A front and back split panel interface layout energy harvesting gateway housing structure
By setting arc-shaped connecting parts and elastic abutment structures on the front and rear panels of the energy acquisition gateway housing, the problems of panel offset and detachment during assembly are solved, achieving stable pre-positioning and final fixation, and improving assembly efficiency and stability.
Patent Information
- Application Number
- CN202621633004.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-21
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2036-10-21
AI Technical Summary
During the assembly process, the front and rear panels of the existing energy harvesting gateway housing are prone to shifting or falling off, causing inconvenience in assembly operations and affecting efficiency.
Arc-shaped connecting parts are provided on both sides of the front cover and rear panel facing the side panel, and are equipped with elastic abutment structure and guide structure. The guide structure guides the side panel to squeeze the elastic abutment structure, causing it to undergo elastic deformation. After reaching the installation position, it forms an abutment and positioning with the side panel. Combined with the housing locking structure, pre-positioning and final fixation are achieved.
By combining the flexible abutment structure and the guide structure, the front and rear panels are pre-positioned and stably installed during the assembly process, reducing the need for continuous support and repeated adjustments, and improving assembly convenience and stability.
Smart Images

Figure CN225020519U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of gateway housing technology, and in particular to an energy harvesting gateway housing structure with a front and rear split-panel interface layout. Background Technology
[0002] The housing of existing energy harvesting gateways is usually assembled from a top cover, a bottom cover, side panels, and front and rear panels, with the front and rear panels used to set different interfaces.
[0003] When assembling a gateway housing with a front and rear panel structure, the front and rear panels usually need to be aligned with the side panels first, and then fixed to the housing with screws and other connectors. Since the front and rear panels lack a stable pre-positioning structure before final locking, the panels are prone to shifting or falling off during the assembly process. Operators often need to continuously support the panels and repeatedly adjust their installation position before they can be locked, which makes the housing assembly operation inconvenient and affects the assembly efficiency. To address this, we propose an energy acquisition gateway housing structure with a front and rear panel interface layout. Utility Model Content
[0004] The purpose of this utility model is to provide an energy acquisition gateway housing structure with a front and rear panel interface layout to solve the problems mentioned in the background art.
[0005] To achieve the above objectives, this utility model provides the following technical solution: a shell structure for an energy harvesting gateway with a front and rear panel interface layout, including a top cover, a heat dissipation bottom cover, a front cover plate, a side plate, and a rear panel; The side plates are symmetrically arranged on both sides of the heat dissipation bottom cover, and the front cover plate and the rear panel are respectively arranged at the front and rear ends of the side plates; The front cover and rear panel are respectively provided with arc-shaped connecting parts on both sides facing the side panel. The arc-shaped connecting parts are connected to an elastic abutment structure and a guide structure. The guide structure is used to guide the side panel to generate relative compression with the elastic abutment structure, so that the elastic abutment structure undergoes elastic deformation and forms abutment positioning with the side panel after the front cover and rear panel reach the installation position. A housing locking structure is provided between the upper cover and the heat dissipation bottom cover. The housing locking structure cooperates with the front cover plate and the rear panel to fix the pre-positioned front cover plate and rear panel to the upper cover and the heat dissipation bottom cover.
[0006] Preferably, the elastic abutment structure is an elastic abutment part provided on the side of the arc connecting part, and a relief groove is provided at the connection between the arc connecting part and the elastic abutment part. The relief groove provides deformation space for the elastic abutment part when it is squeezed by the side plate, and the elastic abutment part abuts against the side plate after passing over the side plate.
[0007] Preferably, the inlet structure is a rounded chamfer on the side of the elastic abutment portion, the rounded chamfer extending in the insertion direction toward the side plate, and guiding the elastic abutment portion to deform when in contact with the side plate.
[0008] Preferably, the arc-shaped connecting part is located on the side of the elastic abutment part near the side plate. When the front cover plate or the rear panel moves to the installation position, the side plate contacts the arc-shaped chamfer and the elastic abutment part in sequence, causing the elastic abutment part to deform. After the arc-shaped connecting part reaches the corresponding position of the side plate, the elastic abutment part abuts against the side plate to restrict the front cover plate or the rear panel from leaving the installation position.
[0009] Preferably, the housing locking structure includes a first fixing screw, a connecting groove, and a threaded hole. The connecting groove is disposed on the arc-shaped connecting part, and the threaded hole is disposed on the heat dissipation bottom cover. The first fixing screw passes through the top cover and through the connecting groove before being threadedly connected to the threaded hole.
[0010] Preferably, the connecting groove on the arc-shaped connecting part extends along the width direction of the front cover or the rear panel, so that after the front cover or the rear panel is pre-positioned, the first fixing screw can pass through the connecting groove and connect with the heat dissipation bottom cover, and the first fixing screw forms a pressing limit on the arc-shaped connecting part after being locked.
[0011] Preferably, a first circuit board and a second circuit board are provided between the upper cover and the heat dissipation bottom cover. The first circuit board and the second circuit board are arranged along the interval direction between the upper cover and the heat dissipation bottom cover. An inter-board support and fixing structure is provided between the first circuit board and the second circuit board, and a bottom support and fixing structure is provided between the second circuit board and the heat dissipation bottom cover.
[0012] Preferably, the inter-board support and fixing structure includes an internally threaded copper pillar disposed between the first circuit board and the second circuit board, and a second fixing screw threadedly connected to the internally threaded copper pillar. The second fixing screw passes through the first circuit board and is connected to the internally threaded copper pillar. The bottom support fixing structure includes a screw connected to an internally threaded copper pillar and an internally threaded ring fixed to the heat dissipation bottom cover. The screw passes through the second circuit board and is threadedly connected to the internally threaded ring.
[0013] The technical effects and advantages of this utility model are as follows: (1) This utility model provides arc connecting parts on both sides of the front cover plate and the rear panel facing the side panel, and makes the arc connecting parts cooperate with the elastic abutment structure and the guide structure. During the installation of the front cover plate or the rear panel, the guide structure guides the side panel to squeeze the elastic abutment structure, so that it undergoes elastic deformation and forms abutment positioning with the side panel after reaching the installation position. This allows the front cover plate and the rear panel to be kept in the installation position before final locking, reducing the continuous support and repeated alignment operation of the panel during the assembly process, facilitating the subsequent locking of the shell, and improving the assembly convenience of the shell.
[0014] (2) This utility model sets a first circuit board and a second circuit board between the top cover and the heat dissipation bottom cover, and uses the inter-board support and fixing structure and the bottom support and fixing structure to fix the two circuit boards at intervals, so that the two circuit boards can form an upper and lower layered installation state inside the shell, providing a multi-layer circuit board installation position in the limited internal space of the shell, and improving the support stability of the circuit board after installation. Attached Figure Description
[0015] The accompanying drawings are provided to further illustrate the present invention and form part of the specification. They are used together with the embodiments of the present invention to explain the present invention, but do not constitute a limitation thereof. In the drawings: Figure 1 This is a schematic diagram of the split structure of this utility model; Figure 2 This is a three-dimensional structural diagram of the front cover plate of this utility model; Figure 3 This is a three-dimensional structural diagram of the rear panel of this utility model; Figure 4 This is a three-dimensional structural diagram of the elastic contact part of this utility model.
[0016] In the attached diagram: 101, top cover; 102, heat dissipation bottom cover; 201, front cover plate; 202, side plate; 203, rear panel; 301, arc-shaped connecting part; 302, elastic abutment part; 401, clearance groove; 501, first fixing screw; 502, connecting groove; 503, threaded hole; 601, first circuit board; 602, second circuit board; 603, internally threaded copper pillar; 604, second fixing screw; 605, screw rod; 606, internally threaded ring; 701, arc-shaped chamfer. Detailed Implementation
[0017] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0018] This utility model provides, for example Figures 1-4 The energy harvesting gateway housing structure shown has a front and rear panel interface layout, including an upper cover 101, a heat dissipation bottom cover 102, a front cover 201, a side panel 202 and a rear panel 203. Side panels 202 are symmetrically arranged on both sides of the heat dissipation base cover 102, and front cover 201 and rear panel 203 are respectively arranged at the front and rear ends of the side panels 202; The front cover plate 201 and the rear panel 203 are respectively provided with arc connecting parts 301 on both sides facing the side panel 202. The arc connecting parts 301 are connected to an elastic abutment structure and a guide structure. The guide structure is used to guide the side panel 202 to generate relative compression with the elastic abutment structure, so that the elastic abutment structure undergoes elastic deformation, and forms abutment positioning with the side panel 202 after the front cover plate 201 and the rear panel 203 reach the installation position. A housing locking structure is provided between the upper cover 101 and the heat dissipation bottom cover 102. The housing locking structure cooperates with the front cover plate 201 and the rear panel 203 to fix the pre-positioned front cover plate 201 and rear panel 203 to the upper cover 101 and the heat dissipation bottom cover 102. During the assembly of the housing, the front cover plate 201 and the rear panel 203 are first inserted toward the front and rear ends of the side panel 202, respectively, so that the front cover plate 201 and the rear panel 203 move along the direction defined by the side panel 202. During the insertion process, the guide structure first contacts the side panel 202, and as the front cover plate 201 or the rear panel 203 continues to move, the side panel 202 squeezes the elastic abutment structure, and the elastic abutment structure undergoes elastic deformation. When the arc connecting part 301 moves to the position corresponding to the side panel 202, the elastic abutment structure abuts against the side panel 202, so that the front cover plate 201 and the rear panel 203 can be temporarily held in the installation position. With the above assembly method, the front cover 201 and the rear panel 203 do not need to be continuously supported by the operator throughout the installation process. After they are installed into the side panel 202, they can form a preliminary position with the help of the elastic abutment structure, thereby providing a stable assembly state for the subsequent installation of the top cover 101 and the locking of the shell.
[0019] Among them, the elastic abutment structure is an elastic abutment part 302 provided on the side of the arc connecting part 301. A relief groove 401 is provided at the connection between the arc connecting part 301 and the elastic abutment part 302. The relief groove 401 provides deformation space for the elastic abutment part 302 when it is squeezed by the side plate 202. After passing the side plate 202, the elastic abutment part 302 abuts against the side plate 202. During specific assembly, when the side plate 202 presses against the elastic abutment part 302, the elastic abutment part 302 can elastically shift, and the clearance groove 401 provides space for this elastic shift, thereby preventing the elastic abutment part 302 from obstructing the front cover plate 201 or the rear panel 203 from being installed due to the pressure of the side plate 202. After the elastic abutment part 302 passes the side plate 202, it abuts against the side plate 202, so that the front cover plate 201 or the rear panel 203 is kept in the corresponding installation position. By setting the clearance groove 401, the elastic abutment part 302 has a clear elastic deformation space, thereby transforming the insertion action of the front cover plate 201 and the rear panel 203 into the avoidance and reset action of the elastic abutment part 302, and realizing the pre-positioning of the front cover plate 201 and the rear panel 203 without adding independent positioning parts.
[0020] The insertion structure is a rounded chamfer 701 provided on the side of the elastic abutment 302. The rounded chamfer 701 extends in the insertion direction toward the side plate 202 and guides the elastic abutment 302 to deform when it contacts the side plate 202. During the installation of the front cover plate 201 or the rear panel 203, the rounded chamfer 701 first contacts the side panel 202. As the front cover plate 201 or the rear panel 203 continues to move towards the installation position, the side panel 202 gradually applies pressure to the elastic abutment portion 302 along the rounded chamfer 701, causing the elastic abutment portion 302 to deform gradually, rather than being subjected to a sudden pressure during the initial stage of installation. This allows the front cover plate 201 and the rear panel 203 to be installed more smoothly between the side panels 202.
[0021] The arc-shaped connecting part 301 is located on the side of the elastic abutting part 302 near the side plate 202. When the front cover plate 201 or the rear panel 203 moves to the installation position, the side plate 202 contacts the arc-shaped chamfer 701 and the elastic abutting part 302 in sequence, causing the elastic abutting part 302 to deform. After the arc-shaped connecting part 301 reaches the corresponding position of the side plate 202, the elastic abutting part 302 abuts against the side plate 202 to restrict the front cover plate 201 or the rear panel 203 from leaving the installation position. Therefore, the installation process of the front cover plate 201 or the rear panel 203 forms a continuous positioning process consisting of introduction, extrusion, crossing and abutment. After the front cover plate 201 or the rear panel 203 reaches the installation position, the arc connecting part 301 and the side plate 202 form a positional fit, and at the same time, the elastic abutment part 302 abuts against the side plate 202, so that the front cover plate 201 and the rear panel 203 have a relatively stable positional state before final locking.
[0022] The housing locking structure includes a first fixing screw 501, a connecting groove 502 and a threaded hole 503. The connecting groove 502 is provided on the arc connecting part 301, and the threaded hole 503 is provided on the heat dissipation bottom cover 102. The first fixing screw 501 passes through the top cover 101 and through the connecting groove 502 before being threadedly connected to the threaded hole 503. After the front cover 201 and the rear panel 203 are pre-positioned as described above, the upper cover 101 is placed on the heat dissipation bottom cover 102, and the first fixing screw 501 is inserted from one side of the upper cover 101, passes through the connecting groove 502 on the corresponding arc connecting part 301, and engages with the threaded hole 503 on the heat dissipation bottom cover 102. As the first fixing screw 501 is tightened, the upper cover 101 and the heat dissipation bottom cover 102 move closer to each other. At the same time, the first fixing screw 501 locks and limits the arc connecting part 301 located on its connection path, thereby completing the final assembly of the housing. Therefore, the front cover 201 and the rear panel 203 are first pre-positioned through the elastic abutment structure, and then the first fixing screw 501 is used to complete the final fixing, so that the positioning of the panel and the overall locking of the housing form a continuous assembly relationship, which can reduce the repeated adjustment of the position during the assembly of the front and rear panels 203.
[0023] The connecting groove 502 on the arc connecting part 301 extends along the width direction of the front cover plate 201 or the rear panel 203 so that after the front cover plate 201 or the rear panel 203 is pre-positioned, the first fixing screw 501 can pass through the connecting groove 502 and connect with the heat dissipation bottom cover 102. After the first fixing screw 501 is locked, it forms a pressing limit on the arc connecting part 301. Since the connecting groove 502 extends along the width direction of the front cover plate 201 or the rear panel 203, after the front cover plate 201 or the rear panel 203 is pre-positioned by the elastic abutment structure, the first fixing screw 501 can be connected to the threaded hole 503 on the heat dissipation bottom cover 102 through the connecting groove 502. At the same time, after the first fixing screw 501 is tightened, it can press the arc connecting part 301, so that the front cover plate 201 and the rear panel 203 change from the elastic prepositioning state when installed to the final fixed state, thereby improving the stability of the connection between the front and rear panels 203 and the housing.
[0024] Among them, a first circuit board 601 and a second circuit board 602 are provided between the upper cover 101 and the heat dissipation bottom cover 102. The first circuit board 601 and the second circuit board 602 are arranged along the interval direction between the upper cover 101 and the heat dissipation bottom cover 102. An inter-board support and fixing structure is provided between the first circuit board 601 and the second circuit board 602. A bottom support and fixing structure is provided between the second circuit board 602 and the heat dissipation bottom cover 102. When installing the circuit board inside the housing, the second circuit board 602 is first installed on the heat dissipation bottom cover 102 using the bottom support fixing structure. Then, the inter-board support fixing structure is used to support and fix the first circuit board 601 above the second circuit board 602, so that the first circuit board 601 and the second circuit board 602 are kept vertically spaced. This allows for the formation of a layered circuit board installation structure within the limited internal space of the housing, and provides separate installation space for different circuit components.
[0025] The inter-board support and fixing structure includes an internally threaded copper column 603 disposed between the first circuit board 601 and the second circuit board 602, and a second fixing screw 604 threadedly connected to the internally threaded copper column 603. The second fixing screw 604 passes through the first circuit board 601 and is connected to the internally threaded copper column 603. The bottom support fixing structure includes a screw 605 connected to the internal threaded copper pillar 603 and an internal threaded ring 606 fixed on the heat dissipation bottom cover 102. The screw 605 passes through the second circuit board 602 and is threadedly connected to the internal threaded ring 606. During installation, the internally threaded copper pillar 603 is placed between the first circuit board 601 and the second circuit board 602, and the screw 605 passes through the second circuit board 602 and connects with the internally threaded ring 606 on the heat sink cover 102, thereby giving the internally threaded copper pillar 603 and the second circuit board 602 a relatively stable installation position; then the second fixing screw 604 is inserted from one side of the first circuit board 601 and connected to the internally threaded copper pillar 603, so that the same internally threaded copper pillar 603 can simultaneously form a fixed connection for the first circuit board 601 and a supporting connection for the second circuit board 602. The above structure reduces the number of independent connecting parts used to fix the two circuit boards separately, forming a continuous support and fixing relationship between the first circuit board 601, the second circuit board 602 and the heat sink cover 102. At the same time, the internal threaded copper pillar 603 maintains the installation distance between the two circuit boards, which helps to improve the utilization rate of the internal space of the housing and the installation stability of the circuit boards.
[0026] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A housing structure for an energy harvesting gateway with a front and rear panel interface layout, comprising a top cover (101), a heat dissipation bottom cover (102), a front cover plate (201), a side plate (202), and a rear panel (203), characterized in that: The side plates (202) are symmetrically arranged on both sides of the heat dissipation bottom cover (102), and the front cover plate (201) and the rear panel (203) are respectively arranged at the front and rear ends of the side plates (202); The front cover plate (201) and the rear panel (203) are respectively provided with arc connecting parts (301) on both sides facing the side panel (202). The arc connecting parts (301) are connected to an elastic abutment structure and an inlet structure. The inlet structure is used to guide the side panel (202) to generate relative compression with the elastic abutment structure, so that the elastic abutment structure undergoes elastic deformation, and forms an abutment positioning with the side panel (202) after the front cover plate (201) and the rear panel (203) reach the installation position. A housing locking structure is provided between the upper cover (101) and the heat dissipation bottom cover (102). The housing locking structure cooperates with the front cover plate (201) and the rear panel (203) to fix the pre-positioned front cover plate (201) and rear panel (203) to the upper cover (101) and the heat dissipation bottom cover (102).
2. The energy harvesting gateway housing structure with a front and rear panel interface layout according to claim 1, characterized in that, The elastic abutment structure is an elastic abutment part (302) provided on the side of the arc connecting part (301). A relief groove (401) is provided at the connection between the arc connecting part (301) and the elastic abutment part (302). The relief groove (401) provides deformation space for the elastic abutment part (302) when it is squeezed by the side plate (202). The elastic abutment part (302) abuts against the side plate (202) after passing over the side plate (202).
3. The energy harvesting gateway housing structure with a front and rear panel interface layout according to claim 2, characterized in that, The inlet structure is a rounded chamfer (701) provided on the side of the elastic abutment (302). The rounded chamfer (701) extends in the insertion direction toward the side plate (202) and guides the elastic abutment (302) to deform when it contacts the side plate (202).
4. The energy harvesting gateway housing structure with a front and rear panel interface layout according to claim 3, characterized in that, The arc connecting part (301) is located on the side of the elastic abutment part (302) near the side plate (202). When the front cover plate (201) or the rear panel (203) moves to the installation position, the side plate (202) contacts the arc chamfer (701) and the elastic abutment part (302) in sequence, causing the elastic abutment part (302) to deform. After the arc connecting part (301) reaches the corresponding position of the side plate (202), the elastic abutment part (302) abuts against the side plate (202) to restrict the front cover plate (201) or the rear panel (203) from leaving the installation position.
5. The energy harvesting gateway housing structure with a front and rear panel interface layout according to claim 1, characterized in that, The housing locking structure includes a first fixing screw (501), a connecting groove (502) and a threaded hole (503). The connecting groove (502) is provided on the arc connecting part (301), and the threaded hole (503) is provided on the heat dissipation bottom cover (102). The first fixing screw (501) passes through the top cover (101) and through the connecting groove (502) and is threadedly connected to the threaded hole (503).
6. The energy harvesting gateway housing structure with a front and rear panel interface layout according to claim 5, characterized in that, The connecting groove (502) on the arc connecting part (301) extends along the width direction of the front cover plate (201) or the rear panel (203) so that after the front cover plate (201) or the rear panel (203) is pre-positioned, the first fixing screw (501) can pass through the connecting groove (502) and connect with the heat dissipation bottom cover (102). After the first fixing screw (501) is tightened, it forms a pressing limit on the arc connecting part (301).
7. The energy harvesting gateway housing structure with a front and rear panel interface layout according to claim 1, characterized in that, A first circuit board (601) and a second circuit board (602) are provided between the upper cover (101) and the heat dissipation bottom cover (102). The first circuit board (601) and the second circuit board (602) are arranged along the interval direction between the upper cover (101) and the heat dissipation bottom cover (102). An inter-board support and fixing structure is provided between the first circuit board (601) and the second circuit board (602). A bottom support and fixing structure is provided between the second circuit board (602) and the heat dissipation bottom cover (102).
8. The energy harvesting gateway housing structure with a front and rear panel interface layout according to claim 7, characterized in that, The inter-board support and fixing structure includes an internally threaded copper post (603) disposed between the first circuit board (601) and the second circuit board (602) and a second fixing screw (604) threadedly connected to the internally threaded copper post (603). The second fixing screw (604) passes through the first circuit board (601) and is connected to the internally threaded copper post (603). The bottom support fixing structure includes a screw (605) connected to an internally threaded copper column (603) and an internally threaded ring (606) fixed to the heat dissipation bottom cover (102). The screw (605) passes through the second circuit board (602) and is threadedly connected to the internally threaded ring (606).
