Item project configuration and management graphical user interface for electronic devices
CN310193294SActive Publication Date: 2026-09-08SHENZHEN GEYUAN TECH CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202530758302.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-23
- Publication Date
- 2026-09-08
- Estimated Expiration
- 2040-12-23
Smart Images

Figure 000001_ABST
Abstract
1. Name of the product in this design: Graphical User Interface for Project Solution Configuration and Management of Electronic Equipment. 2. Intended use of this design: for use in an electronic device. 3. The key design features of this product are the graphical user interface content on the screen of the electronic device. 4. The picture or photo that best illustrates the key design points: Design 1 front view. 5. Design 1 is designated as the basic design. 6. Purpose of the graphical user interface: The interface of this product design is used for project scheme configuration and model training data management of the defect detection center platform. 7. Human-computer interaction methods of the graphical user interface: Design 1 main view is the project configuration main interface when no configuration is selected; clicking the drop-down icon to the right of "2" in the upper left corner of Design 1 main view enters the Design 1 interface change state diagram 1; clicking any item in the drop-down menu of Design 1 interface change state diagram 1 enters the Design 1 interface change state diagram 2; clicking "Feature Management" in the upper right corner of Design 1 interface change state diagram 2 enters the Design 1 interface change state diagram 3; Design 2 main view is the project configuration main interface when no configuration is selected; clicking "Network Training" in the navigation bar at the top of Design 2 main view enters the Design 2 interface change state diagram 1; clicking any item in the list on the left side of Design 2 interface change state diagram 1 enters the Design 2 interface change state diagram 2; Design 3 main view is the project configuration main interface when no configuration is selected; clicking "Network Training" in the navigation bar at the top of Design 3 main view enters the Design 2 interface change state diagram 3. "Model Deployment" will take you to Design 3 Interface Change State Diagram 1; Click the drop-down icon to the right of "A35-YW1" in the upper left corner of Design 3 Interface Change State Diagram 1 to take you to Design 3 Interface Change State Diagram 2; Enter information in the Design 3 Interface Change State Diagram 2 window and click "OK" to take you to Design 3 Interface Change State Diagram 3; Click "View Configuration" in Design 3 Interface Change State Diagram 3 to take you to Design 3 Interface Change State Diagram 4; The Design 4 main view is the project configuration main interface when no configuration is selected; Click "Training Data Management" in the navigation bar at the top of the Design 4 main view to take you to Design 4 Interface Change State Diagram 1; Click any item "Manage Dataset" on the right side of the list in Design 4 Interface Change State Diagram 1 to take you to Design 4 Interface Change State Diagram 2; Click "Annotated" in the upper left corner of Design 4 Interface Change State Diagram 2 to take you to Design 4 Interface Change State Diagram 3.
Need to check novelty before this filing date? Find Prior Art