Physical testing graphical user interface for electronic devices

CN308996522SActive Publication Date: 2024-12-10GUANGZHOU YUANDONG SMART SPORTS TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202430061675.1
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2024-01-30
Publication Date
2024-12-10
Estimated Expiration
2039-01-30

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. Name of the product of this design: Physical test graphical user interface for electronic equipment. 2. Purpose of the product of this design: an electronic device. 3. The key design point of this design product lies in the content of the graphical user interface. 4. The picture or photo that best illustrates the key points of the design: main view. 5. The hardware design part is conventional and other views are omitted. 6.Purpose of the graphical user interface: This graphical user interface is used to display the screen panel for test process guidance, user body test and other operations; the main view interface is the login interface for the body composition test. Click the "Login" button in the upper left corner of the main view interface or scan the code to log in and enter the interface change state diagram 1 after successful login. Select gender in the interface change state diagram 1 and click the "Next" button to enter the interface change state diagram 2. Select age data in the interface change state diagram 2 and click the "Next" button to enter the interface change state diagram 3. Select height data in the interface change state diagram 3 and click the "Next" button. Click the "Next" button in interface change state diagram 5 to enter interface change state diagram 6. After a period of time, interface change state diagram 6 automatically jumps to interface change state diagram 7. After a period of time, interface change state diagram 7 automatically jumps to interface change state diagram 8. After a period of time, interface change state diagram 8 automatically jumps to interface change state diagram 9. In interface change state diagram 9, the user can enter interface change state diagram 10 after taking the correct steps according to the test process guidance.
Need to check novelty before this filing date? Find Prior Art