Test of the graphical user interface of the examination administration system for electronic devices
CN310148473SActive Publication Date: 2026-08-14IFLYTEK CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-09
- Publication Date
- 2026-08-14
Smart Images

Figure 000001_ABST
Abstract
1. Name of the product in this design: Graphical User Interface for Examination Administration System of Electronic Equipment. 2. Intended use of this design: for use in an electronic device. 3. The key design feature of this product is its graphical user interface. 4. The image or photograph that best illustrates the design's key features: the front view. 5. Purpose of the graphical user interface: for testing the examination administration system. 6. Human-computer interaction method of graphical user interface: Clicking the "Enter Task" button corresponding to any test task in the main view will jump to the test room interface as shown in Interface Change Figure 1; Clicking the "Start Test Terminal" button in the upper right corner of the interface in Interface Change Figure 1 will jump to the starting interface as shown in Interface Change Figure 2. After starting, the interface will jump to the interface indicating that the start-up is complete as shown in Interface Change Figure 3; Clicking the "Go to Test Proctoring" button on the pop-up window in Interface Change Figure 3 will jump to the test proctoring interface as shown in Interface Change Figure 4; Clicking the "Switch to Card View" button at the top of the interface in Interface Change Figure 4 will jump to the test proctoring interface as shown in Interface Change Figure 5; After the test proctoring is completed in Interface Change Figure 5, the interface will jump to the test proctoring completion interface as shown in Interface Change Figure 6; In state diagram 6, clicking the "End Test Task" button in the upper right corner of the interface will redirect to the interface indicating the end of the test task, as shown in state diagram 7. Clicking the "OK" button in the pop-up window in state diagram 7 will redirect to the interface for uploading test data, as shown in state diagram 8. Clicking the "Start Upload" button in the middle of the interface in state diagram 8 will redirect to the interface showing test data uploading in progress, as shown in state diagram 9. Once the test data upload is complete in state diagram 9, the interface will redirect to the interface indicating test data upload completion, as shown in state diagram 10. Clicking the "Close (X)" button in the pop-up window in state diagram 10 will redirect to the interface indicating test completion, as shown in state diagram 11. The rectangular area in the upper left corner of all the above interfaces represents replaceable content, and "XXX" represents replaceable text and / or numbers.
Need to check novelty before this filing date? Find Prior Art