Graphical user interface for managing linkage rules of electronic devices

CN310148371SActive Publication Date: 2026-08-14深圳开鸿数字产业发展有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2025-09-24
Publication Date
2026-08-14

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. Name of the product in this design: Graphical User Interface for Linkage Rule Management of Electronic Devices. 2. Intended use of this design: for use in electronic devices. 3. The key design features of this product are its graphical user interface content. 4. The image or photograph that best illustrates the design's key features: the front view. 5. Purpose of the graphical user interface: The graphical user interface is used for managing linkage rules. 6. Human-computer interaction method of graphical user interface: The main view is for rapid response and standardized handling of various emergencies such as fire and hazardous chemical leakage during tunnel operation. Refer to the reference diagram of the changing status of the main view interface; click "Start" under "Operation" on the right side of the main view. Entering the interface change state diagram 1, it displays the connection between the equipment linkage logic and the contingency plan (fire, hazardous chemical leakage, etc.) in both directions of the tunnel; the real-time images of multiple cameras are integrated below, which can be viewed in full screen to realize equipment status, linkage rules and on-site monitoring, which can be referred to the interface change state diagram 1; select the "Rule Arrangement Node Visualization" mode through the interface change state diagram 1. The interface changes as shown in Figure 2, which clearly presents the execution logic of the hazardous chemical leak emergency plan in a flowchart. It covers environmental perception and reporting, alarm triggering, information acquisition, lighting control, information dissemination, traffic control, and other aspects. The execution status of each aspect is marked. Please refer to Figure 2 for the interface changes.
Need to check novelty before this filing date? Find Prior Art