Graphical user interface for freight station operation integration intelligent evaluation system for electronic device
CN310258861SActive Publication Date: 2026-10-16INFORMATION TECH INST OF CHINA RAILWAY ZHENGZHOU BUREAU GRP CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202530693551.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-25
- Publication Date
- 2026-10-16
- Estimated Expiration
- 2040-11-25
Smart Images

Figure 000001_ABST
Abstract
1. The name of the design product: graphical user interface of freight station operation integrated intelligent evaluation system for electronic equipment. 2. The use of the design product: an electronic device. 3. The design points of the design product: the content of the displayed graphical user interface. 4. The picture or photo that best shows the design points: front view. 5. The rear view, left view, right view, top view and bottom view are conventional designs, and the rear view, left view, right view, top view and bottom view are omitted. 6. The use of the graphical user interface: for multi-dimensional information display, using rich charts to intuitively reflect the operation situation of on-site operators. 7. The human-computer interaction mode of the graphical user interface: click the "arrival train stage plan" icon in the front view, enter interface change state diagram 1, click the "arrival" icon in interface change state diagram 1, enter interface change state diagram 2, click any row table data in interface change state diagram 2, enter interface change state diagram 3, click the "apply for signing" icon in interface change state diagram 3, enter interface change state diagram 4. 8. Other circumstances that need to be explained: the front view is the main interface, which is used to show the user the whole process data of unloading operation in real time, and realizes real-time tracking and early warning of unloading task. Interface change state diagram 1 is the arrival and departure list page, which can intuitively see the number of freight station arrival and departure operations and evaluation. Interface change state diagram 2 is the benchmark audit of arrival and departure operation, which mainly shows the user all the unqualified data to be evaluated and evaluation history data. Interface change state diagram 3 is the operation detail operation realistic page, which mainly shows the user the detailed evaluation results of the operation, and gives the related operation buttons of the unqualified operation, and intuitively presents the efficiency and compliance of the operation process. Interface change state diagram 4 is the operation detail application signing page, which provides a structured signing process for "unqualified" operation to realize digital identification of responsibility, analysis of reasons and formation of management closed loop.
Need to check novelty before this filing date? Find Prior Art