Systems and procedures for formulating or evaluating a construction composition
Patent Information
- Application Number
- ES2020709991T
- Authority / Receiving Office
- ES · ES
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2019-02-11
- Filing Date
- 2020-02-11
- Publication Date
- 2026-11-19
- Estimated Expiration
- 2040-02-11
AI Technical Summary
Construction mixes often vary significantly due to diverse plant conditions, raw materials, and environmental factors, leading to inconsistent performance and unnecessary oversizing to meet engineering requirements, resulting in wasted resources and increased costs.
A predictive model utilizing artificial intelligence and machine learning algorithms is employed to formulate construction compositions, considering historical data and real-time sensor inputs to optimize raw material ratios and mixing techniques, ensuring consistent performance and cost-effectiveness.
The solution significantly reduces experimental efforts, achieves optimized and consistent construction mix formulations, and adapts to changing conditions, improving quality control and reducing material waste.
Smart Images

Figure 00000023_0000 
Figure 00000024_0000 
Figure 00000028_0000
Abstract
Description
Systems and procedures for formulating or evaluating a construction composition Field of invention This application relates to improvements in the production of construction and engineering compositions such as asphalt, concrete, mortar and the like. Background Certain materials used in construction and engineering are compositions of raw materials that are mixed to achieve the desired properties. Typically, a construction composition includes a construction mix made from construction mix raw materials. Such a construction mix can be produced in a plant and includes all the composition materials except for a construction additive, which is a chemical additive used in the production of a combined construction composition. The construction additive is composed of construction additive raw materials. Although a layperson might refer to a construction composition in the abstract (e.g., "concrete"), in practice there are many different ways to formulate such a composition. For example, the type and quantity of construction mix and additive raw materials can vary, the raw materials of the construction composition can be mixed using different procedures and to varying degrees, more or less water can be used, and so on. Different formulations can produce different properties that may be desirable in different contexts. For example, a first construction crew might need concrete that sets relatively quickly, while a second crew might need more time to place the concrete. Setting time can vary depending on the amount of water, cement, additional cementitious materials, cement fineness, and other factors. Construction mixes can also vary for other reasons. It is often impractical to produce the entire construction mix required for a large-scale project in a single location (e.g., a single concrete plant). Instead, many different plants may contribute to a project, and each plant may deliver multiple batches at different times throughout the project. Different construction mix raw materials with varying properties (e.g., larger or smaller aggregate sizes) may be available at the different plants, resulting in less consistency among the construction mixes deployed on the construction site. Furthermore, the environmental conditions at each plant can be different and vary over time. The routes from the plants to the construction site can differ in travel time or distance, and different drivers may take different routes from the same plant. The experience of the workforce at each plant may also vary. Thus, it can be seen that only some of the conditions affecting the properties of the construction mix are under the producer's control. For these and other reasons, different batches of construction mixes delivered to a construction site can vary considerably. However, it is unacceptable for any of the construction mixes to fail to meet the specified engineering requirements. If a certain minimum compressive or tensile strength is required, the plants producing the construction mix cannot choose a combination of raw materials and / or techniques that results in a lower strength than required. If they did, the structure being built could fail. Due to these considerations, construction mixes produced today tend to be oversized. In other words, various procedures are chosen to adjust the properties of construction mixes so that the resulting mix has properties that exceed (sometimes significantly) the engineering requirements. This costs the producer (and, in turn, the contractors, developers, and end users of the constructed structures) money and time, and wastes raw materials unnecessarily. Industry experts estimate that 80% of concrete mixes produced today suffer from this problem. However, the goal of a contractor using construction mixes is to achieve similar consistency between batches in terms of the mix's performance, not necessarily in terms of the raw materials or mixing techniques used. For example, the contractor is likely more concerned with ensuring that each batch has a consistent setting time, which could be achieved by adjusting the mix's water content, changing the percentage of supplemental cementitious materials, or waiting to deploy the mix until a desired ambient temperature is reached. As long as the other properties of the construction mix (e.g., strength, aesthetic qualities, slump, etc.) are not adversely affected, the specific procedure for achieving the desired setting time is less critical. Therefore, some variation in the construction mix composition—raw materials or mixing techniques—of each batch can be tolerated, provided that the performance of each batch is consistent and meets engineering requirements. This creates an opportunity to reduce the cost and quantity of construction mix raw materials used to produce such mixes. Unfortunately, even the most advanced experts cannot account for the wide variety of available inputs, rapidly changing plant and job site conditions, and other factors that could affect the performance of the construction mix. Consequently, these mixes remain unnecessarily oversized. The prior art provisions are known from the document: US 2007 / 266905, which describes an additive dosing system and procedure that doses a dispersing additive raw material and other additive raw materials to cementitious compositions based on performance characteristics; US 2007 / 192257, which discloses a procedure for an additive producer to provide additive formulations to a concrete producer, including the input of technical information into a computer control system by the concrete producer; and DE 44 37970dE 44 37970, which discloses that predefined influencing parameters, on which the consistency of the concrete depends, are input into a neural network that produces a response in the form of a consistency prediction when the concrete is delivered to the construction site. Brief description of the drawings FIG. 1 represents a suitable environment for its use with exemplary implementations. FIG. 2 represents an exemplary data structure suitable for use as a specification of a work with exemplary realizations. FIG. 3A represents an example of mapping modifiable parameters and requirement sources to building composition properties that can be defined by requirements or affected by parameter settings. FIG. 3B represents a mapping of exemplary desired performance parameters to the corresponding properties of a construction composition. FIG. 3C shows an example of mapping modifiable variables to properties of the construction composition affected by a change in the modifiable variables. FIG. 4 is an exemplary input / output specification that represents the inputs to the optimization logic and the corresponding outputs generated by the optimization logic. FIG. 5 is a block diagram representing various hardware and digital components of the devices in the environment of FIG. 1, according to an exemplary embodiment. FIG. 6A is a data flow diagram that describes exemplary exchanges of information between digital components of the environment. FIG. 6B is a flowchart illustrating the key operations according to an exemplary realization. FIG. 7 represents an exemplary computer system suitable for use with exemplary implementations. FIG. 8 represents an exemplary network environment suitable for use with exemplary implementations. Summary of the invention The invention includes a computer-readable non-transient means as set forth in claim 1. The invention also includes any of the means described in the dependent claims. The invention further includes a computer-implemented procedure as defined in claim 10. The invention further includes any of the processes described in the dependent claims. The invention further includes an apparatus as defined in claim 15, as well as in the dependent claims. Detailed description of example realizations As described above, formulating a construction mix to meet all the diverse requirements of an engineering project can be challenging, considering other variables that may affect the availability or performance of the mix's ingredients. Developing an optimal set of raw material ratios for a given project requires a high level of familiarity with the properties of the material being designed, translating project needs and details into a set of preferred characteristics, and familiarity with locally available raw materials. Traditionally, one solution has been to develop a small number of construction mixes with known performance ranges and select from the limited number of available options. However, this approach has several limitations. First, the construction mix may not be optimally formulated for the conditions that will be encountered on the construction site. Second, the raw materials used in the original formulation of the construction mix may not be available to a particular producer, forcing them to use a different construction mix or to change the existing mix, with unknown or unpredictable results.Third, since producers can only choose from a limited number of options to meet all their engineering requirements, these formulations can be designed to overcome a wide variety of requirements, some of which may not apply to a particular project; this leads to the problem of "over-optimization" discussed earlier. Another possibility is to initiate a large-scale experimentation process, creating a series of construction mixes, deploying them under conditions similar to those that will be encountered at the intended work site, allowing them to cure, and measuring their characteristics. This is often prohibitively expensive and time-consuming. Furthermore, not all production facilities may possess the necessary expertise to develop and evaluate such a program. Moreover, such a procedure would not account for changing conditions or performance validation as the mix is deployed throughout the actual project. With either option, achieving an optimal construction mix is difficult or impossible, as it's not feasible to produce and experiment with every possible mix. Furthermore, these procedures tend to focus on the performance of the construction mix, without considering its cost. Exemplary implementations address these and other problems by providing techniques for formulating and evaluating a construction composition (such as a mix for concrete, asphalt, mortar, etc.). According to exemplary implementations, a predictive model, artificial intelligence, machine learning algorithm, etc., can be trained using historical performance data (which can be supplemented with recent data and performance evaluations for construction compositions currently being deployed). Once the model, AI, or algorithm is trained, it can receive a data structure representing a work specification. The structure can include various requirements for the construction composition, which can optionally be prioritized. Additionally, a set of available inputs (e.g., raw materials, mixing techniques, etc.) can be accessed. These inputs can be provided to the model, AI, or algorithm, which can then generate one or more construction compositions that meet or closely approximate the requirements. The output can specify a list of raw materials that make up the construction composition, the quantities or proportions of the raw materials in the construction composition, and any mixing techniques used to blend the raw materials to create the construction composition. As part of or separately from the model, AI, or algorithm, building compositions can be provided to a simulation to estimate or predict its performance (at the time of deployment and / or over time thereafter). Based on the output of the AI, model, or algorithm (and potentially supplemented by simulation data), the performance characteristics of the output building composition(s) can be displayed. In some implementations, only the characteristics that differ from one composition to another can be shown. In some implementations, parameters not specified in the original brief but that differ between formulations can be displayed. In addition to performance, the cost of the building composition can also be estimated. In some implementations, building compositions can be ranked by performance, cost, or a weighted combination of performance and cost (among other possibilities). A user can select one of the construction compositions for use in a project. In some implementations, an optimal construction composition can be automatically selected (based on weighted combinations of performance and / or cost). Optionally, the system can control the mixing machinery to produce the construction composition and / or constituent construction mixtures and / or construction additives (for example, by transmitting configured instructions to have the mixing machinery acquire and mix the raw materials specified in the output in quantities or proportions specified by the output). In some implementations, the AI / model / ML algorithm and / or simulations can be deployed to evaluate a proposed construction composition (rather than proposing its own). The characteristics or estimated performance of the proposed construction composition can be displayed, and if deemed acceptable, the system can control the mixing machinery to produce the construction composition (and / or a construction mix and / or a construction additive). These implementations provide a number of advantages over the conventional solutions described above. First, the model system significantly reduces or eliminates the number of experiments that need to be run on a given mixture or set of building compositions, since the AI / model / algorithm can eliminate building compositions that are unlikely to meet the job requirements; furthermore, the use of simulations replaces or complements experiments. Secondly, exemplary implementations are better able to achieve a set of optimized construction mix proportions, as many more variables can be considered in the design process. Furthermore, the various parameters can be weighed against each other to identify better combinations or synergies. Since cost can be considered a factor, the resulting solution can be less expensive and less prone to over-engineering. Third, exemplary implementations can rapidly optimize build compositions around multiple different performance requirements. The effects of a change in build composition can be immediately assessed across multiple different performance variables; evaluating these trade-offs in a traditional scenario would typically require multiple experiments over a significant period of time. Fourth, existing construction compositions can be quickly optimized again based on changing conditions (e.g., different construction mixes and / or raw materials available, changing conditions at the job site or en route to the job site, etc.). This allows for improved quality control and a more homogeneous product than with traditional methods. The following embodiment description provides representative, non-limiting examples that refer to specific items to describe particular features and lessons learned from different aspects of the invention. The described embodiments should be recognized as capable of being implemented separately or in combination with other embodiments derived from the embodiment description. The embodiment description should facilitate an understanding of the invention to such an extent that other embodiments, not specifically covered but within the knowledge of a person skilled in the art who has read the embodiment description, would be understood to be consistent with an application of the invention. It should be noted that, although exemplary embodiments are described in relation to particular examples (e.g., construction compositions and, in particular, production of concrete mixtures and additives), the present invention is not limited to these examples. FIG. 1 illustrates a construction composition environment 100 according to an example embodiment. At a high level, the production process for construction materials begins with a group of engineers, architects, technical experts, etc. 102. The experts 102 establish the necessary parameters for the mix in the form of technical requirements 104. For example, in the case of concrete, the architect may require certain aesthetic properties for the finished concrete (color, texture, etc.). The engineers may evaluate the structural plans, applicable building codes, etc., and specify the requirements in terms of strength, durability, stability, etc. The technical experts (e.g., concrete placement specialists) may specify the required properties related to the behavior of the construction material as it is placed, such as workability, setting time, and viscosity. The technical requirements 104 can be implemented in a construction compounding plant 108. The construction compounding plant 108 may include raw material silos 110 that store raw materials that can be combined to form the construction compound. Examples of raw materials are cement, coarse and fine aggregates, and supplementary cementitious materials (SCMs). Raw materials may also include water. In some embodiments, the construction mix used in the construction composition may be supplemented with additional materials. For example, concrete (an example of a construction composition 118) is generally formed from a primary general construction mix 114 and a construction admixture 116 that modifies various properties of the finished concrete. Construction admixtures 116 may include, for example, dispersants, setting modifiers (e.g., retarders and accelerators), air controllers (e.g., air occluders and air extractors), strength modifiers, workability retention modifiers, and rheological modifiers. These raw materials may also be present in raw material silos 110, either individually or in combination. The raw materials from silos 110 can be mixed in a mixing facility 112. The mixing facility 112 can include mixing machinery controllable by a computer controller, and can produce the construction mix 114, the construction additive 116, and / or the finished construction composition 118. Once mixed, the finished construction composition 118 can be loaded onto a transport vehicle 126, such as a concrete mixer truck. The transport vehicle 126 can carry the construction composition 118 along a route 128 to a work site 130 where the construction composition 118 will be deployed. Different construction composition plants 108 will necessarily have to use different routes 128 to the work site 130. Furthermore, different transport vehicles 126 can take different routes 128 from a single construction composition plant 108 to a single work site 130. Work site 130 may be supervised by a contractor 132. The contractor 132 may be responsible for ensuring that each batch of construction compound 118 delivered from each construction compound plant 108 is of consistent quality and meets the job requirements. If the contractor 132 determines that a particular batch does not meet its standards or is deficient in any way, the contractor 132 may reject the batch and return it to the construction compound plant 108. Exemplary achievements improve the production process of the building composition by deploying resources in locations throughout the environment 100. For example, a producer server 106 can be provided in the construction compounding plant 108. The producer server 106 can host the optimization logic 122 to optimize the construction mix 114, the construction additive 116, and / or the final construction compound 118. The optimization logic 122 can select different available raw materials from the raw material silos 110 and define their quantities or relative proportions, percentages, or ratios. The available raw materials can be represented in a component library 124, which can identify the raw materials and include further information about them, such as the effect of the raw materials on performance parameters, the certifications the components meet, the concentration of the raw materials, and so on. Optimization logic 122 can incorporate artificial intelligence, a machine learning algorithm (e.g., a neural network, supervised learning process, unsupervised learning process, reinforcement learning process, etc.), a predictive model, and so on. Optimization logic 122 can be trained using labeled training data, which may include historical or current data. The training data can identify the constituents of a construction mix and the measured properties of the mix. Given sufficient training data, optimization logic 122 can learn how various components can be mixed to achieve the target performance parameters. To identify a construction mix that meets technical requirements 104, the producing server 106 can access a work specification 120, which can be a data structure that formalizes technical requirements 104 and represents them in a way that optimization logic 122 can process them. Optimization logic 122 can be applied on the front end to identify an initial build mix 114 or build additive 116. Alternatively, optimization logic 122 can also be applied on the back end (after build composition 118 is produced) to modify build mix 114 or build additive 116 in real time between successive build composition batches. For this purpose, sensors can be deployed on transport 126, along route 128, or at the work site 130, among other possibilities. The sensors can generate sensor data 136, which can be provided to the production server 106. The sensors can include, for example, accelerometers (e.g., to measure the terrain of route 128), thermometers (to measure ambient temperature), barometers, hygrometers, and so on.Data from sensor 136 can be entered into the optimization logic 122, which can (for example) adjust the materials to be used in the next batch of construction additive 116. Similarly, the contractor 138 can manually enter information about site conditions 130 or the delivered construction mix 118 (for example, "setting time too short," "too viscous," etc.). This information can also be provided via a contractor server 134 to the optimization logic 122, so that the construction mix can be altered to take into account the contractor's feedback. Figure 2 shows an example of a data structure representing a work specification 120. Although the exemplary work specification 120 includes specific variables in a particular order, a subject matter expert will recognize that more, fewer, or different variables can be used, depending on the application. If a value is not specified for a variable, a default value can be used (for example, a predefined minimum value, a mean value, etc.). Variable values can be represented qualitatively, quantitatively, or both. Values can be specified as a minimum or maximum value, a range of acceptable values, etc. Values can be associated with a weight or priority, indicating the importance of a particular performance characteristic relative to other performance characteristics. The weight or priority can be zero, indicating that the performance characteristic is inconsequential or should not be prioritized. Work specification 120 may specify parameters relating to the freshness properties 202 of the product. Freshness properties refer to the properties of a fresh (i.e., non-hardened) product. Examples of fresh properties include workability 204, workability retention 206, air content 208, stability 210, uniformity 212, viscosity 214, finishability 216, and setting time 218. Work specification 120 may further specify requirements for the strength 220 of the product. The strength of the product may be measured in various ways, and separate parameters may be provided for (for example) compressive strength 222, flexural strength 224, and tensile strength 226. Work specification 120 may specify quantitative or qualitative measures for appearance 228 of the construction composition. Appearance 228 may specify characteristics such as the color or texture of the finished construction composition. Job specification 120 may further specify a cost or economy parameter 230. Cost or economy 230 may be defined by the cost of raw materials and, optionally, may take into account transportation costs, deployment costs, mixing costs, or other costs that affect the value of the product. Job specification 120 may specify durability characteristics 232. Examples of durability characteristics 232 include resistance to freezing or thawing 234, scaling 236, chemical attack 238, abrasion 240 or shrinkage 242. Work specification 120 may further specify the properties of the slab on the ground and the activities of use 244. Examples of such activities may describe the ease or effort of constructability 246, the time 248 (such as the amount of time for the product to cure or harden), and the value to the owner 250. Other aspects of these activities are shown in FIG. 3B. To aid optimization logic 122, a mapping can be provided from requirements or performance characteristics to the variables that affect those requirements or performance characteristics. Variables can include those directly affected by the producer (such as the amount of aggregate or water used, or the route taken by transport), as well as variables not under the producer's direct control (such as ambient weather conditions or code requirements) but which must nevertheless be considered in determining the expected performance of a mix. Figure 3A shows an example of mapping modifiable parameters and requirement sources to construction mix properties that can be defined by the requirements or affected by parameter adjustments. In some cases, performance requirements (such as finishability or crack resistance) can be indirectly affected by components under the producer's control. For example, FIG. 3B represents an assignment of exemplary desired performance parameters to the corresponding properties of a construction composition. In turn, these properties can be controlled by adjusting the modifiable parameters of the construction composition, as shown in the mapping in FIG. 3C. Thus, the parameters of a mix can be adjusted to directly or indirectly control several properties, and different mapping hierarchies can be provided to account for the levels of control achieved (e.g., a first mapping might assign the adjustable variables to a first set of properties, as in FIG.3C, and a second mapping can map the first set of properties to a second set of properties, as shown in FIG. 3B; this procedure can be repeated up to an arbitrary level). FIG. 4 is an exemplary input / output specification that represents the inputs to optimization logic 122, and the corresponding outputs generated by optimization logic 122. As discussed previously, optimization logic 122 can consider work specification 120. Optimization logic 122 can also consider available materials 402 that can be used to create the finished construction composition (or a construction mix, a construction additive, or a combination of construction mix and construction additive). Available materials 402 can include raw materials 404 (for example, materials available in raw material silos), available premixed construction additives 406, and / or construction additives 408 that can be recreated from available raw materials.The raw materials used to create the new 408 construction additives can be specified in a 410 component library, which specifies the construction additive components available for the 408 construction additive and any finished product properties that may be affected by the inclusion of the construction additive component. A similar 410 component library can be provided for the 404 raw materials used to make the initial construction mix. The optimization logic 122 can select from the available materials 402 and / or can make adjustments to the materials in the construction mix / blend / composition based on a mapping 412, such as the mappings depicted in FIG. 3A-3C. The mappings can specify how adjusting one or more adjustable variables (e.g., a quantity of an available material 402) affects a performance parameter (e.g., a parameter specified in the work specification 120). Optimization logic 122 may consider real-time sensor data 414 and / or contractor input 416. Sensor data 414 and / or contractor input 416 may be taken as having an a priori effect on performance parameters. In other words, real-time sensor data 414 and contractor input 416 may specify values for variables that are taken as given (and may be non-adjustable), and the values for available materials 402 may be optimized around the a priori data. Based on the inputs to optimization logic 122, optimization logic 122 can generate a construction mix formulation 418. The construction mix formulation can include an identifier for the raw materials 420 to be included in the formulation, proportions / quantities / percentages 422 for each raw material 420, and any applicable mixing techniques 424 or requirements. Based on this information, optimization logic 122 can optionally generate instructions for the mixing equipment so that the identified construction mix can be automatically produced by the mixing equipment (and / or raw material manifests so that the ingredients can be manually sourced and then supplied to the mixing equipment). Optimization logic 122 can generate a single construction mix formulation 418 that represents the formulation that best meets the requirements of job specification 120 given the available raw materials 402, real-time sensor data 414, and / or contractor input 416. Alternatively, optimization logic 122 can generate multiple candidate construction mix formulations 418 that balance the requirements in different ways. In some embodiments, construction mix formulations can achieve similar results at different costs, which can be displayed on a screen summarizing the various formulations. In some embodiments, construction mix performance can be prioritized over construction mix cost, such that optimization logic 122 preferentially recommends construction mixes that meet the performance requirements of work specification 120 over construction mixes that do not meet these requirements but are less expensive. In some implementations, performance requirements may be weighted more heavily than cost, so that a balance between performance and cost can be achieved. For example, a construction mix may need to achieve a certain minimum level of cost savings before an acceptable amount of performance degradation is permitted. The optimization logic 122 can generate, for each of the identified construction mix formulations 418, a predicted performance 426 for the construction mix formulation. The predicted performance 426 can specify estimated values for the parameters specified in the work specification 120, or it can include parameters not specified in the work specification (particularly if the different formulations 418 differ in terms of the unspecified parameters). The predicted performance 426 can be based on historical data and / or it can be based on data obtained from virtual simulations of the determined construction mix formulations 418. The optimization logic 122 can further generate an estimated cost 428 for each construction mix formulation 418. The estimated cost 428 can be derived from the cost of available materials 408, any special techniques employed to mix the materials, the cost of transportation, and / or the cost to the contractor's equipment to deploy the construction mix. The optimization logic 122 can include several components, and can receive inputs from the entire environment 100, as depicted in more detail in the block diagram in FIG. 5. As previously mentioned, the construction mix design procedure can begin with a team of architects, technical experts, or engineers. These users can access a 510 design server, which may include an application that supports a user interface allowing users to input technical requirements into a 120 work specification. The 120 work specification can be stored on 512 storage (e.g., a hard drive, SSD, etc.) on the 510 design server. In some implementations, the 120 work specification may be a custom, special-purpose document designed in a special-purpose application. In other cases, the 120 work specification may be a formatted document, such as an XML document, a word processing document, or a spreadsheet, that identifies performance requirements using predefined keywords or identifiers.In this case, the producer server 106 can analyze the job specification 120 upon receipt in order to load the requirements into a suitable data structure for processing by the optimization logic 122. The design server 510 can transmit the working specification 120 to the production server 106 using a network interface 514 (e.g., a wireless card, a wired connection, etc.). The working specification 120 can be transmitted over a network 526, such as a LAN, WAN, or the Internet. The work specification 120 can be received by a corresponding network interface 528 on the producer server 106 and stored in a memory 530 of the producer server 106. The memory 530 can also contain the optimization logic 122, which can include a model or algorithm 540 configured to accept, as input, the performance requirements of the work specification 120 and provide, as output, one or more build mix specifications that identify build mixes that meet or best approximate the performance requirements. The model 540 can be, for example, a machine learning algorithm, an artificial neural network, a predictive model, a set of rules and their corresponding activated outputs, etc. In this context, a data-driven model—preferably a data-driven machine learning model or a purely data-driven model—refers to a trained mathematical model that is parameterized according to a training dataset to reflect the reaction kinetics or physicochemical processes that occur during the mixing and use of the construction composition. An untrained mathematical model refers to a model that does not reflect the reaction kinetics or physicochemical processes; for example, the untrained mathematical model is not derived from a physical law that provides a scientific generalization based on empirical observation. Therefore, the kinetic or physicochemical properties may not be inherent in the untrained mathematical model. The untrained model does not reflect such properties.Feature engineering and training with the respective training datasets allow the untrained mathematical model to be parameterized. The result of this training is a purely data-driven model, preferably a data-driven machine learning model, which, as a result of the training process, preferably solely as a result of the training process, reflects the reaction kinetics or physicochemical properties. Model 540 can be trained using historical training data 532. Training data 532 can include labeled training data that includes a previously produced construction mix and the corresponding measured performance results for that mix. Training data 532 can also include simulation data that estimates the performance parameters for an actual or hypothetical construction mix. Training data 532 can be obtained through experimentation, simulation, or measurement of a deployed version of the construction mix at an actual construction site, among other possibilities. The model or algorithm 540 can be trained using the training data through the training logic 534. The training logic 534 can be specific to the type of model or algorithm 540 used. For example, if the model or algorithm 540 is a genetic algorithm, the training logic 534 might include a heuristic to select a more suitable candidate in a generation and a genetic operator to produce a subsequent generation of candidates. If the model or algorithm 540 is a neural network, the training logic 534 might include an appropriate spread function. The training logic 534 can define initial weights and / or an initial structure for training the model or algorithm 540. Other examples of training logic 534 include clustering functions, logistic regression functions, time series parameters for time series analysis, decision tree structures, and so on. The training data 532 may include all performance parameters relevant to a given build mix (for example, those parameters shown in FIG. 2), or it may include only a subset of those parameters. When only a subset of the parameters is included in a given input of the training data 532, the training logic 534 may be configured to train only a certain portion of the model / algorithm 540 belonging to the available data, or it may be configured to extrapolate the missing data from similar examples or simulations. Training logic 532 can be configured to assign a weight or ranking to the various performance parameters. The weight or ranking can be predetermined (for example, specified by engineers or experts), or it can be assigned by training logic 532 based on training data 532. In some implementations, training logic 534 may consider the cost of the construction mix as one of the performance parameters, but be configured to prioritize mix performance over mix cost. The optimization logic 122 can also include retraining logic 536. Unlike the training logic 534, which operates on historical training data 532, the retraining logic can be configured to adapt the model or algorithm 540 on the fly based on newly received information (for example, information from sensors 516 or the contractor server 134 that may not be reflected in the training data 532). The retraining logic 536 can be configured to adapt the model or algorithm 540 more slowly or conservatively than the initial training process, under the assumption that a properly trained model should not change rapidly due to data limitations. The adaptation rate can be adjusted so that the user can modify the degree to which new data is taken into account. The adaptation rate can also be modified automatically under certain circumstances.For example, if information is received from the contractor server 134 indicating that a batch of concrete that has been delivered is unacceptable or does not meet a certain performance parameter, rapid adaptation is likely to be required and the model or algorithm 540 should be adjusted immediately. The model or algorithm 540 can be constructed, in part, based on variables and mappings 538 that define how particular changes in a mixture are likely to affect performance parameters. Exemplary variables and mappings are depicted in Figures 3A–3C. In determining which raw materials are available for inclusion in a given construction mix or construction additive, the optimization logic 122 may consult a component library 124. The component library 124 may consist of a series of entries 544, each associated with a particular chemical 546 or other material. In the case of a product composed of a construction mix and a construction additive, separate component libraries 124 may be provided for the construction mix and the construction additive. A component library 124 may include a complete set of chemicals 546 that can be used to make the construction composition in question, or it may include only a subset of those chemicals 546. Selecting a smaller, more specific set of components can be tailored to best suit each application. Instead of a single chemical 546 or other single raw material, a 544 entry in the component library 124 may be a composition of several raw materials (maintaining known synergies for certain chemical combinations), or a finished product as it is currently known. When a component is a single raw material, a specific raw material may be selected to take advantage of a significantly higher concentration in the locally available raw material. Basing the components on individual chemicals allows for varying the quantities and ratios and customizing them for each application, set of materials, or condition, such as high or low alkali cement or hot or cold temperatures. The quantities and ratios of the components can also be continuously adjusted on a sliding scale within the customer's facility as conditions or materials change. Each chemical can be categorized by a 548 category representing fundamental performance attributes (for example, "strength," "set modification," etc.) and a 550 function describing how that chemical affects the performance attribute (for example, "increases strength" or "accelerates setting time"). Chemicals can be further separated into primary and secondary 552 classes, where a primary class chemical has as its main purpose (or main effect) to modify the 550 function. A secondary class chemical may not be intended to perform the intended 550 function (for example, it has a major effect on some other function) but may do so as a secondary effect. Table 1 provides a list of exemplary attributes, functions, and classes that may apply to various chemicals. Table 1 Table 2 below provides suitable examples of chemical options for each of the categories above. Other chemical options may also be used, and the categories are not limited to the examples provided below. Table 2 Optionally, entry 544 can identify any 554 certifications the components may qualify for (e.g., C494 Certification). Additionally, entry 544 can specify formulation details 556 (e.g., available or recommended chemical concentration 546, mixing recommendations, etc.). Optimization logic 122 can further provide, for each identified construction mix (or composition), a construction mix cost, an estimated construction mix performance, and a comparison between construction mixes for specified or unspecified performance parameters. These elements can be identified by simulating the construction mix performance using simulation logic 542. Simulation logic 542 can build a model of the structure being designed by the architect / engineer / technical experts using the mix formulations generated by optimization logic 122.Simulation logic 542 can, based on historical performance information for similar construction mixes and / or mathematical models, evaluate the performance of the construction mix for parameters specified in the job specification (and other parameters that may not be specified in the job specification but may be relevant to the performance of the mix). Based on the simulation, simulation logic 542 can generate and / or display a report comparing different construction mixes in terms of performance and cost. In some implementations, only the performance parameters that differ between the construction mixes can be generated or displayed. In some implementations, optimization logic 122 can evaluate and display a comparison based on performance parameters that differ between the construction mixes but were not specified in work specification 120. Consequently, if the construction mixes generated by optimization logic 122 appear to be similar in terms of the specified performance and cost requirements, these similar construction mixes can be differentiated based on other factors that might not have been otherwise considered. Once a particular construction mix design (or composition) has been determined or selected, the producing server 106 can control a mixing device 560 at the concrete plant to produce the construction mix. For example, the mixing device 560 might include a controller 562 capable of operating the mixing machinery based on instructions. The controller 562 might control the release of raw materials from the raw material silos, or it might generate a requested quantity of raw material to be manually added to the mixing device 560. Once the raw materials are added to the mixing device 560, the controller 562 might activate a mixer for a specified amount of time (and potentially at a specified power or in a specified mixing pattern). The producer server 106 can generate instructions for the controller 562 to perform the above activities according to the formulation specified by the optimization logic 122. For example, the controller 562 can expose an application programming interface (API) that allows the producer server 106 to call functions of the controller 562 to perform the activities. The producer server 106 can generate appropriate instructions or function calls and transmit the instructions / calls to a 564 interface of the mixer device 560 through a 558 interface of the producer server. The 558 and 564 interfaces can communicate directly via wired or wireless communication, and / or they can communicate over a network. As batches of the construction compound are manufactured and shipped to a contractor, the producer server 106 can receive further feedback from sensors 516 and / or a contractor server 134. This information can allow the product to be modified or reformulated based on real-time information describing current conditions and / or measured performance. For example, a contractor can generate a performance report 506 in memory 504 on the contractor server 134. The performance report can specify quantitative measurements (e.g., generated by the sensors used by the contractor) and / or qualitative assessments by the contractor. The performance report 506 can be entered into the contractor server 134 through one or more input / output devices 502, such as a keyboard, a microphone (for voice input), a data port, etc.The performance report can be transmitted to the producer server 106 via a network interface 508. Similarly, performance data and / or details about environmental conditions can be transmitted to the producer server from one or more deployed 516 sensors. The 516 sensors can be deployed, for example, on transport vehicles that carry the mixture to the work site, at the work site itself, or on structures along the route from the plant to the work site. The 516 sensors can include a measuring device 518, such as an accelerometer, anemometer, hygrometer, photometer, etc. The measurements from the measuring device can be transmitted directly to the production server 106 via a network interface 524, or they can be aggregated into a buffer 522 stored in the memory 520 of the 516 sensor. After a predetermined amount of time, a predetermined number of readings, or when the memory 520 is filled to a certain level, the data stored in the buffer can be transmitted to the production server 106. The exchange of data between the design server 510, the contractor server 134, the sensor 516, and the producer server 106 is described in more detail in the data flow diagram shown in FIG. 6A. Initially, the producer server can initiate a 602 training process. The training logic described above can query historical data to build a model or algorithm to optimize a formulation, given the performance requirements in a work specification. Next, a work specification 120 can be transmitted from the designer server to the producer server. In response to receiving the work specification 120, the producer server can initiate a mix formulation procedure 604, which applies the algorithm model to the received work specification 120 to generate one or more suitable mixes that meet or closely approximate the requirements of the work specification. If multiple construction mixes are generated, the system can compare them and allow the user to select one. Once a target construction mix is identified, the producing server can initiate a construction mix production procedure 606, which may involve generating instructions and / or controlling the mixing machinery to produce the identified construction mix. In some cases, the construction mix may be a general-purpose construction mix whose properties are modified by a construction additive. During the construction additive production procedure, data from sensor 136 can optionally be read to identify the environmental conditions that must be considered. Based on the data from sensor 136 and the requirements of work specification 120, the system can initiate a construction additive formulation procedure 608 to create the construction additive (similar to the construction mix formulation procedure 604, although likely with different raw materials). The producing server can then initiate a construction mix production procedure 610 to create the construction mix (similar to the construction mix production procedure 606).The construction additive can be added directly to the construction mix, or it can be created separately and added later to the construction mix. In 612, the producing server can release the combined build composition to the worksite. This may involve registering a build composition batch identifier and loading the build composition onto a transport. During or after mix delivery, the producing server may receive sensor data and / or a 506 performance report from the contractor server. This data can provide real-time information that allows the producing server to update the construction mix formulation between batches, which can improve consistency, performance, and / or cost as a job is performed. In response to this data, the producing server may perform a quality control, reformulation, or retraining process that updates the construction mix and / or construction additive created in 606, 610. The updated data can be provided to the optimization process, which can update the model or algorithm, or alternatively, reapply an existing model or algorithm with the new data provided by the sensors and / or the contractor server. These actions are described in more detail in relation to the flowchart shown in FIG. 6B. The blocks in FIG. 6B can be implemented as 650 logic or instructions stored on a non-transient, computer-readable medium for execution on (for example) the producer server. The processing may occur in block 652, where the system receives training data. This training data may include historical data identifying a construction mix formulation and the associated performance results measured when that formulation was deployed. Information about environmental conditions, location, and other relevant factors may also be provided as part of the historical data. Alternatively, the training data may also include simulation data received as a result of a computer simulation performed on a hypothetical or actual construction mix formulation. Training data can be associated with various performance parameters. In block 608, the priorities associated with these parameters can be set or adjusted by setting a parameter weight. For example, the cost of a construction mix can be devalued compared to performance parameters. A user can also specify the relative performance of various parameters (for example, strength and durability are more important than aesthetics). Based on the training data and specified priorities, the model or algorithm can be trained by the training logic in block 654. Training can continue until a set of training conditions is met. For example, a set of training data can be kept in reserve to test the performance of the trained model or algorithm. The model or algorithm can then be tested against the reserved training data to determine whether it generates a suitable mix based on performance characteristics (where a "suitable" mix would be considered to be within a certain threshold of difference from the mix defined in the training data). If, in block 656, the system determines that the model has been sufficiently trained, then processing can proceed to block 568. Otherwise, processing can return to block 652 and the system can incorporate additional training data into the model or algorithm. The system may be capable of operating in several different modes. In an "evaluation" mode, the system may accept, as input, one or more construction mix formulations and perform a performance evaluation of the formulation(s). In a "formulate" mode, the system accepts a set of requirements (for example, a job specification) and generates a formulation for a construction mix (or set of construction mixes) that meets or approximates the requirements. If the system is in formulation mode in block 568, processing can proceed to block 660, and the system can receive the formulation. The formulation can be entered through an interface (for example, by specifying quantities or proportions of identified raw materials) or received as a finished specification identified in a data structure. A single formulation can be received for evaluation, or multiple formulations can be received for evaluation and comparison. In block 662, the system can run a simulation on the formulation(s) using the simulation logic described previously. The result of the simulation can be a set of performance characteristics, cost parameters, etc., which are estimated in block 664. In block 666, the system determines whether multiple formulations were submitted for comparison. If not, the system generates (in block 668) the estimated values determined in block 664. This may involve storing the estimated values in memory, transmitting the values over a network, and / or displaying the values on a screen. If the formulation was submitted for evaluation as part of a production procedure, then in block 670, the system can request approval to create the evaluated formulation. If approval is received in block 670, processing proceeds to block 672, and the system instructs the blending team to create the formulation, as described above. Returning to block 666, if multiple formulations were evaluated, the system can generate a comparison of the evaluations in block 674. This comparison can provide an overview of each formulation and highlight differences in various performance characteristics. In some implementations, all performance characteristics may be displayed for comparison. In others, only the performance characteristics that differ between formulations may be displayed or highlighted. Furthermore, performance characteristics not specified as part of the original evaluation request may be considered and displayed if they differ.In some embodiments, unspecified performance characteristics may be considered only if the specified performance characteristics are the same or differ by less than a predetermined threshold amount (thus allowing relatively similar formulations to be differentiated for other reasons). Based on the comparison, the system can receive a selection in block 676 from one of the formulations (from a user, or programmatically based on a weighting of the importance of several parameters). Processing can then proceed to block 672, and the system can mix the selected formulation as described above. If, in block 658, the system is in "formulate" mode, then processing can proceed to block 678, where a work specification or a set of performance requirements can be received. In block 680, the system can access a set of inputs, variables, or mappings that describe how the available raw materials affect the parameters set in block 678 (this information can also or alternatively be incorporated into the model / AI / ML algorithm). In block 682, the system can apply an artificial intelligence, machine learning algorithm, or model to generate a formulation based on the parameters received in block 678. The optimization logic can apply the algorithm or model to generate one or more output formulations as described above. In some implementations, the AI / ML / model may be able to run continuously until an explicit stop command is received. In these implementations, the optimization logic may continue to run on the AI / ML / model for a predetermined number of iterations, for a predetermined period of time, or until the characteristics of the specified manufacturing mix fall within a predetermined threshold range of the job specification. Other stop conditions may also apply. After the stop conditions have been met, processing can proceed to block 684, where the system determines whether to evaluate the formulation(s) generated in block 682. If so, processing can return to block 662, and the system can run simulations on the formulated product(s). If not, processing can proceed to block 686, where the formulation(s) can be generated (e.g., to a network, memory, or display). A formulation can then be selected for use (or, in the case of a single formulation, approved), and processing can proceed to block 672, where the formulation can be sent for blending. The procedures described above may be incorporated as instructions on a computer-readable medium or as part of a computer architecture. Figure 7 illustrates one embodiment of an exemplary computer architecture 700 suitable for implementing various embodiments such as those described above. In one embodiment, the computer architecture 700 may comprise or be implemented as part of an electronic device, such as a computer 701. The embodiments are not limited in this context. As used in this application, the terms "system" and "component" are intended to refer to a computer-related entity, whether hardware, a combination of hardware and software, software, or running software, examples of which are provided by Exemplary Computing Architecture 700. For example, a component may be, among other things, a process running on a processor, a processor, a hard disk drive, multiple storage units (optical and / or magnetic), an object, an executable, a thread of execution, a program, and / or a computer. By way of example, both an application running on a server and the server itself can be a component. One or more components may reside within a procedure and / or thread of execution, and a component may be located on one computer and / or distributed across two or more computers.Furthermore, components can be coupled together using various types of communication media to coordinate operations. This coordination can involve the unidirectional or bidirectional exchange of information. For example, components can communicate information in the form of signals transmitted through the communication media. The information can be implemented as signals assigned to various signal lines. In this type of assignment, each message is a signal. Other implementations, however, may alternatively employ data messages. These data messages can be sent across various connections. Exemplary connections include parallel interfaces, serial interfaces, and bus interfaces. The 700 series computing architecture includes various common computing elements, such as one or more processors, multi-core processors, coprocessors, memory units, chipsets, controllers, peripherals, interfaces, oscillators, timing devices, video cards, audio cards, multimedia input / output (I / O) components, power supplies, etc. However, implementations are not limited to the 700 series computing architecture. As shown in FIG. 7, the 700 computing architecture comprises a processing unit 702, a system memory 704, and a system bus 706. The processing unit 702 can be any of several commercially available processors, including, but not limited to, AMD® Athlon®, Duron®, and Opteron® processors; ARM® application, embedded, and secure processors; IBM® and Motorola® DragonBall® and PowerPC® processors; IBM M and Sony® Cell processors; Intel® Celeron®, Core (2) Duo®, Itanium®, Pentium®, Xeon®, and XScale® processors; and similar processors. Dual-core microprocessors, multi-core processors, and other multiprocessor architectures can also be used as the processing unit 702. System bus 706 provides an interface for system components, including, but not limited to, system memory 704 and processing unit 702. System bus 706 can be any of several bus architecture types and can be further interconnected to a memory bus (with or without a memory controller), a peripheral bus, and a local bus using any of a variety of commercially available bus architectures. Interface adapters can connect to system bus 706 via a slot architecture. Examples of slot architectures include, but are not limited to, Accelerated Graphics Port (AGP), Card Bus, (Extended) Industry and Standard Architecture ((E)ISA), Micro Channel Architecture (MCA), NuBus, Peripheral Component Interconnect (Extended) (PCI(X)), PCI Express, Personal Computer Memory and Card International Association (PCMCIA), and similar architectures. The 700 computer architecture can comprise or implement various manufacturing components. A manufacturing component can comprise a computer-readable storage medium for storing logic. Examples of a computer-readable storage medium can include any tangible medium capable of storing electronic data, including volatile or non-volatile memory, removable or non-removable memory, erasable or non-eraseable memory, writable or rewritable memory, and so on. Examples of logic can include executable instructions of computer programs implemented using any suitable type of code, such as source code, compiled code, interpreted code, executable code, static code, dynamic code, object-oriented code, visual code, and the like.The realizations can also be implemented, at least in part, as instructions contained in or on a non-transitory, computer-readable medium, which can be read and executed by one or more processors to enable the performance of the operations described herein. The 704 system memory can include various types of computer-readable storage media in the form of one or more high-speed memory units, such as read-only memory (ROM), random access memory (RAM), dynamic RAM (DRAM), double data rate DRAM (DDRAM), synchronous DRAM (SDRAM), static RAM (SRAM), programmable ROM (PROM), erasable programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM), flash memory, polymeric memory such as ferroelectric polymer memory, ovonic memory, phase-change or ferroelectric memory, silicon-oxide-nitride-oxide-silicon (SONOS) memory, magnetic or optical cards, an array of devices such as RAID (Redundant Array of Independent Disks) units, solid-state memory devices (e.g., USB flash drives, solid-state drives (SSDs)), and any other type of storage media suitable for storing information.In the illustrated embodiment of FIG. 7, the system memory 704 may include non-volatile memory 708 and / or volatile memory 710. A basic input / output system (BIOS) may be stored in the non-volatile memory 708. The 700 computing architecture can include various types of computer-readable storage media in the form of one or more low-speed memory units, including an internal (or external) hard disk drive (HDD) 712, a magnetic floppy disk drive (FDD) 714 for reading from or writing to a removable magnetic disk 716, and an optical disk drive 718 for reading from or writing to a removable optical disk 720 (e.g., a CD-ROM or DVD). The HDD 712, FDD 714, and optical disk drive 720 can be connected to the system bus 706 via an HDD interface 722, an FDD interface 724, and an optical disk drive interface 726, respectively. The hard disk interface 722 for external drive implementations can include at least one or both Universal Serial Bus (USB) and IEEE 694 interface technologies. The drives and associated computer-readable media provide volatile and / or non-volatile storage of data, data structures, computer-executable instructions, and so forth. For example, a number of program modules may be stored on the drives and memory units 708, 712, including an operating system 728, one or more application programs 730, other program modules 732, and program data 734. In one embodiment, the one or more application programs 730, other program modules 732, and program data 734 may include, for example, the various applications and / or messaging system components 500. A user can input commands and information into the 701 computer through one or more wired / wireless input devices, for example, a 736 keyboard and a pointing device, such as a 738 mouse. Other input devices may include microphones, infrared (IR) remote controls, radio frequency (RF) remote controls, game controllers, light pens, card readers, dongles, fingerprint readers, gloves, graphics tablets, joysticks, keyboards, retina readers, touch screens (capacitive, resistive, etc.), trackballs, touch panels, sensors, light pens, and the like.These and other input devices are usually connected to the 702 processing unit via an input device interface 740 that is coupled to the system bus 706, but they can be connected via other interfaces, such as a parallel port, an IEEE 694 serial port, a game port, a USB port, an IR interface, etc. A monitor 742 or other type of display device also connects to the system bus 706 through an interface, such as a video adapter 744. The monitor 742 can be internal or external to the computer 701. In addition to the monitor 742, a computer usually includes other output peripheral devices, such as speakers, printers, etc. Computer 701 can operate in a network environment using logical connections via wired and / or wireless communications to one or more remote computers, such as a remote computer 744. The remote computer 744 can be a workstation, server computer, router, personal computer, laptop, microprocessor-based entertainment device, peer device, or other common network node, and typically includes many or all of the elements described relating to computer 701, although, for the sake of brevity, only a memory / storage device 746 is illustrated. The logical connections depicted include wired / wireless connectivity to a local area network (LAN) 748 and / or larger networks, e.g., a wide area network (WAN) 750.These LAN and WAN network environments are common in offices and businesses, and facilitate company-wide computer networks, such as intranets, all of which can be connected to a global communications network, for example, the Internet. When used in a LAN network environment, computer 701 connects to LAN 748 through a wired and / or wireless communication network interface or adapter 752. Adapter 752 can facilitate wired and / or wireless communications to LAN 748, which may also include a wireless access point arranged therein to communicate with the wireless functionality of adapter 752. When used in a WAN environment, computer 701 may include a modem 754, or be connected to a communications server on the WAN 750, or have other means of establishing communications across the WAN 750, such as via the Internet. The modem 754, which may be internal or external and a wired and / or wireless device, connects to the system bus 706 through the input device interface 740. In a network environment, the program modules depicted in relation to computer 701, or parts thereof, may be stored on the remote memory / storage device 746. It should be noted that the network connections shown are illustrative and that other means may be used to establish a communications link between computers. The 701 computer is operable for communicating with wired and wireless devices or entities that use the IEEE 802 family of standards, such as wireless devices operating in wireless communication (e.g., IEEE 802.13 over-the-air modulation techniques). This includes at least Wi-Fi (or Wireless Fidelity), WiMAX, and Bluetooth™ wireless technologies, among others. Thus, communication can be a predefined structure, as in a conventional network, or simply ad hoc communication between at least two devices. Wi-Fi networks use radio technologies designated IEEE 802.13x (a, b, g, n, etc.) to provide secure, reliable, and fast wireless connectivity. A Wi-Fi network can be used to connect computers to each other, to the Internet, and to wired networks (which use media and functions related to IEEE 802.3). Figure 8 is a block diagram representing an exemplary 800 communications architecture suitable for implementing various implementations such as those described above. The 800 communications architecture includes several common communications elements, such as a transmitter, receiver, transceiver, radio, network interface, baseband processor, antenna, amplifiers, filters, power supplies, etc. However, the implementations are not limited to the 800 communications architecture. As shown in FIG. 8, the 800 communications architecture includes one or more 802 clients and 804 servers. The 802 clients can implement the 510 client device. The 804 servers can implement the 526 server device. The 802 clients and 804 servers are operationally connected to one or more respective 806 client data stores and 808 server data stores, which can be used to store local information from the respective 802 clients and 804 servers, such as cookies and / or associated contextual information. 802 clients and 804 servers can communicate information with each other using an 810 communication framework. The 810 communication framework can implement any known communication technique and protocol. It can be implemented as a packet-switched network (e.g., public networks like the Internet, private networks like a corporate intranet), a circuit-switched network (e.g., the public switched telephone network), or a combination of a packet-switched and a circuit-switched network (with appropriate gateways and translators). The 810 communications framework can implement various network interfaces designed to accept, communicate with, and connect to a communications network. A network interface can be considered a specialized form of input / output interface. Network interfaces can employ connection protocols including, but not limited to, direct connection, Ethernet (e.g., thick, thin, 10 / 100 / 1000 Base-T twisted pair, and similar), token ring, wireless network interfaces, cellular network interfaces, IEEE 802.8ax network interfaces, IEEE 802.16 network interfaces, IEEE 802.20 network interfaces, and similar. Furthermore, multiple network interfaces can be used to connect to different types of communications networks. For example, multiple network interfaces can be used to enable communication across broadcast, multicast, and unicast networks.In cases where processing requirements demand higher speed and capacity, distributed network controller architectures can be employed to pool, load balance, and otherwise increase the communication bandwidth required by 802 clients and 804 servers. A communications network can be any and the combination of wired and / or wireless networks, including without limitation a direct interconnect, a secure custom connection, a private network (e.g., an enterprise intranet), a public network (e.g., the Internet), a personal area network (PAN), a local area network (LAN), a metropolitan area network (MAN), an operational mission network as nodes on the Internet (OMNI), a wide area network (WAN), a wireless network, a cellular network, and other communications networks. The components and features of the devices described above can be implemented using any combination of discrete circuits, application-specific integrated circuits (ASICs), logic gates, and / or single-chip architectures. Furthermore, the device features can be implemented using microcontrollers, programmable logic arrays, and / or microprocessors, or any combination thereof, as appropriate. It should be noted that the hardware, firmware, and / or software elements may be referred to herein, collectively or individually, as "logic" or "circuit." It will be appreciated that the exemplary devices shown in the block diagrams described above can represent a functionally descriptive example of many potential implementations. Therefore, the division, omission, or inclusion of block functions represented in the accompanying figures does not imply that the hardware components, circuits, software, and / or elements for implementing these functions will necessarily be divided, omitted, or included in the actual implementations. At least one computer-readable storage medium may include instructions that, when executed, cause a system to perform any of the computer-implemented procedures described herein. Some realizations may be described using the expression "an embodiment" or "a realization" along with its derivatives. These terms mean that a particular feature, structure, or characteristic described in relation to the embodiment is included in at least one embodiment. Occurrences of the phrase "in an embodiment" in various places in the specification do not necessarily refer to the same embodiment. Furthermore, unless otherwise stated, it is recognized that the features described above may be used together in any combination. Therefore, any feature discussed separately may be employed in combination with others, unless it is stated that the features are incompatible with each other. With general reference to the notation and nomenclature used herein, the detailed descriptions herein may be presented in terms of program procedures executed on a computer or computer network. Those skilled in the art use these descriptions and representations of procedures to most effectively convey the essence of their work to other those skilled in the art. A procedure is conceived here, and in general, as a self-consistent sequence of operations leading to a desired result. These operations require physical manipulation of physical quantities. Usually, though not necessarily, these quantities take the form of electrical, magnetic, or optical signals capable of being stored, transferred, combined, compared, and otherwise manipulated. It is sometimes convenient, mainly for reasons of common usage, to refer to these signals as bits, values, elements, symbols, characters, terms, numbers, or the like. However, it should be noted that all these terms and others like them must be associated with the appropriate physical quantities and are merely convenient labels applied to those quantities. Furthermore, the manipulations performed are often described in terms such as adding or comparing, which are commonly associated with mental operations performed by a human operator. Such human operator capability is neither necessary nor desirable in most cases for any of the operations described herein, which form part of one or more implementations. These are, rather, mechanical operations. Machines useful for performing the operations in the various implementations include general-purpose digital computers or similar devices. Some implementations can be described using the terms "coupled" and "connected," along with their derivatives. These terms are not necessarily synonymous. For example, some implementations can be described using the terms "connected" and / or "coupled" to indicate that two or more elements are in direct physical or electrical contact with each other. The term "coupled," however, can also mean that two or more elements are not in direct contact with each other, but still cooperate or interact with each other. Several embodiments also refer to apparatus or systems for performing these operations. This apparatus may be specially constructed for the required purpose or may comprise a general-purpose computer selectively activated or reconfigured by a computer program stored on the computer. The procedures presented here are not intrinsically related to any particular computer or other apparatus. Various general-purpose machines may be used with programs written in accordance with the teachings here, or it may be convenient to construct more specialized apparatus to perform the required steps of the procedure. The structure required for a variety of these machines will appear in the given description.
Claims
1. A non-transient, computer-readable medium (530) that stores instructions (122, 650) that, when executed by one or more processors, cause the one or more processors to: receive, on a producer server 106, a work specification (120) for a construction composition (118), the work specification (120) specifying one or more performance requirements for the construction composition (202-250); access a set of inputs (402) that affect one or more properties of the construction composition; provide the work specification (120) and the set of inputs (402) to a predictive model (540); programmatically determine, using the predictive model, a plurality of construction compositions (118) that meet or approximate the performance requirements of the work specification given the set of inputs, wherein each construction composition comprises a plurality of raw materials (114,116) mixed in a determined proportion, the determination comprising eliminating from consideration at least one construction composition that does not meet or approximate the performance requirements of the work specification according to the predictive model; generating the plurality of construction compositions that approximate the performance requirements of the work specification; running a simulation (542) on each of the plurality of compositions to predict an expected performance of each respective construction composition; and generating the expected performance of each respective construction composition.
2. The means of claim 1, further storing instructions (562) for producing the determined construction composition.
3. The means of claim 1, wherein the construction composition is selected from the group of an asphalt mixture,a concrete mix or a mortar mix.
4. The means of claim 1, wherein the performance specification (120) comprises one or more of a fresh property of the construction composition (202), a hardened property of the construction composition, a strength of the construction composition (220), a surface appearance of the construction composition (228), a cost of the construction mix (230), or a durability of the construction composition (232).
5. The means of claim 1, further comprising receiving priority for one or more of the performance requirements, and accounting for the priority.
6. The means of claim 1, wherein the input set comprises one or more of the available raw materials, climatological data for a construction site, the construction procedures to be employed with the construction composition, project specification information,the available construction additives, and information relating to the transport from a mixing site to a construction site.
7. The means of claim 1, further comprising storing instructions for selecting one or more performance characteristics in which the plurality of construction compositions differ, the one or more performance characteristics not being specified as part of the work specification, and generating a comparison of the plurality of construction compositions based on the selected performance characteristics.
8. The means of claim 1, further comprising storing instructions for: receiving a notification that the input set has been modified; and re-optimizing the determined construction composition based on the notification.
9. The means of claim 8,wherein the modified input comprises a set of available raw materials and components different from that which was available when the construction composition was first determined.
10. A computer-implemented procedure (650) comprising: receiving, on a producer server 106, a work specification (120) for a construction composition (118), the work specification (120) specifying one or more characteristics for the construction composition (202-250); accessing a set of inputs (402) that affect one or more properties of the construction composition, each input being associated with one or more corresponding characteristics that are affected by a change in the respective input; providing the work specification (120) and the set of inputs (402) to a predictive model (540); and determining programmatically, using the predictive model,a plurality of construction compositions (118) that meet or approximate the characteristics of the work specification given the set of inputs, wherein each construction composition comprises a plurality of raw materials (114, 116) mixed in a determined proportion, the determination comprising eliminating from consideration at least one construction composition that does not meet or approximate the characteristics of the work specification (120) according to the predictive model; generating the plurality of construction compositions that approximate the characteristics of the work specification; running a simulation (542) on each of the plurality of compositions to predict an expected performance of each respective construction composition; and generating the expected performance of each respective construction composition.
11. The procedure of claim 10,further comprising determining an initial build composition using initial values for the set of inputs, the initial build composition being associated with an initial set of features; applying the predictive model to adjust one or more of the inputs in the initial build composition, the adjustment causing the corresponding features associated with the one or more inputs to change; adjusting the initial set of features based on the adjusted inputs; determining at least one build composition that meets or approximates the features specified in the work specification based on the adjusted inputs, wherein the build composition comprises a list of ingredients; generating the at least one determined build composition; repeating the application and adjustment: for a predetermined number of iterations, for a predetermined period of time,or until the characteristics of the determined construction composition are within a predetermined threshold range of the job specification.
12. The method of claim 10, wherein the input set (402) comprises one or more construction mix proportions or construction additives for the construction composition or behavior of the raw material of the construction composition.
13. The method of claim 10, wherein the input set (402) comprises environmental conditions.
14. The method of claim 10, wherein the characteristics comprise one or more of settling, stickiness, bleeding, loss of settling, strength deviation, and volume change of the manufacturing mix.
15. An apparatus 106 comprising: a computer-readable, non-transient storage means (530) that stores logic (122,650) for a predictive model (540) configured to select a combination of construction mixes and additives; a hardware interface (528) configured to receive training data (532), the training data comprising a predefined construction composition and associated performance characteristics for the predefined construction composition; and a hardware processor circuit (702) configured to: train the predictive model (654) based on the training data; receive, via the interface, a work specification (120) specifying one or more performance requirements for a new construction composition (678); and use the predictive model to select a plurality of new construction compositions based on the received performance requirements (682),comprising the selection process of eliminating from consideration at least one construction composition that does not meet or approximate the performance requirements received from the work specification according to the predictive model, and running a simulation (542) on each of the plurality of new construction compositions to predict an expected performance of each respective construction composition, wherein the expected performance of the new construction compositions is generated using the interface (528).
16. The apparatus of claim 15, wherein the predictive model is configured to prioritize a performance factor over a cost factor.
17. The apparatus of claim 15,wherein the processor is further configured to: receive a performance report (506) of the new construction composition; and retrain the predictive model (536) based on the performance of the new construction composition.
18. The apparatus of claim 15, wherein the performance requirements comprise one or more of a fresh property of the construction composition (202), a hardened property of the construction composition, a strength of the construction composition (220), a surface appearance of the construction composition (228), a cost of the construction composition (230), or a durability of the construction composition (232).
19. The apparatus of claim 15, wherein the construction composition specifies one or more of the available raw materials, the construction procedures to be employed with the construction composition,the project specification information and available construction additives.