 1, there is no need to change the wiring configuration between the existing rear-mounted turbine generator 2 and the existing back-pressure turbine generator 1. Therefore, there is no need to redesign the wiring configuration in the power generation system, greatly improving the scalability of the power generation system. The fact that the wiring configuration of the existing back-pressure turbine generator 1 does not need to be changed significantly reduces the difficulty of connecting the new rear-mounted turbine generator 2 into the power generation system.
[0041] If the newly added back-pressure turbine generator 1 malfunctions, since the newly added back-pressure turbine generator 1 has a relatively small impact on the original back-pressure turbine generator 1, the malfunction of the newly added back-pressure turbine generator 1 will have a relatively small impact on the normal operation of the original back-pressure turbine generator 1.
[0042] If the newly added back-pressure turbine generator 1 malfunctions, since the newly added back-pressure turbine generator 1 has little impact on the original gas turbine generator 5, the malfunction of the newly added back-pressure turbine generator 1 will have little impact on the normal operation of the original gas turbine generator 5.
[0043] If the newly added back-pressure turbine generator 1 malfunctions, since the newly added back-pressure turbine generator 1 is connected in parallel with the original rear-mounted turbine generator 2, the malfunction of the newly added back-pressure turbine generator 1 will not affect the normal operation of the original rear-mounted turbine generator 2.
[0044] Furthermore, the power generation system involved in this embodiment can also be connected to new energy generator sets, allowing new energy generators to be integrated into the power generation system. New energy generators that can be integrated into this power generation system include: wind turbines, photovoltaic generators, hydroelectric generators, geothermal generators, hydrogen generators, bioenergy generators, and ocean energy generators, etc.
[0045] The access method is as follows.
[0046] When the newly added new energy generator is connected to the power generation system involved in this embodiment, the connection relationship between the newly added new energy generator and the original back-pressure steam turbine generator 1, the original rear-mounted steam turbine generator 2 and the original gas turbine generator 5 is a parallel relationship.
[0047] Specifically, the newly added new energy generator, the original back-pressure steam turbine generator 1, the original rear-mounted steam turbine generator 2, and the original gas turbine generator 5 are connected in parallel between gas-insulated busbar I and gas-insulated busbar II through the new energy generator main transformer, the gas turbine main transformer 3, the rear-mounted generator main transformer 4, and the gas turbine main transformer 3, respectively.
[0048] The connection between the newly added new energy generator set and the original new energy generator set is a parallel connection. Specifically, the newly added new energy generator set and the original new energy generator set are connected in parallel between gas-insulated busbar I and gas-insulated busbar II through the newly added new energy generator main transformer and the original new energy generator main transformer, respectively.
[0049] In this way, when the power supply load of the new energy unit is unstable, the power supply load can be compensated by increasing the gas turbine generator 5, the rear-mounted steam turbine generator 2, and the back-pressure steam turbine generator 1, thereby improving the stability of the power generation system.
[0050] If the newly added new energy generator malfunctions, since the newly added new energy generator is connected in parallel with the original rear turbine generator 2, the malfunction of the newly added new energy generator will not affect the normal operation of the rear turbine generator 2.
[0051] If the newly added new energy generator fails, since the connection between the newly added new energy generator and the original back pressure turbine generator 1 is in parallel, the failure of the newly added new energy generator will not affect the normal operation of the back pressure turbine generator 1.
[0052] If the newly added new energy generator malfunctions, since the newly added new energy generator is connected in parallel with the original gas turbine generator 5, the malfunction of the newly added new energy generator will not affect the normal operation of the gas turbine generator 5.
[0053] If the newly added renewable energy generator malfunctions, since the newly added renewable energy generator is connected in parallel with the original renewable energy generator, the malfunction of the newly added renewable energy generator will not affect the normal operation of the renewable energy generator.
[0054] Therefore, the power generation system involved in this embodiment has a wide range of application scenarios.
[0055] In areas with a large number of thermal power plants, it is necessary to add two more sets of rear-mounted steam turbine generators and one more set of back-pressure steam turbine generators to improve the utilization rate of fossil energy.
[0056] In regions with fewer thermal power plants and more new energy power plants, the number of additional rear-mounted steam turbine generators 2 and additional back-pressure steam turbine generators 1 can be reduced.
[0057] The wiring method of the power generation system involved in this embodiment improves the scalability and integration of the power generation system without affecting its stability. This improved scalability and integration also makes the power generation system easier to maintain, saves maintenance time for relevant maintenance personnel, and increases maintenance efficiency.
[0058] Example 2: This example discloses the working method of the power generation system related to this utility model. (See attached document.) Figure 2 .
[0059] The power generation system involved in this embodiment includes: a gas-insulated busbar, a gas turbine main transformer 3, a rear-mounted main transformer 4, a back-pressure steam turbine generator 1, a gas turbine generator 5, a high-voltage plant transformer 6, a generator circuit breaker, a new energy generator, and a rear-mounted steam turbine generator 2.
[0060] The power generation system involved in this embodiment also includes: a control system for a rear-mounted steam turbine generator 2 and a control system for a new energy generator.
[0061] The control system for the rear-mounted steam turbine generator 2 is used to control the power output of the rear-mounted steam turbine generator 2, and the control system for the new energy generator is used to control the output power of the new energy generator.
[0062] When the gas turbine generator 5 generates electricity, it produces steam, which has a considerable amount of heat. At this time, the steam generated by the gas turbine generator 5 enters the back pressure turbine generator 1, and the back pressure turbine generator 1 uses the steam generated by the gas turbine generator 5 to generate electricity.
[0063] When the back-pressure turbine generator 1 generates electricity, it also produces steam, which contains a considerable amount of heat. At this time, the downstream turbine generator 2 is needed to use the steam generated by the back-pressure turbine generator 1 to generate electricity.
[0064] When the back-pressure turbine generator 1 produces a large amount of steam, it is necessary to use the wiring method described in Example 1 to better utilize the heat of the steam generated by the back-pressure turbine generator 1 without affecting its normal operation.
[0065] When the power generation system involved in this embodiment is connected to a new energy generator, in application scenarios where there are many new energy generators, a certain number of new energy generators are connected to the system of this embodiment. The new energy generator control system is used to control the output power of the new energy generator to not exceed the maximum predicted output power of the new energy generator, thereby improving the service life of the new energy generator.
[0066] When the power supply load of the new energy generator set is insufficient, the power supply load is compensated by the back pressure steam turbine generator 1, gas turbine generator 5 and rear steam turbine generator 2 involved in the power generation system of this embodiment.
[0067] This utility model illustrates its purpose, technical solution, and beneficial effects through specific embodiments. However, these embodiments are merely examples to demonstrate the application of the invention and do not constitute a limitation on the scope of protection of this utility model. We explicitly state that any reasonable modifications, equivalent substitutions, or technical improvements guided by the spirit and principles of this utility model should be included within its scope of protection. This means that as long as these changes do not deviate from the core idea and basic function of the invention, they should be protected by patent rights. The scope of protection of this utility model should be broad, including all directly obvious variations as well as non-obvious innovations that a technical expert can reasonably deduce from the disclosure of this utility model. This broad protection aims to promote further research and development based on this utility model, while ensuring that its innovativeness and practicality receive comprehensive legal protection.
Claims
1. A power generation circuit that is easy to add a rear-mounted steam turbine generator, characterized in that, The circuit has at least a back-pressure turbine generator (1) and a rear-mounted turbine generator (2); the back-pressure turbine generator (1) is connected to the gas turbine main transformer (3); the rear-mounted turbine generator (2) or an additional rear-mounted turbine generator (2) is connected to the rear-mounted main transformer (4); the rear-mounted turbine generator (2) and the back-pressure turbine generator (1), or the additional rear-mounted turbine generator (2) and the back-pressure turbine generator (1), are respectively connected to the gas-insulated busbar through the rear-mounted main transformer (4) and the gas turbine main transformer (3); The input end of the rear turbine generator (2) is connected to the second end of the rear turbine main transformer (4), and the first end of the rear turbine main transformer (4) is connected to the gas-insulated busbar. The added rear-mounted steam turbine generator (2) and gas turbine generator (5) are connected in parallel with the gas turbine main transformer (3) through the rear-mounted main transformer (4) between the gas-insulated busbar I and the gas-insulated busbar II; The first end of the gas turbine main transformer (3) extends to two access ends, referred to as the first access end and the second access end. The first access end is connected to the gas-insulated bus I, and the second access end is connected to the gas-insulated bus II.
2. The power generation circuit according to claim 1, which is easy to add a rear-mounted steam turbine generator, is characterized in that, The gas turbine main transformer (3) is connected to the gas turbine generator (5), and the gas turbine generator (5) is connected to the gas-insulated busbar through the gas turbine main transformer (3); The first end of the gas turbine main transformer (3) is connected to the gas-insulated busbar.
3. The power generation circuit for easily adding a rear-mounted steam turbine generator according to claim 1, characterized in that, The gas turbine main transformer (3) is connected to the high-voltage plant transformer (6), and the high-voltage plant transformer (6) is connected to the gas-insulated busbar through the gas turbine main transformer (3); The connection end of the high-voltage plant transformer (6) is connected to the third end of the gas turbine main transformer (3).
4. The power generation circuit for easily adding a rear-mounted steam turbine generator according to claim 1, characterized in that, The gas-insulated busbar includes: gas-insulated busbar I and gas-insulated busbar II, wherein gas-insulated busbar I and gas-insulated busbar II are connected by at least one resistor; The first end of the main transformer (4) extends to two access ends, referred to as the first access end and the second access end. The first access end is connected to the gas-insulated bus I, and the second access end is connected to the gas-insulated bus II.
5. A power generation circuit that is easy to add a rear-mounted steam turbine generator according to any one of claims 1 to 4, characterized in that, At least one back-pressure turbine generator circuit breaker is connected between the back-pressure turbine generator (1) and the gas turbine main transformer (3); The connection end of the back pressure turbine generator (1) is connected to the first end of the back pressure turbine generator (1) circuit breaker, and the second end of the back pressure turbine generator circuit breaker is connected to the second end of the gas turbine main transformer (3).
6. A power generation circuit that is easy to add a rear-mounted steam turbine generator according to any one of claims 1 to 4, characterized in that, The newly added rear-mounted steam turbine generator (2) is connected in parallel with the original rear-mounted steam turbine generator (2).
7. A power generation circuit that is easy to add a rear-mounted steam turbine generator according to claim 4, characterized in that, The rear-mounted steam turbine generator (2) and the back-pressure steam turbine generator (1) are connected in parallel between the gas-insulated bus I and the gas-insulated bus II via the rear-mounted main transformer (4) and the gas turbine main transformer (3), respectively.
8. A power generation circuit that is easy to add a rear-mounted steam turbine generator according to claim 2, characterized in that, At least one gas turbine generator circuit breaker is connected between the gas turbine generator (5) and the gas turbine main transformer (3); The connection end of the gas turbine generator (5) is connected to the first end of the gas turbine generator (5) circuit breaker, and the second end of the gas turbine generator (5) circuit breaker is connected to the third end of the gas turbine main transformer (3).