METHOD AND APPARATUS FOR THE PRODUCTION OF A PRIMER MATERIAL
Patent Information
- Application Number
- DE502022002020
- Authority / Receiving Office
- DE · DE
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2022-01-13
- Filing Date
- 2022-09-26
- Publication Date
- 2024-11-14
- Estimated Expiration
- 2042-09-26
AI Technical Summary
The production of bitumen sheets generates significant waste, leading to increased disposal costs, and existing methods for producing primer materials require fresh bitumen, which is costly and inefficient.
Utilizing scrap bitumen sheets, which are rolled and treated with a solvent to extract the bitumen, allowing for the production of primer material without the need for fresh bitumen and reducing waste disposal costs, by dissolving the bitumen in a solvent that penetrates between the layers of the rolled sheet, even with limited initial contact area.
This method enables the efficient and cost-effective production of primer material by utilizing waste bitumen sheets, reducing disposal costs and maintaining the same bitumen composition as conventional production, with optional additive adjustments for the desired primer quality.
Description
[0001] The invention relates to a process for producing a primer material and a plant for carrying out this process. The primer material contains bitumen, solvents, and additives.
[0002] The invention is based on the object of providing a method that enables the cost-effective production of the primer material. Furthermore, the invention is based on the object of providing a system suitable for carrying out this method.
[0003] This object is achieved by a method according to claim 1 and by a device according to claim 16. Advantageous embodiments are described in the subclaims.
[0004] In other words, the invention proposes separating bitumen from bitumen sheets. The invention is based on the consideration that, due to strict standards regarding, for example, the dimensions and design of the bitumen sheets, a certain amount of rejects always arise during the production of bitumen sheets. Instead of disposing of the rejected bitumen sheets, which entails additional costs, the proposal is to use them to produce the primer. The bitumen portion is extracted from the bitumen sheets, so that only, for example, covering foils and any grit used for covering remain. The amount of material to be disposed of is correspondingly reduced, thus significantly cutting disposal costs. Furthermore, no fresh bitumen needs to be specifically prepared to produce the primer.While, for example, during the production of the primer material a certain amount of solvent is provided and then bitumen is added, according to the proposal bitumen is first provided, namely in the form of the scrap bitumen sheets, and then solvent is added in order to dissolve the bitumen portion from the bitumen sheets.
[0005] Initial practical tests have surprisingly shown that the bitumen sheets can be processed even when rolled up. This eliminates the need for shredding, e.g., cutting or chopping, to allow for extensive contact with the solvent. Accordingly, shredding of the carrier film is also avoided, which significantly facilitates further processing of the carrier film in one piece.
[0006] Assuming standard commercial dimensions of the bitumen sheet of approximately 100 cm wide and 500 cm long and a bitumen layer of approximately 0.3 cm thick, each of the two opposite upper sides results in a surface area of 50,000 cm 2< and the narrow edges on each end have a surface area of 30 cm 2< and on each long side a surface area of 150 cm 2<, so that the bitumen layer of the bitumen sheet offers a total surface area of 100,360 cm 2<, of which only the narrow edges with 360 cm 2< allow contact with the solvent. If one further assumes that the outward-facing upper side of the bitumen layer is exposed on the outer circumference of the rolled-up bitumen sheet and accordingly also allows contact with the solvent, then with a diameter of 35 cm there is an exposed area of approximately 11,000 cm 2< , so that ultimately only an area proportion of approximately 11.4% is wettable by the solvent.Surprisingly, initial tests have shown that, despite this small attack surface, the bitumen layer can be dissolved within an acceptable time. Initial assumptions suggest that this is possible because the solvent can penetrate between the individual winding layers of the rolled bitumen membrane, even though these areas are poorly permeable and therefore intensive flushing with solvent cannot be guaranteed.
[0007] As a result, the same composition of solvent and bitumen can be achieved as in the conventional production of a primer. If the primer is also to contain additives, these can either be added during the proposed production process or, if necessary, the additives are already contained in the bitumen membrane, so that either no additives need to be added at all to obtain the desired primer, or only a comparatively small correction dosage is required to increase the existing additive content to the desired amount in the primer.
[0008] First, bitumen sheets are produced. This can be done, for example, in a conventional manner. Bitumen sheets that do not meet certain criteria and are therefore not economically viable or can only be used with significant limitations are separated. The separated bitumen sheets are then used for the proposed process. The following process steps are planned: A bitumen sheet is placed in a container. The bitumen sheet is then flushed with a solvent in the container, which dissolves the bitumen, so that, on the one hand, bitumen is broken down in the original bitumen sheet and the bitumen is concentrated in the solvent. The solvent is circulated so that the flow ensures particularly intensive contact between the solvent and the bitumen sheet and the bitumen it contains. The concentration of bitumen in the solvent is repeatedly or continuously determined in order to determine when the solvent has such a high bitumen content that it can be further processed for use as a primer or even used directly for use as a primer when the concentration of bitumen in the solvent has reached a predetermined value.This concentrated solvent is removed and used to prepare a primer. After the concentrated solvent has been removed, solvent with a low or no bitumen concentration is reintroduced into the circuit. A bitumen concentration below the predetermined value is considered low, at which point the solvent is removed.
[0009] In one embodiment of the method, it can be provided that the bitumen sheet is introduced into the container in roll form. This corresponds to the way in which the bitumen sheet is presented anyway after completion of the manufacturing process. For example, bitumen sheets are typically sold in roll form. In order to make the proposed method as economical as possible, an additional processing step is omitted, for example to unroll the bitumen sheet initially provided on a roll and to prepare it as a flat sheet. Initial tests have surprisingly shown that the bitumen can be completely dissolved from the bitumen sheet in a sufficiently short period of time, even though the solvent can initially only attack the narrow edges of the bitumen layer.Apparently, however, the solvent soon penetrates between the bitumen layer and the next adjacent layer of the roll, even along these narrow edges, allowing the bitumen to degrade in a sufficiently short time. In addition, the production time of the primer material does not necessarily need to be optimized, since the bitumen sheets used for the proposed process are not produced specifically for the production of the primer, nor are they provided in large quantities and therefore need to be processed quickly. Rather, they are waste, whose share in the production of the bitumen sheets is kept as low as possible for economic reasons.
[0010] In one embodiment of the method, it can be provided that a bitumen sheet is used whose top and / or bottom side is covered. In this case, too, there is no need for specially designed processing of the initially conventionally produced bitumen sheet. Typically, the bitumen sheets are covered on their top side in order to prevent the bitumen sheets from binding unwanted foreign bodies due to their stickiness, for example in cases of high outside temperatures or strong sunlight. The top side can be covered in the form of a film or by sprinkling such as sand, slate or the like. The bitumen sheet can also have a cover film on its underside, after which the bitumen sheet can be processed to be self-adhesive.The top and / or bottom of the bitumen sheet can accordingly be covered with a plastic film, a paper sheet, a covering of mineral particles, or the like. As mentioned above, such coverings do not unduly impede bitumen degradation by the solvent. Once the bitumen has been completely dissolved, the covering material remains in the container. Depending on the material's properties, it can, for example, be removed from the container when the container is opened, as is possible with films, for example, or it can collect in a sump at the bottom of the container and be drained off, as is possible with a covering, for example.
[0011] In one embodiment, a bitumen sheet can be used that has a carrier layer to which a bitumen layer is laminated. In this case, not only any cover, if present, but also the carrier layer remains in the container after the bitumen has been completely removed from the bitumen sheet. In addition to the already known materials that can be used for the cover, other materials can therefore remain in the container as residue after the process is completed. For example, the carrier layer can comprise a polyester fleece and / or glass fiber fleece.
[0012] In one embodiment, the container can be designed as a tube, adapted to the fact that the bitumen sheet is in roll form and therefore has a cylindrical shape. In principle, several bitumen sheets can be placed in a container of almost any shape. However, optimal exposure of the solvent to the bitumen sheet, and in particular monitoring whether the bitumen in the bitumen sheet has been completely degraded, can advantageously be achieved by having the container contain only a single bitumen sheet. Accordingly, the container can advantageously be designed tubularly in order to accommodate the cylindrical roll of bitumen sheet in the most space-saving manner possible.In particular, the container can be designed as a tube with a circular cross-section, also in adaptation to the cylindrical shape of the rolled-up bitumen sheet, and avoiding poorly flowed areas of the container, which could be disadvantageous, for example, in a tubular container with a square cross-section.
[0013] In one embodiment, the solvent can be fed into a collection tank and from there back into the tank. Firstly, this allows access to the solvent at a central location, and secondly, it also allows a quantity of solvent to be provided that exceeds the volume of the tank, so that the additional volume remaining after the tank has been filled is present in the collection tank. If the tank can hold different quantities of solvent depending on the dimensions of the bitumen sheet to be treated in the tank, the collection tank serves as a compensating tank, so that the quantity of solvent provided does not always need to be precisely adjusted to the solvent filling volume that the tank containing the bitumen sheet can hold.
[0014] The collection tank can, for example, be designed to be transportable so that fresh solvent can be supplied in such a tank. Furthermore, during the process, the circulating solvent can be pumped into the collection tank and withdrawn from it again. And since the amount of solvent increases during the process due to the bitumen entering the solvent, the collection tank can also serve as a compensation tank during the process, absorbing this increase in volume. After the process is completed, the solvent enriched with the desired proportion of bitumen can be transported in the collection tank to where it is to be further processed, for example to a downstream production facility, a filling station, or the like.
[0015] In one embodiment of the method, it can advantageously be provided that the solvent is heated to a temperature of more than 20°C and fed into the container in a heated state. The temperature, which is above so-called room temperature, increases the reaction rate, so that, firstly, the degradation of the bitumen in the bitumen membrane advantageously occurs quickly, and secondly, the bitumen can be dissolved as completely as possible from the bitumen membrane particularly thoroughly and with a correspondingly high degree of efficiency.
[0016] In one embodiment of the method, the container is opened and residues are removed from the container before the container is refilled with a bitumen sheet. This procedure can be particularly advantageous when the container contains not only granules as residue from the treatment of a bitumen sheet, which granules can be collected in a sump of the container, but also films as residues. Removing the residues always ensures, especially in the case of films, the most unhindered flow through the container, so that the solvent can act on the bitumen sheet as efficiently as possible.
[0017] In one embodiment of the method, it can be provided that a ready-to-sale bitumen sheet is pretreated before it is placed in the container. This pretreatment consists of opening or removing tensioning bands which hold the rolled bitumen sheet together in order to ensure a small diameter of the rolled bitumen sheet in order to minimize transport and storage volume. The tensioning bands can be fiber-reinforced self-adhesive tapes, for example. By removing the tensioning bands, the penetration of the solvent between the individual winding layers of the rolled bitumen sheet is facilitated, thus promoting the largest possible contact between the solvent and the bitumen and thus the fastest possible dissolution of the bitumen layer.
[0018] If necessary, a second pretreatment step may involve loosening the rolled bitumen membrane after opening or removing the tensioning straps, for example, by placing it firmly against a substrate and thus mechanically shaking it. This allows adhering layers of the rolled bitumen membrane to be separated, thereby facilitating the penetration of the solvent between the layers.
[0019] For example, the container can be closed at the top with a lid that can be opened at will. This can prevent or reduce unwanted cooling of the container contents or undesirable emissions of the solvent. To insert the bitumen sheet into the container, the lid is opened and then closed again after the bitumen sheet has been inserted.
[0020] Before a new bitumen sheet is introduced into the container, large-area residues of the previously treated and largely dissolved bitumen sheet - e.g. its carrier and cover films - can advantageously be removed from the container in order not to hinder the flow through the container for the treatment of the newly used bitumen sheet, namely the access of the solvent to the bitumen.
[0021] The removal of the aforementioned large-scale residues, e.g. in the form of carrier and cover films, from the container can be carried out in one embodiment of the system suitable for the process using an inner container. The inner container can be designed in the manner of a sieve basket, advantageously with a very large mesh size of the sieve, e.g. a mesh size of several centimeters, so that on the one hand the container can be flushed as unhindered as possible, but on the other hand the large-scale carrier and cover films are reliably retained in the inner container. The inner container, together with the large-scale residues retained therein, can be lifted out of the container and then emptied. Equipped with a new bitumen sheet, the inner container can then be reinserted into the container.However, a different process sequence can also be provided, whereby the empty inner container is first returned to the container and then the new bitumen sheet is introduced into the container and thus into the inner container.
[0022] The inner container can be open at the top, similar to a wastepaper basket, so that the quickest, most uncomplicated, process-reliable and time-saving handling is ensured when filling the inner container with a new bitumen sheet and later when removing the large-area residues from the inner container.
[0023] The inner container can have perforations not only along its peripheral surface but also at the bottom. Smaller particles released during the dissolution of the bitumen membrane, e.g., grit in the form of sand, slate flakes, or the like, can thus sink downwards from the inner container due to gravity or, in the case of lighter materials, be carried out of the inner container and possibly also out of the container with the flow of the solvent and collected, for example, in a settling chamber, a particle filter, or the like.
[0024] Smaller particles that accumulate at the bottom of the container can be advantageously removed from the container through an outlet. This can be an opening in the container bottom that can be opened or closed using a valve, a drain plug, or the like.
[0025] In one embodiment of the method considered advantageous, several containers are combined into a group and flushed with solvent simultaneously. Particularly if the solvent is to be recycled anyway, the containers can be connected in series so that the solvent enters all containers one after the other and then flows through all containers simultaneously, but in series. A container is opened and refilled with a bitumen sheet once the bitumen from the bitumen sheet initially located in this container has been completely dissolved.
[0026] During the removal of this "used" bitumen sheet, the solvent can continue to flow through this container, allowing, for example, the aforementioned solvent circulation to be maintained unchanged. Alternatively, for the removal of the "used" bitumen sheet—more precisely, its residues—the solvent line to this container can be interrupted first, thus suspending the flushing of this container. This allows for the removal of the "used" bitumen sheet or its residues from the container with as little dripping as possible, even at high flow velocities. In particular, the subsequent insertion of a new bitumen sheet into the container can be carried out splash- and spill-free, since an undesirably high solvent level does not build up in the container before the new bitumen sheet is inserted, which could potentially lead to the container overflowing.
[0027] In any case, this embodiment of the process provides that while the bitumen sheet is being replaced in the respective container, the other containers in the same group continue to be flushed with the solvent. Particularly since reject bitumen sheets can be processed preferentially within the framework of the proposed process, it cannot be ruled out that the individual bitumen sheets are very differently designed, so that they may contain different amounts of bitumen. Instead of always opening all containers simultaneously and always replacing the bitumen sheets of the entire container group practically simultaneously, this embodiment of the process allows the replacement of a bitumen sheet to be carried out individually.This is also advantageous in that it avoids a prolonged interruption in the operation of the device, which would otherwise be unavoidable if the flow through all the containers were interrupted in order to be able to open all the containers practically simultaneously and replace the bitumen sheets of the entire container group, before all the freshly filled containers are then closed and the flow through them is restarted.
[0028] Accordingly, the treatment time for each bitumen sheet can always be adjusted to the time required to fully process the respective bitumen sheet and completely extract the bitumen it contains. Assuming that specific types of bitumen sheet are manufactured, for example, by measuring the weight of the respective bitumen sheet, it is possible to determine with sufficient accuracy how much bitumen the respective bitumen sheet of a particular type contains based on its weight, so that the treatment time for this bitumen sheet can be individually determined accordingly.
[0029] In one embodiment of the method, it can be provided that a timer is started after a container has been opened and filled with a bitumen sheet, and that the solvent line to this container is interrupted after a certain period of time has elapsed, such that the flushing of this container is suspended. This can be a standardized timer with a fixed time period, so that after the time has elapsed, the container can be opened and checked to determine whether the bitumen sheet can be replaced or whether further treatment is required. However, it can also be an individually programmable timer, so that, as already described above, the treatment duration of the bitumen sheet can initially be estimated, for example by individually recording the weight of the bitumen sheet, and so that the timer can be set based on this estimate.
[0030] The timer can, for example, be designed as a functional module of an electronic system control system, which can already be provided to control the entire device. In particular, each container can be assigned its own timer, so that even if the containers are not filled simultaneously and / or if they are filled with differently designed bitumen sheets that require different treatment times, the optimal flushing time can always be assigned to each container.
[0031] In one embodiment of the method, it can be provided that the solvent line to a container is first interrupted and then the solvent contained in the container is emptied from the container. In this way, it can be ensured that smaller particles and similar residues are also flushed out of the container along with the solvent. For example, the solvent can be drained passively by opening an outlet opening located at a sufficiently low level on the container, allowing the solvent to flow out of the container simply due to gravity. Alternatively, the solvent can be drained actively by being pumped out of the container using a pump.
[0032] In one embodiment of the process, it can be provided that the concentrated solvent used to prepare a primer material is used directly as the primer material. This particularly economical embodiment of the process is possible if, for example, no additional additives need to be added to the solvent to achieve the desired quality of the primer. This can be the case, for example, if the bitumen membrane itself already contains the desired additives in the desired amount, and these additives are dissolved out of the bitumen membrane together with the bitumen by the solvent.
[0033] Alternatively, however, it may be provided that one or more substances are added to the bitumen-concentrated solvent used to provide a primer before it is used as a primer. This can always be advantageous if the type and quantity of additives present in the bitumen membrane do not correspond to the desired type and quantity of additives desired in the primer. In particular, if the primer is to contain additives that are not present at all in the bitumen membrane, such additives can advantageously be added to the concentrated solvent to obtain the desired primer.
[0034] A plant suitable for operating the method described so far comprises at least one container designed to hold a bitumen sheet. The container can be oriented upright. The container can have a lid on top, which can be opened or closed as desired to allow the container to be loaded with a bitumen sheet when the lid is open, and to prevent liquid or gaseous emissions in the form of splashes or solvent vapors when the lid is closed. The container can be tubular, which, given that the bitumen sheet is provided in a rolled-up state, is optimally adapted to the shape of the bitumen sheet and, in contrast to a container with a square cross-section, prevents flow-calmed, ineffective areas within the container.In addition, pipes of a suitable diameter can be used as commercially available semi-finished products to ensure the most economical design of the system. To treat several bitumen sheets simultaneously, the system can have multiple tanks. Furthermore, the system includes a collection tank and pipes connecting the tank and the collection tank, as well as a pump designed to circulate a solvent through the collection tank, the pipes, and the tank.
[0035] Furthermore, the system can advantageously contain the following components: ▪ a filter to retain particles originating from the bitumen sheet. The filter can have a flow-through filter medium, wherein the permeability of this filter medium can be selected such that the particles with which a bitumen sheet is sprinkled are retained. As an alternative or in addition to such a filter, which has a flow-through filter medium, the filter can be designed as a separator in which, for example, the comparatively heavy particles mentioned are separated from the bitumen-containing solvent stream in a settling chamber, by centrifugal force or the like, ▪ a heater to allow the solvent to act on the bitumen sheet at a temperature above the so-called room temperature of 20 °C, ▪ a handling device such as a crane system or the like to be able to mechanically introduce the bitumen sheet into the containers.The handling device can be designed as a single-armed manipulator that can grasp a provided bitumen sheet and place it into a single container to which this manipulator is assigned. Advantageously, several containers can be provided, and the handling device can be designed such that it can grasp a provided bitumen sheet and optionally place it into one of two or more containers. For example, two or more containers can be arranged in the grasping area of the manipulator. If the system has a plurality of containers, several manipulators can be provided accordingly in order to be able to mechanically feed each of the containers with a bitumen sheet. By means of a crane system that runs on rails that run, for example, above the containers, all of the containers can be easily reached.The crane system can have a gripper which is used to pick up a provided bitumen sheet, which can then be transported to the desired container by means of the crane system and filled into the container there, ▪ a waste container for taking the residues such as granulate, films, carrier material or the like which remain in the container after the bitumen has been removed from the bitumen sheet, ▪ an intermediate storage area in which bitumen sheets can be made available so that short changeover times can be made possible due to short distances when a container is opened and the residues of a bitumen sheet are removed from the container and then a new bitumen sheet is introduced into the container.
[0036] An exemplary embodiment of the proposed method and an embodiment of a proposed system are explained using purely schematic drawings. Fig. 1 is a plan view of a plant used to process waste bitumen sheets for the production of a primer material, and Fig. 2 is a horizontal view of the plant of Fig. 1 .
[0037] The drawings show a plant 1 comprising two groups of five containers 2 connected in series. At the end of each group, a filter 3 is arranged to the left of the containers 2. The two groups of containers are surrounded by a grid floor 4, which is arranged above ground and accessible via a staircase 5. The plant 1 is installed in the corner of a building, and the two walls of the building bordering this corner are each marked 6. Four crane supports 7 are arranged outside the grid floor 4.
[0038] On the right side opposite the filters 3, next to the two groups of containers 2, there is an intermediate storage 8 in which, as can be seen from Fig. 1 15 bitumen sheets 9 in roll form are stored. The circular cross-section of the bitumen sheets 9 is also made of Fig. 1 The containers 2 are designed as tubes with a circular cross-section to match the shape of the bitumen sheets 9.
[0039] To the right of the intermediate storage 8, a waste container 10 is visible, which is located between two Fig. 2 visible collecting containers 11 containing solvents. A similar, but empty container is designated as product container 12 and is shown in Fig. 1 shown to the right of stairs 5. Furthermore, Fig. 1 Two solvent containers 16 are visible, which are designed as commercially available IBC containers. Fresh solvent is supplied to them, and from them the collection containers 11 are filled with fresh solvent by gravity. This filling of the collection containers 11 takes place as needed, so that the two solvent containers 16 are emptied gradually and, if necessary, at different rates.
[0040] In plant 1, a bituminous primer is produced. For this purpose, bitumen sheets 9 are introduced into the containers 2 from above, and the containers 2 are then closed with lids 17 provided on the top of the containers 2. Additional bitumen sheets 9 are provided in the intermediate storage 8, whereby Fig. 2 It is clear that the system 1 offers space for the temporary storage of more than the 15 bitumen sheets 9 shown. The portable solvent containers 16, which are designed as IBC containers and contain fresh solvent, are installed above the collection containers 11 in the position shown in the drawings, and the collection containers 11 can be filled with the solvent using a hose or pipe. The collection containers 11 are connected to a network of pipes, which is not fully shown in the drawings for reasons of clarity and which contains both rigid pipes and flexible hose sections.
[0041] The solvent is pumped from a collection tank 11 into a first tank 2, namely the right-hand tank 2 of each group in the drawings. From there, the solvent flows into the next tank 2, and so on, until it finally flows into the filter 3 assigned to this group and from there is pumped back into the collection tank 11. In this way, the solvent is circulated, possibly passing through a heater to be heated to a temperature of more than 20 °C.
[0042] The individual bitumen sheets 9 are, as expected, not identically designed, so that from the group of five containers 2, one bitumen sheet 9 will be the first to be completely processed, in that its bitumen material will have been completely dissolved from the bitumen sheet by the solvent. The corresponding time can initially be determined by controls and stored so that it can be retrieved later as an empirical value and, depending on the nature of the respective bitumen sheets 9, the respective container 2 can be opened after the corresponding treatment time. For this purpose, the lid 17 is opened so that the interior of the container 2 and its contents are accessible from above. A crane system that has fallen onto the ground via the crane supports 7, in Fig. 2 however, is not itself visible, serves to fill the containers 2 and remove unwanted residues from them using suitable grippers or similar tools.
[0043] Before opening a container 2, it is removed from the solvent flow circuit. For this purpose, valves are switched, of which Fig. 2 Some are indicated by 14. The remaining containers 2 of the same group continue to be flowed through by the solvent, while the container 2 in question is disconnected from the circuit and, for example, the solvent contained therein can also be removed. Residues of the completely treated bitumen sheet 9 are removed from the container 2 and stored in the waste container 10.
[0044] In particular, large-scale residues such as carrier and cover films, which could later impede flow through container 2, are removed. For example, a sieve-basket-like inner container can be lifted out of container 2 to contain these large-scale residues. The large-scale residues are removed after each bitumen sheet has been treated, before a new bitumen sheet is introduced into container 2. Residues in the form of smaller particles, which arise, for example, from sprinkling the bitumen sheet, are either transported with the solvent flow within system 1 and enter filter 3, or they sink to the bottom of container 2, where they can either be removed after each bitumen sheet has been treated or collected over a longer period and removed at suitable intervals.
[0045] A new bitumen sheet 9 is removed from the intermediate storage area 8 using the aforementioned crane system and placed into the open container 2. When using the aforementioned inner container, the new bitumen sheet 9 can either be placed into the container 2 together with the inner container, or the inner container is first returned to the container 2, and then the new bitumen sheet, once placed into the container 2, is placed in the inner container. The lid 17 of this container 2 is then closed again so that it can now be reintegrated into the solvent circuit using the valves 14.
[0046] The handling of the bitumen sheets 9 as well as the large-area residues and the inner container, if used, is carried out by means of a crane system, namely an overhead crane, which can be moved by means of the crane supports 7 at a distance above the grid floor 4 and the other equipment of the system 1.
[0047] A sensor is arranged within the solvent circuit which directly detects the concentration of bitumen in the solvent or which provides a measured value from which the concentration of bitumen in the solvent can be calculated. When this concentration has reached the desired value, i.e. the solvent has been enriched with bitumen to the desired extent and the bitumen in the solvent has concentrated to the desired level, the concentrated solvent is pumped into the product tank 12. The solvent tanks 16 and the product tank 12 are basically designed identically and have the same capacity, e.g. 1000 l each. However, the collection tanks 11 are only partially filled from their respective assigned solvent tank 16 and initially contain, for example, only approximately 600 l of fresh solvent.The amount of solvent circulated in system 1 increases during the process as more bitumen is extracted from the bitumen sheets 9 and absorbed into the solvent. Accordingly, the capacity of the product container 12 is sufficiently large to accommodate the correspondingly large amount of concentrated solvent from a collection container 11.
[0048] The two groups of five containers 2 each are operated simultaneously, meaning that solvent flows through them simultaneously. Two separate solvent circuits are present due to the two collection containers 11. Accordingly, both circuits can be pumped into the product container 12 at staggered times, with the capacity of the product container 12 being sufficient to hold the concentrated solvent of a single circuit.
[0049] At its lower end, each container 2 is provided with a dished bottom and an outlet 15 so that material residues in the form of smaller particles, which form a kind of sediment in the container 2 and are neither conveyed to the filter 3 by the solvent circuit nor retained in the inner container, if used, can be drained from the container 2. Reference symbol:
[0050] 1System 2Container 3Filter 4Grid floor 5Staircase 6Wall 7Crane support 8Intermediate storage 9Bitumen sheet 10Waste container 11Collection container 12Product container 14Valve 15Outlet 16Solvent container 17Cover
Claims
1. Method for producing a primer material containing bitumen, solvents and additives, characterised by the following steps: • a bitumen sheet (9) is placed in a container (2), • the bitumen sheet (9) is immersed in a solvent in the container (2), • the solvent circulates, • the concentration of bitumen in the solvent is repeatedly or continuously monitored, • when the concentration of bitumen in the solvent has reached a predetermined value, this solvent, whose bitumen concentration has now increased, is removed and used to prepare a primer material, • after the concentrated solvent has been removed, solvent is reintroduced into the cycle, which has a low or no concentration of bitumen.
2. Method in accordance with claim 1, characterised in that the bitumen sheet (9) is placed in the container (2) in roll form.
3. Method in accordance with claim 1 or claim 2, characterised in that a bitumen sheet (9) is used, the upper side and / or underside of which is covered.
4. Method in accordance with claim 3, characterised in that the upper side and / or underside is covered with a plastic film, with a paper web, and / or with a sprinkling of mineral particles.
5. Method in accordance with any one of the preceding claims, characterised in that a bitumen sheet (9) is used that has a backing layer onto which a layer of bitumen is laminated.
6. Method in accordance with claim 5, characterised in that the backing layer comprises a polyester fleece and / or fibreglass fleece.
7. Method in accordance with any one of the preceding claims, characterised in that the container (2) is shaped as a tube.
8. Method in accordance with any one of the preceding claims, characterised in that the solvent is returned to a collecting tank (11) and from there to the container (2).
9. Method in accordance with any one of the preceding claims, characterised in that the solvent is heated to a temperature of more than 20 °C and fed into the container (2) in a heated state.
10. Method in accordance with any one of the preceding claims, characterised in that the container (2) is opened and residues are removed from the container (2) before the container (2) is refilled with a bitumen sheet (9).
11. Method in accordance with any one of the preceding claims, characterised in that several containers (2) are combined to form a group and are simultaneously flushed with solvent, and that a container (2) is opened and refilled with a bitumen sheet (9), the solvent pipe to this container initially being interrupted in such a way that the flushing of this container (2) is suspended and the other containers (2) in the same group continue to be flushed with the solvent in the meantime.
12. Method in accordance with any one of the preceding claims, characterised in that a timer is started after a container (2) has been opened and filled with a bitumen sheet (9) and that the solvent pipe to this container (2) is interrupted after a certain period of time has elapsed in such a way that the flushing of this container (2) is suspended.
13. Method in accordance with any one of claims 10 to 12, characterised in that, that initially the solvent pipe to a container (2) is interrupted and then the solvent in the container (2) is removed from the container (2).
14. Method in accordance with any one of the preceding claims, characterised in that the concentrated solvent used to prepare a primer material is used immediately as a primer material.
15. Method in accordance with any one of claims 1 to 13, characterised in that, that one or more substances is or are added to the concentrated solvent used to prepare a primer material before it is used as a primer material.
16. Device to operate a method in accordance with any one of the preceding claims, with a container (2), that is intended to incorporate a bitumen sheet (9), with a collecting tank (11), with pipes that connect the container (2) and the collecting tank (11) together, and with a pump intended to circulate a solvent through the collecting tank (11), the pipes and the container (2) using the pump.
