Engine virtual disassembly dynamic training graphical user interface for electronic devices

CN310177030SActive Publication Date: 2026-08-28芜湖联合飞机科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202530750616.X
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2025-12-19
Publication Date
2026-08-28
Estimated Expiration
2040-12-19

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. Name of the product in this design: Dynamic training graphical user interface for virtual disassembly and assembly of an electronic engine. 2. Purpose of this design: An electronic device. 3. The key design feature of this product is its graphical user interface. 4. The picture or photo that best illustrates the key design points: Design 1 front view. 5. Design 1 is designated as the basic design. 6. Purpose of the graphical user interface: for training in virtual engine installation and removal. 7. Human-computer interaction method of graphical user interface: In the main view of Design 1, click the "Prompt box switch" button in the upper right corner to enter the interface change state diagram of Design 1. In the main view of Design 2, click the "Scene Light Switch" button in the upper right corner to enter the Design 2 interface change state diagram. In the main view of Design 3, click the "14mm open-end wrench" button on the left to enter the Design 3 interface change state diagram 1; in the Design 3 interface change state diagram 1, move the "14mm open-end wrench" tool to the position to be used in the virtual installation scene (such as near the M10 nut 1 to be loosened), and enter the Design 3 interface change state diagram 2; in the Design 3 interface change state diagram 2, click the M10 nut 1 to be loosened, the wrench and nut will combine and automatically perform an animation demonstration of loosening the nut, dynamically entering the Design 3 interface change state diagram 3, Design 3 interface change state diagram 4, and Design 3 interface change state diagram 5, and after the demonstration ends, enter the Design 3 interface change state diagram 6. In the main view of Design 4, click the installation / removal switch selection box at the top to enter the Design 4 interface change state diagram 1; in the Design 4 interface change state diagram 1, click to select "Engine Virtual Installation" to enter the Design 4 interface change state diagram 2; in the Design 4 interface change state diagram 2, click the "Engine" button on the right to enter the Design 4 interface change state diagram 3; in the Design 4 interface change state diagram 3, by clicking the specified position in the virtual installation scene in the middle area of ​​the interface (such as the engine mounting shell), place the engine in the specified position in the virtual installation scene to enter the Design 4 interface change state diagram 4. In the design 5 front view, click the upper installation / dismounting switch selection box to enter the design 5 interface change state diagram 1; in the design 5 interface change state diagram 1, click to select "engine virtual installation" to enter the design 5 interface change state diagram 2; in the design 5 interface change state diagram 2, click the process selection box on the interface to enter the design 5 interface change state diagram 3; in the design 5 interface change state diagram 3, click to select a process (for example, select "14mm open spanner 1") to automatically demonstrate the installation animation in sequence according to the left process, dynamically enter the design 5 interface change state diagram 4, design 5 interface change state diagram 5, design 5 interface change state diagram 6, design 5 interface change state diagram 7, and enter the design 5 interface change state diagram 8 after the demonstration is completed; in the design 5 interface change state diagram 8, click the "14mm open spanner" button on the left to enter the design 5 interface change state diagram 9; in the design 5 interface change state diagram 9, move the "14mm open spanner" tool to a specified position (such as near the M10 nut 1 to be tightened) in the virtual installation scene to enter the design 5 interface change state diagram 10; in the design 5 interface change state diagram 10, click the M10 nut 1 to be tightened, the spanner is combined with the nut and automatically demonstrates the animation of tightening the nut, dynamically enters the design 5 interface change state diagram 11, design 5 interface change state diagram 12, design 5 interface change state diagram 13, and enters the design 5 interface change state diagram 14 after the demonstration is completed.
Need to check novelty before this filing date? Find Prior Art