Project management graphical user interface for electronic devices
CN308912910SActive Publication Date: 2024-10-29HUNAN 208 ADVANCED TECH CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202430175387.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2039-04-01
Smart Images

Figure 000001_ABST
Abstract
1. Name of the design product: Project management graphical user interface for electronic equipment. 2. Purpose of this design product: used to run programs and display information, especially for project managers to issue project tasks and facilitate tracking of project progress, and for project members to upload project progress information. 3. The design highlights of this design product are the graphical user interface displayed on the electronic device. 4. The picture or photo that best illustrates the key points of the design: main view. 5. The electronic equipment is of conventional design, and the rear view, left view, right view, top view and bottom view are omitted. 6. Purpose of the graphical user interface: When the software is started, the main view interface is entered. Users can log in, register, or directly click on the "Progress Dashboard" on this interface to enter the interface change status diagram 1 to view the project progress visualization dashboard data without logging in. If you need to register, click the "Register" button on the main view interface to enter the interface change status diagram 2. After completing the registration, press the "Return" button to return to the login interface. Different users will see different interfaces after logging in. After a project member successfully logs in, the interface they see is interface change status diagram 3. After a project administrator successfully logs in, the interface they see is interface change status diagram 4. The project administrator can click the "User Management" button to enter interface change status diagram 5 to add or delete project members. After logging in, project members can click the "Project Management" button to enter the interface change status diagram 6. In this interface, project members can view the status of each project but cannot edit it. After clicking the "Progress" button, they can enter the interface change status diagram 7. In this interface, project members can view the progress of the selected project, and can add, delete, modify, etc. the project content, but the planned start time and planned end time cannot be edited. After the project administrator logs in, he can click the "Project Management" button to enter the interface change status diagram 8. In this interface, the project administrator can view the status of each project and can add, delete, modify, copy and other operations on the project content; after clicking the "Progress" button, the interface change status diagram 9 is entered. In this interface, the project administrator can view the progress of the selected project, can add, delete, modify and other operations on the project content, and can also edit the planned start time and planned end time.
Need to check novelty before this filing date? Find Prior Art
