Graphical User Interface for Engineering Project Management Platform for Electronic Equipment

CN309842903SActive Publication Date: 2026-03-13HENAN RUIDA INFORMATION TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2025-02-17
Publication Date
2026-03-13

Smart Images

  • Figure 000002_ABST
    Figure 000002_ABST
Patent Text Reader

Abstract

1. Name of the product in this design: Graphical User Interface for Engineering Construction Project Management Platform for Electronic Equipment. 2. Purpose of this design: For use in electronic devices to enable human-computer interaction and to store and manage project data. 3. The key design features of this product are its graphical user interface. 4. The image or photo that best illustrates the design points: Design 1 Interface Change State Diagram 1. 5. Design 1 is designated as the basic design. 6. Purpose of the graphical user interface: It is used to manage and monitor the entire process of project implementation. The smart construction site function, combined with BIM technology, enables dynamic supervision of project implementation. 7. Other situations requiring explanation are illustrated in the diagrams: Design 1's main view is the graphical user interface displayed on the system login screen; entering the correct "username and password" in Design 1's main view and clicking the "Login" button will take you to Design 1's interface state change diagram 1, which is the homepage interface of the engineering construction project management platform, allowing you to get an overview of the project implementation and view the project's basic information; clicking the "Tender Management" button in Design 1's interface state change diagram 1 will switch to Design 1's interface state change diagram 2, where the system displays tender batches, bid opening times, etc., in a list format. Selecting a specific project name allows you to query the project's bidding information; Design 2's main view is the graphical user interface displayed on the system login screen; entering the correct "username and password" in Design 1's main view and clicking the "Login" button will take you to Design 2's interface state change diagram 1, which is the homepage interface of the engineering construction project management platform; clicking the "Contract Management" button in Design 2's interface state change diagram 1 will switch to Design 2's interface state change diagram 2, where the system displays the contract number, contract name, contractor, amount, signing date, etc., in a list format. The system displays various information such as contract duration. Selecting a specific contract name allows you to view the project's contract documents. The main view of Design 3 is the graphical user interface (GUI) for the system login screen. Entering the correct username and password in the Design 3 main view and clicking the "Login" button leads to the Design 3 interface (Figure 1), which is the homepage of the engineering construction project management platform. Clicking the "Acceptance Management" button in Design 3 interface (Figure 1) switches to the Design 3 interface (Figure 2), where the system displays the project's contract section, acceptance type, acceptance date, and status in a list format. Selecting a specific project name allows you to view the relevant acceptance documents. The main view of Design 4 is also the GUI for the system login screen. Entering the correct username and password in the Design 4 main view and clicking the "Login" button leads to the Design 4 interface (Figure 1), which is the homepage of the engineering construction project management platform. Clicking the "Smart Construction Site" button in Design 4 interface (Figure 2) switches to the Design 4 interface (Figure 2), where the system displays the project's progress, safety, quality, investment, BIM animations, and other information in graphical and curve formats. 8. Other situations requiring explanation: X indicates replaceable content.
Need to check novelty before this filing date? Find Prior Art