Graphical user interface for pre-delivery and post-payment management in CRM for electronic devices
CN308952589SActive Publication Date: 2024-11-19BEE SELECT (BEIJING) TECH CO LTD
View PDF 0 Cites -1 Cited by
Patent Information
- Application Number
- CN202430057834.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2039-01-29
Smart Images

Figure 000002_ABST
Abstract
1. Name of the product of this design: A graphical user interface for managing delivery before payment in CRM of electronic devices. 2. The purpose of this design product: to manage products on a delivery-first-payment-later basis. 3. The design highlights of this appearance design product lie in the interface content and interface layout of the graphical user interface. 4. The picture or photo that best illustrates the design points: Interface change state diagram 1. 5. Since the hardware part of the display screen panel is of conventional design, the rear view is omitted; since the hardware part of the display screen panel is of conventional design, the left view is omitted; since the hardware part of the display screen panel is of conventional design, the right view is omitted; since the hardware part of the display screen panel is of conventional design, the top view is omitted; since the hardware part of the display screen panel is of conventional design, the bottom view is omitted. 6. Purpose of the graphical user interface: The graphical user interface of the product under this design is used to manage the product on a delivery-first-payment-later basis. 7. Human-computer interaction method of the graphical user interface: Click "Fengcai CRM" in the main view to switch to the interface change state Figure 1. Click "Payment after delivery" in interface change state diagram 1 to switch to interface change state diagram 2. Click "Add delivery first, payment later" in interface change state diagram 2 to switch to interface change state diagram 3. Click “Add Company” and “Add Product Name” in interface change state diagram 3 to switch to interface change state diagram 4. Click “Batch” in interface change state diagram 2 to switch to interface change state diagram 5. After clicking "Prohibit" in the interface change state diagram 5 and selecting the products that prohibit delivery before payment, switch to the interface change state diagram 6. Click “OK” in interface change state diagram 6 to switch to interface change state diagram 7.
Need to check novelty before this filing date? Find Prior Art
