Graphical user interface for linking task dashboards and to-do lists on electronic devices.
CN310193230SActive Publication Date: 2026-09-08AISPEECH CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202530524775.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-03
- Publication Date
- 2026-09-08
- Estimated Expiration
- 2040-09-03
Smart Images

Figure 000001_ABST
Abstract
1. Name of the product in this design: Graphical User Interface for Task Dashboard and To-Do Linkage in Electronic Devices. 2. Purpose of this design: An electronic device. 3. The key design feature of this product is its graphical user interface. 4. The picture or photo that best illustrates the key design points: Design 1 main view. 5. The key to the design lies in the graphical user interface; everything else is omitted. 6. Design 1 is designated as the basic design. 7. Uses of the graphical user interface: for linking task dashboards and to-do items, managing to-do items, filtering to-do items by time, and viewing weekly reports. 8. Human-computer interaction method of graphical user interface: Click the "Notes" option under "Workboard" in the main view of Design 1 to switch to the interface change state diagram 1 of Design 1. After performing the "swipe up" operation in the area below the "Workboard" option in the interface change state diagram 1 of Design 1, switch to the interface change state diagram 2 of Design 1. Click the "XXXX" item on the right side of the "Filter by Project" column in the interface change state diagram 2 of Design 1 to switch to the interface change state diagram 3 of Design 1. Click the "Notes" option under "Work Board" in the main view of Design 2 to switch to the Design 2 interface change state diagram 1. After performing the "swipe up" operation in the area below the "Work Board" option in the Design 2 interface change state diagram 1, switch to the Design 2 interface change state diagram 2. Click the "XXXX" item on the right side of the "Filter by Project" column in the Design 2 interface change state diagram 2 to switch to the Design 2 interface change state diagram 3. Click the "To-Do" option under "Work Board" in the main view of Design 3 to switch to the Design 3 interface change state diagram 1. When you perform the "swipe up" operation in the area below the "Work Board" option in the Design 3 interface change state diagram 1, you will switch to the Design 3 interface change state diagram 2. Click the "XXXX" project on the right side of the "Filter by Project" column in the Design 3 interface change state diagram 2 to switch to the Design 3 interface change state diagram 3. Click the "Email" option under "Work Board" in the main view of Design 4 to switch to the Design 4 interface change state diagram 1. When you perform the "swipe up" operation in the area below the "Work Board" option in the Design 4 interface change state diagram 1, you will switch to the Design 4 interface change state diagram 2. Click the "XXXX" project on the right side of the "Filter by Project" column in the Design 4 interface change state diagram 2 to switch to the Design 4 interface change state diagram 3. Click the "Telephone" option under "Work Board" in the main view of Design 5 to switch to the Design 5 interface change state diagram 1. When you perform the "swipe up" operation in the area below the "Work Board" option in the Design 5 interface change state diagram 1, you will switch to the Design 5 interface change state diagram 2. Click the "XXXX" project on the right side of the "Filter by Project" column in the Design 5 interface change state diagram 2 to switch to the Design 5 interface change state diagram 3. When you swipe down in the area below the "Workboard" option in the Design 6 main view, you will be switched to the Design 6 interface change state diagram. When you swipe down in the area below the "Workboard" option in the Design 7 main view, you will be switched to the Design 7 interface change state diagram. When you swipe down in the area below the "Workboard" option in the Design 8 main view, you will be switched to the Design 8 interface change state diagram. When you swipe down in the area below the "Workboard" option in the Design 9 main view, you will be switched to the Design 9 interface change state diagram. When you swipe down in the area below the "Workboard" option in the Design 10 main view, you will be switched to the Design 10 interface change state diagram.
Need to check novelty before this filing date? Find Prior Art