Power plant monitoring system graphical user interface for PC
CN309274932SActive Publication Date: 2025-05-06ZHEJIANG ZHENENG LANXI POWER GENERATION CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202430416288.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-04
- Publication Date
- 2025-05-06
- Estimated Expiration
- 2039-07-04
Smart Images

Figure 000001_ABST
Abstract
1. The name of the product of this design: Graphical user interface for power plant monitoring system for computer. 2. Purpose of this design product: the interface change process and interface content displayed on the screen. 3. The key design point of this appearance design product lies in the interactive interface on the screen. 4. The picture or photo that best illustrates the key points of the design: Main view of Design 1. 5. Due to the conventional design of the computer, other views are omitted. 6. Designate Design 1 as the base design. 7. Purpose of the graphical user interface: The main view of Design 1 is the system interface for power plant monitoring, which displays the status changes of the main parameters of each related unit in real time; when the main parameters of the related units are abnormal, the color indicating the abnormal parameters will change; click the first "Pulverizing System" button on the right side of the main view of Design 1 to enter the interface change status diagram of Design 1 to view the changes of the relevant parameters of the pulverizing system; click the second "Boiler Parameters" button on the right side of the main view of Design 2 to enter the interface change status diagram of Design 2 to view the changes of the boiler parameters; click the third "Turbine Parameters" button on the right side of the main view of Design 3 to enter the interface change status diagram of Design 3 Click the fourth "Electrical Parameters" button on the right in the main view of Design 4 to enter the interface change status diagram of Design 4 and check the changes in electrical parameters; click the fifth "Environmental Parameters" button on the right in the main view of Design 5 to enter the interface change status diagram of Design 5 and check the changes in environmental parameters; click the sixth "Chemical Parameters" button on the right in the main view of Design 6 to enter the interface change status diagram of Design 6 and check the changes in chemical parameters; click the seventh "HVAC Parameters" button in the main view of Design 7 to enter the interface change status diagram of Design 7 and check the changes in HVAC parameters.
Need to check novelty before this filing date? Find Prior Art