Graphical user interface of the inspection management system showing the screen panel

CN308912850SActive Publication Date: 2024-10-29ZHEJIANG CHINT INSTR & METER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202330635479.6
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2023-09-27
Publication Date
2024-10-29
Estimated Expiration
2038-09-27

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. The name of the product of this design: Graphical user interface of inspection management system for display screen panel. 2. Purpose of the product of this design: used to display information. The display screen panel can be used in computers, notebooks, and multimedia display electronic products. 3. The key design point of this appearance design product lies in the graphical user interface. 4. The picture or photo that best illustrates the key points of the design: Main view of Design 1. 5. Since the display screen panel is of conventional design, the rear view, left view, right view, top view and bottom view of Design 1 to Design 10 are omitted. 6. Designate Design 1 as the base design. 7.Purpose of the graphical user interface: used to display system display information for inspection task management. 8. Human-computer interaction mode of graphical user interface: Design 1 main view is the interface homepage. Click the "Inspection Plan" module in the toolbar on the left side of the Design 1 main view interface to enter the Design 1 interface change state diagram 1; click "Details" in the list of Design 1 interface change state diagram 1 to enter the Design 1 interface change state diagram 2; click "Plan 1-Temporary Inspection" in the page of Design 1 interface change state diagram 2 to enter the Design 1 interface change state diagram 3; click "Select Route" in the Design 1 interface change state diagram 3 to enter the Design 1 interface change state diagram 4; Design 2 main view is the interface homepage. Click "Inspection Task" in the toolbar on the left side of the Design 2 main view interface to enter the Design 2 interface change state diagram 1; click Design 2 Click "Details" of "Plan 1" in the list of interface change status diagram 1 to enter design 2 interface change status diagram 2; click the "Details" button of "1001" in the list of design 2 interface change status diagram 2 to enter design 2 interface change status diagram 3; the design 3 main view is the interface homepage, click "Inspection Task" in the toolbar on the left side of the design 3 main view interface to enter design 3 interface change status diagram 1; click the "Inspection Playback" button in the list of design 3 interface change status diagram 1 to enter design 3 interface change status diagram 2; the design 4 main view is the interface homepage, click the "Inspection Configuration" module after the "Inspection Item" module in the toolbar on the left side of the design 4 main view interface to enter design 4 interface change status diagram 1; click design The "Edit" button of "Flow" in the list of Design 4 interface change state diagram 1 can enter Design 4 interface change state diagram 2; Design 5 main view is the interface homepage, click the "Inspection Item" module after "Inspection Configuration" in the toolbar on the left side of the Design 5 main view interface to enter Design 5 interface change state diagram 1; click the "Add Inspection Item" button in the list of Design 5 interface change state diagram 1 to enter Design 5 interface change state diagram 2; Design 6 main view is the interface homepage, click the "Inspection Point" module after "Inspection Configuration" in the toolbar on the left side of the Design 6 main view interface to enter Design 6 interface change state diagram 1; click the "Edit" button in Design 6 interface change state diagram 1 to enter Design 6 interface change state diagram Figure 2; Click the "Add Inspection Item" button in the Design 6 interface change state diagram 2 to enter the Design 6 interface change state diagram 3; The Design 7 main view is the interface homepage, click the "Inspection Point" module after "Inspection Configuration" in the toolbar on the left side of the Design 7 main view interface to enter the Design 7 interface change state diagram 1; Click the "Add Inspection Point" button in the Design 7 interface change state diagram 1 to enter the Design 7 interface change state diagram 2; The Design 8 main view is the interface homepage, click the "Inspection Point" module after "Inspection Configuration" in the toolbar on the left side of the Design 8 main view interface to enter the Design 8 interface change state diagram 1; Click the coordinate button in the list of the Design 8 interface change state diagram 1 to enter the Design 8 interface change state diagram 2;The main view of Design 9 is the home page of the interface. Click the "Inspection Point" module after "Inspection Configuration" in the toolbar on the left side of the main view interface of Design 9 to enter the interface change state diagram 1 of Design 9; click the "Preview" button in the list of the interface change state diagram 1 of Design 9 to enter the interface change state diagram 2 of Design 9; the main view of Design 10 is the home page of the interface. Click the "Inspection Route" module after "Inspection Configuration" in the toolbar on the left side of the main view interface of Design 10 to enter the interface change state diagram 1 of Design 10; click the "Edit" button in the list of the interface change state diagram 1 of Design 10 to enter the interface change state diagram 2 of Design 10; click the "Add Inspection Point" button in the interface change state diagram 2 of Design 10 to enter the interface change state diagram 3 of Design 10; click the "Apply Existing Route" button in the interface change state diagram 3 of Design 10 to enter the interface change state diagram 4 of Design 10. ; 9. Other situations that require explanation: Other explanations: The gray blocks in each view are content screens.
Need to check novelty before this filing date? Find Prior Art