Wafer carrier inlet / outlet port docking nozzle structure
By designing the nozzle structure for docking the gas inlet and outlet of the wafer carrier, the problem of gas leakage caused by the deviation of the FOUP gas filling hole was solved, ensuring sufficient nitrogen, protecting the wafer from damage, and improving production stability.
Patent Information
- Application Number
- CN202522663770.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-16
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-16
AI Technical Summary
The FOUP bottom gas filling hole has size and level deviations, which leads to gas leakage and insufficient nitrogen, damaging the wafer.
Design a nozzle docking structure for the gas inlet and outlet of a wafer carrier, including a fixed base and a suction cup nozzle, which are connected by a magnetic component. The gas outlet channel and the limiting channel are coaxially arranged to prevent gas leakage and ensure sufficient nitrogen.
It effectively prevents gas leakage, ensures sufficient nitrogen in the FOUP, avoids wafer damage, and improves the reliability of wafer production.
Smart Images

Figure CN225020972U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of wafer fabrication equipment, and more specifically, to a structure for docking nozzles at the inlet and outlet of a wafer carrier. Background Technology
[0002] As semiconductor manufacturing processes advance, the carriers (foups) used to transport wafers require stricter control over humidity and oxygen levels to minimize contact between the wafers and oxygen / humidity, thus preventing oxidation. Nitrogen purging of the foam is currently the most critical process, and equipment for this purpose is becoming essential in the wafer manufacturing industry.
[0003] During chip manufacturing, the wafers are purged with nitrogen during the OHB bridge temporary storage stage to control the humidity and oxygen content in the transport carrier environment, thus preventing wafer oxidation and achieving higher process requirements.
[0004] During wafer manufacturing, the wafer transfer carrier—the Foup—placed on the OHB bridge needs to be filled with nitrogen to prevent oxidation caused by prolonged placement of the wafers on the OHB bridge and to extend the wafer processing time. However, some manufacturers produce Foups with dimensional or horizontal deviations in the bottom vent holes, which can affect Foup tolerances, causing gas leakage or insufficient nitrogen filling, resulting in wafer damage. Utility Model Content
[0005] To overcome the shortcomings of the existing system, this application provides a wafer carrier inlet / outlet nozzle docking structure, which can solve the problems of dimensional and horizontal deviations in the bottom air filling hole of the FOUP, which affect the FOUP tolerance and cause gas leakage, insufficient nitrogen filling in the FOUP, and wafer damage.
[0006] The technical solution adopted by the embodiments of this application to solve its technical problem is: a wafer carrier inlet and outlet nozzle docking structure, including a fixed base and a suction cup nozzle.
[0007] The suction cup nozzle is detachably mounted on the fixed base. A limiting channel is provided at the center of the suction cup nozzle. A first horizontal air inlet channel is provided inside the fixed base. A vertical air outlet channel is provided inside the fixed base. The air outlet channel extends to the limiting channel of the suction cup nozzle and is at the same height as the outer end of the limiting channel. The air outlet channel and the limiting channel are coaxially arranged.
[0008] In one specific implementation, a magnetic suction element is provided between the suction cup nozzle and the fixed base.
[0009] In one specific embodiment, the magnetic suction component includes a magnet block and a magnet, the magnet block being connected to the outer wall of the suction cup nozzle, the magnet being connected to the interior of the fixed base, and the magnet block and the magnet cooperating with each other.
[0010] In one specific implementation, the fixed base has an installation groove inside, the magnet is installed on the inner wall of the installation groove, and the suction cup nozzle is detachably installed inside the installation groove through the cooperation of the magnet and the magnet.
[0011] In one specific implementation, the mounting groove has a step inside, and the magnet is installed on the inner wall of the step.
[0012] In one specific implementation, the fixed base is further provided with a second horizontal air intake channel, which is horizontally connected to the first air intake channel and vertically connected to the air outlet channel.
[0013] In one specific implementation, an air intake connector is installed at the outer end of the first air intake channel.
[0014] The advantages of the embodiments of this application are: By extending the air outlet channel on the fixed base into the limiting channel of the suction cup nozzle and aligning it with the height of the limiting channel, leakage of filling gas from the FOUP filling port due to tolerances can be prevented, thus ensuring sufficient nitrogen gas inside the FOUP and preventing damage to the wafer.
[0015] The suction cup nozzle design provides better coverage when installed with the fixed base. This allows the nozzle to cover the inflation port on the bottom of the FOUP even if it is not level, thus preventing gas leakage. Attached Figure Description
[0016] Figure 1 A schematic diagram of the structure of the gas inlet / outlet docking nozzle of the wafer carrier provided in the embodiments of this application; Figure 2 A cross-sectional structural diagram showing the connection relationship between the fixed base and the suction cup nozzle provided in the embodiments of this application; Figure 3 A cross-sectional view of the fixed base provided in the embodiments of this application; Figure 4 Provided for the implementation of this application Figure 2 A magnified schematic diagram of the structure at point A.
[0017] In the diagram: 1-Fixed base; 2-Suction cup nozzle; 3-Air inlet connector; 4-Second air inlet channel; 5-Air outlet channel; 6-First air inlet channel; 7-Mounting groove; 8-Step; 9-Limiting channel; 10-Magnet; 11-Magnetic block. Detailed Implementation
[0018] The technical solution in this application embodiment is to solve the problem that the dimensional and horizontal deviations of the gas filling hole at the bottom of the FOUP affect the FOUP tolerance, causing gas leakage and insufficient nitrogen filling inside the FOUP, resulting in wafer damage. The overall idea is as follows: Please see Figures 1-4 A wafer carrier inlet / outlet nozzle docking structure includes a fixed base 1 and a suction cup nozzle 2.
[0019] Please see Figure 1 , Figure 2 , Figure 3 and Figure 4 The suction cup nozzle 2 is detachably mounted on the fixed base 1, which is made of stainless steel. A limiting channel 9 is located at the center of the suction cup nozzle 2. The fixed base 1 has a horizontal first air inlet channel 6 and a vertical air outlet channel 5, which extends to the limiting channel 9 of the suction cup nozzle 2 and is at the same height as the outer end of the limiting channel 9. The air outlet channel 5 and the limiting channel 9 are coaxially arranged. By extending the air outlet channel 5 on the fixed base 1 into the limiting channel 9 of the suction cup nozzle 2 and aligning it with the limiting channel 9, leakage of filling gas from the FOUP inflation port due to tolerances can be prevented, thus ensuring sufficient nitrogen inside the FOUP and preventing damage to the wafer. The suction cup nozzle 2 provides better coverage when installed with the fixed base 1, allowing it to cover the inflation port at the bottom of the FOUP even if the port is not level, thus preventing gas leakage.
[0020] A magnetic attraction element is provided between the suction cup nozzle 2 and the fixed base 1. The magnetic attraction element includes a magnet 11 and a magnet 10. The magnet 11 is connected to the outer wall of the suction cup nozzle 2, and the magnet 10 is connected to the inside of the fixed base 1. The magnet 11 and the magnet 10 cooperate with each other. The cooperation of the magnet 11 and the magnet 10 further limits the position of the suction cup nozzle 2, improving the stability of the suction cup nozzle 2.
[0021] The fixed base 1 has an internal mounting groove 7. A magnet 10 is installed on the inner wall of the mounting groove 7. The suction cup nozzle 2 is detachably installed inside the mounting groove 7 through the cooperation of the magnet 11 and the magnet 10. The mounting groove 7 has a step 8 inside, and the magnet 10 is installed on the inner wall of the step 8. When the suction cup nozzle 2 is installed inside the mounting groove 7, the magnet 11 and the magnet 10 are precisely aligned and fixed in place.
[0022] The fixed base 1 also has a second horizontal air intake channel 4 inside, which is horizontally connected to the first air intake channel 6 and vertically connected to the air outlet channel 5. An air intake connector 3 is installed at the outer end of the first air intake channel 6. The air intake connector 3 is connected to the inflation device.
[0023] When this application is used: By extending the air outlet channel 5 on the fixed base 1 into the limiting channel 9 of the suction cup nozzle 2 and aligning it with the height of the limiting channel 9, leakage of filling gas from the FOUP's filling port due to tolerances can be prevented, thus ensuring sufficient nitrogen inside the FOUP and preventing damage to the wafer. The suction cup nozzle 2 provides better coverage when installed with the fixed base 1, allowing it to cover the bottom filling port of the FOUP even if it is not level, thereby preventing gas leakage.
[0024] In summary, by extending the air outlet channel 5 on the fixed base 1 into the limiting channel 9 of the suction cup nozzle 2 and making it at the same height as the limiting channel 9, this application can prevent the leakage of filling gas from the FOUP filling port due to tolerance, thereby ensuring sufficient nitrogen in the FOUP and preventing damage to the wafer.
[0025] Finally, it should be noted that the above embodiments are merely examples for clearly illustrating the present invention and are not intended to limit the implementation. Those skilled in the art will recognize that other variations or modifications can be made based on the above description. It is neither necessary nor possible to exhaustively list all possible implementations. However, obvious variations or modifications derived therefrom are still within the scope of protection of this invention.
Claims
1. A structure for docking nozzles at the inlet and outlet of a wafer carrier, characterized in that, include A fixed base (1) and a suction cup nozzle (2) are provided. The suction cup nozzle (2) is detachably mounted on the fixed base (1). A limiting channel (9) is provided at the center of the suction cup nozzle (2). A first horizontal air inlet channel (6) is provided inside the fixed base (1). A vertical air outlet channel (5) is provided inside the fixed base (1). The air outlet channel (5) extends to the limiting channel (9) of the suction cup nozzle (2) and is at the same height as the outer end of the limiting channel (9). The air outlet channel (5) and the limiting channel (9) are coaxially arranged.
2. The wafer carrier inlet / outlet nozzle docking structure as described in claim 1, characterized in that, A magnetic suction element is provided between the suction cup nozzle (2) and the fixed base (1).
3. The wafer carrier inlet / outlet nozzle docking structure as described in claim 2, characterized in that, The magnetic suction component includes a magnet (11) and a magnet (10). The magnet (11) is connected to the outer wall of the suction cup nozzle (2), and the magnet (10) is connected to the interior of the fixed base (1). The magnet (11) and the magnet (10) cooperate with each other.
4. The wafer carrier inlet / outlet nozzle docking structure as described in claim 3, characterized in that, The fixed base (1) has an installation groove (7) inside. The magnet (10) is installed on the inner wall of the installation groove (7). The suction cup nozzle (2) can be detachably installed inside the installation groove (7) through the cooperation of the magnet (11) and the magnet (10).
5. The wafer carrier inlet / outlet nozzle docking structure as described in claim 4, characterized in that, The mounting groove (7) has a step (8) inside, and the magnet (10) is installed on the inner wall of the step (8).
6. The wafer carrier inlet / outlet nozzle docking structure as described in claim 1, characterized in that, The fixed base (1) is also provided with a second horizontal air intake channel (4), which is connected to the first air intake channel (6) in the horizontal direction and to the air outlet channel (5) in the vertical direction.
7. The wafer carrier inlet / outlet nozzle docking structure as described in claim 1, characterized in that, An air intake connector (3) is installed at the outer end of the first air intake channel (6).