Boiler system arranged in a pressurized boiler room

DE707799AInactive Publication Date: 1941-07-04OSKAR JEBENS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
DEJ0055977
Authority / Receiving Office
DE · DE
Patent Type
Applications
Current Assignee / Owner
Filing Date
1936-09-19
Publication Date
1941-07-04
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In closed boiler rooms, auxiliary boilers are affected by pressure fluctuations due to changes in the main engine's load, leading to undesirable operation, and existing solutions like additional blowers require constant monitoring and structural challenges.

Method used

The auxiliary boiler receives combustion air from outside the boiler room, with a separate blower system that compresses part of the air to a higher pressure within the boiler room, ensuring independent operation from the main engine's load changes.

Benefits of technology

This solution maintains consistent combustion air pressure, preventing undesirable operation fluctuations and eliminating the need for constant monitoring of auxiliary boiler operation.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader
Need to check novelty before this filing date? Find Prior Art
No text content released.