PREFABRICATED LOADBEARING

DE602024005544T2Active Publication Date: 2026-06-17TECNOSTRUTTURE
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
DE · DE
Patent Type
Patents
Current Assignee / Owner
TECNOSTRUTTURE
Filing Date
2024-12-20
Publication Date
2026-06-17

AI Technical Summary

Technical Problem

Existing pre-fabricated steel and steel-concrete lattice beams face issues with fire resistance, deformability of side panels, and complex on-site installation due to the need for additional fire-resistant treatments and reinforcement bars.

Method used

A pre-fabricated load-bearing beam with integrated reinforcement bars and rest members, where the reinforcement bars are attached to head elements projecting from the bottom plate, providing fire resistance and simplifying on-site installation.

Benefits of technology

The solution enhances fire resistance and reduces deformability of side panels, ensuring faster and more efficient construction by integrating reinforcement bars during fabrication, thus overcoming the limitations of traditional methods.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader
Need to check novelty before this filing date? Find Prior Art
No text content released.