A method for monitoring and increasing the reliability of an operating nuclear power plant based on a high-accuracy reliability prediction
The method and apparatus enhance the accuracy of reliability prediction and monitoring in nuclear power plants by categorizing based on years of operation and incorporating planned maintenance, thereby improving reliability.
Patent Information
- Application Number
- FR2023009452
- Authority / Receiving Office
- FR · FR
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-23
- Filing Date
- 2023-09-08
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 00000068_0000 
Figure 00000068_0001 
Figure 00000069_0000
Abstract
Description
Title of the invention: Method for monitoring and increasing the reliability of an operating nuclear power plant based on a high-precision reliability prediction. FIELD
[0001] This disclosure relates to a technical area of an operating nuclear power plant, and more particularly to a method for predicting and monitoring reliability suitable for an operating nuclear power plant, a method for increasing reliability suitable for an operating nuclear power plant, a device for predicting and monitoring reliability suitable for an operating nuclear power plant, a device for increasing reliability suitable for an operating nuclear power plant, an electronic device, a storage medium and a platform for reliability monitoring. CONTEXT
[0002] Currently, with the energy shortage, it is urgently necessary to develop a new energy source to meet energy needs. Nuclear energy has been widely used due to its energy conservation, environmental protection, and emission reduction capabilities. An operating nuclear power plant is an important component of nuclear energy technology. In related fields, it is necessary to predict the reliability of an operating nuclear power plant to ensure normal operation. However, there are problems related to the low accuracy of prediction and the low accuracy of monitoring the reliability of an operating nuclear power plant, and a method for increasing the reliability of an operating nuclear power plant is lacking. SUMMARY
[0003] The present disclosure aims to resolve at least one of the technical problems in the related art at least to some extent.
[0004] In view of this, in a first aspect of this disclosure, a method for predicting and monitoring reliability is provided. The method is appropriate for an operating nuclear power plant and includes obtaining the number of years of operation of the operating nuclear power plant, and determining a target reliability prediction category for the operating nuclear power plant based on the number of years of operation; performing a reliability prediction on the operating nuclear power plant based on initial baseline reliability data for the operating nuclear power plant in the case where the target reliability prediction category is a first reliability prediction category; performing a reliability prediction on the nuclear power plant in operation based on second basic reliability data of the nuclear power plant in operation in the case where the target reliability prediction category is a second reliability prediction category; and the performance of reliability monitoring on the nuclear power plant in operation based on a reliability prediction value and a planned maintenance category of the nuclear power plant in operation.
[0005] In a second aspect of this disclosure, a device for predicting and monitoring reliability is provided. The device is suitable for an operating nuclear power plant and includes a determination module configured to obtain a number of years of operation of the operating nuclear power plant, and to determine a target reliability prediction category for the operating nuclear power plant based on the number of years of operation;a prediction module configured to perform a reliability prediction on the operating nuclear power plant based on initial baseline reliability data of the operating nuclear power plant in the case where the target reliability prediction category is a first reliability prediction category, or to perform a reliability prediction on the operating nuclear power plant based on second baseline reliability data of the operating nuclear power plant in the case where the target reliability prediction category is a second reliability prediction category; and a monitoring module configured to perform reliability monitoring on the operating nuclear power plant based on a predicted reliability value and a planned maintenance category of the operating nuclear power plant.
[0006] The number of years of operation of the nuclear power plant is obtained, and a target reliability prediction category for the nuclear power plant is determined based on the number of years of operation. If the target reliability prediction category is a first reliability prediction category, the reliability prediction is performed on the nuclear power plant based on initial basic reliability data for the nuclear power plant. If the target reliability prediction category is a second reliability prediction category, the reliability prediction is performed on the nuclear power plant based on second basic reliability data for the nuclear power plant.Reliability monitoring is performed on the operating nuclear power plant based on a reliability prediction value and a planned maintenance category for the operating nuclear power plant. In this way, the target reliability prediction category can be determined based on the number of years of operation of the nuclear power plant, thereby predicting the reliability of the operating nuclear power plant and improving the accuracy of the reliability prediction. The prediction value of... The reliability and planned maintenance category of the operating nuclear power plant are comprehensively considered to monitor its reliability, thereby improving the accuracy of this monitoring. The number of scheduled and unscheduled maintenance days for the operating nuclear power plant can also be optimized and improved to further enhance its reliability.
[0007] It is understood that the general description above and the detailed description in the following text are only illustrative and explanatory, and do not limit this disclosure. Brief description of the drawings
[0008] These aspects and advantages and / or other aspects and advantages of the embodiments of this disclosure will become apparent and will be more readily appreciated from the following descriptions made with reference to the drawings, in which:
[0009] The [Fig. 1] is a flowchart showing a method for predicting and monitoring the reliability appropriate for an operating nuclear power plant according to an embodiment of the present disclosure;
[0010] Fig. 2 is a flowchart showing a method for predicting and monitoring the reliability appropriate for an operating nuclear power plant according to an embodiment of the present disclosure;
[0011] The [Fig.3] is a flowchart showing a method for predicting and monitoring the reliability appropriate for an operating nuclear power plant according to an embodiment of the present disclosure;
[0012] The [Fig.4] is a flowchart showing a method for predicting and monitoring the reliability appropriate for an operating nuclear power plant according to an embodiment of the present disclosure;
[0013] Fig. 5 is a flowchart showing a method for predicting and monitoring the reliability appropriate for an operating nuclear power plant according to one embodiment of the present disclosure;
[0014] Figure 6 is a flowchart showing a method for predicting and monitoring the reliability appropriate for an operating nuclear power plant according to one embodiment of the present disclosure;
[0015] Fig. 7 is a flowchart showing a method for increasing the reliability appropriate for an operating nuclear power plant according to an embodiment of the present disclosure;
[0016] Fig. 8 is a flowchart showing a method for increasing the reliability appropriate for an operating nuclear power plant according to an embodiment of the present disclosure;
[0017] The [Fig.9] is a schematic diagram showing a device for the prediction and monitoring of reliability suitable for an operating nuclear power plant according to an embodiment of the present disclosure;
[0018] Fig. 10 is a schematic diagram showing a device for increasing reliability suitable for an operating nuclear power plant according to an embodiment of the present disclosure;
[0019] Fig. 11 is a schematic diagram showing an electronic device according to an embodiment of the present disclosure. DETAILED DESCRIPTION
[0020] The embodiments of this disclosure are described in detail below, examples of which are illustrated in the drawings. Identical or similar elements are designated by the same reference numbers in the different drawings, unless otherwise indicated. The embodiments described herein with reference to the drawings are explanatory and configured to generally understand this disclosure. The embodiments should not be construed as limiting this disclosure.
[0021] The following describes a method for predicting and monitoring reliability suitable for an operating nuclear power plant, a method for increasing reliability suitable for an operating nuclear power plant, an apparatus for predicting and monitoring reliability suitable for an operating nuclear power plant, an apparatus for increasing reliability suitable for an operating nuclear power plant, an electronic device, a storage medium and a platform for reliability monitoring.
[0022] The [Fig. 1] is a flowchart showing a method for predicting and monitoring the reliability appropriate for an operating nuclear power plant according to an embodiment of the present disclosure.
[0023] As shown in [Fig.1], the method for predicting and monitoring the reliability appropriate for the nuclear power plant in operation in the embodiments of this disclosure includes the following steps S101 to S104.
[0024] In step S101, a number of years of operation of the nuclear power plant in service is obtained, and a target reliability prediction category of the nuclear power plant in service is determined on the basis of the number of years of operation.
[0025] In some embodiments of this disclosure, the reliability prediction is performed during a current operating year of the nuclear power plant in operation during a previous year or in January of each year.
[0026] It is noted that the method for predicting and monitoring the reliability appropriate for the operating nuclear power plant has high accuracy, which can be performed by The device for predicting and monitoring reliability appropriate for the operating nuclear power plant in the embodiments of this disclosure. The device for predicting and monitoring reliability appropriate for the operating nuclear power plant can be configured in any platform for predicting and monitoring reliability appropriate for an operating nuclear power plant, to perform the method for predicting and monitoring reliability appropriate for the operating nuclear power plant in the embodiments of this disclosure.
[0027] It is noted that the number of years of operation refers to a cumulative number of years of operation of the nuclear power plant in service.
[0028] In certain embodiments, the determination of the target reliability prediction category of the operating nuclear power plant based on the number of years of operation includes: determining the target reliability prediction category as the first reliability prediction category when the number of years of operation is less than a defined first threshold; or determining the target reliability prediction category as the second reliability prediction category when the number of years of operation is greater than or equal to the defined first threshold. In this way, in the process, the target reliability prediction category is determined based on a relationship between the number of years of operation and the defined first threshold.
[0029] It is noted that the first threshold defined can be chosen according to actual needs, such as over 5 years.
[0030] In certain embodiments, determining the target reliability prediction category for the operating nuclear power plant based on the number of years of operation includes identifying a defined interval within which the number of years of operation falls. The target reliability prediction category is obtained based on the corresponding relationship between the defined interval for the number of years of operation and the target reliability prediction category.
[0031] It is understood that the number of years of operation can be divided into a plurality of defined intervals, and the corresponding relationship between each defined interval and the reliability prediction category can be established. Different defined intervals may correspond to different reliability prediction categories.
[0032] In some embodiments, the number of years of operation of the nuclear power plant in service can be obtained in a year before the current operating year or in January of the current operating year, so as to predict the reliability of the nuclear power plant in service with high accuracy.
[0033] In step S102, in the case where the target reliability prediction category is a first reliability prediction category, the reliability prediction is performed on the nuclear power plant in operation on the basis of initial basic data reliability of the nuclear power plant in operation.
[0034] In step S103, in the case where the target reliability prediction category is a second reliability prediction category, the reliability prediction is carried out on the nuclear power plant in operation on the basis of second basic reliability data of the nuclear power plant in operation.
[0035] In certain embodiments of this disclosure, the target reliability prediction category may be the first reliability prediction category or the second reliability prediction category, and the first basic reliability data may differ from the second basic reliability data. In one embodiment, the first basic reliability data and the second basic reliability data may include characteristic reliability quantities and planned downtime factors. The characteristic reliability quantity may include an equivalent availability factor.
[0036] In some embodiments, the realization of the reliability prediction on the nuclear power plant in operation includes, in the previous year or in January of each year, a prediction of reliability characteristics during the current operating year of the nuclear power plant in operation.
[0037] In certain embodiments, the realization of the reliability prediction on the nuclear power plant in operation on the basis of the first basic reliability data of the nuclear power plant in operation includes the realization of the reliability prediction on the nuclear power plant in operation on the basis of a reliability prediction strategy corresponding to the first category of reliability prediction and the first basic reliability data.
[0038] In certain embodiments, the realization of the reliability prediction on the nuclear power plant in operation on the basis of the second basic reliability data of the nuclear power plant in operation includes the realization of the reliability prediction on the nuclear power plant in operation on the basis of a reliability prediction strategy corresponding to the second category of reliability prediction and the second basic reliability data.
[0039] In certain embodiments, a corresponding relationship between each reliability prediction category and the basic reliability data, and a corresponding relationship between each reliability prediction category and the reliability prediction strategy, can be established. Based on the reliability prediction category, the basic reliability data and the reliability prediction strategy for the operating nuclear power plant can be determined, which includes obtaining the basic reliability data and the reliability prediction strategy based on the corresponding relationship between the reliability prediction category, the basic reliability data, and the reliability prediction strategy.
[0040] In certain embodiments, predicting the reliability of the operating nuclear power plant based on initial baseline reliability data for the operating nuclear power plant includes inputting this initial baseline reliability data into a reliability prediction model and outputting a reliability prediction value for the operating nuclear power plant from the reliability prediction model. It is noted that the reliability prediction model can be chosen according to actual requirements, such as deep learning models. The reliability prediction model can be obtained through pre-training.
[0041] In step S104, reliability monitoring is carried out on the nuclear power plant in operation on the basis of a reliability prediction value and a planned maintenance category of the nuclear power plant in operation.
[0042] It is noted that the reliability prediction value can be obtained by predicting the reliability of the nuclear power plant in operation. The reliability prediction value refers to a predicted value of the characteristic reliability quantity of the nuclear power plant in operation during the current operating year.
[0043] It is noted that the planned maintenance category for the nuclear power plant in operation can be defined by the users.
[0044] In some embodiments, the planned maintenance categories for nuclear power plants in operation include the following four categories.
[0045] A first type of planned maintenance is a planned overhaul of a conventional island. The interval for a planned overhaul of a conventional island for an operating nuclear power plant is 6 to 12 years, and the duration of the planned overhaul for an operating nuclear power plant is 60 to 80 days.
[0046] A second type of planned maintenance is an overhaul during a nuclear island refueling. The interval for an overhaul during a nuclear island refueling for an operating nuclear power plant is 12 to 18 months, and the duration of the overhaul during a nuclear island refueling for an operating nuclear power plant is 20 to 40 days.
[0047] A third type of planned maintenance is scheduled maintenance during off-peak hours, which is scheduled once a year for unscheduled island overhauls and island refueling overhauls at operating nuclear power plants. The planned duration of maintenance days during off-peak hours for an operating nuclear power plant is 5 to 15 days.
[0048] A fourth type of the planned maintenance category is the unplanned maintenance category, which means that there is no planned conventional island overhaul, no overhaul during nuclear island fuel refueling, or no scheduled maintenance during holidays during the year.
[0049] In some embodiments, the performance of reliability monitoring on the nuclear power plant in operation based on reliability prediction values and planned maintenance categories includes obtaining reliability monitoring criteria for the nuclear power plant in operation based on planned maintenance categories; determining that there is no reliability anomaly in the nuclear power plant in operation in the case where the reliability prediction value is greater than or equal to a reliability monitoring criteria value; determining that there is a reliability anomaly in the nuclear power plant in operation in the case where the reliability prediction value is less than the reliability monitoring criteria value.
[0050] In certain embodiments, after determining that there is no reliability anomaly in the nuclear power plant in operation, the method further includes generating indication information to indicate that there is no reliability anomaly in the nuclear power plant in operation, and informing users in a timely manner that there is no reliability anomaly in the nuclear power plant in operation.
[0051] In some embodiments, after determining that reliability anomalies are occurring in the operating nuclear power plant, the method further includes generating indication information to indicate that reliability anomalies are occurring in the operating nuclear power plant, and informing users in a timely manner that reliability anomalies are occurring in the operating nuclear power plant.
[0052] In some embodiments, a mapping linking the planned maintenance category and the reliability monitoring criterion value can be established in advance. Obtaining the reliability monitoring criterion value of the operating nuclear power plant based on the planned maintenance category may include requesting the reliability monitoring criterion value in the aforementioned mapping based on the operating nuclear power plant category and the planned maintenance category, and determining the requested reliability monitoring criterion value as the reliability monitoring criterion value of the operating nuclear power plant.
[0053] In summary, the number of years of operation of the nuclear power plant in service is obtained, and a target reliability prediction category for the nuclear power plant in service is determined based on the number of years of operation. If the target reliability prediction category is a first reliability prediction category, the reliability prediction is performed on the nuclear power plant in service based on initial basic reliability data for the nuclear power plant in service. If the target reliability prediction category is a second reliability prediction category, the reliability prediction is performed on the The reliability of an operating nuclear power plant is monitored based on secondary baseline reliability data. Reliability monitoring is performed on the operating nuclear power plant using a reliability prediction value and a planned maintenance category. In this way, the target reliability prediction category can be determined based on the number of years the nuclear power plant has been in operation, thereby improving the accuracy of the reliability prediction and thus improving the accuracy of the power plant's reliability forecast.The reliability prediction value and the planned maintenance category of the operating nuclear power plant are comprehensively considered to monitor the reliability of the operating nuclear power plant, thereby improving the accuracy of the reliability monitoring. The planned and unplanned maintenance days of the operating nuclear power plant can also be optimized and improved to increase the reliability of the operating nuclear power plant.
[0054] Figure 2 is a flowchart showing a method for prediction and on appropriate reliability monitoring for an operating nuclear power plant according to an embodiment of this disclosure.
[0055] As shown in [Fig.2], the method for predicting and monitoring the reliability appropriate for the nuclear power plant in operation in the embodiments of this disclosure includes the following steps S201 to S205.
[0056] In step S201, a number of years of operation of the nuclear power plant in service is obtained, and a target reliability prediction category of the nuclear power plant in service is determined on the basis of the number of years of operation.
[0057] The relevant content of step S201 can be found in the embodiments mentioned above, which will not be repeated here.
[0058] In step S202, a strategy for acquiring basic reliability data to predict the reliability of the operating nuclear power plant is determined based on the target reliability prediction category. The acquisition strategy includes a source operating nuclear power plant and a data collection condition for the basic reliability data.
[0059] In step S203, data collection is carried out on the source operating nuclear power plant based on the data collection condition to obtain basic reliability data to predict the reliability of the operating nuclear power plant.
[0060] It is noted that the data collection condition may include a data category, a data quantity, a historical operating year to which the data belong, which may be chosen according to actual needs.
[0061] In some embodiments, a mapping linking the prediction category The target reliability and acquisition strategy can be established in advance. Determining the acquisition strategy for basic reliability data for predicting the operating nuclear power plant, based on the target reliability prediction category, includes requesting the acquisition strategy in the aforementioned mapping based on the target reliability prediction category, and determining the requested acquisition strategy as the acquisition strategy for basic reliability data for predicting the operating nuclear power plant.
[0062] In certain embodiments, where the target reliability prediction category is the first reliability prediction category, a reference operating nuclear power plant with the same power output as the operating nuclear power plant is determined as the source operating nuclear power plant. The basic reliability data of the operating nuclear power plant over a plurality of historical operating years are obtained as the first basic reliability data of the operating nuclear power plant.
[0063] It is noted that the historical operating year refers to the operating year prior to the current operating year, and that there is no excessive limit on the number of historical operating years according to the first reliability prediction category. For example, the historical operating year may include N years prior to the current operating year, where N is a first defined threshold. For example, the first defined threshold is N = 5; if the target reliability prediction category is the first reliability prediction category and the current operating year of the nuclear power plant in operation is 2023, the historical operating years may include 2018 to 2022.
[0064] In some embodiments, in the case where the target reliability prediction category is the second reliability prediction category, the nuclear power plant in operation is determined as the source nuclear power plant in operation, and the basic reliability data of the nuclear power plant in operation during the plurality of historical operating years are obtained as the second basic reliability data of the nuclear power plant in operation.
[0065] It is noted that the number of historical operating years in the second reliability prediction category, for example, may include the T years preceding the current operating year, where T is greater than or equal to N. For example, the first threshold defined is N = 5, if the target reliability prediction category is the second reliability prediction category and the current operating year of the nuclear power plant in operation is 2023, the historical operating years may include 2013 to 2022.
[0066] In step S204, the reliability prediction is performed on the nuclear power plant in service based on basic reliability databases of the nuclear power plant in operation.
[0067] It is noted that if the target reliability prediction category is the first reliability prediction category, the basic reliability data for the in-service nuclear power plant prediction are the first basic reliability data. Based on the basic reliability data for the in-service nuclear power plant prediction, the realization of the reliability prediction for the in-service nuclear power plant includes the realization of the reliability prediction based on the first basic reliability data.
[0068] It is noted that if the target reliability prediction category is the second reliability prediction category, the basic reliability data for the in-service nuclear power plant prediction are the second basic reliability data. Based on the basic reliability data for the in-service nuclear power plant prediction, the realization of the reliability prediction for the in-service nuclear power plant includes the realization of the reliability prediction based on the second basic reliability data.
[0069] In step S205, reliability monitoring is carried out on the nuclear power plant in operation on the basis of a reliability prediction value and a planned maintenance category of the nuclear power plant in operation.
[0070] The relevant content of step S205 can be found in the embodiments mentioned above, which will not be repeated here.
[0071] In summary, according to the method for high-precision prediction and reliability monitoring appropriate for the operating nuclear power plant in the embodiments of this disclosure, the strategy for acquiring basic reliability data to predict the reliability of the operating nuclear power plant is determined based on the target reliability prediction category. The acquisition strategy includes a source operating nuclear power plant and a data collection condition for basic reliability data. Data collection is performed on the source operating nuclear power plant based on the data collection condition to obtain the basic reliability data for predicting the reliability of the operating nuclear power plant. Reliability prediction is performed on the operating nuclear power plant based on the operating nuclear power plant's basic reliability data.In this way, the target reliability prediction category can be considered to determine the acquisition strategy, so as to obtain the basic reliability data for the prediction of the nuclear power plant in operation, and to perform the reliability prediction on the nuclear power plant in operation.
[0072] Fig. 3 is a flowchart showing a method for predicting and monitoring the reliability appropriate for an operating nuclear power plant according to an embodiment of the present disclosure.
[0073] As shown in [Fig.3], the method for predicting and monitoring the reliability appropriate for the operating nuclear power plant includes the following steps S301 to S310.
[0074] In step S301, a number of years of operation of the nuclear power plant in service is obtained.
[0075] In step S302, a target reliability prediction category is determined as the first reliability prediction category in the case where the number of years of operation is less than a first defined threshold.
[0076] In step S303, a reference operating nuclear power plant having the same power as the operating nuclear power plant is determined.
[0077] In some embodiments, the source nuclear power plant in operation is the reference nuclear power plant in operation having the same power output as the nuclear power plant in operation. For example, if the power output of a nuclear power plant in operation 1 is 1,000 MW and the years of operation are greater than 4 years but less than 5 years, in the case where the first threshold is defined as 5 years, it can be determined that the number of years of operation is less than 5 years, the target reliability prediction category is determined as the first reliability prediction category, and a nuclear power plant in operation 2 having a power output of 1,000 MW is determined as the reference nuclear power plant in operation.
[0078] In step S304, a first equivalent availability factor and a first planned shutdown factor of the reference in-service nuclear power plant during the plurality of historical operating years is determined as first basic reliability data of the in-service nuclear power plant.
[0079] For example, a first equivalent availability factor (Eaf) and a first planned shutdown factor (POF) of the nuclear power plant in operation 2 over the last 5 years can be obtained as first basic reliability data of the nuclear power plant in operation 1. The first equivalent availability factor and the first planned shutdown factor of the nuclear power plant in operation 2 over the last 5 years are shown in Table 1.
[0080] [Table 1] Statistical values of the first equivalent availability factor and the first planned shutdown factor of the operating nuclear power plant 2 over the last 5 years
[0081]
[0082]
[0083]
[0084]
[0085]
[0086]
[0087]
[0088] where ti represents a current operating year, represents a first equivalent availability factor of the nuclear power plant in operation 2 during the historical operating year, and POf(L / ) represents a first planned shutdown factor of the nuclear power plant in operation 2 during the historical operating year, where 1 < j < 5, and j is a positive integer. In step S305, the first equivalent availability factor after deduction of planned shutdowns is determined on the basis of an average value of the first equivalent availability factors of the nuclear power plant in source service during the plurality of historical operating years, and an average value of the first planned shutdown factors of the nuclear power plant in source service during the plurality of historical operating years. The average value of the first equivalent availability factor EAi,n for the operating nuclear power plant 2 over the last 5 years is as follows: 0.894g 4 0005 4- 0.9001 + 0 158 4- 0.9000 - .jl-----------------------l--------------O--------------------------------= 09226 5 The average value of the planned shutdown factor P0Fm for the operating nuclear power plant 2 over the last 5 years is calculated as follows: aô5624- 0.0654 4- 0D6824- 0.0582 4- 0.0708 --~-------------......----------;............................................;------- .... 0.06370 The first equivalent availability factor after deduction of planned outages E APm for the operating nuclear power plant 2 is calculated as follows:
[0089] In step S306, the predicted reliability value of the nuclear power plant in operation in different planned maintenance categories is obtained on the basis of the first equivalent availability factor after deduction of planned shutdowns.
[0090] In some embodiments, obtaining the reliability prediction value of the nuclear power plant in operation in different planned maintenance categories based on the first equivalent availability factor after deduction of planned shutdowns includes inputting the first equivalent availability factor after deduction of planned shutdowns into a reliability prediction model, and outputting the reliability prediction values of the nuclear power plant in operation in different planned maintenance categories from the reliability prediction model.
[0091] In some embodiments, the method further includes obtaining planned maintenance data for the operating nuclear power plant. The planned maintenance data includes planned maintenance categories, planned maintenance days, and newly added unplanned maintenance days, etc.
[0092] In some embodiments, the planned maintenance categories for nuclear power plants in operation include the following four categories.
[0093] A first type of planned maintenance is a planned overhaul of a conventional island. The interval for a planned overhaul of a conventional island for an operating nuclear power plant is 6 to 12 years, and the duration of the planned overhaul for an operating nuclear power plant is 60 to 80 days.
[0094] A second type of planned maintenance is an overhaul during a nuclear island refueling. The interval for an overhaul during a nuclear island refueling for an operating nuclear power plant is 12 to 18 months, and the duration of the overhaul during a nuclear island refueling for an operating nuclear power plant is 20 to 40 days.
[0095] A third type of planned maintenance is scheduled maintenance during off-peak hours, which is scheduled once a year for unscheduled island overhauls and island refueling overhauls at operating nuclear power plants. The planned duration of maintenance days during off-peak hours for an operating nuclear power plant is 5 to 15 days.
[0096] A fourth type of the planned maintenance category is the unplanned maintenance category, which means that there is no planned conventional island overhaul, overhaul during nuclear island fuel reloading, or scheduled maintenance during holidays during the year.
[0097] In some embodiments, the scheduled maintenance days include the scheduled maintenance days of conventional cell mb and the maintenance days for refueling of nuclear island m2, and scheduled maintenance days during holidays m3.
[0098] In certain embodiments, obtaining the prediction values of the reliability of nuclear power plants in different categories of planned maintenance on the basis of the first equivalent availability factor after deduction of planned shutdowns includes the following implementation method.
[0099] In a first method, if the planned maintenance category includes only a planned conventional island overhaul, the reliability prediction value for nuclear power plants in operation during the planned conventional island overhaul year is obtained on the basis of the first equivalent availability factor after deducting planned outages, planned conventional island overhaul days and newly added unplanned maintenance days for the nuclear power plant in operation.
[0100] For example, if the planned maintenance category of the operating nuclear power plant 1 during the current operating year includes only a planned conventional island overhaul, the number of planned conventional island overhaul days for the operating nuclear power plant 1 during the current operating year is mi = 70 days, and the number of newly added unplanned maintenance days for the operating nuclear power plant 1 during the current operating year is Aud = 7 days, the predicted equivalent availability factor Eafi(A) of the operating nuclear power plant 1 during the planned conventional island overhaul year is calculated as follows:
[0101] f 24 m. i E^(M = EsîJ ] 8760 24Aud 8760 f' ^4x70' = Œ9637il 1 — I- - = 0.7597 V 8760 / 876Û
[0102] In a second method, if the planned maintenance category includes only an overhaul during a nuclear island fuel refueling, the predictive value of the reliability of nuclear power plants in operation during the overhaul year during nuclear island fuel refueling is obtained on the basis of the first equivalent availability factor after deducting planned outages, the number of overhaul days during nuclear island fuel refueling for nuclear power plants in operation, and newly added unplanned maintenance days.
[0103] For example, if the planned maintenance category of the operating nuclear power plant 1 includes only one overhaul during a nuclear island refueling during the current operating year, and the number of days for the overhaul during the refueling of the nuclear island in the nuclear power plant Service 1 during the current operating year is m2 = 33 days, and the number of newly added days of unplanned maintenance at the nuclear power plant If service 1 during the current operating year is Aud = 7 days, the predicted equivalent availability factor EAFi(t,) of the nuclear power plant in service 1 during the year of shutdown for refueling of the nuclear island is calculated as follows:
[0104] 24m23 24Aud 8760 y 8760 = 056371| 1-x 24x33^ 24x7 8760 J 8760 0.8574
[0105] In a third method, if the planned maintenance category includes only planned maintenance during holidays, the predictive value of the reliability of nuclear power plants in operation during the years of planned maintenance during holidays is obtained on the basis of the first equivalent availability factor after deducting planned shutdowns, days of planned maintenance during holidays of nuclear power plants in operation, and newly added unplanned maintenance days.
[0106] For example, if the planned maintenance category of nuclear power plant in operation 1 during the current operating year includes only planned maintenance during holidays, and the number of days of planned maintenance during holidays of nuclear power plant in operation 1 during the current operating year is m3 = 14 days, the number of newly added unplanned maintenance days of nuclear power plant in operation 1 during the current operating year is Aud = 7 days, the predicted equivalent availability factor EafiCO of nuclear power plant in operation 1 under planned maintenance during holidays is calculated as follows:
[0107] 24m, \ 8760) 24Aud 8760 24x141 = 0.963 / 1 1------ l 8760 J = 05076
[0108] In a fourth method, if the planned maintenance category is an unplanned maintenance category, the prediction value of the reliability of nuclear power plants in operation during the years of unplanned maintenance is obtained on the basis of the first equivalent availability factor after deducting the planned shutdowns and the newly added days of unplanned maintenance of the nuclear power plants in operation.
[0109] For example, if the planned maintenance category of the nuclear power plant in Service 1 is the unplanned maintenance category during the current operating year, and the number of newly added unplanned maintenance days of the nuclear power plant in service 1 during the current operating year is Aud = 10 days. The predicted equivalent availability factor Eafi(A) of the nuclear power plant in service 1 during the unplanned maintenance year is calculated as follows: 74 Au. 74x10 = 0.96371 - =0.9363 8 / 60 8760
[0111] In step S307, the predicted reliability value of the reference operating nuclear power plant during a zth year of historical operation is obtained by predicting a characteristic quantity of reliability of the reference operating nuclear power plant during the zth year of historical operation on the basis of a first planned shutdown factor and a first equivalent availability factor after deducting the planned shutdowns of the reference operating nuclear power plant from the zth year of historical operation.
[0112] In step S308, the verification of the accuracy of the prediction is carried out on the predicted value of the reliability of the nuclear power plant in operation on the basis of a relative error between the predicted value of the reliability and a statistical value of the quantity characteristic of the reliability of the source nuclear power plant in operation during the same historical operating year.
[0113] In step S309, if the predicted value of the reliability of the nuclear power plant in operation does not satisfy the verification of the accuracy of the prediction, a method for obtaining the predicted value of the reliability of the nuclear power plant in operation is carried out again until the predicted value of the reliability obtained from the nuclear power plant in operation satisfies the verification of the accuracy of the prediction.
[0114] In this way, the method can verify the accuracy of the prediction of the reliability prediction values for nuclear power plants in operation, and perform a further method for obtaining the reliability prediction values for nuclear power plants in operation when the reliability prediction values do not satisfy the verification of the accuracy of the prediction, until the reliability prediction values obtained for nuclear power plants in operation satisfy the verification of the accuracy of the prediction. That is to say, the method for obtaining the reliability prediction values for nuclear power plants in operation can be repeated until the accuracy of the prediction of the reliability prediction values for nuclear power plants in operation is relatively high, which can make it possible to achieve a high-precision prediction of the reliability prediction values for nuclear power plants in operation.
[0115] For example, in the operating nuclear power plant 1 and the operating nuclear power plant 2, a relative error Eri between the predicted value of the equivalent availability factor Eafi(L7) and a first statistical value of the equivalent availability factor Eaf(L / ) of the nuclear power plant in operation 2 during the historical years of operation is calculated as follows:
[0116] P
[0117] The results of the calculation of the relative error Er[ between the predicted value of the equivalent availability factor Eafi(L / ) and the statistical value of the first equivalent availability factor Eaf(L / ) of the nuclear power plant in operation 2 during the historical years t, / i'operation are shown in Table 2.
[0118] [Table 2] Results of calculation of the relative error of the nuclear power plant in operation 2 over the last 5 years
[0119] In certain embodiments, based on the relative error between the reliability prediction value and the statistical value of the characteristic quantity of reliability of the reference operating nuclear power plant during the same historical operating years, the accuracy of the prediction of the reliability prediction value of the operating nuclear power plant is verified, which includes whether an absolute value of the relative error of the reference operating nuclear power plant during a plurality of historical operating years is less than or equal to the second defined threshold, the reliability prediction value of the operating nuclear power plant is determined by verifying the accuracy of the prediction, or whether the absolute value of the relative error of the reference operating nuclear power plant during at least one historical operating year is greater than the second defined threshold,It is determined that the predicted value of the target reliability of the operating nuclear power plant does not meet the accuracy of the prediction.
[0120] For example, in Table 2, if the second defined threshold is 1.9%, the absolute values of the relative errors of the operating nuclear power plant 2 over the last 5 years are all less than 1.70%, and it is determined that the prediction value of the equivalent availability factor of the group of nuclear power plants in service 1 was verified through prediction accuracy verification.
[0121] In step S310, based on the reliability prediction values and the planned maintenance categories of the nuclear power plants in operation, reliability monitoring is carried out on the nuclear power plants in operation.
[0122] The relevant content of step S310 can be found in the embodiments mentioned above, which will not be repeated here.
[0123] In summary, according to the method for high-precision prediction and reliability monitoring appropriate for the nuclear power plant in operation in the embodiments of this disclosure, the first equivalent availability factor after deduction of planned outages is determined on the basis of the average value of the first equivalent availability factors of the reference nuclear power plant in operation during the plurality of historical operating years, and the average value of the first planned outage factors of the reference nuclear power plant in operation during the plurality of historical operating years.The predictive value of the reliability of the nuclear power plant in operation in different categories of planned maintenance is obtained on the basis of the first equivalent availability factor after deduction of planned shutdowns, which is appropriate for the high-precision prediction of the reliability of the first category of predictive reliability of nuclear power plants in operation.
[0124] Fig. 4 is a flowchart showing a method for prediction and on appropriate reliability monitoring for an operating nuclear power plant according to an embodiment of this disclosure.
[0125] As shown in [Fig.4], the method for predicting and monitoring the reliability appropriate for an operating nuclear power plant includes the following steps S401 to S412.
[0126] In step S401, a number of years of operation of the nuclear power plant in service is obtained.
[0127] In step 402, a target reliability prediction category is determined as a second reliability prediction category in the case where the number of years of operation is greater than or equal to a first defined threshold.
[0128] In step S403, a second equivalent availability factor and a second planned interruption factor of the nuclear power plant in operation over a plurality of historical operating years are determined as second basic reliability data of the nuclear power plant in operation.
[0129] For example, if the power of a nuclear power plant in operation 3 is 1100 MW and has been in operation for 6 years but less than 7 years, in the case where the first threshold is defined as 5 years, it can be determined that the number of years in operation has reached 6 years, and the target reliability prediction category is de completed as the second reliability prediction category. The second equivalent availability factor (Eaf) and the second planned outage factor (Pof) of the operating nuclear power plant 3 over the last 6 years can be obtained and determined as the second basic reliability data for the operating nuclear power plant 3. The second equivalent availability factor and the second planned outage factor of the operating nuclear power plant 3 over the last 6 years are shown in Table 3.
[0130] [Table 3] Statistical value of the nuclear power plant in operation 3 over the last 6 years ara»* 4' LafV * [ 1 SWWWW'.WWVWWWW iW“ 0.0002(^ 'A'.'A'.'A'.'A'.'A'.'A'.'A'.'A'.'A'.'A'.'A'.'A'.'A'.'A -------------------------- n $0^ Ù ï p s « x .-y .«y .«y ÿ 0,0 00 “3 i | 3 0 0.003 HO sssssssssssssssssssssss 1 4 o 0,0^30 0.00021¼ s . (L9042 1 .OOtkKK) ] 0.000001 ] | 6 S-ssssssssssssssssssssssssssssssssssssssss 1.0000 0 ss<ssssssssssssssssssssssssssssssssss<i.s 0,000001 î
[0131] where, s, represents the number of years of operation for the nuclear power plant in operation 3; s, = 1 represents the first year of operation of the nuclear power plant in operation 3, namely, the first historical year of operation; s, = 2 represents the second year of operation of the nuclear power plant in operation 3, namely, the second historical year of operation; s, = 3 represents the third year of operation of the nuclear power plant in operation 3, namely, the third historical year of operation; s, = 4 represents the fourth year of operation of the nuclear power plant in operation 3, namely, the fourth historical year of operation; s, = 5 represents the fifth year of operation of the nuclear power plant in operation 3, namely, the fifth historical year of operation; and st = 6 represents the sixth year of operation of the nuclear power plant in operation 3, namely, the sixth historical year of operation.
[0132] where EafC^ / ) represents the second equivalent availability factor of the nuclear power plant in operation 3 during the historical operating year st; PofC^) represents the second planned interruption factor of the nuclear power plant in operation 3 during the historical operating year st, 1 < i < M, M and i are positive integers, M represents the cumulative number of operating years, M > 5.
[0133] In step S404, based on the second equivalent availability factor and the second planned outage factor of the nuclear power plant in operation during a zth year of historical operation, the second equivalent availability factor after deduction of planned shutdowns of the nuclear power plant in operation during the zth year of historical operation is obtained, where i is a positive integer.
[0134] The second equivalent availability factor after deduction of planned shutdowns Eap(5,) of the nuclear power plant in operation 3 during the zth year of historical operation is calculated as follows: 1-Pœ(54
[0136] The results of the calculation of the second equivalent availability factor after deduction of planned shutdowns EapCO of the nuclear power plant in operation 3 during the last 6 years are shown in Table 3.
[0137] In step S405, a maintenance factor after deduction of planned shutdowns of the nuclear power plant in source service during the zth year of historical operation is obtained on the basis of the second equivalent availability factor after deduction of planned shutdowns of the nuclear power plant in source service during the zth year of historical operation.
[0138] For example, the maintenance factor after deduction of planned shutdowns p(s,) of the nuclear power plant in operation during the zth historical year s, of operation is calculated as follows:
[0140] The results of the calculation of maintenance factors after deduction of planned shutdowns p(s,) of the nuclear power plant in operation source 3 during the last 6 years are shown in Table 3.
[0141] In step S406, a power function expression of the maintenance factor after deduction of planned shutdowns of the nuclear power plant in operation is obtained on the basis of the maintenance factor after deduction of planned shutdowns of the nuclear power plant in operation during the plurality of historical operating years.
[0142] In step S407, the maintenance factor after deduction of planned shutdowns of the nuclear power plant in operation during the current operating year is obtained on the basis of the power function expression.
[0143] It is noted that the power function expression is not limited in this disclosure. For example, the power function expression may be as follows:
[0144] , -5.
[0145] where, a is a scaling parameter of the power function, [3 is a factor of growth of the power function, and s, is the number of years of operation of the nuclear power plant in service.
[0146] In certain embodiments, according to a nonlinear regression method and a least squares method, using the maintenance factors after deduction of planned shutdowns p(s,) of the nuclear power plant in operation 3 during the last 6 years in Table 3, the power function of the maintenance factor after deduction of planned shutdowns of the nuclear power plant in operation 3 is expressed as follows: 101471 p(s. ) = as? = 0.002229^3- 16714 ^
[0148] Namely, a = 0.002229, and [3 = 3.167142.
[0149] It can be seen that the current operating year of the nuclear power plant in operation 3 is the 7th operating year of the nuclear power plant in operation 3, namely s, = 7. The maintenance factor after deduction of planned shutdowns p^,) of the nuclear power plant in operation 3 during the current operating year is calculated as follows: 101501 p(s) = 0.002229 x?" 3 -1 ™ 2 '
[0151] In step S408, the prediction values of the reliability of nuclear power plants in operation in different planned maintenance categories are obtained on the basis of the maintenance factor after deducting the planned shutdowns of nuclear power plants in operation during the current operating year.
[0152] In certain embodiments, based on the maintenance factor after deduction of planned shutdowns of nuclear power plants in operation during the current operating year, the reliability prediction values of nuclear power plants in operation in different categories of planned maintenance are obtained, which includes the input of the maintenance factor after deduction of planned shutdowns into the reliability prediction model, and the output of the reliability prediction values of nuclear power plants in operation in different categories of planned maintenance by the reliability prediction model.
[0153] In certain embodiments, based on the maintenance factor after deducting planned shutdowns of nuclear power plants in operation during the current operating year, obtaining the reliability prediction values of nuclear power plants in operation in different planned maintenance categories may include the following processes.
[0154] In a first method, if the planned maintenance category includes only a planned conventional island overhaul, the reliability prediction value for nuclear power plants in operation during the planned conventional island overhaul year is obtained on the basis of the maintenance factor after deduction of the planned shutdowns, planned overhaul days of conventional islands and newly added unplanned maintenance days of the operating nuclear power plant.
[0155] For example, if the planned maintenance category of the operating nuclear power plant 3 during the current operating year includes only planned conventional island maintenance, the number of planned conventional island overhaul days for the operating nuclear power plant 3 during the current operating year is mi = 70 days, and the number of newly added unplanned maintenance days for the operating nuclear power plant 2 during the current operating year is Aud = 7 days, and s, = 7, a predicted value of the equivalent availability factor Eafi^O for the operating nuclear power plant 3 during the planned conventional island overhaul year is calculated as follows:
[0156] 24m / 3 8760 J 24 years old 8760 1 f 24x77 j ].+O,O02229x7'"^ 8760 / 24x7 0.7699 8 > 60
[0157] In a second method, if the planned maintenance category includes only an overhaul during a nuclear island fuel refueling, the predictive value of the reliability of nuclear power plants in operation during the overhaul year during nuclear island fuel refueling is obtained on the basis of the maintenance factor after deducting planned shutdowns, the number of overhaul days during nuclear island fuel refueling of nuclear power plants in operation, and newly added unplanned maintenance days.
[0158] For example, if the planned maintenance category of the nuclear power plant in operation 3 during the current operating year includes only an overhaul during an island fuel refueling, and the number of days for the overhaul during the island fuel refueling of the nuclear power plant in operation 3 during the current operating year is m2 = 40 days, the newly added unplanned maintenance days of the nuclear power plant in operation 3 during the current operating year Aud = 7 days, and Si = 7, a predicted value of the equivalent availability factor Eae,^) of the nuclear power plant in operation 3 during the year of shutdown for island fuel refueling is calculated as follows: t0159] 1 f. 24Aud ï I —---------T : i ”----:--- s — --------- 1 +xxç5 \ 8760 / 8760 _______________1______________ ~ 14-0.002229x7^^
[0160] In a third method, if the planned maintenance category includes only 24x40 1 24x7 1 - s - = og ? 12 planned maintenance during holidays, the predictive value of the reliability of nuclear power plants in operation during years of planned maintenance during holidays is obtained on the basis of the maintenance factor after deducting planned shutdowns, days of planned maintenance during holidays of nuclear power plants in operation, and newly added unplanned maintenance days.
[0161] For example, if the planned maintenance category of the nuclear power plant in operation 3 during the current operating year includes only planned maintenance during holidays, and the days of planned maintenance during holidays of the nuclear power plant in operation 3 during the current operating year m3 = 15 days, the newly added unplanned maintenance days of the nuclear power plant in operation 3 during the current operating year Aud = 7 days, and s, = 7, the predicted value of the equivalent availability factor EafiC^z) of the nuclear power plant in operation 3 under planned maintenance during holidays is calculated as follows:
[0162] if 24m, 3 24Aa.i ' ' 1 ,-ï-V S76ÛJ 87-60 1 f, 24x7 = —----------------- : 1----:---—--:—■ = 0^9^9 / ; :8760
[0163] In a fourth method, if the planned maintenance category is an unplanned maintenance category, the prediction value of the reliability of nuclear power plants in operation during the years of unplanned maintenance is obtained on the basis of the maintenance factor after deducting the planned shutdowns and the newly added days of unplanned maintenance of the nuclear power plants in operation.
[0164] For example, if the planned maintenance category of the operating nuclear power plant 3 is the unplanned maintenance category during the current operating year, the number of newly added unplanned maintenance days of the operating nuclear power plant 3 during the current operating year is Aud = 10 days, and Si = 7, a predicted value of the equivalent availability factor Eai oCvJ of the operating nuclear power plant 3 during the unplanned maintenance year is calculated as follows:
[0165] , x 1 24Au. 1 24x12 1 + 8760 1 +0.002229 x 7^0^ 8760
[0166] In step S410, on the basis of the second equivalent availability factor after deduction of planned shutdowns and the second planned shutdown factor of the nuclear power plant in operation during the zth year of historical operation, the prediction value of the reliability of the nuclear power plant in operation during the zth year of historical operation is obtained.
[0167] In step S411, based on the relative error between the prediction value of the reliability and the statistical value of the characteristic quantity of reliability of the nuclear power plant in operation during the same historical operating year, the verification of the accuracy of the prediction is carried out on the predicted value of the reliability of the nuclear power plant in operation.
[0168] In step S411, if the predicted value of the reliability of the nuclear power plant in operation does not satisfy the verification of the accuracy of the prediction, the process of obtaining the predicted value of the reliability of the nuclear power plant in operation is carried out again until the predicted value of the reliability obtained from the nuclear power plant in operation satisfies the verification of the accuracy of the prediction.
[0169] Therefore, the method can perform a verification of the accuracy of the prediction on the reliability prediction values of nuclear power plants in operation, and return to the method of obtaining the reliability prediction values of nuclear power plants in operation when the reliability prediction values do not satisfy the verification of the accuracy of the prediction until the reliability prediction values obtained from the nuclear power plants in operation satisfy the verification of the accuracy of the prediction. Namely, the method of obtaining the reliability prediction values of nuclear power plants in operation can be repeated until the accuracy of the prediction of the reliability prediction values of nuclear power plants in operation is relatively high, which helps to achieve a high-precision prediction of the reliability prediction values for nuclear power plants in operation.
[0170] For example, in the group of operating nuclear power plants 3, the relative error Er2 between the predicted value of the equivalent availability factor EAF2(5 / ) and the statistical value of the second equivalent availability factor Ea^s,) of the operating nuclear power plant 3 during the zth historical operating year s, is calculated as follows: | 1 - ( 3 . ) HH s ) - E .< r ( S. j = - ' J ___________:________x 1 00% E ÂF U)
[0172] The results of the calculation of the relative error Er2 between the predicted value of the equivalent availability factor Ea^s,) and the statistical value EafC^) of the second equivalent availability factor of the nuclear power plant in operation 3 during the zth year of historical operation s, are shown in Table 4.
[0173]
[0174]
[0175]
[0176] [Table 4] Results of the calculation of the relative error of the nuclear power plant in operation 3 over the last 6 years year of operation s. Eap(Si) Pof(^ / ) EAF2(^i)) — EAF2(^i)[l-PoF (^ / )] Eaf^i) Er2 / % 1 1 0.0827 0.9152 0.9171 -0.20 2 0.0971 0.9027 0.9022 0.05 3 0 0.9999 0.9969 0.30 4 0.0820 0.9180 0.9178 0.02 5 0.0958 0.9042 0.9042 -0.03 6 0 1.0000 1.0000 0 In certain embodiments, based on the relative error between the reliability prediction values and the characteristic reliability statistics of nuclear power plants in operation during the same historical operating year, the accuracy of the prediction of the reliability prediction values of nuclear power plants in operation is verified, which includes determining the reliability prediction value of the nuclear power plant in operation by means of a verification of the accuracy of the prediction in the case where the absolute values of the relative error of nuclear power plants in operation during the plurality of historical operating years are less than or equal to a second defined threshold,or the determination of the predicted reliability value of the operating nuclear power plant by means of a verification of the accuracy of the prediction in the case where the absolute value of the relative error of the operating nuclear power plant during at least one year of historical operation is greater than the second defined threshold. To continue with Table 4 as an example, if the second defined threshold is 1.90%, we can see from Table 4 that the absolute values of the relative errors for the group of operating nuclear power plants 3 over the last 5 years are all less than 0.35%. It is determined that the predicted value of the equivalent availability factor for operating nuclear power plant 3 has been verified through the prediction accuracy check.
[0177] In step S412, based on the reliability prediction values and the planned maintenance categories of the nuclear power plants in operation, reliability monitoring is carried out on the nuclear power plants in operation.
[0178] The relevant content of step S412 can be found in the embodiments mentioned above, which will not be repeated here.
[0179] In summary, according to the method for high-precision prediction and reliability monitoring appropriate for an operating nuclear power plant in the embodiments of this disclosure, the second equivalent availability factor after deduction of planned outages of operating nuclear power plants during the zth year of historical operation is obtained on the basis of the second equivalent availability factor and the second planned interruption factor of operating nuclear power plants during the zth year of historical operation. The equivalent availability factor after deduction of planned outages of operating nuclear power plants during the zth year of historical operation is obtained on the basis of the second equivalent availability factor after deduction of planned outages of operating nuclear power plants during the zth year of historical operation.The power function expression for the equivalent availability factor after deducting planned outages of operating nuclear power plants is derived from the equivalent availability factor after deducting planned outages of operating nuclear power plants over a plurality of historical operating years. The equivalent availability factor after deducting planned outages of operating nuclear power plants during the current operating year is derived from the power function expression.The reliability prediction values for nuclear power plants in operation in different planned maintenance categories are obtained on the basis of the equivalent availability factor after deducting planned shutdowns of nuclear power plants in operation during the current operating year, which is appropriate for high-precision reliability prediction of the second reliability prediction category for nuclear power plants in operation.
[0180] Based on any one of the embodiments mentioned above, as shown in [Fig.5], in step S104, the realization of reliability monitoring on the nuclear power plant in operation based on a reliability prediction value and a planned maintenance category of the nuclear power plant in operation includes the following steps S501 to S502.
[0181] In step S501, a monitoring qualification condition for the operating nuclear power plant is determined on the basis of the planned maintenance category.
[0182] In certain embodiments, the determination of the supervisory qualification condition for the operating nuclear power plant based on the category of Planned maintenance includes determining the monitoring qualification condition for the operating nuclear power plant based on a corresponding relationship between the planned maintenance categories and the monitoring qualification condition. It is understood that different planned maintenance categories may correspond to different monitoring qualification conditions or to the same monitoring qualification conditions.
[0183] In some embodiments, the determination of the monitoring qualification condition for the nuclear power plant in operation on the basis of the planned maintenance category includes: the determination of a reliability monitoring criterion value for the nuclear power plant in operation on the basis of the planned maintenance category; and the determination of the monitoring qualification condition on the basis of the reliability monitoring criterion value.
[0184] In some embodiments, the determination of the reliability monitoring criterion value for the nuclear power plant in operation on the basis of the planned maintenance category includes: the determination of the reliability monitoring criterion value for the nuclear power plant in operation on the basis of the corresponding relationship between the planned maintenance category and the reliability monitoring criterion value.
[0185] In some embodiments, the determination of the monitoring qualification condition for the operating nuclear power plant on the basis of the reliability monitoring criterion value includes determining that the target reliability prediction value is greater than or equal to the reliability monitoring criterion value as a monitoring qualification condition.
[0186] In some embodiments, the determination of the monitoring qualification condition for operating nuclear power plants based on the reliability monitoring criterion value includes determining that the target reliability prediction value is less than the reliability monitoring criterion value as a monitoring failure condition.
[0187] In step S502, it is determined whether the reliability prediction value meets the monitoring qualification condition to perform reliability monitoring on the operating nuclear power plant.
[0188] In some embodiments, determining whether the reliability prediction value meets the monitoring qualification requirement for performing reliability monitoring at the operating nuclear power plant included determining that there are no reliability anomalies at the operating nuclear power plant if the reliability prediction value meets the monitoring qualification requirements, and determining that reliability anomalies occur at the operating nuclear power plant if the reliability prediction value does not does not meet the qualification requirements for surveillance.
[0189] For example, if the reliability prediction value is greater than or equal to the reliability monitoring criterion value based on the monitoring qualification condition, determining whether the reliability prediction value meets the monitoring qualification condition for carrying out reliability monitoring on the operating nuclear power plant includes determining that there are no reliability anomalies in the operating nuclear power plant if the reliability prediction value is greater than or equal to the reliability monitoring criterion value, and determining that there are reliability anomalies in the operating nuclear power plant if the reliability prediction value is less than the reliability monitoring criterion value.
[0190] Therefore, in the process, based on the planned maintenance category, the monitoring qualification conditions for operating nuclear power plants are determined, and the target reliability prediction value is determined as fulfilling the monitoring qualification conditions for reliability monitoring of operating nuclear power plants. Specifically, the planned maintenance category can be considered to determine the monitoring qualification conditions for performing reliability monitoring on the operating nuclear power plant.
[0191] Fig. 6 is a flowchart showing a method for prediction and on appropriate reliability monitoring for an operating nuclear power plant according to an embodiment of this disclosure.
[0192] As shown in [Fig.6], the method for predicting and monitoring the reliability appropriate for the nuclear power plant in operation in the embodiments of this disclosure includes the following steps S601 and S610.
[0193] In step S601, a number of years of operation of the nuclear power plant in operation is obtained, and a target reliability prediction category of the nuclear power plant in operation is determined on the basis of the number of years of operation.
[0194] In step S602, reliability prediction is performed on the nuclear power plant in operation on the basis of first basic reliability data of the nuclear power plant in operation in the case where the target reliability prediction category is a first reliability prediction category.
[0195] In step S603, reliability prediction is performed on the nuclear power plant in operation on the basis of second basic reliability data of the nuclear power plant in operation in the case where the target reliability prediction category is a second reliability prediction category.
[0196] In step S604, a planned maintenance category for operating nuclear power plants is obtained.
[0197] In step S605, in the case where the planned maintenance category includes only a planned revision of conventional island, a first reliability monitoring criterion value for the operating nuclear power plant is obtained.
[0198] In step S606, in the case where the planned maintenance category includes only an overhaul during a nuclear island fuel reloading, a second reliability monitoring criterion value for the operating nuclear power plant is obtained.
[0199] In step S607, in the case where the planned maintenance category includes only planned maintenance during holidays, a third reliability monitoring criterion value for the operating nuclear power plant is obtained.
[0200] In step S608, in the case where the planned maintenance category is an unplanned maintenance category, a fourth reliability monitoring criterion value for the nuclear power plant in operation is obtained.
[0201] In step S609, in the case where the reliability prediction value is greater than or equal to the reliability monitoring criterion value, it is determined that the reliability prediction value fulfills the monitoring qualification condition.
[0202] In step S610, in the case where the reliability prediction value is less than the reliability monitoring criterion value, it is determined that the reliability prediction value does not meet the monitoring qualification condition.
[0203] In certain embodiments, in the case where the reliability prediction category of the nuclear power plant in operation 1 is the first reliability prediction category, the reliability monitoring of the nuclear power plant in operation 1 is carried out as follows.
[0204] For example, if the power of the nuclear power plant in operation 1 is 1,000 MW and has been in operation for 4 years but less than 5 years, the characteristic quantity of reliability is taken as the equivalent availability factor, the equivalent availability factor of the nuclear power plant in operation 1 can be predicted during the current operating year, and the predicted value of the equivalent availability factor EafiCO can be obtained, where t, is the current operating year.
[0205] In some embodiments, the reliability monitoring criteria for the operating nuclear power plant 1 are indicated in Table 5.
[0206] [Table 5] Reliability monitoring criteria for operating nuclear power plants Number of reliability monitoring criterion values: 1. First reliability monitoring criterion value: Eafoi 0.77; 2. Second reliability monitoring criterion value: EAF02 0.87 3. Third value of the reliability monitoring criterion E^s 0.91 4. Fourth value of the reliability monitoring criterion E AF04 0.94
[0207] If the planned maintenance category includes only a planned overhaul of a conventional cell, the prediction value of the equivalent availability factor E^^t, ) = 0.7597, and EafiCO < E^i, it is determined that the prediction value of the equivalent availability factor Eafi(A) does not meet the monitoring qualification condition.
[0208] If the planned maintenance category includes only one overhaul during a nuclear island fuel refueling, the prediction value of the equivalent availability factor EAFi(t,) = 0.8574, and EafiCO < EA|,02. H is determined that the prediction value of the equivalent availability factor EAFi(t,) does not meet the monitoring qualification conditions.
[0209] If the planned maintenance category includes only planned maintenance during holidays, the prediction value of the equivalent availability factor E^^t, ) = 0.9076, and EafiCO < E^s, it can be determined that the prediction value of the equivalent availability factor does not meet the monitoring qualification conditions.
[0210] If the planned maintenance category is the unplanned maintenance category, the prediction value of the equivalent availability factor Eàp^A ) = 0.7597, and Eàp^A) < Eafo4, it can be determined that the prediction value of the equivalent availability factor Eàp^A) does not meet the monitoring qualification conditions.
[0211] In some embodiments, if the reliability prediction category of the nuclear power plant in operation 3 is the second reliability prediction category, the reliability monitoring on the nuclear power plant in operation 3 is carried out as follows.
[0212] For example, a nuclear power plant in operation has a power of 1100 MW and a total of 6 years of operation but less than 7 years, the characteristic reliability quantity is used as an equivalent availability factor, the equivalent availability factor of the nuclear power plant in operation 3 can be predicted during the current operating year, and the predicted value of the equivalent availability factor EAF2(5I) can be obtained, where s, is the number of years of operation of the nuclear power plant in operation 3, and s, = 7 refers to the 7th year of operation of the nuclear power plant in operation 3, namely the current operating year.
[0213] In some embodiments, the reliability monitoring criteria for the operating nuclear power plant 3 are indicated in Table 5.
[0214] If the planned maintenance category includes only a planned overhaul of a conventional cell, the prediction value of the equivalent availability factor E^C^-) = 0.7699, and E^C^) < Eapoi, it can be determined that the prediction value of the equivalent availability factor Ea^s,) does not meet the monitoring qualification requirements.
[0215] If the planned maintenance category includes only one overhaul during a nuclear island fuel refueling, the prediction value of the equivalent availability factor EAF2(^i) = 0.8712, and Ea^s,) > EAF02, it can be determined that the prediction value of the equivalent availability factor Ea^s,) meets the monitoring qualification conditions.
[0216] If the planned maintenance category includes only planned maintenance during holidays, the prediction value of the equivalent availability factor Ea^s, ) = 0.9397, and E^C^,) > Eapos, it can be determined that the prediction value of the equivalent availability factor E^^s,) fulfills the monitoring qualification condition.
[0217] If the planned maintenance category is the unplanned maintenance category, the prediction value of the equivalent availability factor E^Cs, ) = 0.9671, and Eaf2(s<) > Eafo4, it can be determined that the prediction value of the equivalent availability factor E^^s,) fulfills the monitoring qualification condition.
[0218] In summary, according to the method for high-precision prediction and reliability monitoring appropriate for the operating nuclear power plant in the embodiments of this disclosure, if the planned maintenance category includes only conventional island planned maintenance, the first reliability monitoring criterion value is obtained. If the planned maintenance category includes only an overhaul during a nuclear island refueling, the second reliability monitoring criterion value is obtained. If the planned maintenance category includes only scheduled maintenance during holidays, the third reliability monitoring criterion value is obtained. If the planned maintenance category is unplanned maintenance, the fourth reliability monitoring criterion value is obtained.Based on the relationship between the obtained reliability monitoring criterion value and the reliability prediction value, it is determined whether the reliability prediction value meets the monitoring qualification condition, which is appropriate for carrying out reliability monitoring of operating nuclear power plants.
[0219] Fig. 7 is a flowchart showing a method for increasing the reliability appropriate for an operating nuclear power plant according to an embodiment of the present disclosure.
[0220] As shown in [Fig.7], the method for increasing the reliability appropriate for the nuclear power plant in operation in the embodiments of this disclosure includes the following steps S701 to S703.
[0221] In step S701, the reliability prediction is performed on the nuclear power plant in operation on the basis of a number of years of operation of the nuclear power plant in operation to obtain a reliability prediction value of the nuclear power plant in operation;
[0222] The relevant content of step S701 can be found in [Fig.1] to [Fig.4] of the following embodiments, which will not be repeated here.
[0223] In step S702, abnormal reliability data of the nuclear power plant in operation are determined on the basis of a planned maintenance category of the nuclear power plant in operation in the event that the reliability prediction value does not meet a monitoring qualification condition.
[0224] It is noted that there are not too many limitations on abnormal reliability data. For example, abnormal reliability data include scheduled maintenance days corresponding to the scheduled maintenance categories and / or newly added unscheduled maintenance days for operating nuclear power plants.
[0225] In certain embodiments, the determination of abnormal reliability data for the operating nuclear power plant based on the planned maintenance category includes the determination of abnormal reliability data based on the corresponding relationship between the planned maintenance category and the abnormal reliability data. It is understood that different planned maintenance categories may correspond to different abnormal reliability data or to the same abnormal reliability data.
[0226] In step S703, the abnormal reliability data are optimized, and a method for obtaining the reliability prediction value is again carried out until the reliability prediction value obtained meets the monitoring qualification condition.
[0227] In some embodiments, the optimization of abnormal reliability data includes determining an optimization strategy for the abnormal reliability data based on the planned maintenance categories, and optimizing the abnormal reliability data according to the optimization strategy. Therefore, the method can consider the planned maintenance category and determine the optimization strategy for the abnormal reliability data, so as to optimize the abnormal reliability data and improve the accuracy of the optimization of the abnormal reliability data.
[0228] In certain embodiments, the optimization of abnormal reliability data includes determining an adjustment range for scheduled maintenance days based on the scheduled maintenance category, optimizing scheduled maintenance days within the adjustment range, determining an adjustment range for newly added unscheduled maintenance days, and optimizing newly added unscheduled maintenance days within the adjustment range for new unscheduled maintenance days.
[0229] In some embodiments, a mapping linking the planned maintenance category and the adjustment interval for planned maintenance days can be established in advance. Determining the adjustment interval for planned maintenance days based on the planned maintenance category includes requesting the adjustment interval in the mapping based on the planned maintenance category, and determining the requested adjustment interval as the adjustment interval for planned maintenance days.
[0230] In summary, according to the method for high-precision reliability enhancement for the operating nuclear power plant in the embodiments of this disclosure, if the reliability prediction value does not meet the monitoring qualification requirements, the abnormal reliability data for the operating nuclear power plant are determined based on the planned maintenance category, the abnormal reliability data are optimized, and the method for obtaining the reliability prediction value is performed again until the obtained reliability prediction value meets the monitoring qualification requirements.Therefore, when the reliability prediction value does not meet the monitoring qualification conditions, the abnormal reliability data can be optimized, and the process of obtaining the reliability prediction value can be run again until the resulting reliability prediction value meets the monitoring qualification conditions, which can improve the reliability of the operating nuclear power plant.
[0231] Fig. 8 is a flowchart showing a method for high-precision reliability enhancement suitable for an operating nuclear power plant according to an embodiment of this disclosure.
[0232] As shown in [Fig.8], the method for high-precision reliability enhancement for the nuclear power plant in operation in the embodiments of this disclosure includes the following steps S801 to S807.
[0233] In step S801, the reliability prediction is performed on the nuclear power plant in operation on the basis of a number of years of operation of the nuclear power plant in operation to obtain a reliability prediction value of the nuclear power plant in operation;
[0234] In step S802, abnormal reliability data of the nuclear power plant in operation are determined on the basis of a planned maintenance category of the nuclear power plant in operation in the event that the reliability prediction value does not meet a monitoring qualification condition.
[0235] The relevant content of steps S801 to S802 can be found in the embodiments mentioned above, which will not be repeated here.
[0236] In step S803, in the case where the planned maintenance category includes only a planned overhaul of a conventional cell, a first adjustment interval is determined as the adjustment interval for the planned maintenance days of a conventional cell, and the number of planned overhaul days of a conventional cell within the first adjustment interval is optimized.
[0237] In step S804, in the case where the planned maintenance category includes only one overhaul during a nuclear island fuel reload, a third adjustment interval is determined as the adjustment interval for overhaul days during nuclear island fuel reload, and the number of overhaul days during nuclear island fuel reload within the third adjustment interval is optimized.
[0238] In step S805, in the case where the planned maintenance category includes only planned maintenance during leave, a fourth adjustment interval is determined as the adjustment interval for planned maintenance days during leave, and the number of planned maintenance days during leave within the fourth adjustment interval is optimized.
[0239] In step S806, in the case where the planned maintenance category includes only a planned conventional island overhaul, or the planned maintenance category includes only an overhaul during a nuclear island refueling, or the planned maintenance category includes only planned maintenance during holidays, or the planned maintenance category is unplanned maintenance, a second adjustment interval is determined as an adjustment interval for newly added unplanned maintenance days, and the number of newly added unplanned maintenance days within the second adjustment interval is optimized.
[0240] In step S807, the process for obtaining reliability prediction values is carried out again until the reliability prediction values obtained meet the monitoring qualification criteria.
[0241] In some embodiments, if the reliability prediction category of the nuclear power plant in operation 1 is the first reliability prediction category, the method for increasing the reliability for the nuclear power plant in operation 1 is carried out as follows.
[0242] For example, the characteristic quantity of reliability is the equivalent availability factor.
[0243] Method 1: If the planned maintenance category includes only a planned overhaul of a conventional cell, a lower limit of the first adjustment interval is greater than or equal to 60 days, an upper limit of the first adjustment interval is less than or equal to 80 days. A lower limit of the second adjustment interval is greater than or equal to 1 day, and an upper limit of the second adjustment interval is less than or equal to 12 days.
[0244] The target equivalent availability factors EafiCO of the operating nuclear power plant 1 corresponding to different planned overhaul days of conventional islands mb and newly added unplanned maintenance days Aud are shown in Table 6.
[0245] [Table 6] EafiCO corresponding to different mi and Aud of the nuclear power plant in operation 1 Days of planned overhaul of conventional cells, half-days of unplanned maintenance newly added. Aud 2 3 4 5 6 7 66 0.7840 0.7812 0.7785 0.7758 0.7730 0.7703 67 0.7813 0.7786 0.7759 0.7731 0.7704 0.7676 68 0.7787 0.7760 0.7732 0.7705 0.7677 0.7650 69 0.7760 0.7733 0.7706 0.7678 0.7651 0.7624 70 0.7734 0.7707 0.7679 0.7652 0.7625 0.7597
[0247] As shown in Table 6, it can be seen that the optimization of abnormal reliability data only during the planned overhaul years of conventional island includes the following implementations.
[0248] In a first improvement, the number of planned conventional island overhaul days for the operating nuclear power plant 1 is adjusted to 66 days, the number of newly added unplanned overhaul days is determined to be from 1 to 7 days, and the number of newly added unplanned maintenance days for the operating nuclear power plant 1 is optimized within the range of 1 to 7 days.
[0249] In a second improvement, the number of planned conventional island overhaul days for the operating nuclear power plant 1 is adjusted to 67 days, the number of newly added unplanned overhaul days is determined to be from 1 to 6 days, and the number of newly added unplanned maintenance days is determined to be 67 days.
[0250]
[0251]
[0252]
[0253]
[0254]
[0255]
[0256] The added Aud for the operating nuclear power plant 1 is optimized within the range of 1 to 6 days. In a third improvement, the number of planned conventional island overhaul days for the operating nuclear power plant 1 is adjusted to 68 days, the number of newly added unplanned overhaul days is determined to be 1 to 5 days, and the number of newly added unplanned maintenance days for the operating nuclear power plant 1 is optimized within the range of 1 to 5 days. In a fourth improvement, the number of planned conventional island overhaul days for the operating nuclear power plant 1 is adjusted to 69 days, the number of newly added unplanned overhaul days is determined to be 1 to 4 days, and the number of newly added unplanned maintenance days for the operating nuclear power plant 1 is optimized within the range of 1 to 4 days. In a fifth improvement, the number of planned conventional island overhaul days for the operating nuclear power plant 1 is adjusted to 70 days, the number of newly added unplanned overhaul days is determined to be 1 to 3 days, and the number of newly added unplanned maintenance days for the operating nuclear power plant 1 is optimized within the range of 1 to 3 days. Method 2: If the planned maintenance category includes only an overhaul during a nuclear island fuel reload, a lower limit of the third adjustment interval is greater than or equal to 20 days, an upper limit of the third adjustment interval is less than or equal to 40 days, a lower limit of the second adjustment interval is greater than or equal to 1 day, and an upper limit of the second adjustment interval is less than or equal to 12 days. The predicted values of the target equivalent availability factor EafiCO of the operating nuclear power plant 1 corresponding to different days of overhaul during nuclear island fuel refueling m2 and newly added unplanned maintenance days Audsont are shown in Table 7. [Table 7] EafiCO of the operating nuclear power plant 1 corresponding to different Au detm2 Days of overhaul during refueling of the nuclear island (m2) Newly added days of unplanned maintenance (Aud 2 3 4 5 6 7) 29 0.8817 0.8789 0.8762 0.8734 0.8707 0.8680 30 0.8790 0.8763 0.8735 0.8708 0.8681 0.8653 31 0.8764 0.8736 0.8709 0.8682 0.8654 0.8627 32 0.8737 0.8710 0.8683 0.8655 0.8628 0.8600 33 0.8711 0.8684 0.8656 0.8629 0.8601 0.8574
[0257] As shown in Table 7, it can be seen that the abnormal reliability data only during the overhaul years during the refueling of nuclear island fuel are optimized by the following implementations.
[0258] In a first improvement, the number of overhaul days during the refueling of nuclear island m2 for the operating nuclear power plant 1 is adjusted to 29 days, the number of newly added unplanned overhaul days Aud is determined to be from 1 to 6 days, and the number of newly added unplanned maintenance days Aud for the operating nuclear power plant 1 is optimized within the range of 1 to 6 days.
[0259] In a second improvement, the number of overhaul days during the refueling of nuclear island m2 for the operating nuclear power plant 1 is adjusted to 30 days, the number of newly added unplanned overhaul days Aud is determined to be from 1 to 5 days, and the number of newly added unplanned maintenance days Aud for the operating nuclear power plant 1 is optimized within the range of 1 to 5 days.
[0260] In a third improvement, the number of overhaul days during the refueling of nuclear island m2 for the operating nuclear power plant 1 is adjusted to 31 days, the number of newly added unplanned overhaul days Aud is determined to be from 1 to 4 days, and the number of newly added unplanned maintenance days Aud for the operating nuclear power plant 1 is optimized within the range of 1 to 4 days.
[0261] In a fourth improvement, the number of overhaul days during the refueling of nuclear island m2 for the operating nuclear power plant 1 is adjusted to 32 days, the number of newly added unplanned overhaul days Aud is determined to be 1 to 3 days, and the number of newly added unplanned maintenance days Aud for the operating nuclear power plant 1 is optimized within the range of 1 to 3 days.
[0262] In a fifth improvement, the number of overhaul days during the refueling of nuclear island m2 for the operating nuclear power plant 1 is adjusted to 33 days, the number of newly added unplanned overhaul days is determined to be 1 to 2 days, and the number of maintenance days
[0263]
[0264]
[0265]
[0266]
[0267]
[0268]
[0269] Unplanned newly added Aud for the operating nuclear power plant 1 is optimized within the range of 1 to 2 days. Method 3: If the planned maintenance category includes only planned maintenance during holidays, a lower limit of the fourth adjustment interval is greater than or equal to 5 days, an upper limit of the fourth adjustment interval is less than or equal to 15 days, a lower limit of the second adjustment interval is greater than or equal to 1 day, and an upper limit of the second adjustment interval is less than or equal to 12 days. The predicted values of the target equivalent availability factor EafiCO of the operating nuclear power plant 1 corresponding to different days of planned maintenance during leave m3, and newly added unplanned maintenance days Aud are shown in Table 8. [Table 8] EafiCO of the operating nuclear power plant 1 corresponding to different m3 and A ud Days of planned maintenance during holidays m3 days of unplanned maintenance newly added Aud 5 6 7 8 9 10 10 0.9236 0.9209 0.9181 0.9154 0.9126 0.9099 11 0.9210 0.9182 0.9154 0.9127 0.9100 0.9073 12 0.9183 0.9156 0.9128 0.9101 0.9074 0.9046 13 0.9157 0.9129 0.9102 0.9075 0.9047 0.9020 14 0.9130 0.9103 0.9076 0.9048 0.9021 0.8993 As shown in Table 8, abnormal reliability data during holidays are optimized by the following implementations. In a first improvement, the number of scheduled maintenance days during m3 holidays for the operating nuclear power plant 1 is adjusted to 10 days, and an adjustment interval for newly added unplanned maintenance days Aud is determined to be 1 to 9 days, and the number of newly added unplanned maintenance days Aud for the operating nuclear power plant 1 is improved within 1 to 9 days. In a second improvement, the number of scheduled maintenance days during the m3 holiday period for the operating nuclear power plant 1 is adjusted to 11 days, and an adjustment range for newly added unscheduled maintenance days is determined to be from 1 to 9 days, and the number of newly added unscheduled maintenance days for the operating nuclear power plant 1 is improved
[0270]
[0271]
[0272]
[0273]
[0274]
[0275]
[0276] within 1 to 9 days. In a third improvement, the number of scheduled maintenance days during m3 holidays for the operating nuclear power plant 1 is adjusted to 12 days, and an adjustment interval for newly added unscheduled maintenance days Aud is determined to be 1 to 8 days, and the number of newly added unscheduled maintenance days Aud for the operating nuclear power plant 1 is improved within 1 to 8 days. In a fourth improvement, the number of scheduled maintenance days during m3 holidays for the operating nuclear power plant 1 is adjusted to 13 days, and an adjustment interval for newly added unscheduled maintenance days Aud is determined to be 1 to 7 days, and the number of newly added unscheduled maintenance days Aud for the operating nuclear power plant 1 is improved within 1 to 7 days. In a fifth improvement, the number of scheduled maintenance days during m3 holidays for the operating nuclear power plant 1 is adjusted to 14 days, and an adjustment interval for newly added unscheduled maintenance days Aud is determined to be 1 to 6 days, and the number of newly added unscheduled maintenance days Aud for the operating nuclear power plant 1 is improved within 1 to 6 days. Method 4: If the planned maintenance category is an unplanned maintenance category, a lower limit of the second adjustment interval is greater than or equal to 1 day, and an upper limit of the second adjustment interval is less than or equal to 12 days. The predicted values of the target equivalent availability factor EafiCO of the operating nuclear power plant 1 corresponding to different newly added unplanned maintenance days Aud are shown in Table 9. [Table 9] AEafi^) of the operating nuclear power plant 1 corresponding to different Aud Newly added unplanned maintenance days Aud 1 2 3 4 5 6 Equivalent availability factor E AF1(O 0.9610 0.9582 0.9555 0.9528 0.9500 0.9473 Newly added unplanned maintenance days Aud 7 8 9 10 11 12 Equivalent availability factor E AF1(O 0.9445 0.9418 0.9391 0.9363 0.9336 0.9308
[0277]
[0278]
[0279]
[0280]
[0281]
[0282]
[0283]
[0284]
[0285] As indicated in Table 9, the adjustment range for newly added unplanned maintenance days Aud is determined to be from 1 to 8, and the number of newly added unplanned maintenance days Aud for the operating nuclear power plant 1 is optimized within 1 to 8 days. In some embodiments, if the reliability prediction category of the nuclear power plant in operation 3 is the second reliability prediction category, the increase in the reliability of the nuclear power plant in operation 3 is achieved as follows. For example, the characteristic quantity of reliability is the equivalent availability factor. Method 1: If the planned maintenance category includes only a planned overhaul of a conventional island, a lower limit of the first adjustment interval is greater than or equal to 60 days, an upper limit of the first adjustment interval is less than or equal to 80 days, a lower limit of the second adjustment interval is greater than or equal to 1 day, and an upper limit of the second adjustment interval is less than or equal to 12 days. The predicted values of the target equivalent availability factor EafiIa,) of the operating nuclear power plant 3 corresponding to different days of planned overhaul of conventional islands mi and newly added days of unplanned maintenance Audsont are shown in Table 10. [Table 10] AEa^s,) of the operating nuclear power plant 3 corresponding to different Aud and mi Days of planned overhaul of conventional islands, half of unplanned maintenance days newly added. Aud 6 7 8 9 10 11 12 73 0.7836 0.7808 0.7781 0.7753 0.7726 0.7699 0.7671 74 0.7808 0.7781 0.7753 0.7726 0.7699 0.7671 0.7644 75 0.7781 0.7753 0.7726 0.7699 0.7671 0.7644 0.7616 76 0.7753 0.7726 0.7699 0.7671 0.7644 0.7616 0.7589 77 0.7726 0.7699 0.7671 0.7644 0.7616 0.7589 0.7562 As shown in Table 10, it can be seen that abnormal reliability data only during the planned overhaul years of conventional island are optimized by the following implementations. In an initial improvement, the number of planned conventional island overhaul days for the operating nuclear power plant is adjusted to 73 days, and an in The adjustment range for newly added unplanned maintenance days Aud is determined to be 1 to 10 days, and the number of newly added unplanned maintenance days Aud for the operating nuclear power plant 3 is optimized within 1 to 10 days.
[0286] In a second improvement, the number of planned conventional island overhaul days for the operating nuclear power plant is adjusted to 74 days, and an adjustment interval for the newly added unplanned maintenance days is determined to be 1 to 9 days, and the number of newly added unplanned maintenance days for the operating nuclear power plant is optimized within 1 to 9 days.
[0287] In a third improvement, the number of planned conventional island overhaul days for the operating nuclear power plant is adjusted to 75 days, and an adjustment interval for newly added unplanned maintenance days is determined to be 1 to 8 days, and the number of newly added unplanned maintenance days for the operating nuclear power plant is optimized within 1 to 8 days.
[0288] In a fourth improvement, the number of planned conventional island overhaul days for the operating nuclear power plant is adjusted to 76 days, and an adjustment interval for the newly added unplanned maintenance days is determined to be 1 to 7 days, and the number of newly added unplanned maintenance days for the operating nuclear power plant is optimized within 1 to 7 days.
[0289] In a fifth improvement, the number of planned conventional island overhaul days for the operating nuclear power plant is adjusted to 77 days, and an adjustment interval for the newly added unplanned maintenance days is determined to be 1 to 6 days, and the number of newly added unplanned maintenance days for the operating nuclear power plant is optimized within 1 to 6 days.
[0290] Method 2: If the planned maintenance category includes only an overhaul during a nuclear island fuel reload, a lower limit of the third adjustment interval is greater than or equal to 20 days, an upper limit of the third adjustment interval is less than or equal to 40 days, a lower limit of the second adjustment interval is greater than or equal to 1 day, and an upper limit of the second adjustment interval is less than or equal to 12 days.
[0291] The predicted values of the target equivalent availability factor EafiIa,) of the operating nuclear power plant 3 corresponding to different overhaul days during nuclear island fuel refueling m2 and different non-maintenance days Newly added planned Aud are shown in Table 11.
[0292] [Table 11] AEAF2(^Ij of the operating nuclear power plant 3 corresponding to different m2 and Aud Days of overhaul during refueling of nuclear island (m2) Newly added unplanned maintenance days Au d 6 7 8 9 10 11 12 36 0.8849 0.8822 0.8794 0.8767 0.8740 0.8712 0.8685 37 0.8822 0.8794 0.8767 0.8740 0.8712 0.8685 0.8057 38 0.8794 0.8767 0.8740 0.8712 0.8685 0.8657 0.8630 39 0.8767 0.8740 0.8712 0.8685 0.8657 0.8630 0.8603 40 0.8740 0.8712 0.8685 0.8657 0.8630 0.8603 0.8575
[0294] As shown in Table 11, it can be seen that the abnormal reliability data only during the overhaul years during nuclear island fuel reloading are optimized by the following implementations.
[0295] In a first improvement, the number of overhaul days during the refueling of nuclear island m2 of the operating nuclear power plant 3 is adjusted to 36 days, and an adjustment interval for the newly added unplanned maintenance days Aud is determined to be from 1 to 11 days, and the number of newly added unplanned maintenance days Aud for the operating nuclear power plant 3 is optimized within 1 to 11 days.
[0296] In a second improvement, the number of overhaul days during the refueling of nuclear island m2 of the operating nuclear power plant 3 is adjusted to 37 days, and an adjustment interval for the newly added unplanned maintenance days Aud is determined to be 1 to 10 days, and the number of newly added unplanned maintenance days Aud for the operating nuclear power plant 3 is optimized within 1 to 10 days.
[0297] In a third improvement, the number of overhaul days during the refueling of nuclear island m2 of the operating nuclear power plant 3 is adjusted to 38 days, and an adjustment interval for the newly added unplanned maintenance days Aud is determined to be 1 to 9 days, and the number of newly added unplanned maintenance days Aud for the operating nuclear power plant 3 is optimized within 1 to 9 days.
[0298] In a fourth improvement, the number of overhaul days during the refueling of nuclear island m2 of the operating nuclear power plant 3 is adjusted to 39 days, and an adjustment interval for unplanned maintenance days
[0299]
[0300]
[0301]
[0302]
[0303]
[0304]
[0305] newly added Aud is determined to be 1 to 8 days, and the number of newly added unplanned maintenance days Aud for the operating nuclear power plant 3 is optimized within 1 to 8 days. In a fifth improvement, the number of review days during the refueling of the m2 nuclear island of the operating nuclear power plant 3 is adjusted to 40 days, and an adjustment interval for the newly added Aud unplanned maintenance days is determined to be 1 to 7 days, and the number of newly added Aud unplanned maintenance days for the operating nuclear power plant 3 is optimized within 1 to 7 days. Method 3: If the planned maintenance category includes only planned maintenance during holidays, a lower limit of the fourth adjustment interval is greater than or equal to 5 days, an upper limit of the fourth adjustment interval is less than or equal to 15 days, a lower limit of the second adjustment interval is greater than or equal to 1 day, and an upper limit of the second adjustment interval is less than or equal to 12 days. The predicted values of the target equivalent availability factor EafiIa,) of the operating nuclear power plant 3 corresponding to different days of planned maintenance during holidays m3, and newly added unplanned maintenance days Aud are shown in Table 12. [Table 12] AE^lAi) of the operating nuclear power plant 3 corresponding to different m3 and Aud Days of planned maintenance during holidays m3 days of unplanned maintenance newly added Aud 6 7 8 9 10 11 12 11 0.9534 0.9507 0.9479 0.9452 0.9425 0.9397 0.9370 12 0.9507 0.9479 0.9452 0.9425 0.9397 0.9370 0.9342 13 0.9479 0.9452 0.9425 0.9397 0.9370 0.9342 0.9315 14 0.9452 0.9425 0.9397 0.9370 0.9342 0.9315 0.9288 15 0.9425 0.9397 0.9370 0.9342 0.9315 0.9288 0.9260 As shown in Table 12, it can be seen that the abnormal reliability data only for the year of planned maintenance during the holidays are optimized for subsequent implementations. In an initial improvement, the number of scheduled maintenance days during the operating 3 nuclear power plant's shutdown period is adjusted to 11 days, and an adjustment interval for newly added unscheduled maintenance days is introduced. determined to be from 1 to 12 days, and the number of newly added unplanned maintenance days for the operating nuclear power plant 3 is optimized within 1 to 12 days.
[0306] In a second improvement, the number of scheduled maintenance days during the m3 holidays of the operating nuclear power plant 3 is adjusted to 11 days, and an adjustment interval for the newly added unplanned maintenance days Aud is determined to be from 1 to 12 days, and the number of newly added unplanned maintenance days Aud for the operating nuclear power plant 3 is optimized within 1 to 12 days.
[0307] In a third improvement, the number of scheduled maintenance days during the m3 holidays of the operating nuclear power plant 3 is adjusted to 13 days, and an adjustment interval for the newly added unplanned maintenance days Aud is determined to be from 1 to 13 days, and the number of newly added unplanned maintenance days Aud for the operating nuclear power plant 3 is optimized within 1 to 13 days.
[0308] In a fourth improvement, the number of scheduled maintenance days during the m3 holidays of the operating nuclear power plant 3 is adjusted to 14 days, and an adjustment interval for the newly added unplanned maintenance days Aud is determined to be from 1 to 12 days, and the number of newly added unplanned maintenance days Aud for the operating nuclear power plant 3 is optimized within 1 to 12 days.
[0309] In a fifth improvement, the number of scheduled maintenance days during the m3 holidays of the operating nuclear power plant 3 is adjusted to 15 days, and an adjustment interval for the newly added unplanned maintenance days Aud is determined to be from 1 to 12 days, and the number of newly added unplanned maintenance days Aud for the operating nuclear power plant 3 is optimized within 1 to 12 days.
[0310] Method 4: If the planned maintenance category is an unplanned maintenance category, a lower limit of the second adjustment interval is greater than or equal to 1 day, and an upper limit of the second adjustment interval is less than or equal to 12 days.
[0311] The prediction values of the target equivalent availability factor E^C^) corresponding to different newly added unplanned maintenance days Aud of the operating nuclear power plant 3 are shown in Table 13.
[0312] [Table 13] AEaf2(^) of the operating nuclear power plant 3 corresponding to different Aud Days of unplanned maintenance: 1 2 3 4 5 6 Newly added Aud equivalent availability factor E AF2(^i) 0.9973 0.9945 0.9918 0.9890 0.9863 0.9836 days of unplanned maintenance Newly added Aud 7 8 9 10 11 12 equivalent availability factor E AF2(^i) 0.9808 0.9781 0.9753 0.9726 0.9699 0.9671
[0314] As indicated in Table 13, an adjustment range for newly added unplanned maintenance days Aud is determined to be 1 to 12 days, and the number of newly added unplanned maintenance days Aud for the operating nuclear power plant 3 within 1 to 12 days is optimized.
[0315] In summary, according to the method for high-precision reliability enhancement for the operating nuclear power plant in the embodiments of this disclosure, if the planned maintenance category includes only a planned conventional island overhaul, the number of days for the planned conventional island overhaul is optimized within the first adjustment interval. If the planned maintenance category includes only an overhaul during a nuclear island refueling, the number of days for the overhaul during the nuclear island refueling is optimized within the third adjustment interval. If the planned maintenance category includes only a planned overhaul during holidays, the number of days for planned maintenance during holidays is optimized within the fourth adjustment interval.If the planned maintenance category includes only a planned conventional island overhaul, or the planned maintenance category includes only an overhaul during a nuclear island refueling, or the planned maintenance category includes only planned maintenance during holidays, or the planned maintenance category is unplanned maintenance, the number of newly added unplanned maintenance days is optimized within the second adjustment interval, which is appropriate for increasing the reliability of operating nuclear power plants.
[0316] In order to achieve the embodiments mentioned above, the present disclosure has provided a device for predicting and monitoring the reliability of an operating nuclear power plant.
[0317] The [Fig.9] is a schematic diagram showing a device for predicting and monitoring reliability suitable for an operating nuclear power plant according to an embodiment of this disclosure.
[0318] As shown in [Fig.9], the device 100 for predicting and monitoring reliability suitable for the nuclear power plant in operation in the embodiments of this disclosure includes a determination module 110, a prediction module 120 and a monitoring module 130.
[0319] The determination module 110 is configured to obtain a number of years of operation of the nuclear power plant in operation, and determine a target reliability prediction category of the nuclear power plant in operation based on the number of years of operation.
[0320] The prediction module 120 is configured to perform a reliability prediction on the nuclear power plant in operation on the basis of initial basic reliability data of the nuclear power plant in operation in the case where the target reliability prediction category is a first reliability prediction category.
[0321] The prediction module 120 is further configured to perform a reliability prediction on the nuclear power plant in operation on the basis of second basic reliability data of the nuclear power plant in operation in the case where the target reliability prediction category is a second reliability prediction category.
[0322] The monitoring module 130 is configured to perform reliability monitoring on the nuclear power plant in operation on the basis of a predicted reliability value and a planned maintenance category of the nuclear power plant in operation.
[0323] In one embodiment of this disclosure, the determination module 110 is further configured to determine the target reliability prediction category as the first reliability prediction category in the case where the number of years of operation is less than a first defined threshold; or to determine the target reliability prediction category as the second reliability prediction category in the case where the number of years of operation is greater than or equal to the first defined threshold.
[0324] In one embodiment of this disclosure, the prediction module 120 is further configured to determine a basic reliability data acquisition strategy to predict the reliability of the nuclear power plant in operation based on the target reliability prediction category, wherein the acquisition strategy includes a source nuclear power plant in operation and a data collection condition for basic reliability data; perform data collection on the source nuclear power plant in operation based on the data collection condition to obtain basic reliability data to predict the reliability of the nuclear power plant in operation.
[0325] In one embodiment of this disclosure, the prediction module 120 is further configured to determine, as the source operating nuclear power plant, a reference operating nuclear power plant having the same power output as the power plant nuclear in operation in the case where the target reliability prediction category is the first reliability prediction category; and determine, as first baseline reliability data for the nuclear plant in operation, baseline reliability data for the source nuclear plant in operation over a plurality of historical operating years.
[0326] In one embodiment of this disclosure, the prediction module 120 is further configured to determine the operating nuclear power plant as the source operating nuclear power plant in the case where the target reliability prediction category is the second reliability prediction category; and to determine, as second basic reliability data for the operating nuclear power plant, basic reliability data for the operating nuclear power plant over a plurality of historical operating years.
[0327] In one embodiment of this disclosure, the prediction module 120 is further configured to determine a first equivalent availability factor after deducting planned shutdowns based on a first equivalent availability factor and a first planned shutdown factor in the first basic reliability data; and to obtain the prediction value of the reliability of the nuclear power plant in operation in different planned maintenance categories based on the first equivalent availability factor after deducting planned shutdowns.
[0328] In one embodiment of this disclosure, the prediction module 120 is further configured to determine the first equivalent availability factor after deducting planned shutdowns based on an average value of the first equivalent availability factors of the nuclear power plant in source service during the plurality of historical operating years, and an average value of the first planned shutdown factors of the nuclear power plant in source service during the plurality of historical operating years.
[0329] In one embodiment of this disclosure, the prediction module 120 is further configured to obtain the reliability prediction value of the nuclear plant in operation during the planned conventional island overhaul year based on the equivalent availability factor of the first equivalent availability factor after deducting outages, planned conventional island overhaul days for the nuclear plant in operation, and newly added unplanned overhaul days in the case where the planned maintenance category includes only a planned conventional island overhaul.
[0330] In one embodiment of this disclosure, the prediction module 120 is further configured to obtain the predicted reliability value of the nuclear power plant in operation during the overhaul year during nuclear island fuel refueling based on the first equivalent availability factor after deduction of shutdowns, overhaul days during nuclear island fuel reloading for the operating nuclear power plant, and newly added unplanned maintenance days in cases where the planned maintenance category includes only an overhaul during a nuclear island fuel reloading.
[0331] In one embodiment of this disclosure, the prediction module 120 is further configured to obtain the prediction value of the reliability of the nuclear power plant in operation during the year of scheduled maintenance during holidays based on the first equivalent availability factor after deducting shutdowns, scheduled maintenance days during holidays of the nuclear power plant in operation, and newly added unplanned maintenance days in the case where the planned maintenance category includes only scheduled maintenance during holidays.
[0332] In one embodiment of this disclosure, the prediction module 120 is further configured to obtain the prediction value of the reliability of the nuclear power plant in operation during an unplanned maintenance year based on the first equivalent availability factor after deducting the newly added shutdowns and unplanned maintenance days of the nuclear power plant in operation in the case where the planned maintenance category is an unplanned maintenance category.
[0333] In one embodiment of this disclosure, the prediction module 120 is further configured to obtain the predicted value of the reliability of the nuclear power plant in source operation during a zth year of historical operation by predicting a characteristic quantity of reliability of the nuclear power plant in source operation during the zth year of historical operation on the basis of a first planned shutdown factor and a first equivalent availability factor after deducting the planned shutdowns of the nuclear power plant in source operation in the th year of historical operation;and to carry out the verification of the accuracy of the prediction on the predicted value of the reliability of the nuclear power plant in operation based on a relative error between the predicted value of reliability and a statistical value of the quantity characteristic of the reliability of the source nuclear power plant in operation during the same historical operating year.
[0334] In one embodiment of this disclosure, the prediction module 120 is further configured to determine a maintenance factor after deducting planned outages of the operating nuclear power plant during a current operating year based on a second equivalent availability factor and a second planned outage factor in the second basic reliability data; and to obtain a reliability prediction value for the operating nuclear power plant in different planned maintenance categories based on the maintenance factor after deducting planned shutdowns of the nuclear power plant in operation during the current operating year.
[0335] In one embodiment of this disclosure, the prediction module 120 is further configured to obtain maintenance factors after deducting planned shutdowns of the nuclear power plant in operation over the plurality of historical operating years based on the second equivalent availability factor and the second planned shutdown factor in the second basic reliability data; obtain a power function expression of the maintenance factor after deducting planned shutdowns of the nuclear power plant in operation based on the maintenance factor after deducting planned shutdowns of the nuclear power plant in operation over the plurality of historical operating years; and obtain the maintenance factor after deducting planned shutdowns of the nuclear power plant in operation during the current operating year based on the power function expression.
[0336] In one embodiment of this disclosure, the prediction module 120 is further configured to obtain a second equivalent availability factor after deducting planned shutdowns of the nuclear power plant in operation during the zth year of historical operation based on the second equivalent availability factor and the second planned shutdown factor of the nuclear power plant in operation during the zth year of historical operation, where i is a positive integer; and to obtain the maintenance factor after deducting planned shutdowns of the nuclear power plant in operation during the ith year of historical operation based on the second equivalent availability factor after deducting planned shutdowns of the nuclear power plant in operation during the zth year of historical operation.
[0337] In one embodiment of this disclosure, the prediction module 120 is further configured to obtain the reliability prediction value of the nuclear power plant in operation during the planned conventional island overhaul year based on the maintenance factor after deducting planned outages, planned conventional island overhaul days, and newly added unplanned maintenance days for the nuclear power plant in operation during the current operating year in the case where the planned maintenance category includes only a planned conventional island overhaul.
[0338] In one embodiment of this disclosure, the prediction module 120 is further configured to obtain the reliability prediction value of the nuclear power plant in operation during the overhaul year when refueling the nuclear island based on the maintenance factor after deducting planned outages, overhaul days during refueling the nuclear island, and newly added unplanned maintenance days for the nuclear power plant in operation during the current operating year in the event that the category of Planned maintenance includes only one overhaul during a nuclear island fuel refueling.
[0339] In one embodiment of this disclosure, the prediction module 120 is further configured to obtain the reliability prediction value of the nuclear power plant in operation during the planned maintenance year during holidays based on the maintenance factor after deducting planned shutdowns, planned maintenance days during holidays, and newly added unplanned maintenance days for the nuclear power plant in operation during the current operating year in the case where the planned maintenance category includes only planned maintenance during holidays.
[0340] In one embodiment of this disclosure, the prediction module 120 is further configured to obtain the predicted reliability value of the nuclear power plant in operation during the unplanned maintenance year based on the maintenance factor after deducting planned shutdowns and newly added unplanned maintenance days for the nuclear power plant in operation during the current operating year in the case where the planned maintenance category is an unplanned maintenance category,
[0341] In one embodiment of this disclosure, the prediction module 120 is further configured to obtain a second equivalent availability factor after deducting planned shutdowns of the nuclear power plant in operation during the zth year of historical operation based on the second equivalent availability factor and the second planned shutdown factor of the nuclear power plant in operation during the zth year of historical operation, where i is a positive integer; obtain the prediction value of the reliability of the nuclear power plant in operation during the zth year of historical operation based on the second equivalent availability factor after deducting planned shutdowns and the second planned shutdown factor of the nuclear power plant in operation during the zth year of historical operation;and to perform a verification of the accuracy of the prediction on the predicted value of the reliability of the nuclear power plant in operation based on a relative error between the predicted value of reliability and a statistical value of the quantity characteristic of the reliability of the nuclear power plant in operation during the same historical operating year.
[0342] In one embodiment of this disclosure, the monitoring module 130 is further configured to determine a monitoring qualification condition for the operating nuclear power plant based on the planned maintenance category; and to determine whether the reliability prediction value meets the monitoring qualification condition to perform reliability monitoring on the operating nuclear power plant.
[0343] In one embodiment of this disclosure, the monitoring module 130 is further configured to determine a reliability monitoring criterion value for the nuclear power plant in operation based on the planned maintenance category; and to determine the monitoring qualification condition based on the reliability monitoring criterion value.
[0344] In one embodiment of this disclosure, the monitoring module 130 is further configured to obtain the first reliability monitoring criterion value for the nuclear power plant in operation if the planned maintenance category includes only a planned conventional island overhaul; or to obtain the second reliability monitoring criterion value for the nuclear power plant in operation if the planned maintenance category includes only an overhaul during a nuclear island refueling; or to obtain the third reliability monitoring criterion value for the nuclear power plant in operation if the planned maintenance category includes only planned maintenance during holidays; or to obtain the fourth reliability monitoring criterion value for the nuclear power plant in operation if the planned maintenance category is an unplanned maintenance category.
[0345] In one embodiment of this disclosure, the monitoring module 130 is further configured to determine that the reliability prediction value is greater than or equal to the reliability monitoring criterion value as a monitoring qualification condition.
[0346] It is noted that reference is made to the undisclosed details in the apparatus for predicting and monitoring reliability for the nuclear power plant in operation in the embodiments of the method for predicting and monitoring reliability for the nuclear power plant in operation in the embodiments of this disclosure, which will not be further elaborated here.
[0347] In summary, in the apparatus for high-precision prediction and reliability monitoring suitable for an operating nuclear power plant in the embodiments of this disclosure, the number of years of operation of the operating nuclear power plant is obtained, and a target reliability prediction category for the operating nuclear power plant is determined based on the number of years of operation. In the case where the target reliability prediction category is a first reliability prediction category, the reliability prediction is performed on the operating nuclear power plant based on first basic reliability data for the operating nuclear power plant.In cases where the target reliability prediction category is a second reliability prediction category, the reliability prediction is performed on the operating nuclear power plant based on second basic reliability data for the operating nuclear power plant. Monitoring of the... Reliability is assessed at the operating nuclear power plant based on a reliability prediction value and a planned maintenance category for the plant. In this way, the target reliability prediction category can be determined based on the number of years the nuclear power plant has been in operation, thereby improving the accuracy of reliability predictions and thus enhancing the accuracy of these predictions. The reliability prediction value and the planned maintenance category are considered comprehensively to monitor the reliability of the operating nuclear power plant, further improving the accuracy of reliability monitoring.
[0348] In order to achieve the embodiments mentioned above, the present disclosure provides a device for increasing the reliability of an in-service nuclear power plant.
[0349] Fig. 10 is a schematic diagram showing a device for increasing reliability suitable for an operating nuclear power plant according to an embodiment of the present disclosure.
[0350] As shown in [Fig.10], the device 200 increasing the reliability appropriate for a nuclear power plant in operation in the embodiments of this disclosure includes a prediction module 210, a determination module 220, and an optimization module 230.
[0351] The prediction module 210 is configured to perform a reliability prediction on the nuclear power plant in operation based on a number of years of operation of the nuclear power plant in operation to obtain a reliability prediction value of the nuclear power plant in operation.
[0352] The determination module 220 is configured to determine abnormal reliability data of the nuclear power plant in operation on the basis of a planned maintenance category of the nuclear power plant in operation in the event that the reliability prediction value does not meet a monitoring qualification condition.
[0353] The optimization module 230 is configured to optimize abnormal reliability data, and perform a new process of obtaining the reliability prediction value until the obtained reliability prediction value meets the monitoring qualification condition.
[0354] In one embodiment of this disclosure, abnormal reliability data include scheduled maintenance days corresponding to the scheduled maintenance category and / or newly added unplanned maintenance days of the operating nuclear power plant.
[0355] The optimization module 230 is further configured to determine an adjustment interval for scheduled maintenance days based on the category of planned maintenance, and optimize the planned maintenance days within the planned maintenance days adjustment range; and determine an adjustment range for newly added unplanned maintenance days, and optimize the newly added unplanned maintenance days within the newly added unplanned maintenance days adjustment range.
[0356] In one embodiment of this disclosure, if the planned maintenance category includes only a planned conventional island overhaul, the optimization module 230 is further configured to determine a first adjustment interval as the adjustment interval for planned conventional island overhaul days, and optimize planned conventional island overhaul days within the first adjustment interval; determine a second adjustment interval as the adjustment interval for newly added unplanned maintenance days, and optimize newly added unplanned maintenance days within the second adjustment interval.
[0357] In one embodiment of this disclosure, if the planned maintenance category includes only one overhaul during a nuclear island fuel refueling, the optimization module 230 is further configured to determine a third adjustment interval as the adjustment interval for overhaul days during nuclear island fuel refueling, and optimize the overhaul days during nuclear island fuel refueling within the third adjustment interval; determine a second adjustment interval as the adjustment interval for newly added unplanned maintenance days, and optimize the newly added unplanned maintenance days within the second adjustment interval.
[0358] In one embodiment of this disclosure, if the planned maintenance category includes only scheduled maintenance during holidays, the optimization module 230 is further configured to determine a fourth adjustment interval as the adjustment interval for scheduled maintenance days during holidays, and optimize scheduled maintenance days during holidays within the fourth adjustment interval; determine a second adjustment interval as the adjustment interval for newly added unplanned maintenance days, and optimize newly added unplanned maintenance days within the second adjustment interval.
[0359] In one embodiment of this disclosure, if the planned maintenance category is an unplanned maintenance category, the optimization module 230 is further configured to determine a second adjustment interval as the adjustment interval for newly added unplanned maintenance days, and optimize the unplanned maintenance days newly added within the second adjustment interval.
[0360] In one embodiment of this disclosure, the prediction module 210 is further configured to obtain the number of years of operation of the nuclear power plant in operation and determine the target reliability prediction category of the nuclear power plant in operation based on the number of years of operation; perform a reliability prediction on the nuclear power plant in operation based on the first basic reliability data of the nuclear power plant in operation if the target reliability prediction category is the first reliability prediction category; perform a reliability prediction on the nuclear power plant in operation based on the second basic reliability data of the nuclear power plant in operation if the target reliability prediction category is the second reliability prediction category.
[0361] In one embodiment of this disclosure, the prediction module 210 is further configured to determine that the target reliability prediction category is the first reliability prediction category in the case where the number of years in operation is less than the first defined threshold; or to determine that the target reliability prediction category is the second reliability prediction category in the case where the number of years in operation is greater than or equal to the first defined threshold.
[0362] In one embodiment of this disclosure, the prediction module 210 is further configured to determine a basic reliability data acquisition strategy to predict the reliability of the nuclear power plant in operation based on the target reliability prediction category, wherein the acquisition strategy includes a source nuclear power plant in operation and a basic reliability data collection condition; perform data collection on the source nuclear power plant in operation based on the data collection condition to obtain the basic reliability data to predict the reliability of the nuclear power plant in operation.
[0363] In one embodiment of this disclosure, the prediction module 210 is further configured to determine, as the source operating nuclear power plant, a reference operating nuclear power plant having the same power rating as the operating nuclear power plant in the case where the target reliability prediction category is the first reliability prediction category; and to determine, as the first baseline reliability data for the operating nuclear power plant, baseline reliability data for the source operating nuclear power plant over a plurality of historical operating years.
[0364] In one embodiment of this disclosure, the prediction module 210 is further configured to determine the operating nuclear power plant as nuclear power plant in operation source in the case where the target reliability prediction category is the second reliability prediction category; and determine, as second basic reliability data of the nuclear power plant in operation, basic reliability data of the nuclear power plant in operation over a plurality of historical operating years.
[0365] In one embodiment of this disclosure, the determination module 220 is further configured to determine a monitoring qualification condition for the group of nuclear power plants in operation based on the planned maintenance category.
[0366] In one embodiment of this disclosure, the determination module 220 is further configured to determine a reliability monitoring criterion value for the nuclear power plant in operation based on the planned maintenance category; and to determine the monitoring qualification condition based on the reliability monitoring criterion value.
[0367] In one embodiment of this disclosure, the determination module 220 is further configured to determine that the reliability prediction value is greater than or equal to the reliability monitoring criterion value as a monitoring qualification condition.
[0368] It is noted that reference is made to the undisclosed details in the apparatus for increasing reliability for the nuclear power plant in operation in the embodiments of the method for increasing reliability for the nuclear power plant in operation in the embodiments of the present disclosure, which will not be further elaborated here.
[0369] In summary, according to the apparatus for high-precision reliability enhancement for the nuclear power plant in operation in the embodiments of this disclosure, if the reliability prediction value does not meet the monitoring qualification conditions, the abnormal reliability data of the nuclear power plant in operation are determined on the basis of the planned maintenance category, the abnormal reliability data are optimized, and the process of obtaining the reliability prediction value is carried out again until the obtained reliability prediction value meets the monitoring qualification conditions.Therefore, when the reliability prediction value does not meet the monitoring qualification conditions, the abnormal reliability data can be optimized, and the process of obtaining the reliability prediction value can be run again until the resulting reliability prediction value meets the monitoring qualification conditions, which can improve the reliability of the operating nuclear power plant.
[0370] In order to implement the embodiment mentioned above, as shown In [Fig. 1 1], the present disclosure provides an electronic device 300, which includes a memory 310, a processor 320, and computer programs stored in the memory 310 and executable by the processor 320. When the processor 320 is configured to execute the computer programs, the method for predicting and monitoring the reliability of an operating nuclear power plant and / or the method for high-precision reliability enhancement of an operating nuclear power plant mentioned above can be implemented.
[0371] In the electronic device in the embodiments of this disclosure, the computer program stored in memory is executed by means of the processor to obtain the number of years of operation of the nuclear power plant in operation, and to determine a target reliability prediction category for the nuclear power plant in operation based on the number of years of operation; to make a reliability prediction on the nuclear power plant in operation based on first basic reliability data for the nuclear power plant in operation in the case where the target reliability prediction category is a first reliability prediction category; to make a reliability prediction on the nuclear power plant in operation based on second basic reliability data for the nuclear power plant in operation in the case where the target reliability prediction category is a second reliability prediction category;To perform reliability monitoring on the operating nuclear power plant based on a reliability prediction value and a planned maintenance category for the operating nuclear power plant. In this way, the target reliability prediction category can be determined based on the number of years of operation of the operating nuclear power plant, so as to predict the reliability of the operating nuclear power plant, thus improving the accuracy of the reliability prediction of the operating nuclear power plant. The reliability prediction value and the planned maintenance category of the operating nuclear power plant are considered comprehensively to monitor the reliability of the operating nuclear power plant, thus improving the accuracy of the reliability monitoring of the operating nuclear power plant.
[0372] To implement the embodiments mentioned above, this disclosure provides a computer-readable storage medium on which a computer program is stored. When the program is executed by a processor, the steps of the method for predicting and monitoring the reliability of an operating nuclear power plant and / or the method for increasing the reliability of an operating nuclear power plant mentioned above can be implemented.
[0373] In the computer-readable storage medium in the embodiments of this disclosure, the computer program stored in memory is executed via the processor to obtain the number of years of operation of the nuclear power plant in operation, and determine a target reliability prediction category for the nuclear power plant in operation based on the number of years of operation; make a reliability prediction on the nuclear power plant in operation based on first basic reliability data of the nuclear power plant in operation in the case where the target reliability prediction category is a first reliability prediction category; make a reliability prediction on the nuclear power plant in operation based on second basic reliability data of the nuclear power plant in operation in the case where the target reliability prediction category is a second reliability prediction category;To perform reliability monitoring on the operating nuclear power plant based on a reliability prediction value and a planned maintenance category for the operating nuclear power plant. In this way, the target reliability prediction category can be determined based on the number of years of operation of the operating nuclear power plant, so as to predict the reliability of the operating nuclear power plant, thus improving the accuracy of the reliability prediction of the operating nuclear power plant. The reliability prediction value and the planned maintenance category of the operating nuclear power plant are considered comprehensively to monitor the reliability of the operating nuclear power plant, thus improving the accuracy of the reliability monitoring of the operating nuclear power plant.
[0374] In order to implement the embodiments mentioned above, this disclosure provides a platform for reliability monitoring for an operating nuclear power plant, which includes the device for predicting and monitoring reliability for the operating nuclear power plant as shown in [Fig. 9], and / or the device for increasing reliability for an operating nuclear power plant as shown in [Fig. 10]; or the electronic device mentioned above; or the computer-readable storage medium mentioned above.
[0375] In the platform for reliability monitoring for the operating nuclear power plant in the embodiments of this disclosure, the number of years of operation of the operating nuclear power plant is obtained, and a target reliability prediction category for the operating nuclear power plant is determined based on the number of years of operation. If the target reliability prediction category is a first reliability prediction category, the reliability prediction is performed on the operating nuclear power plant based on first basic reliability data for the operating nuclear power plant. If the target reliability prediction category is a second reliability prediction category, the reliability prediction is performed on the operating nuclear power plant based on second basic reliability data for the operating nuclear power plant. Reliability monitoring is performed on the operating nuclear power plant based on a reliability prediction value and a planned maintenance category. In this way, the target reliability prediction category can be determined based on the number of years of operation of the nuclear power plant, thereby improving the accuracy of the reliability prediction. The reliability prediction value and the planned maintenance category are considered comprehensively to monitor the reliability of the operating nuclear power plant, further enhancing the accuracy of the reliability monitoring.The scheduled and unscheduled maintenance days of the operating nuclear power plant can also be optimized and improved, in order to increase the reliability of the operating nuclear power plant.
[0376] In the document, it is understood that terms such as "central", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "above", "below", "internal", "external", "clockwise", "counterclockwise", "axial", "radial" and "circumferential" are to be interpreted as referring to the orientation or position relationship as described or as shown in the drawings referred to, which are given only for the sake of description and simplification of this disclosure, rather than to indicate or imply that the device or component referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of this disclosure.
[0377] Furthermore, terms such as "first" and "second" are used here for descriptive purposes only and are not intended to indicate or imply relative importance or significance, or to imply the number of technical features indicated. Thus, the feature defined by "first" and "second" may include one or more of that feature. In the description of the present invention, "a plurality of" means two or more, unless otherwise specified.
[0378] In the present invention, unless otherwise indicated or limited, the terms "mounted", "connected", "coupled", "fixed" and others are used in a broad sense, and may be, for example, fixed connections, removable connections or integrated connections; they may also be mechanical or electrical connections; they may also be direct connections or indirect connections through intermediate structures; they may also be internal communications of two elements, which can be understood by a person skilled in the art according to the specific situations.
[0379] In the present invention, unless otherwise indicated or limited, a structure in which a first feature is "on" or "under" a second feature may include an embodiment in which the first feature is in direct contact with the second feature, and may also include an embodiment in which the first feature and the second feature are not in direct contact with each other, but are brought into contact through an additional feature formed between them.Furthermore, a first feature "on", "above" or "at the upper part" of a second feature may include an embodiment in which the first feature is linearly or obliquely "on", "above" or "at the upper part" of the second feature, or simply means that the first feature is at a higher height than the second feature; whereas a first feature "under", "below" or "at the lower part of" a second feature may include an embodiment in which the first feature is linearly or obliquely "under", "below" or "at the lower part of" the second feature, or simply means that the first feature is at a lower height than the second feature.
[0380] In the description of the document, descriptions referring to the terms "an embodiment," "certain embodiments," "an example," "a specific example," or "certain examples" mean that the specific features, structures, materials, or characteristics described in connection with the embodiments or examples are included in at least some embodiments or examples of this disclosure. In this document, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any appropriate manner in any one or more embodiments or examples.Furthermore, a person skilled in the art can combine the different embodiments or examples described in this booklet, as well as the particularities of the different embodiments or examples, without mutual contradiction.
Claims
1. Claims Method for predicting and monitoring reliability, suitable for a nuclear power plant in operation, characterized in that it comprises the following steps: - obtaining a number of years of operation of the nuclear power plant in service, and determining a target reliability prediction category of the nuclear power plant in service based on the number of years of operation, the target reliability prediction category comprising a first reliability prediction category and a second reliability prediction category, and determining the target reliability prediction category of the nuclear power plant in service based on the number of years of operation comprising: determining the target reliability prediction category as the first reliability prediction category in the case where the number of years of operation is less than a first set threshold; or determining the target reliability prediction category as the second reliability prediction category in the case where the number of years of operation is greater than or equal to the first set threshold;- performing a reliability prediction on the nuclear power plant in service on the basis of first basic reliability data of the nuclear power plant in service in the case where the target reliability prediction category is the first reliability prediction category; - performing a reliability prediction on the nuclear power plant in service on the basis of second basic reliability data of the nuclear power plant in service in the case where the target reliability prediction category is the second reliability prediction category, the first basic reliability data being different from the second basic reliability data; - obtaining a reliability prediction value by introducing the first basic reliability data or the second basic reliability data into a reliability prediction model; - determination of a monitoring qualification condition for the nuclear power plant in service on the basis of a planned maintenance category; - determination whether the reliability prediction value meets the monitoring qualification condition for carrying out reliability monitoring of the nuclear power plant in service.
2. The method of claim 1, further comprising: - determining a basic reliability data acquisition strategy for predicting the reliability of the operating nuclear power plant based on the target reliability prediction category, wherein the acquisition strategy comprises a source operating nuclear power plant and a data collection condition of the basic reliability data; - performing data collection on the source operating nuclear power plant based on the data collection condition to obtain the basic reliability data for predicting the reliability of the operating nuclear power plant.
3. The method of claim 2, further comprising: - determining, as the source operating nuclear power plant, a reference operating nuclear power plant having the same power as the operating nuclear power plant in the case where the target reliability prediction category is the first reliability prediction category, and - determining, as first basic reliability data of the operating nuclear power plant, basic reliability data of the source operating nuclear power plant during a plurality of historical operating years.
4. The method of claim 2, further comprising: - determining the operating nuclear power plant as the source operating nuclear power plant in the case where the target reliability prediction category is the second reliability prediction category; and - determining, as second basic reliability data of the operating nuclear power plant, basic reliability data of the operating nuclear power plant during a plurality of historical operating years.
5. The method of claim 3, wherein performing the reliability prediction on the operating nuclear power plant based on the first basic reliability data of the operating nuclear power plant comprises: - determining a first equivalent availability factor after deducting planned outages based on a first equivalent availability factor and a first planned outage factor as first basic reliability data; - obtaining the prediction value of the reliability of the nuclear power plant in service in different categories of planned maintenance on the basis of the first equivalent availability factor after deduction of planned shutdowns; and wherein determining the first equivalent availability factor after deducting planned shutdowns based on the first equivalent availability factor and the first planned shutdown factor as first basic reliability data comprises: - a determination of the first equivalent availability factor after deduction of planned shutdowns on the basis of an average value of the first equivalent availability factors of the nuclear power plant in source service during the plurality of historical operating years, and an average value of the first planned shutdown factors of the nuclear power plant in source service during the plurality of historical operating years.
6. The method of claim 5, further comprising: - obtaining the prediction value of the reliability of the nuclear power plant in source service during a zth year of historical operation by predicting a characteristic quantity of reliability of the nuclear power plant in source service during the zth year of historical operation on the basis of a first planned shutdown factor and a first equivalent availability factor after deduction of the planned shutdowns of the nuclear power plant in source service in the zth year of historical operation; and - carrying out verification of the accuracy of the prediction on the reliability prediction value of the nuclear power plant in operation on the basis of a relative error between the reliability prediction value and a statistical value of the characteristic quantity of reliability of the source nuclear power plant in operation during the same historical operating year.
7. The method of claim 4, wherein performing the reliability prediction on the operating nuclear power plant based on the second basic reliability data of the operating nuclear power plant comprises: - a determination of a maintenance factor after deduction of planned shutdowns of the nuclear power plant in service during a year current operation on the basis of a second equivalent availability factor and a second planned shutdown factor as second basic reliability data; and - obtaining a prediction value of the reliability of the nuclear power plant in service in different planned maintenance categories on the basis of the maintenance factor after deduction of the planned shutdowns of the nuclear power plant in service during the current operating year.
8. The method of claim 7, wherein determining the maintenance factor after deducting planned shutdowns of the nuclear power plant in service during the current operating year based on the second equivalent availability factor and the second planned shutdown factor as second basic reliability data comprises: - obtaining maintenance factors after deducting planned shutdowns of the nuclear power plant in service during a zth historical operating year based on the second equivalent availability factor and the second planned shutdown factor as second basic reliability data;- obtaining a power function expression of the maintenance factor after deducting the planned outages of the nuclear power plant in service on the basis of the maintenance factor after deducting the planned outages of the nuclear power plant in service during the zth year of historical operation; and - obtaining the maintenance factor after deducting the planned outages of the nuclear power plant in service during the current year of operation on the basis of the power function expression.;
9. The method of claim 8, wherein obtaining the maintenance factors after deducting the planned outages of the nuclear power plant in service during the zth year of historical operation on the basis of the second equivalent availability factor and the second planned outage factor as second basic reliability data comprises: - obtaining a second equivalent availability factor after deducting the planned outages of the nuclear power plant in service during the zth year of historical operation on the basis of the second equivalent availability factor and the second planned outage factor of the nuclear power plant in operation during the zth year of historical operation, where i is a positive integer; - obtaining the maintenance factor after deduction of the planned shutdowns of the nuclear power plant in service during the zth year of historical operation on the basis of the second equivalent availability factor after deduction of the planned shutdowns of the nuclear power plant in service during the zth year of historical operation.
10. The method of claim 8, further comprising: - obtaining a second equivalent availability factor after deducting the planned shutdowns of the nuclear power plant in service during the zth year of historical operation on the basis of the second equivalent availability factor and the second planned shutdown factor of the nuclear power plant in service during the zth year of historical operation, where i is a positive integer; - obtaining the reliability prediction value of the nuclear power plant in service during the zth year of historical operation on the basis of the second equivalent availability factor after deduction of planned shutdowns and the second planned shutdown factor of the nuclear power plant in service during the zth year of historical operation; - carrying out verification of the accuracy of the prediction on the reliability prediction value of the nuclear power plant in operation on the basis of a relative error between the reliability prediction value and a statistical value of the characteristic quantity of reliability of the nuclear power plant in operation during the same year of historical operation.
11. The method of claim 1, wherein determining the monitoring qualification condition for the operating nuclear power plant based on the planned maintenance category comprises: - a determination of a reliability monitoring criterion value for the nuclear power plant in service based on the planned maintenance category; - a determination of the monitoring qualification condition based on the reliability monitoring criterion value; in which the determination of the monitoring qualification condition based on the reliability monitoring criterion value understand : determining that the reliability prediction value is greater than or equal to the reliability monitoring criterion value as a monitoring qualification condition.
12. Apparatus for reliability prediction and monitoring, suitable for a nuclear power plant in operation and comprising: - a determination module (110) configured to obtain a number of years of operation of the nuclear power plant in service, and determine a target reliability prediction category of the nuclear power plant in service based on the number of years of operation, the target reliability prediction category comprising a first reliability prediction category and a second reliability prediction category, the determination module (110) being further configured to: determine that the target reliability prediction category is the first reliability prediction category if the number of years of operation is less than a first set threshold; or determine that the target reliability prediction category is the second reliability prediction category if the number of years of operation is greater than or equal to the first set threshold; - a prediction module (120) configured to perform a reliability prediction on the operating nuclear power plant based on first basic reliability data of the operating nuclear power plant in the case where the target reliability prediction category is the first reliability prediction category, or perform a reliability prediction on the operating nuclear power plant based on second basic reliability data of the operating nuclear power plant in the case where the target reliability prediction category is the second reliability prediction category, the first basic reliability data being different from the second basic reliability data; and - a monitoring module (130) configured to obtain a reliability prediction value by inputting the first basic reliability data or the second basic reliability data into a reliability prediction model; determine a monitoring qualification condition for the in-service nuclear power plant based on a planned maintenance category; and determine whether the reliability prediction value satisfies the monitoring qualification condition for performing reliability monitoring of the in-service nuclear power plant. service.
13. The apparatus of claim 12, wherein the prediction module (120) is further configured to: - determining a basic reliability data acquisition strategy for predicting the reliability of the operating nuclear power plant based on the target reliability prediction category, wherein the acquisition strategy comprises a source operating nuclear power plant and a data collection condition of the basic reliability data; and - performing data collection on the source operating nuclear power plant based on the data collection condition to obtain the basic reliability data for predicting the reliability of the operating nuclear power plant.
