Railway completion acceptance management platform graphical user interface for electronic equipment
CN308989244SActive Publication Date: 2024-12-06INST OF COMPUTING TECH CHINA ACAD OF RAILWAY SCI +1
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202430039067.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-19
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2039-01-19
Smart Images

Figure 000001_ABST
Abstract
1. Name of the product of this design: Graphical user interface of railway completion acceptance management platform for electronic equipment. 2. Purpose of this design product: for use in an electronic device. 3. The key design point of this appearance design product lies in the graphical user interface. 4. The picture or photo that best illustrates the key points of the design: Main view of Design 1. 5. Designate Design 1 as the base design. 6.Purpose of the graphical user interface: It is used for the information management of the entire closed-loop process of inputting, confirming, rectifying, reviewing and canceling problems during the early intervention and final acceptance stages of railway projects. 7. Human-computer interaction method of the graphical user interface: Design 1. The left side of the main view page displays "Home", "Problem Management", "Basic Data", "Statistical Query" and "System Management" from top to bottom respectively, and the right side of the page displays "Problem Overview", "Classification Statistics" and "Problem Library Trend" from top to bottom respectively. The "Problem Overview" section displays the total number of problems and the number of problems to be confirmed, rectified, self-inspected, re-inspected and closed. The "Classification Statistics" section displays the number of different problem statuses corresponding to different majors and the number of different problem statuses corresponding to different types of problems in the form of charts. The "Problem Library Trend" section displays the number of processed problems corresponding to different dates in the form of charts, and displays the rectification rate and cancellation rate in the form of percentages. Click "Problem Management" on the left side of the Design 1 main view to display the Design 1 change status diagram 1, and then click "Problem Management" in the "Problem Management" column of the Design 1 change status diagram 1 to display the Design 1 change status diagram 2. The page displays all problems, and you can query data by status, stage, inspection time and problem number. Click "Export" on the right side of the page to export data to Excel. Click "Confirm" on the right side of the Design 1 change status diagram 2 to display the Design 1 change status diagram 3 for confirming the problem. Click "Submit" on the page to complete the confirmation of the problem. Click "Problem Management" on the left side of the Design 2 main view to display the Design 2 Change Status Diagram 1, then click "Problem Management" in the "Problem Management" column of Design 2 Change Status Diagram 1 to display the Design 2 Change Status Diagram 2, click "Add" on the right side of Design 2 Change Status Diagram 2 to display Design 2 Change Status Diagram 3 for adding problems, pull down the scroll bar in Design 2 Change Status Diagram 3 to display Design 2 Change Status Diagram 4, and you can enter content on the page through drop-down selection, template, switch selection, etc. Click "Problem Management" on the left side of the Design 3 main view to display the Design 3 Change Status Diagram 1, then click "Problem Management" in the "Problem Management" column of Design 3 Change Status Diagram 1 to display the Design 3 Change Status Diagram 2, select multiple issues to be confirmed in Design 3 Change Status Diagram 2 to display Design 3 Change Status Diagram 3, click "Batch Confirmation" in Design 3 Change Status Diagram 3 to display Design 3 Change Status Diagram 4 for confirmation of multiple issues, click "OK" to complete the confirmation of multiple issues. Click "Problem Management" on the left side of the Design 4 main view to display the Design 4 Change Status Diagram 1, then click "Problem Management" in the "Problem Management" column of Design 4 Change Status Diagram 1 to display the Design 4 Change Status Diagram 2, click "Rectification" on the right side of Design 4 Change Status Diagram 2 to display the Design 4 Change Status Diagram 3, pull down the scroll bar in Design 4 Change Status Diagram 3 to display the Design 4 Change Status Diagram 4, pull down the scroll bar in Design 4 Change Status Diagram 4 to display the Design 4 Change Status Diagram 5, which is used to rectify the problem. After the rectification unit rectifies the problem, it enters the rectification information and pictures into the system. Click "Problem Management" on the left side of the Design 5 main view to display the Design 5 Change Status Diagram 1, then click "Problem Management" in the "Problem Management" column of Design 5 Change Status Diagram 1 to display the Design 5 Change Status Diagram 2, click "Self-check" on the right side of Design 5 Change Status Diagram 2 to display the Design 5 Change Status Diagram 3, pull down the scroll bar in Design 5 Change Status Diagram 3 to display Design 5 Change Status Diagram 4, which is used for self-checking problems. The rectification unit shall self-check the problems whose rectification has been completed and enter the self-check information and pictures into the system. Click "Problem Management" on the left side of the Design 6 main view to display the Design 6 change status diagram 1, then click "Problem Management" in the "Problem Management" column of Design 6 change status diagram 1 to display Design 6 change status diagram 2, click "Re-inspection" on the right side of Design 6 change status diagram 2 to display Design 6 change status diagram 3, pull down the scroll bar in Design 6 change status diagram 3 to display Design 6 change status diagram 4, which is used to re-inspect the problem. After the rectification is completed, the inspection team will re-inspect the problem and record the re-inspection information and proof pictures into the system. Click "Basic Data" on the left side of the Design 7 main view to display the Design 7 change status diagram 1, and then click "Project Management" in the "Basic Data" column of the Design 7 change status diagram 1 to display the Design 7 change status diagram 2, which is used to display information such as the name, code and acceptance stage of different projects. Click "Basic Data" on the left side of the Design 8 main view to display the Design 8 change status diagram 1. Click "Section Management" in the "Basic Data" column of the Design 8 change status diagram 1 to display the Design 8 change status diagram 2, which is used to display the names of different sections, the names of the projects they belong to, the construction units and responsible persons and other information.
Need to check novelty before this filing date? Find Prior Art
