MODELING AN UNDERGROUND CONSTRUCTION SITE

DE602019086514T2Active Publication Date: 2026-07-15SANDVIK MINING & CONSTR OY

Patent Information

Authority / Receiving Office
DE · DE
Patent Type
Patents
Current Assignee / Owner
SANDVIK MINING & CONSTR OY
Filing Date
2019-09-20
Publication Date
2026-07-15

AI Technical Summary

Technical Problem

Existing methods for generating 3D models of underground worksites, such as mines, often result in models that are not seamless due to non-completely matching portions and struggle with unique tunnel shapes, leading to difficulties in accurately representing and navigating within these environments.

Method used

A virtual probe is used to navigate within a 3D input model of an underground worksite, avoiding collisions with obstacles and determining tunnel headings by casting rays in multiple directions, allowing for the generation of a logical tunnel model that seamlessly connects different model portions.

Benefits of technology

This approach enables the creation of a simplified and accurate logical tunnel model that facilitates efficient navigation, route planning, and operational control within underground worksites, improving safety and efficiency by providing a unified representation of complex tunnel structures.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader
Need to check novelty before this filing date? Find Prior Art
No text content released.