Energy storage management settings graphical user interface for an electronic device

CN310253907SActive Publication Date: 2026-10-13ROYPOW TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202530233462.7
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2025-04-27
Publication Date
2026-10-13
Estimated Expiration
2040-04-27

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. The name of the design product: energy storage management setting graphical user interface of electronic equipment. 2. The use of the design product: an electronic device. 3. The design points of the design product: the interface content of the graphical user interface in the screen. 4. The picture or photo that best indicates the design points: design 1 front view. 5. Design 1 is designated as the basic design. 6. The use of the graphical user interface: the graphical user interface is used for display, control and operation of energy storage management setting. Among them, design 1 front view is the display interface of the home page, click the arrow option on the right side of the "voltage" module in design 1 front view, enter design 1 interface change state diagram; Design 2 front view is the display interface of the home page, click the arrow option on the right side of the "temperature" module in design 2 front view, enter design 2 interface change state diagram; Design 3 front view is the display interface of the home page, click the "scheduled heating" option in design 3 front view, enter design 3 interface change state diagram 1; Click the "every week" option in the pop-up window of design 3 interface change state diagram 1, enter design 3 interface change state diagram 2; Design 4 front view is the display interface of the home page, click the "scheduled heating" option in design 4 front view, enter design 4 interface change state diagram 1; Click the "every month" option in the pop-up window of design 4 interface change state diagram 1, enter design 4 interface change state diagram 2; Design 5 front view is the display interface of the home page, click the "scheduled heating" option in design 5 front view, enter design 5 interface change state diagram 1; Click the "every day" option in the pop-up window of design 5 interface change state diagram 1, enter design 5 interface change state diagram 2; Design 6 front view is the display interface of the home page, click the "scheduled heating" option in design 6 front view, enter design 6 interface change state diagram 1; Click the "please select date" option in the pop-up window of design 6 interface change state diagram 1, enter design 6 interface change state diagram 2; Design 7 front view is the display interface of the home page, click the "scheduled heating" option in design 7 front view, enter design 7 interface change state diagram 1; Click the "monday" option in the pop-up window of design 7 interface change state diagram 1, and slide up and down the pop-up window options, enter design 7 interface change state diagram 2; Design 8 front view is the display interface of the home page, click the "scheduled heating" option in the design 8 front view, enter design 8 interface change state diagram 1; Click the "1 day" option in the pop-up window of design 8 interface change state diagram 1, and slide up and down the pop-up window options, enter the design 8 interface change state diagram 2; Design 9 front view is the display interface of the home page, click the "scheduled heating" option in Design 9 front view, enter design 9 interface change state diagram 1; Click the "please select time" option in the pop-up window of design 9 interface change state diagram 1, enter design 9 interface change state diagram 2.
Need to check novelty before this filing date? Find Prior Art