Subway engineering site construction safety monitoring information visualization graphical user interface for electronic equipment

CN308870375SActive Publication Date: 2024-10-01WUHAN UNIV OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202430561906.5
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-10-01
Estimated Expiration
2039-09-03

Smart Images

  • Figure 000002_ABST
    Figure 000002_ABST
Patent Text Reader

Abstract

1. Name of the product of this design: Graphical user interface for visualization of construction safety monitoring information of subway engineering sites of electronic equipment. 2. Purpose of this design product: for electronic equipment. 3. The design highlights of this appearance design product are: the visualization of the graphical user interface content for construction safety monitoring information at subway engineering sites. 4. The picture or photo that best illustrates the key points of the design: Design 1 interface change state diagram 1. 5. Designate Design 1 as the base design. 6.Purpose of the graphical user interface: to display data information of construction safety monitoring of subway project sites. 7. Human-computer interaction method of graphical user interface: The main view of design 1‑5 is the subway project site workbench display interface, and the map and subway station information are displayed on the right side of the interface. In the main view of Design 1, the user clicks on the subway station legend in the map on the right side of the interface to present the Design 1 interface change state diagram 1, which is used to view the 3D modeling data information of the construction safety monitoring of the corresponding subway station. In the interface change state diagram 1 of design 1, the user clicks "switch site" in the upper left corner of the interface to present the interface change state diagram 2 of design 1, which is used to view the map and other subway stations. In the main view of Design 2, the user clicks on the subway station legend in the map on the right side of the interface to present the Design 2 interface change state diagram 1, which is used to view the 3D modeling data information of the construction safety monitoring of the corresponding subway station. In Design 2 interface change state diagram 1, the user clicks "Latest Aerial Photography" in the upper right corner of the interface to present Design 2 interface change state diagram 2, which is used to view the aerial photography of the corresponding subway station. In the main view of Design 3, the user clicks on the subway station legend in the map on the right side of the interface to display the Design 3 interface change state diagram 1, which is used to view the 3D modeling data information of the construction safety monitoring of the corresponding subway station. In the design 3 interface change state diagram 1, the user clicks the monitoring point legend in the modeling in the middle of the interface to present the design 3 interface change state diagram 2, which is used to view the information of the corresponding monitoring point. In the main view of Design 4, the user clicks on the subway station legend in the map on the right side of the interface to display the Design 4 interface change state diagram 1, which is used to view the 3D modeling data information of the construction safety monitoring of the corresponding subway station. In the Design 4 interface change state diagram 1, the user double-clicks the monitoring point legend in the modeling in the middle of the interface to display the Design 4 interface change state diagram 2, which is used to view the data trend information of the corresponding monitoring point. In the main view of Design 5, the user clicks on the subway station legend in the map on the right side of the interface to display the Design 5 interface change state diagram 1, which is used to view the 3D modeling data information of the construction safety monitoring of the corresponding subway station. In the Design 5 interface change state diagram 1, the user clicks "Switch View" in the upper right corner of the interface to present the Design 5 interface change state diagram 2, which is used to correspond to the two-dimensional plane design drawing data information of the subway station construction safety monitoring. The "XX" in the interface are all characters or text content.