Computer with graphical user interface for engineering material testing report function
CN309257286SActive Publication Date: 2025-04-25XIAMEN HYMAKE TECH
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202430485634.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2039-08-01
Smart Images

Figure 000001_ABST
Abstract
1. The name of the product of this design: Computer with a graphical user interface with engineering material test report function. 2. Purpose of this design product: used to display information. 3. The key design point of this appearance design product lies in the graphical user interface. 4. The picture or photo that best illustrates the key points of the design: Main view of Design 1. 5. The computer is of conventional design and other views are omitted. 6. Designate Design 1 as the base design. 7. Purpose of the graphical user interface: to collect, manage and utilize construction material inspection reports in the electronic archive platform. 8. The area of the graphical user interface in the product: the entire area located on the computer screen. 9. Human-computer interaction method of graphical user interface: Users can perform different functional operations by clicking different areas or icons displayed on the interface with the mouse. 10. Description of the changing status of the graphical user interface: The interface shown in the main view of Design 1 is the main interface of the construction project material inspection report function list. The left area displays the classification of test items, and the right area displays the test report related information in list form. Design 1 change status diagram 1 shows that after the user checks the report to be evaluated in the Design 1 main view, he clicks the "Generate Evaluation Table" button in the Design 1 main view and selects the template, unit project, file name, strength grade, maintenance method, evaluation date, and number type corresponding to the evaluation. Design 1 change state diagram 2 shows that when the user clicks "OK" on Design 1 change state diagram 1, the data is automatically filled into the selected evaluation table template to form corresponding engineering data. The interface shown in the main view of Design 2 is the main interface of the construction project material inspection report function list. The left area displays the classification of test items, and the right area displays the test report related information in list form. Design 2 change status diagram 1 shows that after the user checks the reports to be summarized in the Design 2 main view, he clicks the "Generate Summary Table" button in the Design 2 main view and selects the corresponding inspection category, table template, unit project, file name, and number type. Design 2 change state diagram 2 shows that when the user clicks "OK" in Design 2 change state diagram 1, the data is automatically filled into the selected summary table template to form the corresponding engineering data.
Need to check novelty before this filing date? Find Prior Art