Graphical user interface for clearing and settlement project management of electronic equipment

CN308929720SActive Publication Date: 2024-11-08CHINA MOBILE FINANCIAL TECHNOLOGY CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202330451121.8
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2023-07-18
Publication Date
2024-11-08
Estimated Expiration
2038-07-18

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. Name of the product of this design: Graphical user interface for clearing and settlement project management for electronic equipment. 2. Purpose of this design product: for use in an electronic device. 3. The key design point of this appearance design product lies in the graphical user interface. 4. The picture or photo that best illustrates the key points of the design: Main view of Design 1. 5. The other surfaces of the electronic device are of conventional design and other views are omitted. 6. Designate Design 1 as the base design. 7. Purpose of Graphical User Interface: The interface is used for the management of clearing and settlement items. The main view interface of Design 1 is the initial interface of Design 1. Click "New Warehouse" in the interface shown in the main view of Design 1 to enter the interface change state diagram 1 of Design 1; in the interface change state diagram 1 of Design 1, drag the "scroll bar" on the right side downward to enter the interface change state diagram 2 of Design 1; the interface shown in the main view of Design 2 is the initial interface of Design 2. Click "New Build Cluster" in the interface shown in the main view of Design 2 to enter the interface change state diagram 1 of Design 2; enter the content in the window below "Build Cluster Name" in the interface change state diagram 1 of Design 2 and click "Save" to enter the interface change state diagram 2 of Design 2; click "Add Resource" in the interface change state diagram 2 of Design 2 to enter Enter the Design 2 interface change state diagram 3; the interface shown in the Design 3 main view is the Design 3 initial interface, click "New Application" in the interface shown in the Design 3 main view to enter the Design 3 interface change state diagram 1, drag the "scroll bar" on the right side of the Design 3 interface change state diagram 1 downwards to enter the Design 3 interface change state diagram 2; the interface shown in the Design 4 main view is the Design 4 initial interface, click "New Database" on the right side of the Design 4 main view to enter the Design 4 interface change state diagram 1; in the Design 4 interface change state diagram 1, click "Cancel" and click "Host Maintenance" to enter the Design 4 interface change state diagram 2; in the Design 4 interface change state diagram 2, click "New Host", Enter the Design 4 interface change state diagram 3, drag the "scroll bar" on the right side of the Design 4 interface change state diagram 3 downwards to enter the Design 4 interface change state diagram 4; the first column of icons just below the "operation" on the right side of the Design 4 interface change state diagram 2 is the "association" icon, click "Cancel" and any "association" icon in the Design 4 interface change state diagram 4 to enter the Design 4 interface change state diagram 5; in the Design 4 interface change state diagram 5, click "Associate Host" to enter the Design 4 interface change state diagram 6; the interface shown in the Design 5 main view is the Design 5 initial interface, in the interface shown in the Design 5 main view, click "New" in the upper right corner to enter the Design 5 interface change state diagram 1; in In Design 5 Interface Change State Diagram 1, click "Next" to enter Design 5 Interface Change State Diagram 2; in Design 5 Interface Change State Diagram 2, click "Add Task" to enter Design 5 Interface Change State Diagram 3, slide up the window on the right side of Design 5 Interface Change State Diagram 3, and enter Design 5 Interface Change State Diagram 4, Design 5 Interface Change State Diagram 5 and Design 5 Interface Change State Diagram 6 in turn; in Design 5 Interface Change State Diagram 6, click "Confirm" to enter Design 5 Interface Change State Diagram 7; click "Add Task" in Design 5 Interface Change State Diagram 7 to enter Design 5 Interface Change State Diagram 8; slide up the window on the right side of Design 5 Interface Change State Diagram 8. Enter the Design 5 interface change state diagram 9 and the Design 5 interface change state diagram 10 in turn.
Need to check novelty before this filing date? Find Prior Art